In the same category

Copper Fox Metals Inc.

Published : February 16th, 2011

Announces Fourth Quarter Highlights and 2010 Year-End Financial Results

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Copper | Molybdenum | Paramount |

http://www.copperfoxmetals.com/i/tdot.gif

http://www.copperfoxmetals.com/i/tdot.gif

http://www.copperfoxmetals.com/i/tdot.gif

 


Copper Fox Announces Fourth Quarter Highlights and 2010 Year-End Financial Results



Vancouver, British Columbia - February 16, 2011 Copper Fox Metals Inc. ("Copper Fox" or the "Company") (TSX-V: CUU) announces its operating results for 2010 fourth quarter and year-end results. The Company has made considerable progress toward completing the Environmental Assessment Application, an updated National Instrument 43-101 compliant resources estimate and completion of the feasibility study. Copper Fox incurred a net loss for the fourth quarter of $421,346 ($0.00 loss per share) and a loss of $1,614,027 ($0.01 loss per share) for the year ended October 31, 2010. Copies of the financial statements and notes and related management discussion and analysis may be obtained on SEDAR at
www.sedar.com, the Company web site at www.copperfoxmetals.com or by contacting the Company directly. All amounts are in Canadian dollars unless otherwise stated.

Copper Fox's main asset is 100% working interest of Schaft Creek, one of the largest undeveloped copper-molybdenum-gold-silver porphyry deposits in Canada located in northwest British Columbia.

Schaft Creek - A New Perspective:

The recent discovery of high-grade copper-gold mineralization at depth below the Red Chris porphyry deposit located in northwest British Columbia has changed the thinking related to the possibility of finding deep higher grade mineralization below what typically was thought to be moderate to low grade porphyry deposits.

The depth of the pre-2010 drilling at Schaft Creek averaged 226m, a very shallow depth in terms of porphyry deposits. The work completed in 2010 clearly shows a large zone of higher grade mineralization at depth which could have significant depth extent, possibly in excess of 800m at the north end of the Schaft Creek deposit.

The majority of the resources defined to date at Schaft Creek are in what was formerly referred to as the Liard Zone. The 2010 geophysical program and the pre 2010 drilling results strongly suggest this zone occurs on the flank of the deposit and the former Paramount Zone, at the north end of the deposit is the core of the porphyry system, where deep and higher grade mineralization would be expected to occur. So far, the 2010 drilling completed in the Paramount Zone supports this interpretation.

Feasibility Study - Strategy:

The value of a mineral project has two major components, the Net Present Value of the mineral deposit based on a feasibility study and the value related to the potential of finding additional mineralization. Copper Fox identified four aspects of the preliminary feasibility study that would have a direct impact on improving the economics of the Schaft Creek deposit. These are: i) "a higher-grade" starter pit, ii) increased daily milling rate, iii) reduced capital costs, and iv) a realistic resource estimate geared toward maximizing the economic return/benefits of the Schaft Creek deposit over the life of mine.

The above four points are being assessed in the feasibility study currently underway. Due to the limited amount of drilling completed, only a portion of the deep zone of higher grade mineralization intersected in 2010 will be included in the resource estimate. After completion of the feasibility study additional drill testing of the deep zone of higher grade mineralization is being considered and if successful, is expected to add considerable value to the Schaft Creek mineral property.

Less than 1,500 acres of the 50,000 acre Schaft Creek property has been explored using modern exploration techniques. To identify/add value over and above that established by the feasibility study, Copper Fox is considering the merits of completing a high sensitivity airborne geophysical survey over the entire Schaft Creek property to identify other potential areas of porphyry style mineralization.

Highlights

During the quarter, Copper Fox's activities focused on completing the work necessary to update the resource estimate and the feasibility study on the Schaft Creek deposit. Field work completed in the quarter included prospecting, mapping, compilation of historical data, a second geophysical survey, diamond drilling and additional environmental baseline studies.

Field Activities:

  • six diamond drill holes were completed in an area that measures approximately 600m by 200m wide to outline a "higher-grade" starter pit;
  • the drilling intersected an intrusive breccia of unknown thickness and strike length at depth that contains significantly higher grades of copper-gold-molybdenum-silver. This higher-grade zone is open at depth and to the east under Mount LaCasse;
  • the Induced Polarization/Resistivity (chargeability) anomaly outlined by the geophysical surveys completed in 2010 strongly suggest that the Schaft Creek mineral deposit extends a significant distance to the north, the east and at depth beyond the limits of the diamond drilling; and
  • environmental baseline studies show that the Schaft Creek deposit contains a very low amount (estimated 5%) of potential acid generating rock and that the streams in the immediate vicinity of the proposed open pit mine, waste rock storage areas and tailings areas are non fish bearing.

Feasibility Study:

A considerable number of the studies required for the feasibility study were completed during the quarter. The feasibility study is expected to be completed by the end of June 2011. During the quarter, Wardrop, a Tetra Tech Company, and the main contractor for the feasibility study, finalized the site layout, mill design, reagent, maintenance and explosive facilities, road system, metallurgical process, expected mill recoveries and the options available to the Company for transportation and shipping facilities of bulk concentrate for smelting and refining. Quotes from suppliers for the main components of the feasibility study were requested and are expected to be received before the end of March 2011.

Knight Piesold completed the designs for the Tailing Storage Facility, the tailings pipeline, reclaim water for the processing plant and site water management parameters. The sites for the milling and maintenance facilities and other components of the infrastructure were finalized during the quarter.

BGC Engineering completed the potential geo-hazards assessment for the road and power line access to Schaft Creek.

Resource Estimation:

All the technical work required for an updated resource estimate has been completed. The Company is working with its contractors to complete the resource update before the end of March 2011. One of the key components of a feasibility study is the average grade of the metals contained in the resource estimate. Small increases in metal content in large porphyry deposits such as Schaft Creek can have a significant impact on the Net Present Value of the deposit. With the strong possibility of including higher grade mineralization into the resource estimate, completion of the resource estimate was deferred to include the assay results from the 2010 diamond drilling and core re-sampling program. These assays have been received and are undergoing QA/QC testing prior to delivery to AMEC Americas Limited (AMEC).

AMEC will use this data base in conjunction with the other tests and work complete to date to complete the final phases of the resource estimate which is expected by the end of March 2011.

Environmental Assessment Process:

During the quarter, Copper Fox worked with the Tahltan Heritage Resources Environmental Assessment Team and provincial and federal regulators to finalize the Application Information Requirements (AIR-formerly the Terms of Reference) for the Environmental Assessment (EA) Application for the Schaft Creek project. The collection of environmental base line data including detailed environmental and socio-economic studies related to development of the Schaft Creek deposit continued during the quarter.

The AIR is the last major milestone in the pre-Application stage of the environmental assessment process for the Schaft Creek project. The approval for the terms and conditions of the AIR was received on February 7, 2011. Copper Fox expects to obtain a BC Environmental Assessment Certificate and an approval under the Canadian Environmental Assessment Act in the fourth quarter of 2011.

Stantec Consulting Ltd. (Stantec) has been contracted to assemble the environmental data collected over the past five years and to prepare the Environmental Assessment (EA) Application for the Schaft Creek project. Copper Fox's goal is to minimize the impact on the environment and develop the Schaft Creek deposit in an environmentally responsible manner.

Selected Financial Information:

During the year, Copper Fox received $9.5 million in cash from the exercise of warrants and incurred an additional $11.5 million of capital expenditures related to the Schaft Creek Project.

Net Loss

Net (loss)/income per share - basic and diluted

2010

Fourth Quarter

$ (421,346)

$ 0.00

Third Quarter

$ (436,792)

$ 0.00

Second Quarter

$ (309,067)

$ 0.00

First Quarter

$ (446,822)

$ 0.00

2009

Fourth Quarter

$ 1,533,575

$ 0.01

Third Quarter

$ (491,057)

$ 0.00

Second Quarter

$ (431,763)

$ 0.00

First Quarter

$ (29,135,359)

$ (0.28)


Liquidity and Capital Resources:

The Company's working capital, defined as current assets less current liabilities, was ($836,755) at October 31, 2010, (2009 - $2,544,341), (2008 - ($2,059,026)). The Company has sufficient funds available to meet its current obligations. Subsequent to year end the Company completed a further $4,005,000 financing.

During the year, 108,052,553 warrants were exercised at a strike price of $0.075 and 11,888,341 warrants were exercised at a strike price of $0.115 for total proceeds of $9,471,100.

The Company has in place a budget process to determine the funds required for the completion of the feasibility study. At October 31, 2010 the Company had spent approximately $54.5 million of qualifying expenditures toward this study, which increased to $57.2 at December 31, 2010. The Company will require additional capital to complete this study and to provide for the administration of its Vancouver and Calgary offices. The Company believes that it will be able to raise the capital required to complete the feasibility study through the continued exercise of its outstanding options or through the public market as required.

About Copper Fox

Copper Fox is a Canadian based resource company listed on the TSX-Venture Exchange (CUU) focused on completing a Feasibility Study on the Schaft Creek deposit, one of the largest undeveloped copper, gold, molybdenum and silver deposits in North America. Categorized as a "giant porphyry deposit" this project is at the advanced development stage with a Preliminary Feasibility Study ("PFS") prepared by Samuel Engineering, Inc. of Denver, Colorado, in September 2008. The results of the PFS were extremely "robust" reporting a NPV @ 8% (before tax) of $2.8 billion dollars over a 23 year mine life. They contemplated processing 100,000 tonne per day ("tpd") from an open pit mine using a standard flotation recovery process. The PFS estimated the current Mineral Resources (using a 0.2% copper equivalent cutoff) at Schaft Creek includes; Measured Resources of 436.5 million tonnes grading 0.30% copper, 0.23 g/t gold, 0.02% molybdenum and 1.55 g/t silver, Indicated Resources of 929.8 million tonnes grading 0.23% copper, 0.15 g/t gold, 0.02% molybdenum and 1.56 g/t silver.

A Feasibility Study on a minimum 120,000 tpd open pit mine is expected to be completed by the end of June 2011.

Copper Fox holds title and a 100% working interest in a contiguous 21,025 hectares (51,954 acres) property which includes the Schaft Creek deposit subject to certain royalty agreements, a 30% carried interest held by Laird Copper and an earn back option held by Teck Resources Limited ("Teck"). Copper Fox is currently earning a 78% interest in Liard Copper from Teck. Teck's earn back option to acquire 20%, 40% or 75% of the Schaft Creek project is triggered upon completion of a positive Feasibility Study. Should Teck elect to exercise its option for 75% they are required to fund subsequent property expenditures up to a total of 400% of those incurred by Copper Fox ($57.2 million as of December 31, 2010) and arrange for project financing, including the Copper Fox portion. For full details of the option please refer to the Company's website
www.copperfoxmetals.com.

*United States investors are advised that current Mineral Resources are not current Mineral Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate and in keeping with "best practice principles".
Elmer B. Stewart, MSc. P. Geol., President of Copper Fox, is the Company's nominated Qualified Person pursuant to National Instrument 43-101, Standards for Disclosure for Mineral Projects, has reviewed the technical information disclosed in this news release.


For additional information contact: Investor line 1-866-913-1910 or J. Michael Smith, EVP, at 1-604-689-5080

On behalf of the Board of Directors

Elmer B. Stewart
President & Chief Executive Officer

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information


This news release contains "forward-looking information" within the meaning of the Canadian securities laws. Forward-looking information is generally identifiable by use of the words "believes," "may," "plans," "will," "anticipates," "intends," "budgets", "could", "estimates", "expects", "forecasts", "projects" and similar expressions, and the negative of such expressions. Forward-looking information in this news release include statements about the timing of completion, scope of and anticipated results for an Environmental Assessment Application, an updated National Instrument 43-101 compliant resources estimate and a feasibility study for the Schaft Creek project; anticipated timing and results of geophysical surveys (including the possibility of completing a high sensitivity airborne geophysical survey over the entire Schaft Creek project) and drilling programs; the possibility of discovering deep higher grade mineralization on the Schaft Creek project; the possibility that the Schaft Creek mineral deposit extends a significant distance to the north, the east and at depth beyond the limits of diamond drilling; the timing of receipt of quotes from suppliers for the main components of the feasibility study; the continued financing of the Feasibility Study; estimated timing and amounts of future expenditures; the availability of additional financing through exercise of outstanding options or through the public market; estimated timing and amounts of future expenditures and "earn-back" options; geological interpretations and potential mineral recovery processes. Information concerning mineral reserve and resource estimates also may be deemed to be forward-looking information in that it reflects a prediction of the mineralization that would be encountered if a mineral deposit were developed and mined.

The forward-looking information contained in this news release, Copper Fox has made numerous assumptions, regarding, among other things: the geological, metallurgical, engineering, financial and economic advice that Copper Fox has received is reliable, and is based upon practices and methodologies which are consistent with industry standards; and the continued financing of the Copper Fox's operations, including the preparation and completion of the Feasibility Study. While Copper Fox considers these assumptions to be reasonable, these assumptions are inherently subject to significant uncertainties and contingencies. Additionally, there are known and unknown risk factors which could cause Copper Fox's actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information contained herein. Known risk factors include, among others: the completion of the Environmental Assessment Application, an updated National Instrument 43-101 compliant resources estimate and a feasibility study for the Schaft Creek project may not occur on a timely basis, or at all, or yield expected results; geophysical surveys (including the possibility of completing a high sensitivity airborne geophysical survey over the entire Schaft Creek project) and drilling programs may not occur on a timely basis or at all; fluctuations in copper and other commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, recovery rates, production estimates and estimated economic return; the need for co-operation of government agencies and native groups in the exploration and development of properties and the issuance of required permits; the need to obtain additional financing to develop properties and uncertainty as to the availability and terms of future financing; the possibility of delay in exploration or development programs or in construction projects and uncertainty of meeting anticipated program milestones; uncertainty as to timely availability of permits and other governmental approvals.

A more complete discussion of the risks and uncertainties facing Copper Fox is disclosed in Copper Fox's continuous disclosure filings with Canadian securities regulatory authorities at
www.sedar.com. All forward-looking information herein is qualified in its entirety by this cautionary statement, and Copper Fox disclaims any obligation to revise or update any such forward-looking information or to publicly announce the result of any revisions to any of the forward-looking information contained herein to reflect future results, events or developments, except as required by law.

http://www.copperfoxmetals.com/i/tdot.gif


 

Copper Fox Metals Inc.

DEVELOPMENT STAGE
CODE : CUU.V
ISIN : CA21749Q1046
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Copper Fox is a copper development stage company based in Canada.

Copper Fox develops copper, gold, molybdenum and silver in Canada.

Its main asset in development is SCHAFT CREEK in Canada.

Copper Fox is listed in Canada. Its market capitalisation is CA$ 100.5 millions as of today (US$ 73.4 millions, € 68.6 millions).

Its stock quote reached its highest recent level on April 21, 2011 at CA$ 2.63, and its lowest recent point on March 13, 2020 at CA$ 0.01.

Copper Fox has 427 809 984 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Copper Fox Metals Inc.
2007 Annual report
2006 Annual report
Financings of Copper Fox Metals Inc.
7/1/2016Announces Closing of the Second placement
4/8/2013Announces Closing of a $2,653,000 Financing
2/22/2013announces a $2,500,000 Private Placement Unit Offering, insi...
1/22/2013ANNOUNCES the Closing of a $1,500,000 Financing by an Inside...
1/16/2013Announces a $1,500,000 Private Placement Unit Offering, Insi...
1/16/2013Announces a $1,500,000 Private Placement Unit Offering, Insi...
10/24/2012ANNOUNCES the Closing of a $2,500,000 Financing by an Inside...
9/14/2012Announces the Closing of a $4,025,000 Financing by an Inside...
7/23/2012ANNOUNCES a $4,025,000 Private Placement Unit Offering, Insi...
6/18/2012Announces A $4,480,000 Private Placement Unit Offering Insid...
1/30/2012Announces The Closing Of $2,200,000 Financing By An Insider
1/19/2012Announces a $2,200,000 Private Placement Unit Offering Insid...
12/14/2011Announces the Closing of $4,000,000 Financing by an Insider
12/7/2011Announces Increase of $2,000,000 to previously announced Pri...
10/5/2011Announces the Closing of $5,000,000 Financing by an Insider
9/13/2011Announces an Additional $2,000,000 Private Placement Unit Of...
9/8/2011announces a $3,000,000 Private Placement Unit Offering. Ins...
3/31/2011ANNOUNCES THE ACCELERATION TERM TO BE APPLIED TO THE EXPIRY ...
3/17/2011CLOSING OF A $3,750,000 NON BROKERED PRIVATE PLACEMENT FLOW-...
2/17/2011Announces a $3,750,000 Non Brokered Private Placement Flow-T...
10/22/2009closing of a $2,000,000 Private Placement Unit Offering
9/28/2009$2,000,000 Private Placement
6/23/2009Provides Update on its $6,000,000 Private Placement
6/19/2009 Updates on its $6,000,000 private placement
6/2/2009announces a $6,000,000 non-brokered Private Placement of whi...
12/16/2008Announces the Withdrawal of a Private Placement Financing
11/7/2008ANNOUNCES PRIVATE PLACEMENT FINANCING
11/7/2008Announces Private Placement Financing
5/15/2008closes Non Brokered Private Placement Financing of $12,398,2...
7/17/2007to raise $10,000,000 in flow-through and non-flow-through fu...
7/17/2007Intends to offer a brokered private placement
Option Grants of Copper Fox Metals Inc.
4/30/2012Announces Incentive Stock Option Grants
3/14/2011Grant of 1,700,000 shares at $ 1,69 par share
6/26/2008grant of incentive stock options to Employees, Officers, Con...
Nominations of Copper Fox Metals Inc.
5/3/2011ANNOUNCES RESIGNATION OF CFO, APPOINTMENT OF AN INTERIM CFO
7/16/2009Announces Executive Changes and the Appointment of a Directo...
9/17/2007Announces the appointment of Shane Uren as Vice President
Financials of Copper Fox Metals Inc.
9/22/2016Announces 2016 Third Quarter Financial Results
3/31/2016Announces 2016 First Quarter Financial Results
9/29/2015Announces Third Quarter Results
9/28/2013Announces Third Quarter Results
6/24/2013Announces Second Quarter Results
9/27/2012Announces Third Quarter Results
6/18/2012Announces Second Quarter Results
4/25/2012Announces First Quarter Results
2/29/2012Reports 2011 Annual Financial Results and a Corporate Update
9/29/2011Reports 2011 Third Quarter Financial Results and a Corporate...
6/30/2011Advances Feasibility Study and Reports 2011 Second Quarter F...
3/31/2011Announces First Quarter 2011 Highlights and Financial Result...
2/16/2011Announces Fourth Quarter Highlights and 2010 Year-End Financ...
2/25/2010Announces 2009 Year-End Financial Results
3/6/20092008 Year-end Financial Results
6/4/2008Second Quarter Results Three and Six Months Ended April 30, ...
6/3/2008Second Quarter Results
3/31/2008First Quarter Financials
3/27/2008First Quarter Results Three Months Ended January 31, 2008
2/11/20082007 Year-End Financial Results
9/24/2007Announces third quarter results
3/28/2007announces its first quarter results for the three months en...
Project news of Copper Fox Metals Inc.
1/9/2014Outlines 2014 Diamond Drilling Plans for Van Dyke Copper Pro...
11/19/2013Sampling Locates Two Large Areas Of Porphyry Style Copper-M...
4/12/2013Acquires Van Dyke Copper Deposit in Arizona
3/25/2013(Schaft Creek)Enters Into Facilities Study Agreement with BC Hydro for Sch...
2/4/2013(Schaft Creek)Files Positive Feasibility Study on Schaft Creek Project
9/10/2012Completes Acquisition Of Sombrero Butte Copper Project And V...
7/9/2012To Acquire From Bell Copper The Van Dyke Copper Deposit And ...
5/31/2012(Schaft Creek)Schaft Creek Resource Estimate Update
5/24/2012(Schaft Creek)Provides Update on Schaft Creek Project
5/10/2012(Schaft Creek)Announces 2012 Exploration Program And Acquires Additional M...
3/27/2012(Schaft Creek)Completes Land Acquisitions Covering Positive Magnetic Linea...
3/19/2012(Schaft Creek)s Activities on the Schaft Creek-Copper-Gold-Molybdenum-Silv...
2/3/2012(Schaft Creek)Announces Drilling Intersect of 0.96% CuEq Over 110m and Rep...
12/12/2011Drilling Expands Paramount Zone with Intersection of 1.10% C...
10/13/2011(Schaft Creek)Secures Shipping Facilities for Concentrate at Port of Stewa...
9/23/2011(Schaft Creek)Extends Mineralized Zone to the East And Completes Strategic...
9/6/2011Welcomes the Awarding of the Construction Contract for the N...
7/26/2011(Schaft Creek)Drilling Intersects 1.18% Copper Equivalent Over 161M at Sch...
5/31/2011(Schaft Creek)Commences 2011 Drilling Program, Updates Other Activities ...
5/10/2011(Schaft Creek)Welcomes the Federal Government of Canada's Approval of the ...
5/6/2011(Schaft Creek)Provides Update on 2011 Plans for Schaft Creek, Diamond Dril...
5/5/2011(Schaft Creek)FOX PROVIDES UPDATE ON 2011 PLANS FOR SCHAFT CREEK, DIAMOND ...
3/24/2011(Schaft Creek)Announces Strategic Acquisitions to Enlarge Schaft Creek Pro...
2/28/2011(Schaft Creek)Copper Fox Metals Applauds the Announcement of the Province ...
2/23/2011(Schaft Creek)DDH CF405 Tests Chargeability Anomaly And Expands Zone Of De...
2/14/2011(Schaft Creek)News Release
2/3/2011(Schaft Creek)Latest Assay Results Expands Zone of Deep, Higher Grade Mine...
6/18/2010files an amended Preliminary Feasibility Study on SEDAR
4/1/2010s Status of Feasibility Study and Reports 2010 First Quarter...
1/21/2010(Schaft Creek)Awards Feasibility Study On Schaft Creek Project
11/18/2009(Schaft Creek)Geophysical Survey Outlines "8" IP Anomalies at Schaft Creek...
9/15/2008Positive Results of Preliminary Feasibility Study on Schaft ...
9/15/2008Announces Positive Results of Preliminary Feasibility Study ...
7/14/2008(Schaft Creek)Strategic Drilling Program and Greenfield Camp Expansion Hig...
6/26/2008(Schaft Creek)2007 Drilling And Geophysical Results All Show Increased Pot...
3/20/2008(Schaft Creek)Announces Schaft Creek progress
1/14/2008(Schaft Creek)Releases Positive Preliminary Economic Assessment on its Sch...
11/27/2007(Schaft Creek)continues development of its Schaft Creek British Columbia m...
10/22/2007(Schaft Creek)'Pit Optimization Study Demonstrates 65,000-tonne per-day Op...
7/10/2007(Schaft Creek)Updates 2007 Schaft Creek Work Program
7/4/2007(Schaft Creek)Significantly Increases Resources at Schaft Creek
Corporate news of Copper Fox Metals Inc.
6/29/2016Copper Fox Announces 2016 Second Quarter Financial Results
6/10/2016Copper Fox Announces a $1,000,000 Non-Brokered Private Place...
3/31/2016Copper Fox Announces 2016 First Quarter Financial Results
3/30/2016Copper Fox Annnounces 2016 Schaft Creek Program
1/25/2016Copper Fox Announces Mineral Mountain Copper Project in Ariz...
12/24/2015Copper Fox Files Van Dyke Technical Report on SEDAR
12/22/2015Copper Fox Announces $1,650,000 Non-Brokered Private Placeme...
11/6/2015Copper Fox Provides Update of Activities
9/29/2015Copper Fox Announces Third Quarter Results
9/25/2015Copper Fox Extends Size of Exploration Target on Sombrero Bu...
9/8/2015Copper Fox Reports Large Chargeablity Signature on Sombrero ...
7/28/2015Copper Fox Provides Update of Activities
7/13/2015Copper Fox Commences Titan-24 DCIP Survey at Sombrero Butte ...
4/15/2015Copper Fox Announces Preliminary Results of Metallurgical Te...
4/8/2015Copper Fox Announces Commencement of Preliminary Economic As...
3/31/2015Copper Fox Annnounces First Quarter Results
3/17/2015Copper Fox Annnounces 2015 Schaft Creek Program
3/13/2015Copper Fox Receives $3.63 Million Cash Refund
3/12/2015Copper Fox Extends Warrant Expiry Dates and Announces AGM Da...
2/27/2015Copper Fox Announces Annual Results
2/9/2015Copper Fox Updates Schaft Creek Project Activities
2/3/2015Copper Fox Files Van Dyke Technical Report on SEDAR
1/15/2015Copper Fox Completes Top-Up Investmentin Carmax Mining Corp.
12/24/2014Copper Fox Provides Corporate Update on Project Activities
12/19/2014Copper Fox Completes Inferred Mineral Resource Estimate for ...
12/3/2014Copper Fox Announces Preliminary In-Situ Leach Test Results ...
10/28/2014Copper Fox Announces Commencement of Resource Estimate at Va...
10/23/2014Copper Fox Announces Update on Schaft Creek Project
9/25/2014Copper Fox Completes Top-Up Investment in Carmax Mining Corp...
9/23/2014Copper Fox Announces Third Quarter Results
9/10/2014Copper Fox Announces Van Dyke Drill Results and Provides Oth...
8/7/2014Copper Fox Announces Van Dyke Drill Results and Provides Cor...
7/21/2014Copper Fox Completes Van Dyke Drilling Program and Provides ...
6/18/2014Copper Fox Announces Second Quarter Results
5/29/2014Copper Fox Closes Carmax Investment
5/23/2014Copper Fox Announces Carmax Shareholders Approve Private Pla...
5/15/2014Copper Fox Adds Second Drill to Van Dyke Project and Provide...
12/3/2013s Activities on Van Dyke Copper Deposit in Arizona
11/19/2013Sampling locates two large areas of porphyry style copper-mo...
8/30/2013announces a corporate reorganization
8/12/2013provides update on corporate activities
7/16/2013(Schaft Creek)And Teck Resources Form Schaft Creek Joint Venture
6/5/2013(Schaft Creek)provides update on discussions regarding Schaft Creek
2/7/2013(Schaft Creek)Completes Land Acquisitions at Schaft Creek & Sombrero Butte...
1/17/2013Announces Extension Of Expiry Date Of Certain Stock Options
10/17/2012(Schaft Creek)Reports Diamond Drill Results From the 2012 Drilling Program...
9/25/2012(Schaft Creek)Reports the Status of the Schaft Creek Feasibility Study and...
9/25/2012(Schaft Creek)Reports the Status of the Schaft Creek Feasibility Study and...
9/4/2012Drilling Indicates Widespread Mineralization in the Discover...
8/2/2012(Schaft Creek)Drilling Extends Mineralization In Discovery Zone And Acquir...
2/16/2012(Schaft Creek)Locates a New Zone of Copper Mineralization 1,200M North of ...
1/23/2012Announces The Issuance Of 1,272,727 Shares For Outstanding ...
1/13/2012Announces Shares For Debt Agreement
9/6/2011(Schaft Creek)Drilling Intersects 0.81% Copper Equivalent Over 154m at Sch...
7/11/2011(Schaft Creek)Measured and Indicated Resource Estimate Exceeds 1 Billion T...
6/21/2011(Schaft Creek)High Resolution Magnetic Survey at Schaft Creek Confirms Sim...
4/13/2011Announces Completion of 3D Model and Award of High-Resolutio...
4/13/2011ANNOUNCES COMPLETION OF 3D MODEL AND AWARD OF HIGH-RESOLUTIO...
6/17/2010June 17 2010 news release
6/1/2010June 1 2010 News release
2/2/2010Feb 2 2010 news release
1/21/2010Jan 21, 2010
10/23/2009New release attached
10/22/2009announces the closing of a $2,000,000 Private Placement Unit...
9/17/2009Applauds Federal Government’s Support for British Columbia N...
9/17/2009Applauds Federal Government's Support for British Columbia N...
7/13/2009Special Shareholders Meeting Approves a New control Person -...
7/13/2009July 13, 2009 News release
6/30/2009Three and Six Months Ended April 30, 2009
6/26/2009June 25, 2009 news release
3/3/2009Annual Financial
2/27/2009Feb 26, 2009 News release
2/27/2009Lions Gate Metals Inc. and Copper Fox Metals Inc. Announce B...
2/12/2009Correct News release
2/12/2009Feb 11 09 News release
2/12/2009provides an update of Corporate Activities
2/3/2009Highway 37 Power Line Coalition Applauds Premier for Express...
1/22/2009Cambridge House Invitation - Vancouver
12/18/2008December 17 2008 News release
12/18/2008Announces Resignation Of A Director
9/30/2008Sept 30/08
9/29/2008Applauds Advancement of Northwest Power Line
9/29/2008Applauds Advancement of Northwest Power Line
9/26/2008Northwest Power Line Could Create Thousands of Jobs, Attract...
9/17/2008Schaft not Galore says Copper Fox president
9/2/2008LV Hard Assets Conference Personalized Html
7/17/2008from the Ministry of Energy, Mines and Petroleum Resources r...
6/26/2008June 26 2008 Options
6/26/2008June 26, 2008
5/26/2008Register Today for a Discounted Rate to the New Orleans 2008...
4/4/2008Applauds Advancement of Northwest Power Line Study
3/31/2008$16mm offering
11/15/2007announces the renewal of the engagement of Jason Shepherd fo...
10/12/2007Announces is has earned a 70% Direct Interest in the World C...
10/2/2007$400 million to empower B.C.'s far northwest
8/8/2007Drilling to Commence at Copper Flats
7/12/2007Press Release: Augusta Files Plan of Operations for Rosemont...
7/3/2007 2nd Quarter Financials
6/11/2007announces its request for a trading halt
5/4/2007and the Tahltan Nation Development Corporation complete a "M...
4/22/2007Adopts a Shareholder Rights Plan.
2/27/2007Welcomes New Executive to the Team
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (CUU.V)
0.235+0.00%
TSX-V
CA$ 0.235
04/25 12:09 -
0%
Prev close Open
0.235 0.235
Low High
0.235 0.235
Year l/h YTD var.
0.160 -  0.250 2.17%
52 week l/h 52 week var.
0.150 -  0.300 -17.54%
Volume 1 month var.
7,500 30.56%
24hGold TrendPower© : 40
Produces
Develops Copper - Gold - Molybdenum - Silver
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 7/8/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202420.51%
202321.88%0.310.15
2022-36.00%0.320.13
2021-25.37%0.660.20
2020346.67%0.470.01
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.74+7.51%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48+4.20%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.50+1.21%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+7.34%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.00-0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :