Osisko Mining Corp.

Published : January 26th, 2009

Announces Inferred Resource Estimate for South Barnat Deposit

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Debt | Gold | Gold Production | Lead | Market | Recovery |

Osisko Announces Inferred Resource Estimate for South Barnat Deposit

(Montreal, January 26, 2009)  Osisko Mining Corp. (OSK:TSX, EWX: Deutsche Boerse) is pleased to announce a National Instrument 43-101 compliant inferred resource estimate on the western portion of the South Barnat Deposit, located on its 100%-owned Canadian Malartic property in the Abitibi region of Quebec, Canada.  South Barnat is a separate gold deposit contiguous to the Company�s Canadian Malartic deposit, which currently hosts a 6.28 million ounce gold reserve (see November 25, 2008 press release).

Belzile Solutions Inc. of Rouyn-Noranda, Quebec ("BSI"), independent resource estimate consultants for Osisko, has authorized the release of the following estimates.  BSI has estimated a global inferred resource of 1.81 million ounces of gold at an average grade of 2.12 g/t based on a lower cut-off grade of 1.00 g/t Au, and a global inferred resource of 2.03 million ounces of gold at an average grade of 1.74 g/t based on a lower cut-off grade of 0.36 g/t Au.  The table below summarizes results of the estimates using different lower cut-off grades:

South Barnat Deposit global Inferred Resource Estimates

Grade (g/t)

Tonnes   (M)

Lower Cut-off (g/t)

Ounces Au  (M)

2.12

26.5

1.00

1.81

2.04

28.4

0.90

1.86

1.98

30.0

0.80

1.91

1.93

31.4

0.70

1.94

1.87

32.9

0.60

1.97

1.81

34.4

0.50

2.00

1.75

35.9

0.40

2.02

1.74

36.3

0.36

2.03

1.71

36.9

0.30

2.03


South Barnat infill drilling on 25 metre centres is continuing and is expected to be completed by the end of February.  The Company expects this infill drilling will allow the completion of additional resource work to determine a measured & indicated resource by Q2 of this year.

A global project total of 7.69 million ounces gold in the measured and indicated category (at an average grade of 1.03 g/t) and 2.75 million ounces gold in the inferred category (at an average grade of 1.05 g/t), at a lower cut-off of 0.36 g/t Au, is estimated from combining the South Barnat inferred resource with the previously published global resources on the Canadian Malartic deposit (see September 8, 2008 press release and NI 43-101 compliant report filed on SEDAR), as shown in the following table:

Canadian Malartic project global resource estimates (0.36 g/t Au lower cut-off)

 

Total  Measured+Ind*

Inferred

Deposit

Grade (g/t)

Tonnes (M)

Ounces Au (M)

Grade (g/t)

Tonnes (M)

Ounces Au (M)

Canadian Malartic

1.03

232.2

7.69

0.60

37.4

0.72

South Barnat

0.00

0.00

0.00

1.74

36.3

2.03

Total

1.03

232.2

7.69

1.05

73.7

2.75

* The Measured and Indicated resource includes the reserve of 6.28 M ounces gold released in the
Feasibility Study (see November 25, 2008 press release).

A significant higher grade resource totalling 4.98 million ounces gold in the measured and indicated category (at an average grade of 1.75 g/t) and 1.93 million ounces gold in the inferred category (at an average grade of 1.45 g/t) is estimated using a higher cut-off grade of 1.0 g/t Au, as shown in the following table:

Canadian Malartic project global resource estimates (1.00 g/t Au lower cut-off)

 

Total  Measured+Ind

Inferred

Deposit

Grade (g/t)

Tonnes (M)

Ounces Au (M)

Grade (g/t)

Tonnes (M)

Ounces Au (M)

Canadian Malartic

1.75

88.4

4.98

1.45

2.49

0.12

South Barnat

0.00

0.00

0.00

2.12

26.5

1.81

Total

1.75

88.4

4.98

2.07

29.0

1.93


Sean Roosen, President of Osisko, commented: �We are extremely pleased with the inferred resource reported today on South Barnat, as it has exceeded our expectations and offers an opportunity for our shareholders to benefit from a significantly higher grade deposit.  At 1.74 g/t Au overall grade, this represents a 69% higher grade resource than the overall grade of the main Canadian Malartic deposit.  At a higher cut-off of 1 g/t, we are looking at the potential for a higher grade overall project resource of over 100 million tonnes grading 1.8 g/t gold.

South Barnat is located less than 200 metres away from the Canadian Malartic engineered pit, and presents an opportunity for Osisko to integrate higher grade feed into our milling schedule in the early years, at possibly higher average recoveries. Our mill has a processing capacity of 20M tonnes per year, and our current feasibility study indicates that we will process an average 618,000 o unces of gold per year based on a 1.07 g/t head grade.

It is important to note that for each 0.2 g/t Au increase we can achieve in the head grade to the mill, we add 120,000 to 125,000 ounces of additional annual gold production, as shown in the table below:

Grade

(g/t Au)

Mill Annual Production (kt)

Recovery

(%)

Annual Recovery

(oz gold)

1.1

20,075

85.9

610,000

1.3

20,075

87.2

731,000

1.5

20,075

88.4

856,000

We believe South Barnat significantly increases Osisko�s chances to become a low cost producer and to pay down project debt on a faster time line, assuming the higher grade South Barnat resource is converted to reserves.

Management expects that further work on South Barnat will convert most of the inferred resource to an in-pit Measured and Indicated resource, scheduled to be released by Q2 2009.  We currently have eight drills turning on the property, five of which are completing the infill drilling at Barnat, with other three aggressively exploring other significant targets on the property.�

Details on the parameters of the inferred resource estimates are as follows:

  • The database comprised a total of approximately 55,700 metres of drilling completed and assayed by Osisko as of the beginning of December 2008 on a 50 m x 25 m grid along an 855 metre strike length. 
  • The above-reported global resource estimates for the South Barnat deposit are not Whittle-pit constrained but were restricted above a true elevation of 0 metres, corresponding to a true depth of approximately 320 metres.  The system is open below this depth from section 350E to 855E and open along strike to the east. 
  • The resource estimate using the lower cutoff of 0.36 g/t Au will be emphasized for reporting purposes as this is the cut-off that was the in-pit cut-off used in the Feasibility Study completed on the adjacent Canadian Malartic deposit. 
  • Mineralization in the South Barnat Zone is located to the north and south of the old Barnat and East Malartic mine workings along the southern edge of the Cadillac fault, where they intersect the Sladen mine workings (Sladen extension of the Canadian Malartic deposit). The disseminated/stockwork gold mineralization comprises multiple subvertical, tabular subzones striking northwest-southeast. These comprise silicified greywackes of the Pontiac Group south of the fault contact. North of the fault, mineralization is mostly hosted in potassic-altered porphyry dykes, but also in schistose, altered (carbonate-biotite) serpentinites. Porphyry dykes also host late quartz veins containing visible gold. The geological model for the South Barnat resource estimate comprises seven domains, with 89 percent of the resource being hosted by two main domains (Sladen extension south of the fault and porphyry dyke swarm north of the fault). 
  • The estimates were done using Ordinary Kriging (OK) as the geostatistical interpolation method, based on 5.0 meter analytical composites.  Resources were also estimated using Inverse Distance Squared (ID2) interpolation, which produced similar resources that were 1.0 to 1.2 percent lower than the OK method, depending on the cut-off used. 
  • All estimates are based on a Parent Cell dimension of 20 metres E, 10 metres N and 10 metres height with estimation parameters determined by variography.
  • High assays were cut based on the statistics of the original 1.5 metre samples. High assay cut-offs vary from none to a maximum of 30 g/t depending of the domains. This resulted in an approximate 6.7 percent reduction in the overall gold content.
  • Underground void models for Sladen, Barnat and East Malartic mine workings were generated from digitization of historical mine sections and were adjusted according to position of drill interceptions in stopes and drifts.  Furthermore, void volumes of stopes were increased by one meter along all edges to compensate for uncertainties. The void models were then used to deplete the resource block model.
  • Tonnage estimates are based on rock densities of 2.69 tonnes/cubic metre for the porphyry, 2.75 for altered sediments and 2.90 for altered ultramafic rocks.

Osisko Mining Corp. is currently developing the Canadian Malartic gold deposit and adjacent mineralized zones into a large-scale open pit, bulk-tonnage mining operation. The Company is well-funded and is carrying out an aggressive definition drilling and exploration campaign. Eight drills are currently working on the property, with five dedicated to completing the 130,000 metre infill drilling on the South Barnat Zone by mid-February.

A NI 43-101 compliant, 7.7 million ounce gold Measured and Indicated global resource on the main Canadian Malartic gold deposit was released on September 8, 2008 and has been filed on SEDAR.  A NI 43-101 compliant, 6.3 million ounce gold Reserve estimate and Feasibility Study on the main Canadian Malartic gold deposit was released on November 25, 2008 and has been filed on SEDAR. These estimates did not include the South Barnat Zone or any other mineralized zone located outside the main deposit that is currently bein g evaluated by Osisko. The inferred resource estimate for South Barnat is not known to be materially affected by any environmental, legal, title, taxation, socio-political, marketing or other relevant issues.

Mr. Elz�ar Belzile, P. Eng. and Mr. Robert Wares, P. Geo. and Executive Vice-President of Osisko, are the Qualified Persons who have reviewed this news release and are responsible for the technical information reported herein, including verification of the data disclosed including the sampling, analytical and test data underlying the technical information.

Conference Call
Osisko will host a conference call on Monday, January 26 at 2:00 PM EST where senior management will discuss the Study and will be available to respond to questions from analysts and investors. Those interested in participating in the conference call should dial in at 647-426-1845 (Toronto local and international), or 1-866-782-8903 (North American toll free). An operator will direct participants to the call.

Cautionary Notes Concerning Estimates of Mineral Resources

This news release uses the terms measured, indicated and inferred resources as a relative measure of the level of confidence in the resource estimate. Readers are cautioned that the South Barnat mineral resources are not economic mineral reserves and that the economic viability of resources that are not mineral reserves has not been demonstrated. In addition, inferred resources are considered too geologically speculative to have any economic considerations applied to them. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies or economic studies except for Preliminary Assessment as defined under NI 43-101. Readers are cautioned not to assume that that further work will lead to mineral reserves that can be mined economically.

Forward Looking Statements
Certain statements contained in this press release may be deemed �forward-looking statements�. All statements in this release, other than statements of historical fact, that address events or developments that the Corporation expects to occur, are forward looking statements.  Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words �expects�, �plans�, �anticipates�, �believes�, �intends�, �estimates�, �projects�, �potential�, �scheduled� and similar expressions, or that events or conditions �will�, �would�, �may�, �could� or �should� occur.  Although the Corporation believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, including, without limitation that all technical, economical and financial conditions will be met in order to put the Canadian Malartic Project into commercial production, such stateme nts are not guarantees of future performance and actual results may differ materially from those in forward looking statements.  Factors that could cause the actual results to differ materially from those in forward-looking statements include gold prices, access to skilled consultants, mining development and mill production personnel, results of exploration and development activities, the Corporation�s limited experience with production and development stage mining operations, uninsured risks, regulatory changes, defects in title, availability of personnel, materials and equipment, timeliness of government approvals, actual performance of facilities, equipment and processes relative to specifications and expectations, unanticipated environmental impacts on operations market prices, continued availability of capital and financing and general economic, market or business conditions.  These factors are discussed in greater detail in the Corporation�s most recent Annua l Information Form filed on SEDAR, which also provides additional general assumptions in connection with these statements.  The Corporation cautions that the foregoing list of important factors is not exhaustive.  Investors and others who base themselves on the Corporation�s forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail.  The Corporation believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon.  These statements speak only as of the date of this press release.

CONTACT INFORMATION:

Osisko Mining Corporation

John Burzynski
Vice-President Corporate Development
514-735-7131

or

Osisko Mining Corporation
Daniel Boase
Investor Relations
416-742-5600
Toll Free: 1-866-580-8891
www.osisko.com

Renmark Financial Communications Inc.
Eric St-Pierre : estpierre@renmarkfinancial.com
Ryan van de Polder : rvandepolder@renmarkfinancial.com
Montreal - Tel.: 514 939-3989 / Fax: 514 939-3717
Toronto - Tel.: 416 644-2020 / Fax: 416 644-2021
www.renmarkfinancial.com

<
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Osisko Mining Corp.

PRODUCER
CODE : OSK.TO
ISIN : CA6882781009
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Osisko Mining is a gold producing company based in Canada.

Osisko Mining holds various exploration projects in Argentina, in Brazil and in Canada.

Its main asset in production is MALARTIC in Canada and its main exploration properties are GOLDBORO, SLEITAT, JC - SMART SKARNS, HAMMOND REEF, MALARTIC CHL GOLD PROPERTY, DUPARQUET and CLEMENT LAKE in Canada, EL POTOSI and SANTA CLARA / CERRO BONITO in El Salvador, CERRO CONDORINI and COAL CREEK in Peru, CASTELO DOS SONHOS in Brazil and FAMATINA in Argentina.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Osisko Mining Corp.
12/20/2018Osisko Mining reports 39% higher grade than resource model a...
Annual reports of Osisko Mining Corp.
2008 Annual report
Financings of Osisko Mining Corp.
8/31/2011Osisko Announces an Increase in Caterpillar Lease Financing ...
8/31/2011Announces an Increase in Caterpillar Lease Financing Facilit...
11/18/2009Strengthens Balance Sheet With $241 M Proceeds From Exercise...
6/30/2009Closes $10.64 Million Flow-Through Financing
4/17/2006Announces C10$ million "bought deal" financing
Nominations of Osisko Mining Corp.
5/10/2013Anounces Election of Directors
4/17/2012Nominates Michele Darling to Board of Directors
3/14/2012Appoints Gary Sugar to Board of Directors
2/2/2012Board Member Resigns
9/16/2011Osisko Appoints Richard Ross to Board of Directors
9/15/2011Appoints Richard Ross to Board of Directors
8/22/2011Director Resigns
Financials of Osisko Mining Corp.
2/14/2014Provides Notice of Fourth Quarter and Year End 2013 Results ...
8/1/2013Reports Second Quarter 2013 Results
7/15/2013Provides Notice of Second Quarter 2013 Operating and Financi...
5/9/2013Reports First Quarter 2013 Results
4/29/2013Provides Notice of First Quarter 2013 Financial Results Rele...
2/21/2013Reports Fourth Quarter and Year-End 2012 Results
11/13/2012Reports Third Quarter 2012 Results
7/5/2012Produces 92,003 Ounces Au in Second Quarter
5/9/2012Provides Notice of First Quarter 2012 Financial Results Rele...
2/27/2012Q4 2011 Net Profit of $37.8 Million
1/16/2012Provides Notice of Fourth Quarter and Year-End 2011 Financia...
8/11/2011Releases Second Quarter 2011 Results
5/16/2011Osisko Releases First Quarter 2011 Results
5/14/2011Osisko Releases First Quarter 2011 Results
2/28/2011Releases Year-End Financial Results and Review of 2010
11/6/2009Releases Third Quarter 2009 Results
8/11/2009Releases Second Quarter 2009 Results
Project news of Osisko Mining Corp.
7/26/2017OSK Osisko Mining drills 2.7 m of 57 g/t Au at Windfall
2/21/2014Intersects 2.26 g/t Gold Over 128 Metres at Kirkland Lake
2/7/2014(Malartic)Commences 2014 Canadian Malartic Exploration Program
2/6/2014(Malartic)Reports Record January Production at Canadian Malartic
12/4/2013Intersects 61.6 Metres Averaging 1.44 g/t Au at Bidgood
11/21/2013(Malartic)Canadian Malartic Mine Produces Millionth Ounce
10/23/2013GLOBAL'S NEVADA PROJECTS ATTRACT STRONG THIRD PARTY INTEREST...
7/10/2013(Malartic)Deposits Study Reporting Local and Regional Economic Impact ...
1/30/2013Intersects 5.5 g/t Au Over 54.0 Metres at Upper Beaver
12/10/2012(Malartic)Reports November Production From Canadian Malartic
11/12/2012Announces Friendly Acquisition of Queenston
10/11/2012(Malartic)Canadian Malartic Mine Produces Half Millionth Ounce
10/10/2012(Malartic)Reports Record Quarterly Production from Canadian Malartic
9/6/2012(Malartic)Reports Record Monthly Production from Canadian Malartic
7/26/2012Acquires Common Shares of Bowmore Exploration Ltd=2E
5/17/2012(Malartic)Canadian Malartic Mill Returns to Operation
5/10/2012(Malartic)Reports Fire Damage at Canadian Malartic Mill Limited to Cyc...
1/30/2012(Famatina)s Status of Famatina Exploration Project
12/22/2011and DIOS Discover New Gold Showings on the AU33 WEST Project
11/28/2011TSX.V Company Adjacent to Osisko Property - 3 Minute Video
9/29/2011(Goldboro)Orex to Pursue Exploration Work on Goldboro Gold Project
9/8/2011(Malartic)Intersects 1.23 g/t Au Over 172 Metres at Barnat Extension
8/31/2011Osisko and EMSE Sign Agreement for Development of Famatina P...
8/31/2011(Famatina)and EMSE Sign Agreement for Development of Famatina Project ...
8/11/2011(Goldboro)Goldboro Gold Project Drill Assay Results Identify Extension...
8/5/2011Osisko Buys Back a 1% Royalty Interest on Canadian Malartic ...
8/5/2011(Malartic)Buys Back a 1% Royalty Interest on Canadian Malartic Propert...
6/21/2011Osisko Declares Commercial Production at Canadian Malartic
6/21/2011(Malartic)Declares Commercial Production at Canadian Malartic
6/17/2011Osisko Submits Notice of Termination in Duparquet Project
6/17/2011(Duparquet)Submits Notice of Termination in Duparquet Project
6/14/2011(Malartic)Intersects 1.50 g/t Au Over 63.6 Metres at Jeffrey Zone
6/13/2011(Duparquet)et Clifton Star annoncent une estimation de ressources pour ...
6/13/2011(Duparquet)and Clifton Star Release Resource Estimate for the Beattie D...
6/1/2011(Malartic)Officially Inaugurates the Canadian Malartic Mine
6/1/2011Osisko Officially Inaugurates the Canadian Malartic Mine
5/2/2011(Malartic)Announces Revised Mine Production Plan at Canadian Malartic
4/21/2011(Goldboro)Orex Exploration Inc.: Drilling Campaign Has Begun at Goldbo...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/13/2011(Malartic)Pours First Gold at Canadian Malartic Mine
3/31/2011(Malartic)Increases Gold Reserve at Canadian Malartic to 10=2E7 Millio...
3/29/2011(Malartic)Exercises Buy Out Option in Canadian Malartic Net Smelter Ro...
2/28/2011(Malartic) Découverte de minéralisation de type Canadian Malartic
2/24/2011(Hammond Reef)Reports 124 Metres Averaging 0.73 g/t Au in Southeast Extens...
1/29/2011(Malartic)Osisko Reports Significant New Intersections at Barnat Exten...
1/25/2011(Malartic)Reports Significant New Intersections at Barnat Extension, I...
12/21/2009(Malartic)Provides Update on Construction and Development Progress at ...
12/14/2009(Malartic)Releases New Resource Estimate for Canadian Malartic Project
10/20/2009(Malartic) Intersects New Gold Mineralization on the Malartic CHL Prop...
9/14/2009(Malartic)Intersects 1.20 g/t Au Over 86.9 Metres at Jeffrey Zone
9/1/2009(Malartic)Osisko Mining Corporation: Construction Activities at Canadi...
8/20/2009(Malartic)Quebec Government Authorizes Construction of Osisko's Canadi...
2/26/2009(Malartic) Preliminary Metallurgical Results on Barnat
1/26/2009(Malartic)Announces Inferred Resource Estimate for South Barnat Deposi...
12/3/2008(Malartic) Intersects 102 Metres Averaging 3.21 g/t Au at South Barnat
Corporate news of Osisko Mining Corp.
2/13/2014Mails Letter to Shareholders Regarding Inadequate Goldcorp O...
2/5/2014Provides Corporate Update
1/29/2014Commences Legal Proceeding to Restrain Misuse of Confidentia...
1/29/2014Announces Filing and Mailing of Directors' Circular and Reco...
1/20/2014Reports Preliminary Fourth Quarter 2013 Production
1/15/2014Responds to Unsolicited Proposal From Goldcorp Inc=2E
1/13/2014Responds to Announcement by Goldcorp
12/16/2013Completes Long-Term Debt Renegotiation
10/24/2013Provides Notice of Third Quarter 2013 Operating and Financia...
7/30/2013Enhances Financial Flexibility by Improving Long-Term Debt T...
7/5/2013Intercepts 68 Metres Averaging 1=2E26 =?ISO-8859-1?Q?=20g/t=...
7/2/2013Receives Final $30 Million Payment from Kirkland Lake Gold
4/29/2013Corporate Update
4/17/2013Comments on Trading Activities
4/9/2013(Malartic)Previews Q1 2013 Canadian Malartic Operating Results
3/21/2013Discovers Two New Gold-Copper Zones at Upper Beaver
2/19/2013(Malartic)Receives Modified Operating Parameters at Canadian Malartic
2/19/2013(Malartic)s Reserves at Canadian Malartic
2/11/2013Denis Cimon Receives the 2013 Mineral Processor of the Year
1/29/2013(Hammond Reef)Provides Resource Update for Hammond Reef Project
1/24/2013(Malartic)Previews Q4 2012 Canadian Malartic Operating Results and 201...
11/12/2012(Malartic)Reports Record Monthly Throughput at Canadian Malartic
10/15/2012Founder Retires
10/9/2012Acquires Ground in Emerging Gold Belt in Mexico and Identifi...
10/3/2012Deposits the Second Tranche of itsFinancial Guarantee Coveri...
8/3/2012Secondary Crusher Installation Completed
7/24/2012Acquisition of Subscription Receipts of Druk Capital Partner...
5/16/2012Enhances Credit Agreement With CPPIB
5/14/2012(Malartic)Provides Update on Canadian Malartic
5/10/2012(Malartic)Reports Fire at Canadian Malartic Milling Plant
4/3/2012and Metis Nation of Ontario Sign Memorandum of Understanding
3/12/2012Brings First Half of Secondary Crusher Online
3/1/2012Announces Record Date for Annual Meeting
2/16/2012Canadian gold producer Osisko Mining Corporation joins Globa...
1/12/2012(Malartic)Previews Q4 2011 Canadian Malartic Operating Results
1/3/2012Responds to Below Market Price Offer for 5 Million Shares On...
12/14/2011Osisko Comments on Trading of Common Shares
12/14/2011Comments on Trading of Common Shares
10/8/2011President Sean Roosen Named Ernst & Young 2011 Quebec Entrep...
6/17/2011(Duparquet)met fin =E0 sa participation au projet Duparquet
6/13/2011Osisko and Clifton Star Release Resource Estimate for the Be...
5/14/2011Osisko publie ses r=E9sultats du premier trismestre de 2011
5/12/2011Annual and Special Meeting of Shareholders of Osisko Mining ...
4/29/2011Osisko Announces Revised Mine Production Plan at Canadian Ma...
3/29/2011Osisko Exercises Buy Out Option in Canadian Malartic Net Sme...
2/9/2011Goldcorp Sells Osisko Investment
12/22/2009Donates Shares to McGill University
12/11/2009and Clifton Star Complete Joint Venture Agreement on Duparqu...
11/13/2009Options Goldboro Gold Property From Orex Exploration
9/28/2009 Signs Option Agreement With Claim Post Resources for the Mo...
9/24/2009 Enters Into Financing Agreement With CPPIB Credit Investmen...
8/11/2009Signs Option Agreement With Midland Exploration for the Dunn...
7/10/2009Report on Osisko's Canadian Malartic Bape Hearings is Made P...
7/3/2009Osisko Mining Corporation Completes Strategic Investment
6/18/2009Comments on Trading of Common Shares
5/21/2009Discovers New Mineralized Zone Adjacent to South Barnat
5/19/2009Makes Strategic Investment
1/13/2009 Extends South Barnat to 1200 Metres Length
12/4/2008 Recognized for Strong Sustainability Performance
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (OSK.TO)FRANKFURT (EWX.F)
3.06+2.34%2.43-1.62%
TORONTO
CA$ 3.06
04/18 17:00 0.070
2.34%
Prev close Open
2.99 3.01
Low High
2.93 3.10
Year l/h YTD var.
2.42 -  3.06 10.87%
52 week l/h 52 week var.
2.36 -  3.92 -25.18%
Volume 1 month var.
993,206 9.29%
Produces Gold
Develops
Explores for Gold - Lead - Silver - Tin - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202412.09%
2023-22.00%4.532.64
2022-6.17%5.022.36
20210.81%3.972.33
2020-4.88%4.851.67
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.84+1.89%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-4.88%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :