Chart usGOLD   Chart usSILVER  
 
Food for thought
A tacit consent is worth the paper it is not written on
.  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1359.60-27.44
Silver 22.25-0.41
Platinum 1451.52-31.48
Palladium 735.25-1.25
WORLD MARKETS
DOWJONES 15354120
NASDAQ 349934
NIKKEI 15138101
ASX 516016
CAC 40 400122
DAX 839828
HUI 246-10
XAU 97-3
CURRENCIES (€)
AUS $ 1.3166
CAN $ 1.3203
US $ 1.2839
GBP (£) 0.8453
Sw Fr 1.2460
YEN 132.0390
CURRENCIES ($)
AUS $ 1.0260
CAN $ 1.0282
Euro 0.7789
GBP (£) 0.6585
Sw Fr 0.9705
YEN 102.8490
RATIOS & INDEXES
Gold / Silver61.11
Gold / Oil14.16
Dowjones / Gold11.29
COMMODITIES
Copper 3.320.02
WTI Oil 96.020.86
Nat. Gas 4.060.13
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
( 0 vote, 0/5 ) Print article
     
Tweet

Marketwire

 
 
HudBay Minerals Inc.
TSX:HBM
Other Recent News

August 2, 2007
HudBay Announces High-Grade Lalor Lake Drill Results

Zinc mineralization intersected in additional holes

WINNIPEG, MANITOBA --(Marketwire - Aug. 2, 2007) - HudBay Minerals Inc. (TSX:HBM) (HudBay) today announced results from its ongoing diamond drill program at its Lalor Lake mineral property near Snow Lake in the Flin Flon Greenstone Belt. HudBay released results from the first Lalor Lake drill hole on March 20, 2007.

"We are very excited by the high zinc grades and the potential significance of the deposit from the first 10 holes," said Peter Jones, President & CEO, "and four drills have been assigned to the site working 24/7."

The Lalor Lake property is approximately 3 km off highway 395 and 15 km from HudBay's Snow Lake concentrator, which has additional capacity.

Mineralization intersections to date at approximately 800 meters from surface indicate a strike length of approximately 550 meters and a width of approximately 700 meters measured in plan view. The mineralization remains open in at least three directions. The massive sulphide mineralization at Lalor is coarse grained and similar to HudBay's nearby Chisel North mine, and the previously mined Photo Lake and Chisel mines. These mines had excellent concentrator recoveries and have produced 9.8 million ore tonnes to date.

Kelly Gilmore, Chief Exploration Geologist for HudBay said, "The current interpretation indicates a zinc rich main zone near the top of a hydrothermal alteration zone. The footwall to the main zone contains disseminated to massive pyrite, pyrrhotite, chalcopyrite and sphalerite often with additional good zinc intersections. Significant precious metals assays occur in both the footwall and hanging wall of the main zone."

The company expects to provide regular updates of its exploration program at Lalor, as well as its other exploration activities.

HudBay previously announced plans to spend $45 million on exploration activities in 2007 including approximately $34 million in the Flin Flon Greenstone Belt where the company has three underground mines two ore concentrators as well as metallurgical plants within approximately 400,000 hectares of exploration lands. Historically the company has discovered 25 mines and produced in excess of 150 million ore tonnes from this area.

SELECTED INTERSECTION DATA(1)


Main Zone Intersections
-----------------------------------------------------------------
Drill Hole   Zinc  Copper  Intersection  Intersection (meters)
               (%)     (%)      (meters)            From - To
-----------------------------------------------------------------
DUB 168     13.26    0.19         23.95       781.74 - 805.69(2)
-----------------------------------------------------------------
DUB 169      2.62    0.22          4.95       828.08 - 833.03
-----------------------------------------------------------------
DUB 170     15.62    0.21          6.09       841.05 - 847.14
-----------------------------------------------------------------
DUB 171     12.76    0.58          3.31       962.31 - 965.62
-----------------------------------------------------------------
DUB 172      9.83    0.53          4.10       930.00 - 934.10
-----------------------------------------------------------------
DUB 173      5.44    3.13         16.55       982.26 - 998.81
-----------------------------------------------------------------
DUB 174     22.59    0.43          3.93       705.18 - 709.11
-----------------------------------------------------------------
DUB 175      1.01    0.14          3.97       915.54 - 919.51
-----------------------------------------------------------------
DUB 176     10.57    0.14          2.58       643.34 - 645.92
-----------------------------------------------------------------
DUB 177      7.79    0.09          7.86       670.77 - 678.63
-----------------------------------------------------------------


Footwall Intersections
--------------------------------------------------------------
Drill Hole   Zinc  Copper  Intersection  Intersection (meters)
               (%)     (%)      (meters)            From - To
--------------------------------------------------------------
DUB 168     10.21    0.27          3.10       881.76 - 884.86
--------------------------------------------------------------
DUB 169     11.80    0.76          0.79       929.00 - 929.79
--------------------------------------------------------------
DUB 171     10.55    0.21          0.55     1162.00 - 1162.55
--------------------------------------------------------------
DUB 174     10.61    0.29          8.23       722.89 - 731.12
--------------------------------------------------------------
DUB 174      9.94    0.31          5.93       834.29 - 840.22
--------------------------------------------------------------
DUB 174      8.53    0.14          8.15       872.46 - 880.61
--------------------------------------------------------------
DUB 174      5.90    0.27          2.96       885.96 - 888.92
--------------------------------------------------------------
DUB 174      8.15    0.14          4.24       901.41 - 905.65
--------------------------------------------------------------
DUB 174      5.52    0.20         12.10       910.83 - 922.93
--------------------------------------------------------------
DUB 174     10.37    0.82          0.98       932.57 - 933.55
--------------------------------------------------------------
DUB 175      0.02    0.43         57.57       936.00 - 993.57
--------------------------------------------------------------
DUB 176      6.06    0.48          4.29       689.34 - 693.63
--------------------------------------------------------------
DUB 177      7.96    0.17          1.99       753.37 - 755.36
--------------------------------------------------------------


Precious Metal Intersections
---------------------------------------------------------------
Drill Hole   Gold  Silver  Intersection   Intersection (meters)
             (g/t)   (g/t)      (meters)             From - To
---------------------------------------------------------------
DUB 168      5.14   31.54          1.03        890.00 - 891.03
---------------------------------------------------------------
DUB 169     13.47   41.59         11.30        903.70 - 915.00
---------------------------------------------------------------
DUB 171     12.90   58.75          3.80      1078.70 - 1082.50
---------------------------------------------------------------
DUB 172      7.10  137.16          8.47        906.77 - 915.24
---------------------------------------------------------------
DUB 172      5.20   13.75         26.23        928.17 - 954.40
---------------------------------------------------------------
DUB 173      2.03   66.79         22.00      1086.00 - 1108.00
---------------------------------------------------------------
DUB 174      4.75  169.99          4.56        718.33 - 722.89
---------------------------------------------------------------
DUB 174     16.25  194.06          0.61        739.61 - 740.22
---------------------------------------------------------------
DUB 175     11.59  109.37          0.31        985.73 - 986.04
---------------------------------------------------------------
DUB 177      3.87  106.87          6.42        685.58 - 692.00
---------------------------------------------------------------
(1) A complete tabulation of drilling results and assayed
intersections as well as a map depicting the Lalor Lake
property within the Snow Lake area are included as attachments
to this news release.
(2) Ongoing geological interpretation of the main zone in DUB
168 produced a longer intersection and lower zinc grade compared
to the results announced in the March 20, 2007 news release.
Actual assays and intersection lengths are as previously
reported.
 
2007 HudBay Procedures

Exploration core drilling was either BQ or NQ size. The core was logged and mineralized intersections were marked for sampling and assaying by HudBay's subsidiary Hudson Bay Exploration and Development Company Limited (HBED) employed geologists. The marked intersections or intervals were sawn in half by a diamond saw and one half of the core was placed in plastic bags and tagged with unique sample numbers, while the second half was returned to the core box and stored. Each bagged core sample was transported to HudBay's subsidiary Hudson Bay Mining and Smelting Co., Limited's assay laboratory in Flin Flon, Manitoba where it was dried, crushed and pulverized and a 250-gram sample was prepared for assaying. From each 250 gram sample 0.25 grams was removed and leached in aqua regia and analyzed by ICP-AES for Ag, Cu, Zn, As, Pb, Ni and Fe. Also from the 250-gram sample, 15 grams was removed for gold determination by fire assaying with Atomic Absorption finish.

Assaying integrity is monitored internally with a quality control program, which includes the use of assay sample standards, blanks, duplicates and repeats and externally through national and international programs. In addition, within each group of 20 core samples, one core sample has a second 250 gram split collected for check assaying at Acme Analytical Laboratories Ltd. in Vancouver, B.C. This news release provides core lengths and additionally where indicated, horizontal or vertical lengths of mineralization intersected. True widths are not provided. Where metal assays are provided for intersections they are either a single assay of a sample of the entire intersection length or a composite of assays calculated from interval weighted assays over the intersection length. The data herein and the contents of this news release have been reviewed by Kelly Gilmore, B.Sc. P. Geo., Chief Exploration Geologist with HBED, who is a Qualified Person, within the meaning of National Instrument 43-101, with the ability and authority to verify the authenticity and validity of the data.

About HudBay Minerals Inc.

HudBay Minerals Inc. is an integrated mining company that operates mines, concentrators and a metal production complex in northern Manitoba and Saskatchewan. The company also owns a zinc oxide production facility in Ontario, the White Pine Copper Refinery in Michigan and the Balmat zinc mine in New York state. HudBay is a member of the S&P/TSX Composite Index and the S&P/TSX Global Mining Index.

(HBM-G)

Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements with respect to future exploration plans and expenditures by HudBay and the success of such activities. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects", or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "does not anticipate", or "believes" or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might", or "will be taken", "occur", or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of HudBay to be materially different from those expressed or implied by such forward-looking information, including risks associated with the mining industry such as economic factors as they effect exploration, future commodity prices, actual results of current exploration activities, government regulation, environmental risks, permitting timelines, capital expenditures, changes in project parameters as plans continue to be refined as well as those factors discussed in the section entitled "Risk Factors" in HudBay's Annual Information Form for the year ended December 31, 2006, available on www.sedar.com. Although HudBay has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. HudBay does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

To view a table of Hudson Bay Mining and Smelting Lalor Lake Project Hole Locations, please visit the following link: http://www.ccnmatthews.com/docs/hbm0802-link1.pdf

To view tables for Hudson Bay Mining and Smelting Lalor Lake Project Assay Results, please visit the following link: http://www.ccnmatthews.com/docs/hbm0802-link2.pdf

To view a map of the Snow Lake area, please visit the following link: http://www.ccnmatthews.com/docs/hbm0802-link3.pdf

CONTACT INFORMATION:

HudBay Minerals Inc.
Brad Woods
Director, Investor Relations
(204) 949-4272
Fax: (204) 942-8177
Email: Brad.woods@hbms.ca
Website: www.hudbayminerals.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer

Tweet

HudBay Minerals Inc.

PRODUCER
CODE : HBM.TO
ISIN : CA4436281022
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of HudBay Minerals Inc.
8/15/2012Revenues drop 23% as Hudbay posts Q2 loss
10/6/2011Cashed-up HudBay to weather commodity weakness, says analyst
7/6/2011HudBay to build new concentrator at Lalor, extends mine life
5/17/2011Despite railway shipping snafus, HudBay Minerals will meet g...
5/17/2011Callinan Receives Net Profits Interest Payment From HudBay M...
4/6/2011HudBay considering gold spinoff, new Peru projects
3/29/2011HudBay faces fresh $55m lawsuit from Guatemalan group
3/21/2011HudBay exercises Augusta warrants, boosting stake
1/11/2011HudBay to pay C$397.5 for Norsemont
8/5/2010HudBay Minerals sees jump in quarterly operating profits
5/9/2010Higher metal prices help Hud Bay return to profit
5/6/2010Looking for new CEO, acquisitions
4/13/2010HudBay buys Mincom software package
3/5/2010HudBay in 'advanced' talks on copper conc sales
3/4/2010HudBay 4Q09 earnings hit by lower copper output, suspension ...
3/4/2010Q4 profit halved y-on-y
2/3/2010HudBay budgets C$207,9m capex in 2010
12/23/2009HudBay signs earn-in deal with junior Halo
12/19/2009HudBay Updates Drilling on Copper-Gold Zone...
11/13/2009HudBay shares drop as COO resigns, CEO retires
11/12/2009HudBay CEO Jones will retire at year-end, COO resigns
11/4/2009Hudbay sees mid-2010 decision on Guatemala nickel project
11/4/2009Surging gold, lower costs help Hudbay grow profits seven-fol...
11/4/2009Surging gold, lower costs help Hudbay grow profits seven-fol...
11/4/2009HudBay quarterly revenue slid 21%
10/30/2009HudBay announces restart of Manitoba mine, concentrator
10/10/2009Hudbay to fast-track Lalor gold-zinc project
10/9/2009HudBay surges on production plans for new Lalor deposit
9/30/2009HudBay reports protests near Guatamala project
9/22/2009HudBay pursues output at Lalor as 'highest priority', finds ...
8/8/2009HudBay share buyback just 'good housekeeping', M&A still...
8/7/2009Big profit jump for HudBay - but due to Lundin stake sale ga...
8/7/2009HudBay reports increased profit on Lundin stake sale
6/18/2009Hudbay Expects to Close Flin Flon Copper Smelter by July 201...
6/18/2009Hudbay will close Flin Flon copper smelter by July 2010
6/11/2009HudBay eyeing restart of Chisel mine-CEO
5/20/2009SRM Reduces Stake in HudBay
5/11/2009Final parting of ways for HudBay, Lundin
5/6/2009HudBay chief says no talks to sell company
5/5/2009posts C$4m loss on lower copper, zinc prices
4/28/2009Vedanta subsidiary buys 9.5% of Hudbay
4/27/2009Lakomasko takes 10% stake in HudBay - report
4/27/2009Minerals may be looking for buyer - or may be on acquisition...
4/24/2009shares jump on takeover speculation
3/25/2009Returning HudBay CEO Jones sees 'bottom' for metals prices
3/24/2009New HudBay board plans shareholders meeting by mid-year
3/24/2009board to concede loss after proxy battle – report
3/23/2009Rebels win proxy battle for HudBay Minerals
Annual reports of HudBay Minerals Inc.
2008 Annual report
2007 Annual report
Financings of HudBay Minerals Inc.
11/4/2009Exercises Warrants of Polar Star Mining
2/27/2009Lenders Refuse to Renew $80 Million Credit Facility Due to S...
12/12/2008Closes Private Placement
6/27/2008and Skye Announce Closing of $95 Million Private Placement
Option Grants of HudBay Minerals Inc.
8/28/2012Announces Semi-Annual Dividend
Nominations of HudBay Minerals Inc.
11/12/2009Announces CEO Planned Retirement andAppoints Executive Vice-...
3/10/2009Announces Resignation of CEO and Appointment of Interim CEO
10/3/2008Announces the Appointment of MichaelD=2E Winship as Presiden...
5/1/2008Announces Appointment of H. Maura Lendon as Vice President
4/9/2008 Announces Appointment of Two New Directors
11/22/2007 Appoints Director of Tax
10/26/2007 Appoints Director Corporate Relations
6/8/2007Appointing Vice President, Mining
Financials of HudBay Minerals Inc.
11/1/2012Releases Third Quarter 2012 Results
8/15/2012Releases Second Quarter 2012 Results
5/10/2012Releases First Quarter 2012 Results
3/8/2012Releases Fourth Quarter 2011 Results
11/4/2011Releases Third Quarter 2011 Results
8/10/2011Releases Second Quarter 2011 Results
5/17/2011Releases First Quarter 2011 Results
3/14/2011Releases Fourth Quarter and Year-End 2010 Results
8/4/2010Releases Second Quarter 2010 Results; Announces Production D...
5/4/2010Releases First Quarter 2010 Results
3/4/2010Releases Fourth Quarter and Year End 2009 Results
11/3/2009Releases Third Quarter 2009 Results
8/6/2009Releases Second Quarter 2009 Results; Announces Intention to...
5/5/2009Releases First Quarter 2009 Results
3/5/2009Releases Fourth Quarter andYear End 2008 Financial Results
11/4/2008Reports Third Quarter Results
7/31/2008Reports Second Quarter 2008 Results
5/7/2008Reports First Quarter 2008 Results
3/18/2008 Reports Fourth Quarter and Annual 2007 Results
8/15/2007Reports Second Quarter 2007 Results
5/10/2007Reports Strong First Quarter 2007 Results
Project news of HudBay Minerals Inc.
4/25/2011(Lalor)Announces Funding for Snow Lake Waste Water Treatment Plant
4/3/2011(Constancia)Announces Near Quadrupling of Metals Reserves; US$116 Millio...
12/13/2010(777 Mine)Announces 2011 Production Guidance and Capital and Explorati...
12/13/2010(Trout Lake Mine)Announces 2011 Production Guidance and Capital and Explorati...
10/15/2010(Back Forty)Announces Resource Increase of Over 100% at Back Forty Proje...
9/10/2010(Back Forty)Earns 51% Joint Venture Interest in Aquila Resources' Back F...
6/23/2010(Lalor)Discovers Additional Gold and Copper
2/22/2010(Lalor)Updates Drilling at Lalor Deposit: Copper-Gold Zone Remains ...
12/17/2009(Lalor)Drilling on Copper-Gold Zone at the Lalor Deposit
10/30/2009(Chisel North)Re-Start Chisel North Mine and Snow Lake Concentrator
9/22/2009(Lalor)Major New Copper-Gold Intersections at Lalor
5/5/2009(Flin-d)Lalor Exploration Yields More Precious Metal Intersections
1/9/2009(Chisel North)CORRECTION FROM SOURCE: HudBay to Suspend Operations at Its ...
1/9/2009(Chisel North)to Suspend Operations at Its Chisel North Mine and Snow Lake...
11/20/2008Files Fenix Project Technical Report
8/26/2008(Lalor)Announces NI 43-101 Mineral Resource Estimate for Lalor
3/3/2008(Lalor)Updates Drill Results for Lalor Lake
1/14/2008(Flin-d)43-101 Mineral Resource Estimates for Bur and Watts River De...
8/2/2007 Announces High-Grade Lalor Lake Drill Results
Corporate news of HudBay Minerals Inc.
4/15/2013to Host Conference Call for First Quarter 2013 Results
2/19/2013to Present at the BMO Capital Markets 22nd Global Metals & M...
1/24/2013to Host Conference Call for Fourth Quarter 2012 Results
1/17/2013to Present at Upcoming January Investor Conferences
1/17/2013to Present at Upcoming January Investor Conferences
11/30/2012to Attend Upcoming December Investor Conferences
11/22/2012to Present at Upcoming November Investor Conferences
11/12/2012to Present at GMP Latin American Mining Conference
10/12/2012to Host Conference Call for Third Quarter 2012 Results
7/9/2012to Host Conference Call for Second Quarter 2012 Results
4/17/2012to Host Conference Call for First Quarter 2012 Results
2/10/2012to Host Conference Call for Fourth Quarter 2011 Results
2/10/2012to Host Conference Call for Fourth Quarter 2011 Results
10/6/2011to Host Conference Call for Third Quarter 2011 Results
9/9/2011(Fenix)Announces Completion of Sale of Fenix Project and Key Manage...
7/18/2011to Host Conference Call for Second Quarter 2011 Results
5/4/2011Announces Commencement of Compulsory Acquisition of Remainin...
4/21/2011Makes Investment in CuOro Resources
3/17/2011Announces Expiry of Offer and Additional Take-Up of Norsemon...
3/14/2011to Exercise Compulsory Acquisition Rights After Expiry of Of...
3/2/2011Announces Take-up of Over 90% of Norsemont Mining Inc=2E's S...
3/1/2011Announces Semi-Annual Dividend
2/16/2011Makes Investment in Aquila Resources
2/14/2011Makes Investment in VMS Ventures
1/27/2011Hudbay Minerals Makes Investment in Copper Reef Mining Corpo...
1/27/2011Hudbay Minerals Makes Investment in Copper Reef Mining Corpo...
1/25/2011Hudbay and Norsemont Mining Announce Mailing of Offer and Ta...
1/10/2011Announces Agreement to Acquire Norsemont Mining
12/9/2010Makes Investment In Halo Resources Ltd.
10/22/2010to Commence Trading on the New York Stock Exchange Under 'HB...
10/18/2010Releases 2009 Corporate Social Responsibility Report
8/24/2010Makes Investment in Augusta Resource Corporation
7/28/2010to Help Establish Northern Manitoba Mining Academy
7/6/2010Joint Venture With VMS Ventures
4/1/2010New Resource and Significant Increase in Nickel Grade at Fen...
3/4/2010Enters Into Letter of Intent With VMS Ventures
2/3/20102009 Production and 2010 Outlook
1/8/2010Provides Update on Polar Star Holdings
12/22/2009Announces Option Agreement with Halo Resources Ltd.
10/8/2009$85 Million Production Ramp to Lalor Deposit
9/29/2009Files Normal Course Issuer Bid
9/29/2009Provides Update on CGN
8/6/2009Announces Subscription, Option and Joint Venture Agreement w...
6/22/2009CEO Unveils Strategic Plan at AGM
6/19/2009Expects to Close Flin Flon Copper Smelter by July 2010
5/12/2009to Hold Annual and Special Meeting on June 19, 2009
3/24/2009New Board Appointed at HudBay Minerals
3/19/2009Urges Shareholders to Vote the BLUE =?ISO-8859-1?Q?=20Proxy,...
3/16/2009 Riskmetrics, Glass Lewis and HudBay Minerals All Agree: SRM...
3/13/2009Leading Independent Advisory Firm Recommends HudBay Sharehol...
2/27/2009Urges Shareholders to Vote Against SRM Nominee Slate
2/24/2009 Agree to Terminate Arrangement Agreement
2/16/2009Sets Record Date for March 25, 2009 Shareholders' Meeting
2/4/2009Announces That Unions Ratify Collective Agreements
1/27/2009Reaches Tentative Collective Agreements With Unions
1/26/2009Announces Superior Court Hearing Adjourned
1/23/2009OSC Sets Aside TSX Decision
1/13/2009to Defend Application Vigorously
1/9/2009Discovers New Gold Zone at Lalor
1/8/2009Notified of Request for OSC Hearing and Review
12/30/2008Schedules Meeting of Shareholders for March 31, 2009
12/23/2008Announces Lundin Mining's Receipt of Interim Order
12/19/2008Receives Meeting Requisition From Shareholder
12/11/2008Reports Progress in Lundin Acquisition
12/9/2008Responds to the Concerns of Certain Shareholders
12/2/2008Media Advisory: HudBay Launches Special WebSite Section With...
11/26/2008Recommends Shareholders Take no Action in Response to Jaguar...
11/21/2008and Lundin Announce Friendly Business Combination
10/30/2008Wins Manitoba's 2008 Outstanding Large Business Award
8/26/2008Completes Business Combination With Skye Resources; Announce...
8/22/2008Announces Closure of Balmat Zinc Mine
8/21/2008Announces $1 Million 80th Anniversary Fund to Support Commun...
8/19/2008Skye Resources Securityholders Approve Business Combination ...
6/23/2008and Skye Resources AnnounceProposed Business Combination
6/2/2008Reports on U.S. Mine Fatality
2/15/2008 Announces 2007 Production and 2008 Outlook
2/12/2008Announces Updated Mineral Reserves and Resources
1/25/2008Announces Allen J. Palmiere as New President and CEO
1/21/2008 Celebrates 80 Years of Mining Success
12/14/2007 Share Buy Back Program Approved-Normal Course Issuer Bid
12/11/2007 Plans $42.8 Million for 2008 Exploration
11/5/2007Announces Exploration Drilling in South West Ontario
10/24/2007Announces Significant New Zinc Discovery at Lalor Lake
10/16/2007First Half 2007 Exploration Update
8/23/2007Confirms No Investments in Asset-Backed Commercial Paper
6/1/2007President & CEO Peter R. Jones to Appear on BNN TV
5/24/2007to Hold Annual & Special Meeting of Shareholders
5/2/2007Renews Shareholder Rights Plan
3/3/2007Second half exploration update
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (HBM.TO)NYSE (HBM)
7.89-0.88%7.66-0.78%
TORONTO
CA$ 7.89
05/17 16:00 -0.070
-0.88%
Prev close Open
7.96 7.90
Low High
7.86 8.01
Year l/h YTD var.
7.62 -  12.03 -25.21%
52 week l/h 52 week var.
7.49 -  12.03 -5.85%
Volume 1 month var.
339,111 -0.630%
24hGold TrendPower© : -34
Produces Copper - Gold - Silver - Zinc
Develops
Explores for Copper - Gold - Lead - Molybdenum - Nickel - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-21.65%
20120.00%9.9210.03
2011-41.93%9.8410.10
201035.15%19.0810.13
2009288.79%9.3611.12
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Get Investor Information
High Desert Gold
Select
& click