Klondex Mines Ltd

Published : October 08th, 2013

Announces Further Infill Drilling Results

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Global Economy | Gold |
KDX Logo Header
Klondex Mines Infill Drilling Extends Continuity of Vein Structures to the North and South;
Intercepts 286.8 g/t (8.4 opt) Gold over 2.0m (6.5ft) in the North

 

Additional Intercepts:

-        61.9 g/t (1.8 opt) gold over 0.9m (3.1ft) in FC-13-079U

-        211.0 g/t (6.2 opt) gold over 0.2m (0.6ft) in FC-13-085U

-        43.3 g/t (1.3 opt) gold over 1.1m (3.7ft) in FC-13-089U

-        23.2 g/t (0.7 opt) gold over 1.5m (5.0ft) in FC-13-092U

 

Reno, NV & Vancouver, BC - October 8, 2013 - Klondex Mines Ltd. (TSX: KDX; OTCQX: KLNDF), a Nevada gold exploration and development company, reports the results of 20 drill holes in its continuing underground infill drilling program at its Fire Creek gold project, located in Lander County, Nevada. Assay results are set out in Table 1; Table 2 details the hole locations with azimuth and dip, and maps illustrating the locations of the recently completed drill holes are shown in Figures 1, 2, 3 and 4.

 

Infill drilling conducted to the east of the ramp extended the continuity of the Vonnie structure on strike by 50m (165ft) north and 110m (360ft) south. The Joyce structure is extended by 91m (300ft) to the south and remains open to the north. Both structures are open at depth and along strike. Twenty-six drill holes were completed for a total of 3,533.1 meters (11,531.9 feet) with encouraging mineralization intercepted in nearly every drill hole. Assays are pending on six holes, including two drill holes to the west.

 

As a result of a halo effect on the structures, drills are intercepting mineralization on either side of the vein, with gold grades ranging from 3 g/t (0.1 opt) to 30 g/t (0.9 opt).  These halos, although not modeled in the recently updated resource estimate, are supported by drilling and sampling the mineralization in the underground development program. More drilling is required to properly define the halo effect on the veins.

 

Paul Huet, Klondex President and CEO stated, "These recent drill results continue to support our view that Fire Creek requires more drilling. To enhance our exploration program, we plan to follow up on the previously discovered exploration targets to the west and the south of the Main Zone, allowing us to further unlock the potential of Fire Creek. A mineralized halo will assist in managing dilution for any stoping method."

 

Drilling to the South: Muck Bay (MB) 3 and MB 4 (Figures 1, 2 and 4.)

Drill holes FC-13-073U through FC-13-088U were drilled to the east from MB 3 and MB 4 (located 498 ft south of the 5400 crosscut) to test the southern extensions of the Joyce and Vonnie structures. Multiple intercepts greater than 5 g/t Au were encountered in most holes, and five sub-parallel mineralized envelopes were interpreted (Figure 4). The southern extension of the Joyce vein was demonstrated by 8.3 g/t (0.2 opt) Au over 2.6m (8.6ft) in FC-13-084U, and the Vonnie vein extension was supported by an intercept of 211.0 g/t (6.2 opt) Au over 0.2m (0.6ft) in FC-13-085U, within a larger zone of 1.5m (5ft) at a grade of 20.7 g/t Au (0.6 oz/ton Au). The Joyce vein extension is interpreted by the calcite rich breccia, whereas the Vonnie extension is interpreted as quartz vein hosted gold within a dike similar to the north.

 

Drilling to the North: MB 5370 and MB 6 (Figures 1, 3 and4)

Three holes were drilled to the north and east from MB 5370 to test the northern extension of the Joyce and Vonnie structures. All three holes encountered the Joyce vein below the current workings and returned gold grades ranging from 981.0 g/t to 11 g/t (28.6 opt to 0.3 opt). Intercepts of 22.0 g/t (0.6 opt) Au in FC-13-089U, 23.2 g/t (0.7 opt) Au in FC13-092U, and 6.9 g/t (0.2 opt) Au in FC-13-093U suggest the Vonnie structure continues to the northwest. Two holes drilled from MB 5370 and five holes from MB 6, 200 ft north of the 5370 crosscut were also completed, with logging and assay results pending.

 

Future Drilling

For the remainder of 2013, Klondex intends to continue with its infill drilling to assess the continuity of the Joyce and Vonnie structures to the east of the ramp. Through the addition of a second drill, the company plans to follow up on recent discoveries to the west and the south.

 

Hole No.

From

To

Length

From

To

Length

Grade

Grade

Notes

 

(meters)

(meters)

(meters)

(ft)

(ft)

(ft)

(g/t Au)

(opt Au)

 

FC-13-073U

 

 

 

 

No Significant Results

FC-13-074U

55.5

56.8

1.3

182.0

186.2

4.2

6.9

0.2

 

FC-13-075U

74.6

75.6

0.9

244.9

248.0

3.1

20.7

0.6

 

FC-13-076U

 

 

 

 

 

 

 

No Significant Results

FC-13-077U

56.7

57.0

0.3

186.0

187.0

1.0

13.9

0.4

 

and

63.4

64.6

1.3

207.9

212.0

4.1

8.0

0.2

 

FC-13-078U

69.5

70.4

0.9

228.0

231.0

3.0

9.4

0.3

 

and

81.6

83.2

1.7

267.6

273.0

5.4

14.7

0.4

 

including

81.6

82.8

1.2

267.6

271.6

4.0

8.1

0.2

 

including

82.8

83.2

0.4

271.6

273.0

1.4

33.8

1.0

 

FC-13-079U

55.5

59.0

3.5

182.0

193.6

11.6

17.6

0.5

 

including

57.6

58.5

0.9

188.9

192.0

3.1

61.9

1.8

 

and

94.9

96.3

1.4

311.2

315.9

4.7

4.4

0.1

 

including

94.9

95.6

0.7

311.2

313.5

2.3

6.1

0.1

 

FC-13-080U

56.4

58.0

1.6

185.1

190.2

5.1

6.5

0.2

 

and

88.5

90.4

2.0

290.2

296.6

6.4

4.5

0.1

 

including

89.6

90.4

0.8

294.0

296.6

2.6

4.9

0.1

 

FC-13-081U

 

 

 

 

 

 

 

 No Significant Results

FC-13-082U

73.4

74.2

0.8

240.9

243.4

2.5

17.8

0.5

 

FC-13-083U

60.4

61.9

1.5

198.0

203.0

5.0

9.2

0.3

 

FC-13-084U

97.4

100.0

2.6

319.4

328.0

8.6

8.3

0.2

 

including

97.4

98.5

1.1

319.4

323.0

3.6

15.0

0.4

 

and

112.2

113.5

1.3

368.0

372.3

4.3

13.1

0.4

 

FC-13-085U

55.5

57.0

1.5

182.0

187.0

5.0

20.7

0.6

 

and

56.1

56.4

0.2

184.2

185.0

0.8

38.0

1.1

 

and

56.7

56.9

0.2

186

186.6

0.6

211.0

6.2

 

FC-13-087U

 

 

 

 

 

 

 

 

No Significant Preliminary Results

FC-13-088U

 

 

 

 

 

 

 

 

No Significant Preliminary Results

FC-13-089U

8.8

11.9

3.05

29.0

39.0

10.0

23.1

0.7

 

including

8.8

10.0

1.16

29.0

32.8

3.8

11.8

0.3

 

including

10.0

10.5

0.49

32.8

34.4

1.6

12.5

0.4

 

including

10.5

11.6

1.13

34.4

38.1

3.7

43.3

1.3

 

including

11.6

11.9

0.27

38.1

39.0

0.9

6.2

0.2

 

and

49.0

49.3

0.27

160.7

161.6

0.9

22.0

0.6

 

FC-13-090U

73.5

74.1

0.58

241.1

243.0

1.9

8.1

0.2

Preliminary results

FC-13-091U

10.6

10.8

0.18

34.9

35.5

0.6

5.2

0.2

Preliminary results

and

82.6

82.9

0.27

271.0

271.9

0.9

30.0

0.9

 

FC-13-092U

8.1

10.3

2.16

26.6

33.7

7.1

11.7

0.3

 

including

8.1

8.5

0.43

26.6

28.0

1.4

5.3

0.1

 

including

8.5

9.0

0.43

28.0

29.4

1.4

40.00

1.2

 

including

9.0

10.3

1.31

29.4

33.7

4.3

4.7

0.1

 

and

45.1

46.6

1.52

148.0

153.0

5.0

23.2

0.7

 

FC-13-093U

6.2

6.7

0.52

20.2

21.9

1.7

6.9

0.2

 

and

7.5

9.5

1.98

24.7

31.2

6.5

286.8

8.4

 

including

7.5

8.1

0.55

24.7

26.5

1.8

981.0

28.6

 

including

8.1

8.6

0.52

26.5

28.2

1.7

31.5

0.9

 

including

9.1

9.5

0.37

30.0

31.2

1.2

37.0

1.1

 

Table 1: Results from recent Fire Creek drilling. Preliminary results consist of material sampled across veins or veined brecciaidentified from quick-logs. Complete log and sample results for these holes are pending.

Note: Intervals reported are core lengths; true widths are not known at this time.

 

 

 

Location

Hole Id

Azimuth

Dip

Length (m)

Length (ft)

Main Decline MB 3

FC-13-073U

75

35

64.0

210

Main Decline MB 3

FC-13-074U

75

6

216.7

711

Main Decline MB 3

FC-13-075U

75

-10

122.8

403

Main Decline MB 3

FC-13-076U

75

-25

121.9

400

Main Decline MB 3

FC-13-077U

96

10

85.0

279

Main Decline MB 3

FC-13-078U

94

-20

153.5

503.5

Main Decline MB 3

FC-13-079U

94

-49

153.0

502

Main Decline MB 4

FC-13-080U

71

-38

138.4

454

Main Decline MB 4

FC-13-081U

69

-58

159.4

523

Main Decline MB 4

FC-13-082U

74

-13

106.7

350

Main Decline MB 4

FC-13-083U

72

13

64.9

213

Main Decline MB 4

FC-13-084U

75

-90

136.6

448

Main Decline MB 4

FC-13-085U

65

-60

151.5

497

Main Decline MB 4

FC-13-086U

62

-39

135.6

445

Main Decline MB 4

FC-13-088U

60

15

73.8

242

5370 MB

FC-13-089U

88

-22

147.2

483

5370 MB

FC-13-090U

262

-23

215.8

708

5370 MB

FC-13-091U

255

20

116.7

383

5370 MB

FC-13-092U

60

-20

165.5

543

5370 MB

FC-13-093U

35

-20

128.9

423

Total

2,658.0

8,720.5

Table 2: Completed drill holes with length, azimuth and dip.

 

The technical information contained in this press release has been approved and verified by Steven L. McMillin, CPG-11031 (American Inst. of Prof. Geol.), Chief Geologist for Klondex Mines Ltd., as a non-independent Qualified Person for the purposes of National Instrument 43-101.

 

Samples cited in this news release were obtained from in-fill drilling by independent contractor American Drilling of Spokane, Washington under the direction of Klondex staff. Assays were determined by ALS Minerals, an independent analytical laboratory, under the supervision of Klondex staff. Sample preparation is conducted in Elko, Winnemucca, or Reno facilities, and fire-assay analytical work is conducted in Reno. Logging, splitting, and sampling are conducted at the Fire Creek site. Sample intervals are selected by geology and alteration. Core is split, and a � split is archived for reference. Accredited standards and blanks are inserted approximately every 20 samples. Duplicates are generated by ALS by splitting the sample immediately in advance of the duplicate and assaying one split. Standard sample performance is frequently monitored using statistical spreadsheets. Standard fire assays with a 30g charge are performed on all samples up to 10 g/t, and then gravimetric assays are conducted on samples with 10 g/t over-limit assays. Select metallic-screen assays are then conducted by re-sampling the coarse reject using criteria such as clustering of assays, proximity to veins, and mineralized veins. Multi-element ICP samples are collected on 20ft composites and on individual samples in mineralized rock. Assay data is reviewed by certificate, and again after merging with logged data for footage or numbering discrepancies. Standard, blank, and duplicate performance is then reviewed, and no re-assays were requested. Vein material will likely be further assayed by the metallic screen method, which will be used as the best assay.

 

About Klondex Mines Ltd. (http://www.klondexmines.com)

Klondex Mines is focused on the exploration and development of its Fire Creek gold project in North-Central Nevada. Fire Creek is located in a mining-friendly jurisdiction, near major producers, transportation, mining infrastructure and its milling facilities. As at September 30, 2013, Klondex had 65.0M shares issued and outstanding and 87.2M shares, fully diluted.

 

Contact:

Paul Huet                                                        Alison Tullis                                             Toni Trigiani

President & CEO                                            Manager, Investor Relations                  Investor Relations

Klondex Mines Ltd.                                      Klondex Mines Ltd.                                  Catalyst Global LLC

1-775-284-5757                                            1-647-233-4348                                        1-212-924-9800

investors@klondexmines.com                 atullis@klondexmines.com                   kdx@catalyst-ir.com

 

This news release contains certain information that may constitute forward-looking information under applicable Canadian securities legislation, including information about the magnitude and quality of the Fire Creek Project, the results of exploration and metallurgical sampling at the Fire Creek Project and the potential expansion of mineralization, . This forward-looking information entails various risks and uncertainties are based on current expectations, and actual results may differ materially from those contained in such information. These risks and uncertainties include, but are not limited to the risks and hazards associated with environmental compliance and permitting for its underground operations, the strength of the global economy; the price of gold; operational, funding and liquidity risks; the degree to which mineral resource estimates are reflective of actual mineral resources; the degree to which factors which would make a mineral deposit commercially viable are present. Risks and uncertainties about the Company's business are more fully discussed in the Company's disclosure materials filed with the securities regulatory authorities in Canada and available at www.sedar.com. Readers are urged to read these materials. Klondex assumes no obligation to update any forward-looking information or to update the reasons why actual results could differ from such information unless required by law.
This email was sent to .com by investors@klondexmines.com |  
Update Profile/Email Address | Instant removal with � | Privacy Policy.
Catalyst Global LLC | 104 Fifth Avenue | 6th Floor | New York | NY | 10011
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Klondex Mines Ltd

DEVELOPMENT STAGE
CODE : KDX.TO
ISIN : CA4986961031
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Klondex Mines is a gold and silver development stage company based in Canada.

Klondex Mines holds various exploration projects in USA.

Its main asset in development is FIRE CREEK in USA and its main exploration properties are MAGGIE CREEK, REEF, HOT SPRINGS POINT, CORRAL CANYON and SWALES MOUNTAIN in USA.

Klondex Mines is listed in Canada and in United States of America. Its market capitalisation is CA$ 543.8 millions as of today (US$ 414.3 millions, € 354.6 millions).

Its stock quote reached its lowest recent point on December 08, 2000 at CA$ 0.06, and its highest recent level on November 04, 2016 at CA$ 7.95.

Klondex Mines has 177 130 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Klondex Mines Ltd
5/6/2008to Highlight New Gold Intercepts from its Nevada Exploration...
Annual reports of Klondex Mines Ltd
2007 Annual report
Financings of Klondex Mines Ltd
12/9/2013Klondex Updates Proposed Financing with Franco-Nevada
11/2/2012Announces $20 Million Equity Financing and US$7 Million Debt...
7/22/2011Announces Repricing of Lender Warrants to Purchase 1.4 Milli...
8/21/2008Completes CDN $1.75 Million Private Placement
8/1/2008Arranges Non-Brokered Private Placement
9/16/2007to Extend the Expiration Date and Reduce Exercise Price of W...
Nominations of Klondex Mines Ltd
11/15/2013Appoints Barry Dahl as Chief Financial Officer
9/14/2013Appoints Ritch Hall as Special Advisor to the Board
6/29/2012=2DKlondex Mines Announces Independent Board of Directors El...
7/13/2011Confirms Seven-Member Board with Substantial Nevada Gold Min...
10/12/2009Appoints Dr. W. Lang to its Board of Directors
6/22/2009(Fire Creek)Appoints Special Committee to Review Silvercorp Takeover Off...
5/22/2007Expands Board with Appointment of Mining Industry Executive,...
Project news of Klondex Mines Ltd
3/17/2015(Fire Creek)Files Pre-Feasibility Study Technical Report in Relation to ...
2/13/2014(Fire Creek)Infill Drilling Extends Joyce and Vonnie Veins at Fire Creek
2/11/2014Klondex Completes Acquisition of the Midas Mine and Mill Com...
1/20/2014Drilling Details Three Mineralized Structures in the West Zo...
1/14/2014continues to Strengthen Nevada Operations Team; Klondex to E...
12/19/2013(Fire Creek)Intercepts New Areas of Gold Mineralization at its Fire Cree...
12/4/2013Enters into Definitive Agreement with Newmont to Acquire the...
11/1/2013(Fire Creek)Files Technical Report in Connection with Fire Creek Project
10/31/2013Klondex to Begin Drilling West Zone
9/16/2013Reports Updated Resource Estimate
5/13/2013Visible Gold from Exploration
4/2/2013Klondex Secures Toll Milling Agreement w/ Veris Gold for Fir...
1/22/2013Klondex Discovers a New "West Zone" With Significant Visible...
9/24/2012(Fire Creek)Drills 2=2C910 g=2Ft (85 oz=2Fton) Gold over 1.5 Meters at t...
8/11/2012Veteran Mine Engineer=2C Rodney Cooper=2C Named To Board of ...
4/13/2012(Fire Creek)Underground In-Fill Drilling Continues to Intersect Gold Min...
1/10/2012Nevada Gold Explorer Klondex Mines Presents Sunday=2C Jan. 2...
10/5/2011(Fire Creek)Draws U.S. $5 Million from Gold Loan to Fund Continued Devel...
7/26/2011(Fire Creek)Reports Solid Progress at Fire Creek Nevada Gold Deposit
2/15/2011(Fire Creek)Discovers High-Grade Gold Vein in Nevada with 0.31 oz/ton Go...
2/15/2011Klondex Discovers High-Grade Gold Vein in Nevada with 0.31 o...
1/7/2010(Fire Creek)to Review High-Grade Nevada Gold Exploration Program at Vanc...
12/17/2009(Fire Creek)Secures BLM Permits for Confirmation Program at Fire Creek
7/9/2009(Fire Creek)Resumes Drilling Of High-Grade Gold Zones At Fire Creek As I...
5/29/2009(Fire Creek)to Highlight 1.6 mm Oz. Indicated Gold Resource (and 0.5 mm ...
3/2/2009(Fire Creek)Releases Final Gold Assays From 2008 Fire Creek Drill Progra...
12/12/2008Initiates High-Grade Gold Resource Update to Include Two Yea...
3/19/2008(Fire Creek) Confirms Gold Intercept of 0.37 oz/ton (12.7 g/t) over 25 f...
1/17/2008(Fire Creek)'s Drills Gold Intercepts of 67.2 gpt over 1.5 meters
11/26/2007 Reports New High-Grade Gold Intercept 18.0 gpt over 9.1 met...
10/22/2007(Fire Creek)Hits New High-Grade Intercept (41.55 gpt/1.21 oz/ton over 4....
9/14/2007(Fire Creek)Drilling Results Increase Klondex's Gold Resource By Extendi...
7/5/2007(Fire Creek)Records Drill Intercept of 8.32 oz/ton Gold over 2.6 Feet Fr...
Corporate news of Klondex Mines Ltd
5/10/2016Klondex Mines reports 1Q loss
2/1/2016Klondex Receives BLM Approval for the Environmental Assessme...
1/22/2016Klondex Completes Acquisition of Rice Lake Mine and Mill Com...
1/19/2016Klondex Announces 2015 Production of ~128,000 GEOs; 2016 Pro...
12/29/2015Klondex Announces Changes to Its Board of Directors
12/17/2015Klondex Announces Acquisition of Rice Lake Mine and Mill Com...
12/3/2015Klondex Increases Total Mineral Reserves by ~19% in 2015
10/23/2015Klondex Announces Sales of 33,846 GEOs in Q3 2015; Increases...
10/19/2015U.S. Global Investors' Frank Holmes and Ralph Aldis Intervie...
10/8/2015Klondex Provides Update on Midas' Exploration Drill Program
10/6/2015Klondex Modifies NYSE MKT Exchange Symbol to "KLDX"
10/5/2015Klondex Approved for Listing on NYSE MKT Exchange Under the ...
9/10/2015Klondex Completes $26,270,000 Bought Deal Public Offering of...
8/12/2015Klondex Reports Second Quarter 2015 Cash Increase of $13.1 m...
8/6/2015Klondex Mines Bolsters Executive Team by Appointing John Sea...
8/5/2015Klondex Mines Schedules 2Q 2015 Conference Call for Thursday...
8/4/2015Klondex Discovers New Veins at Fire Creek; Intercepts 9.1 g/...
7/22/2015Klondex Reports Record Sales of 34,188 GEOs in 2Q2015; Incre...
7/14/2015Klondex Begins Construction of Midas Tailings Expansion
6/18/2015Klondex Receives WPCP Permit from State of Nevada; The Tonna...
4/14/2015Recovers 32,542 GEO in 1Q2015
4/7/2015Releases Midas Phase I Drill Program Results
4/7/2015Klondex Releases Midas Phase I Drill Program Results
4/1/2015Files Pre-Feasibility Study for the Midas Mine
4/1/2015Klondex Files Pre-Feasibility Study for the Midas Mine
3/25/2015Reports Net Income of $18.3 Million or $0.16 per Share in In...
3/25/2015Klondex Reports Net Income of $18.3 Million or $0.16 per Sha...
3/17/2015Klondex Files Pre-Feasibility Study Technical Report in Rela...
3/9/2015Schedules Fourth Quarter 2014 Conference Call for Wednesday,...
3/9/2015Klondex Mines Schedules Fourth Quarter 2014 Conference Call ...
2/25/2015Klondex to Exhibit and Present at the PDAC; Present at Red C...
2/23/2015Klondex Reports Initial Fire Creek and Midas Mineral Reserve...
1/29/2015Klondex Increases Mineral Resource Estimate at Fire Creek
1/19/2015Klondex Recovers 107,860 Au Equivalent Ounces in First Year ...
12/16/2014Klondex Mines Bolsters Executive Team by Appointing Brian Mo...
12/3/2014Klondex Enters Into Toll Milling Agreement With LKA Gold
11/25/2014Klondex Mines Receives $10.3 Million From the Exercise of Wa...
11/12/2014Klondex Reports Q3 Production Cost of US$439 per Ounce Sold ...
10/28/2014Klondex Mines Schedules Third Quarter 2014 Conference Call f...
10/23/2014Klondex Celebrates 2 Years No Lost Time Accidents at Fire Cr...
10/20/2014Klondex Mines Reports Third Quarter 2014 Operations Results
10/8/2014Klondex Releases Fire Creek Drill Program Results
10/1/2014IIROC Trade Resumption - KDX
9/30/2014Klondex Increases Mineral Resource Estimate at Midas
9/30/2014IIROC Trading Halt - KDX (all issues)
9/18/2014Klondex to Trade on S&P/TSX SmallCap Index
9/15/2014Klondex Identifies Another New Structure, the "Honeyrunner"
9/10/2014Klondex Reports on Midas Infill Drilling Program
9/10/2014Klondex Comments on Report
12/6/2013Klondex Announces Acquisition Financing Update
10/28/2013Completes Secondary Egress Excavation-Enters Bulk Sampling P...
10/22/2013Retires Short-Term Debt
10/16/2013Announces Closing of C$19 Million Financing
10/8/2013Announces Further Infill Drilling Results
9/30/2013Announces August Development Results at Fire Creek
9/23/2013Announces Receipt of Proceeds
9/12/2013Announces July Development Results
8/12/2013(Fire Creek)Sends First Shipment to Newmont, Electrifies Fire Creek
7/29/2013Reports Results of June Development Program
7/26/2013Secures Agreement for High-Grade Mineralization
7/26/2013Klondex Announces Bridge Loan
7/25/2013US Global Investors' Ralph Aldis recommends Klondex Mines Lt...
7/25/2013US Global Investors' Ralph Aldis recommends Klondex Mines Lt...
7/16/2013Announces Renaud Adams to Board
7/16/2013Primero - Klondex Names Mining Executive Renaud Adams to the...
7/10/2013Joyce Vein Sampling Averages 132.8g/t (3.87opt) Gold
6/27/2013Samples 22,396 gpt Gold
6/18/2013Announces New Mineralized Structure
6/13/2013AGM Meeting CORRECTION
6/13/2013Annual General Meeting Invitation
6/12/2013Announcement
5/30/2013Drilling Confirms New West Zone Gold Mineralization; All Fiv...
5/16/2013Profiled by Michael Brush - MSN Money
5/8/2013Klondex Presenting at The MoneyShow in Las Vegas - May 14
5/8/2013CEO to Exhibit and Present at the Las Vegas MoneyShow; CEO C...
5/1/2013Completes Relogging Effort
5/1/2013Completes Core Re-Logging
4/9/2013Confirms Zone of Gold Mineralization South of Mineral Resour...
4/2/2013Veris Gold Enters Into A Toll Milling Agreement With Klondex...
4/2/2013Klondex Signs Milling Agreement with Veris Gold
3/21/2013Featured on B-TV Business Television
3/21/2013Klondex Video on BTV
3/14/2013News Release
2/25/2013NAMES LARRY PHILLIPS CHAIRMAN OF THE BOARD
2/20/2013- The Northern Miner
2/19/2013Nevada Gold Explorer Klondex Mines to Present at Red Cloud M...
2/8/2013- The Northern Miner
1/22/2013Discovers a New "West Zone" With Significant Visible Gold Mi...
1/16/2013Press Announcement
11/8/2012. Provides Update on Offering
10/31/2012Encounters Two Gold Veins with 95.5 g=2Ft (2.79 oz=2Fton) Go...
9/13/2012Names Paul Andre Huet=2C Who Led the Midas and Hollister Und...
8/29/2012(Fire Creek)Drills Long Intercepts of Near=2DSurface=2C Oxidized Gold Mi...
7/16/2012(Fire Creek)Nevada Gold Explorer Klondex Mines Announces Interim CEO And...
6/28/2012=2D Klondex Mines Announces Proxies Will be Accepted Up to C...
6/18/2012(Fire Creek)=3A Underground In=2DFill Drilling Continues to Intersect Go...
4/23/2012Nevada Gold Explorer Klondex Mines Begins Trading Today on t...
4/16/2012(Fire Creek)Underground In=2DFill Drilling Continues to Intersect Gold M...
3/1/2012(Fire Creek)Initial Underground Drill Results Show Continuity of Gold Mi...
2/14/20122011 Drill Program Results Press Release
2/14/2012Mid-Day Breaking News From International Enexco, Klondex, Zi...
1/26/2012Nevada Gold Explorer Klondex Mines to Webcast Merriman Capit...
12/21/2011Nevada Gold Explorer=2C Klondex Mines=2C Appoints Veteran Ge...
10/5/2011Mid-Day Breaking News From Lucky Strike, Galore, Indigo, Klo...
6/30/2011Announces Settlement Agreement and New Proposed Board
6/29/2011Waives Deadline for Submitting Proxies
6/27/2011Proposes Veteran Mining Industry Executive Ken Stowe as Addi...
6/22/2011ISS Recommends Klondex Shareholders Vote For Incumbent Klond...
5/11/2011(Fire Creek)Clarifies Technical Disclosure, To Prepare Fire Creek Report
4/28/2011(Fire Creek)Portal Blast Formally Launches Underground Gold Mining at Kl...
4/18/2011(Fire Creek)Announces Expanded 2011 Surface Exploration Program at its H...
4/6/2011Closes U.S. $20 Million Secured Facility to Advance Undergro...
4/6/2011(Fire Creek)BREAKING NEWS: Klondex Secures $20mm Gold-Backed Funding for...
2/24/2011Names Robin Goad, Veteran Geologist and Mining Industry Exec...
2/22/2011(Fire Creek)Receives Nevada State Approval for Fire Creek High-Grade Gol...
10/6/2009to Vigorously Defend Against Baseless Paramount Suit and to ...
9/25/2009Terminates Agreement with Paramount Gold and Silver Corp. Ci...
9/17/2009Reports Proceeds of $2.0 Million from Warrant/Option Exercis...
7/20/2009Business Combination
6/30/2009Rejects Silvercorp's Hostile Takeover Bid
6/30/2009Completes $3.0 Million Financing with China Mineral United t...
6/26/2009Scotia Capital Appointed by Klondex as Financial Advisor to ...
6/23/2009Waives Application of Previous Shareholder Rights Plan and A...
6/8/2009Responds to Unsolicited Acquisition Offer from Silvercorp Me...
9/18/2008Grants Incentive Options
8/12/2008President Exercises Options
7/9/2008Intercept Averaging 0.361 oz/ton Gold over 18 Feet True Widt...
6/19/2008Announces AGM Voting Results
4/30/2008Provides Investor Update
1/14/2008to Highlight New Gold Intercepts from its Nevada Exploration...
11/27/2007 Highlight Nevada Gold Exploration Progress at Academy & Fin...
11/8/2007to Highlight Nevada Gold Exploration Progress at Hard Assets...
10/11/2007Klondex to Highlight Nevada Gold Exploration and Development...
6/27/2007Receives Shareholder Petition
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (KDX.TO)Other OTC (KLNDF)
3.07+1.32%2.47-1.59%
TORONTO
CA$ 3.07
07/24 17:00 0.040
1.32%
Prev close Open
3.03 3.03
Low High
3.00 3.09
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  3.07 -%
Volume 1 month var.
1,962,298 -%
24hGold TrendPower© : -31
Produces
Develops Gold
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 7/15/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :