Aurcana Corp.

Published : December 04th, 2014

Announces New Mineral Resource Estimate for the La Negra Mining Operation

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Aurcana Announces New Mineral Resource Estimate for the La Negra Mining Operation

Vancouver, BC, December 3, 2014 - Aurcana Corporation ("Aurcana" or the "Company") (TSXV: AUN, OTCQX: AUNFF) is pleased to announce an updated resource estimate for the La Negra Mine, the Company's silver, zinc, lead and copper mining operation located in the State of Queretaro, Mexico.

AMC Mining Consultants (Canada) Limited ("AMC"), an independent mining consulting firm, has recently prepared a new mineral resource estimate (the �Estimate�) for the Company's La Negra mine. The Estimate is based on 14,578 assays comprised of 4,074 drillhole samples, 8,674 channel samples, and 1,829 longhole samples obtained by Minera La Negra S.A. de C.V. (a subsidiary of Aurcana) during the period from 2006 through to 2014, and by Industriales Pe�oles S.A. de C.V. from 1967 to 2000. A summary of the Estimate is tabulated below:


MEASURED AND INDICATED RESOURCES FOR ALL DEPOSITS AND ALL BLOCKS WITH A MINIMUM |
RECOVERED VALUE OF US$30 AS OF SEPTEMBER 30, 2014


Classification
Tonnes
Silver
 (g/t)
Copper
(%)
Lead
 (%)
Zinc
 (%)
Silver Equivalent (g/t)
Measured
1,977,000
107
0.61
0.50
2.23
203
Indicated
2,748,000
54
0.45
0.22
1.04
110
 
Measured plus Indicated
4,724,000
76
0.52
0.34
1.54
149

 

Classification
In Situ Metal Quantities
Silver
 (oz.)
Copper
 (lb.)
Lead
(lb.)
Zinc
 (lb.)
Silver Equivalent
(ounces)
Measured
6,821,600
26,777,200
21,869,800
97,347,600
12,907,200
Indicated
4,758,400
27,439,800
13,119,000
63,111,100
9,700,400
Measured plus Indicated
11,577,700
54,205,800
34,982,000
160,427,200
22,607,600

Ounces and pounds of in situ metal are calculated using only resource blocks with a recovered value of US$30 or greater, which corresponds generally with the $32/tonne operating cost provided by Aurcana for the La Negra Mine from January to October 2014. Metal prices and recoveries used for value and silver equivalent estimates are: Silver - $21.50/83%; Copper - $3.10/75%; Lead - $0.95/78%; Zinc - $1.00/80%. Silver equivalence is calculated using the following formula:

Silver equivalent=[((grade silver g/t)x((US$price silver /Troy Ounce)/31.10348)x(recovery of silver))+((grade copper %)x(US$price of copper/poundx22.046)x(recovery of copper))+((grade lead %)x(US$price of lead/poundx22.046)x(recovery of lead))+ ((grade zinc %)x(US$price of zincpoundx22.046)x(recovery of zinc))] divided by the price of silver/ounce to calculate silver equivalent in ounces, or by the price of silver in grams to calculate gram equivalency.

 

INFERRED RESOURCES FOR ALL DEPOSITS AND ALL BLOCKS WITH A MINIMUM RECOVERED VALUE OF US$30 PER TONNE


Classification
Tonnes
Silver
 (g/t)
Copper
(%)
Lead
(%)
Zinc
(%)
Silver Equivalent Grade (g/t)
Silver Equivalent Ounces
Inferred
642,000
55
0.55
0.18
1.54
130
2,676,800

Notes:

  1. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the estimated Mineral Resources will be converted into Mineral Reserves. The Estimate may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues. La Negra is a producing mine; key risk factors that may have an adverse effect on the continued development of the mineral resources estimated herein include Mexican taxation issues and metals prices.
  2. The Mineral Resources were estimated in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM"), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the Standards Committee on Reserve Definitions and adopted by the CIM Council on November 27, 2010.
  3. Mineral Resources tonnage and contained metal have been rounded: tonnes to the nearest 1,000; silver to the nearest gram; copper, lead and zinc to the nearest two decimal places, to reflect the accuracy of the estimate. Numbers may not add up due to rounding.

Three dimensional solid models of eleven mineralized zones were generated by Aurcana using SURPACTM geological software; the solids were then used to constrain the resource estimate for each mineral zone. Solid models of the underground workings were also provided by Aurcana and the workings were subtracted from the mineral zone solids used to estimate the quantities of resources.  Therefore the Mineral Resources (grades and tonnes) were estimated within the geological solid models with the workings extracted. The Estimate was created using DATAMINE Studio 3 software.

A block model was created to contain all eleven mineralized zones. Within individual zones the size of resource estimation blocks used do not exceed 5 x 5 x 5 metres and are not diluted.  The grades in the block model were estimated using ordinary kriging.

Qualified Persons & Technical Report

The Estimate has an effective date of September 30, 2014, meets the guidelines and form as set out in National Instrument 43-101 � Standards of Disclosure for Mineral Projects (�NI 43-101�) and CIM standards, and was prepared for Aurcana by AMC. The resource estimation was undertaken by Greg Z. Mosher, P.Geo of AMC, a qualified person as defined under NI 43-101 reporting requirements. Mr. Mosher has consented to applicable disclosure contained herein regarding the Estimate. Mr. Mosher is independent of Aurcana and its subsidiary companies.

AMC is currently preparing a Technical Report in support of the Estimate.. This report will be filed by the company in its entirety on SEDAR (www.sedar.com) within 45 days of the date of this news release.

About Aurcana's La Negra Mine

The La Negra mine was discovered and developed by Industriales Pe�oles S.A. de C.V (�Pe�oles�). The mine commenced production in 1970 as an underground operation and produced at 800 tonnes per day (�tpd�) until the mine was put on care and maintenance in 2000. During this 30-year period Pe�oles mined approximately 6,600,000 tonnes of ore producing 36 million ounces of silver, 323 million pounds of zinc, 70 million pounds of copper, and 161 million pounds of lead. In 2006 Aurcana Corporation acquired an initial 80% joint venture interest in the property, subsequently increasing its interest to 99.86%. La Negra was placed back into production June 1, 2007 by Aurcana at a rate of 1,000 tpd.

  • Between June 1, 2007 and December 31, 2013 Aurcana mined 3,226,000 tonnes grading 73 g/t silver, 1.27% zinc, 0.37% lead and 0.49% copper at the La Negra Mine.
  • In the first nine months of 2014 725,388 tonnes were milled at the La Negra mine producing 1,102,222 ounces of silver and 26,126 tonnes of copper, lead and zinc concentrates.
  • Since 2007 Aurcana has mined in excess of three times the estimated tonnage of the mineral inventory as calculated by Pe�oles prior to the time of Aurcana�s acquisition of the La Negra Mine and as of this current resource estimate continues to extend the potential mine life as a result of successful in-mine exploration. Approximately 35% of production at the La Negra Mine comes from outside the areas included in the last mineral resource estimate on the La Negra Mine, which was prepared on behalf of Aurcana in 2012.
  • Mineralization occurs as mantos or chimneys within skarn developed along the contact between diorite intrusions and Lower Cretaceous limestone strata. Individual mantos vary in size with dimensions ranging from 40 meters to 300 meters long, from 0.50 meters to 40 meters thick and up to 300 metres in height.

The Company�s management believes that the opportunity to find and develop new zones of mineralization at La Negra is excellent. The new three-dimensional models prepared in connection with the Estimate serve the purpose of not only constraining resource block models but also highlights unexplored gaps between existing mantos and obvious mineralized trends. Thus far five exploration targets have been flagged for further drilling, all within 200 metres of existing underground workings. These near-term targets mesh well with La Negra�s large, 82,000 hectare property position in the region, known to host similar rock types and structures as are found at La Negra. As metal prices and operating margins improve these brownfields and greenfields exploration opportunities will allow the resumption of aggressive exploration.

Kevin Drover, President and CEO, comments: �This new mineral resource estimate completed by AMC provides Aurcana with a critical tool necessary to plan the mining sequence effectively and efficiently. This new Estimate more precisely represents grade distribution and continuity within the mine area. The model will support life-of-mine planning with the selectivity required to manage grade control and mining-rates that are in-keeping with our operational experience of the past six years.�

The technical information contained in this news release has been reviewed by Jerry Blackwell, P.Geo, a Director and technical advisor of the Company. Mr. Blackwell is a Qualified Person ("QP") as defined by NI 43-101.


Corporate

The Company's shares are also traded in the United States on OTCQX under the symbol "AUNFF". Investors can find current financial disclosure and Real-Time Level 2 quotes for the Company on www.otcqx.com and www.otcmarkets.com.

ON BEHALF OF THE BOARD OF DIRECTORS OF
AURCANA CORPORATION

�Kevin Drover�, President & CEO

For further information, visit the website at www.aurcana.com or contact:

Aurcana Corporation 
Phone: (604) 331-9333 
Toll Free: (866) 532-9333
Fax: (604) 633-9179 

Gary Lindsey, Corporate Relations
Phone: (720)-273-6224
Email: gary@strata-star.com

NR-17-14

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains certain forward-looking statements, including statements regarding forecast silver production, silver and other metal grades, recoveries, potential mineralization, exploration result, future plans and objectives of the Company and the business and anticipated financial performance of the Company. These statements are forward-looking statements that involve various risks and uncertainties. These forward-looking statements include, but are not limited to, statements with respect to mining and processing of mined ore, achieving projected recovery rates, anticipated production rates and mine life, operating efficiencies, costs and expenditures, changes in mineral resources and conversion of mineral resources to proven and probable reserves, and other information that is based on forecasts of future operational or financial results, estimates of amounts not yet determinable and assumptions of management. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects" or does not expect", "is expected", anticipates" or "does not anticipate" "plans", "estimates" or "intends" or stating that certain actions, events or results " may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and may be "forward-looking statements". Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to materially differ from those reflected in the forward-looking statements. 

Actual results may differ materially from results contemplated by the forward-looking statements. Important factors that could differ materially from the Company's expectations include, among others, risks related to international operations, unsuccessful exploration results, conclusions of economic evaluations and changes in project parameters as plans continue to be refined as well as changes in metal prices, changes in the availability of funding for mineral exploration and development, unanticipated changes in key management personnel and general economic conditions. When relying on forward-looking statements to make decisions, investors and others should carefully consider the foregoing factors and other uncertainties and should not place undue reliance on such forward-looking statements. The Company does not undertake to update any forward-looking statements, oral or written, made by itself or on its behalf, except as required by applicable law. Accordingly, readers should not place undue reliance on forward-looking statements.



 

This message was sent by Aurcana.  You may contact Aurcana at:
Suite 1750, 1188 West Georgia Street Vancouver,
British Columbia, Canada, V6E 4A2
604.331.9333
Info@aurcana.com

Data and Statistics for these countries : Canada | Georgia | Mexico | All
Gold and Silver Prices for these countries : Canada | Georgia | Mexico | All

Aurcana Corp.

PRODUCER
CODE : AUN.V
ISIN : CA0519185064
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Aurcana is a silver development stage company based in Canada.

Aurcana produces silver, copper, lead and zinc in Mexico, and holds various exploration projects in Mexico.

Its main assets in production are LA NEGRA and SHAFTER in Mexico.

Aurcana is listed in Canada and in United States of America. Its market capitalisation is CA$ 1.7 millions as of today (US$ 1.4 millions, € 1.2 millions).

Its stock quote reached its highest recent level on October 31, 1997 at CA$ 9.92, and its lowest recent point on November 11, 2022 at CA$ 0.01.

Aurcana has 84 740 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Aurcana Corp.
1/7/2010Aurcana Corp. (Tsxv: Aun): New Recommendation
Annual reports of Aurcana Corp.
2008 Annual Report
2007 Annual Report
Financings of Aurcana Corp.
6/20/2014Closes $5,060,000 Equity Financing
6/14/2013Amends Warrants Expiring June 30, 2013
7/23/2010Closes Non-Brokered Private Placement
6/24/2010To Conduct A Best Efforts Non-Brokered Private Placement
11/30/2009Closes Non-Brokered Financing For CDN$2,549,300
Option Grants of Aurcana Corp.
1/19/2009(Shafter)reports 350,000 stock options at a price of $0.13
Nominations of Aurcana Corp.
11/20/2013Appoints New Board Member
9/25/2013Appoints Andrew Kaczmarek as Interim COO
2/13/2013Announces Appointment of New Board Member
2/22/2011Adds Paul Matysek to the Board of Directors and Strengthens ...
7/6/2010Appoints Director
5/18/2010Appoints Chief Financial Officer
3/4/2010Appoints Financial Advisor
5/21/2009Appoints Lenic Rodriguez President and CEO
12/18/2008Appointment of Director
5/16/2008Appoints Vice President of Operations
Financials of Aurcana Corp.
11/28/2013Announces Date for Q3 2013 Financial Results Webcast and Tel...
8/30/2013Reports Q2 2013 Financial Results and Provides Update
8/23/2013Announces New Date for Q2 2013 Financial Results Webcast and...
7/25/2013Announces Q2 2013 Financial Results Webcast and Teleconferen...
5/13/2013Announces Q1 2013 Financial Results Webcast and Teleconferen...
4/12/2013Reports Year End Financial Results and Provides Operational ...
3/28/2013Announces Year End Financial Results and Operational Update ...
6/27/2011RETRANSMISSION: Aurcana Reports Record 1st Quarter Results
5/9/2011Reports Record 2010 Results
12/2/2009Reports Positive Third Quarter Results
9/3/2009Reports Positive Second Quarter Results
12/3/2008Reports Third Quarter Results
9/5/2008Reports Second Quarter Results
5/2/2008Files Annual Statements La Negra Mine Records Profit in Four...
Project news of Aurcana Corp.
4/3/2013(Shafter)Shafter 2012 Exploration Program Identifies Evidence for a L...
2/11/2013(La Negra)New Discoveries at Aurcana's La Negra Mine Indicates the Pre...
2/5/2013Bull & Bear's Resource Investor: Silver & Gold Forecasts; En...
1/24/2013(La Negra)La Negra Drill Hole Results Confirm High Grade Continuity in...
11/6/2012Bull & Bear's Resource Investor: Commodity Makets, Gold & Si...
7/11/2012(La Negra)Reports: Record Silver Production, up 54% at La Negra Mine; ...
3/31/2012(La Negra)to Commission Plant at Shafter Mine and Completes Mine Expan...
12/14/2011(La Negra)Discovers New Silver Mineralization at Depth at La Negra Min...
4/8/2011(La Negra)Announces Record Silver Production, La Negra Production Expa...
1/21/2011(Shafter)Commences Construction at Shafter Silver Mine
6/1/2010(La Negra)Expansion To 1,500 T/D At La Negra Mine Completed
2/16/2010(La Negra)NI 43-101 Report increases Maravillas Deposit Resources by 4...
6/30/2009(Shafter)Positive Pre-Feasibility for Shafter Silver Mine 7.75 Millio...
6/3/2009(La Negra)Takes Control of Operations at the La Negra Mine: Expansion ...
3/2/2009(Shafter)Scoping Study Upgraded to Pre-Feasibility: Consultant Hired ...
11/20/2008(La Negra)Shafter Silver Mine Timeline and Update; Additional Operatio...
7/31/2008(Shafter)47.4 Million Ounce Silver Resource at Shafter Silver Mine Co...
7/17/2008(Shafter)Finalizes Acquisition of Shafter Silver Mine
4/11/2008(La Negra) Intersects 8.15 Metres of 420 Grams per Tonne Silver and 1....
3/19/2008(La Negra) Adds Over 500,000 Tonnes In Monica Zone
Corporate news of Aurcana Corp.
5/2/2016Aurcana Files 2015 Annual Financial Statements
1/8/2016Aurcana Corporation Announces Completion of Restructuring Tr...
1/7/2016Aurcana Corporation Announces Completion of Restructuring Tr...
1/5/2016Aurcana Voluntarily Delists From OTCQX
12/18/2015Aurcana Corporation Update on Restructuring Transaction
12/1/2015Aurcana Reports Q3 2015 Financials And Provides Update on Re...
11/30/2015Aurcana reports 3Q loss
10/30/2015Aurcana Corporation Announces Commencement of CBCA Proceedin...
10/19/2015Aurcana Production Results for Q3 2015
10/16/2015Aurcana Corporation Announces Restructuring Transaction and ...
8/14/2015Aurcana reports 2Q loss
8/14/2015Aurcana Reports Q2 2015 Financials.
8/14/2015Aurcana Reports Q2 2015 Financials
7/14/2015Change of Auditor
7/3/2015Change of Auditor
4/14/2015Aurcana Reports 2014 Financial Results
3/25/2015Notice regarding the Proposed Class Action Settlement
3/25/2015Notice regarding the Proposed Class Action Settlement (frenc...
2/10/2015Aurcana Announces Settlement of Class Action
1/13/2015Aurcana Delivers Highest Quarterly Production in History in ...
12/16/2014Aurcana Board Update
12/3/2014Aurcana Announces New Mineral Resource Estimate for the La N...
12/1/2014Aurcana Reports 3rd Quarter Financial Results
10/27/2014Aurcana Sets New Production Record in Third Quarter
10/27/2014Aurcana Sets New Production Record in Third Quarter
10/10/2014S&P Dow Jones Indices Announces Quarterly Review of S&P/TSX ...
8/29/2014Aurcana Reports Q2, 2014 Financial Results
7/17/2014Aurcana Appoints New Board Member
7/10/2014Aurcana Announces New President & CEO
6/9/2014Aurcana Reports Voting Results of Annual and Special Meeting
5/30/2014Aurcana Reports Q1, 2014 Financial Results
5/9/2014Aurcana Announces Completion of Issuance of Debt Settlement ...
5/1/2014Aurcana Reports 2013 Financial Results
5/1/2014Aurcana Announces Completion of Transactions Under Amended C...
4/30/2014IIROC Trading Resumption - AUN
4/29/2014IIROC Trading Halt - AUN
4/7/2014Aurcana Reports 55% Increase in Silver Equivalent for First ...
2/6/2014Reports Fourth Quarter and 2013 Production Results
11/4/2013(Shafter)Shafter Update - Aurcana Appoints David Drips General Manage...
10/31/2013Provides Update
10/21/2013Reports Third Quarter Production Results
9/30/2013Announces Departure of VP Operations
9/20/2013Closes $50 million Loan Facility
9/11/2013Announces $5,000,000 Bridge Loan
7/25/2013(Shafter)letter: Shafter's New Miners Training Program Featured on CB...
7/10/2013Provides Corporate Update
6/28/2013Announces $50 million Loan Facility
6/26/2013Reports Voting Results of Annual and Special Meeting
6/7/2013Files Amended Technical Report
5/23/2013(La Negra)Clarifies That La Negra Mineral Resource Estimate Remains U...
5/16/2013Adopts Advance Notice Policy
4/15/2013Announces Share Consolidation Effective Apr 30, 2013
3/28/2013Announces Shareholder Approval of Share Consolidation
2/13/2013Announces Proposed Share Consolidation
1/25/2013letter: Aurcana CEO invited at CNBC Asia to talk about futur...
1/17/2013Reports Fourth Quarter and 2012 Year to Date Production Resu...
10/24/2012Investors Newsletter
10/18/2012(La Negra)Reports: Record Quarter of Silver Production, up 54% at La N...
10/18/2012(La Negra)Reports: Record Quarter of Silver Production, Up 54% at La N...
10/12/2012letter
10/11/2012(La Negra)Files Technical Report on Updated Resource Estimate for La N...
8/28/2012(La Negra)Announces Updated Resource Estimate for La Negra Mine
8/20/2012Reports Record Results for Q2, 2012
6/6/2012(Shafter)Commences Open Pit Mining at Shafter
6/1/2012(Shafter)Intersects High Grades in Shafter Surface Drilling
5/25/2012Reports: Record 1st Quarter Results
4/26/2012(La Negra)Reports: Record Silver Production at La Negra Mine
4/16/2012Reports Record 2011 Results
3/25/2011-Amends Convertible Debenture Terms
6/16/2010Reports 54% Higher Revenues in Q1, 2010 Compared To Q1, 2009...
5/6/2010Reports $3.8M Net Earnings
4/24/2010Announces US$40,000,000 Silver Backed Unit Offering
4/22/20102010 "Virtual" World Money Show
12/4/2009Closes Sale of Rosario Project
9/17/20092009 AGM Invitation
8/18/2009La Negra Corporate Update
5/25/2009Sells Rosario To Focus On Shafter Development
8/22/2008Annual General Meeting Reminder
7/7/2008Receives US$25 Million - Shafter Silver Mine Acquisition to ...
5/21/2008Reports 145 g/t Silver and 1.96% Copper over 23.5 meters
4/7/20082008 Calgary Resource Investment Conference
4/3/2008 Acquires Near Term Silver Production Project
2/26/2008Aurcana Moves to Expand and Mine Higher Grades at La Negra
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (AUN.V)Other OTC (AUNFF)
0.020+33.33%0.010+0.00%
TSX-V
CA$ 0.020
08/01 10:30 0.010
33.33%
Prev close Open
0.015 0.020
Low High
0.020 0.020
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
0.020 -  0.020 33.33%
Volume 1 month var.
0 -%
24hGold TrendPower© : -3
Produces Copper - Lead - Silver - Zinc
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/12/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
20240.00%
202333.33%0.020.01
2022-96.30%0.420.01
2021-61.79%1.250.32
2020307.69%1.190.15
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :