Katanga Mining Announces Ore Reserves and Mineral Resources
Published : February 10, 2015
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Australia | Cobalt |

Katanga Mining Announces Ore Reserves and Mineral Resources

ZUG, SWITZERLAND, Feb. 10, 2015 /CNW/ - Katanga Mining Limited (TSX: KAT) ("Katanga" or the "Company") is pleased to announce its ore reserve and mineral resource estimates as at December 31, 2014.

Key Updates: Mineral Resources

  • Overall, the measured and indicated mineral resource for Kamoto Copper Company SA ("KCC") (in which the Company has a 75% interest) decreased by 4.9 million tonnes.
    • Changes in the measured mineral resource for KTO, KOV Open Pit and T17 Open Pit Mines is a decrease of 1.9 million tonnes at KTO, nil tonnes at KOV Open Pit and 0.1 million tonnes at T17 Open Pit based on the depletion of the mineral resource due to mining in 2014. 
    • Changes in the indicated mineral resource for KOV Open Pit is a decrease of 2.9 million tonnes based on the depletion of the mineral resource due to mining in 2014.
    • Changes in the inferred mineral resource for KOV Open Pit is a decrease of 0.5 million tonnes based on the depletion of the mineral resource due to mining in 2014.

 

  • There are no changes in the measured, indicated or inferred mineral resources reported for Mashamba East Open Pit Mine, Kananga Mine and Tilwezembe Open Pit Mine, as mining was not undertaken in these areas in 2014 and no geological work was done on these areas in 2014.

 

  • A reconciliation table comparing the 2013 and 2014 mineral resource estimates is set out in Annexure A.

Key Updates: Ore Reserves

  • The outcome of the December 31, 2014 ore reserve estimate is a net decrease of 6.9 million tonnes of ore reserves, the net decrease in reserve is based on 7.4 million tonnes being mined in 2014 and minor, short-term ore definition changes and pit design adjustments undertaken in 2014.
  • A reconciliation table comparing the 2013 and 2014 ore reserves is set out in Annexure B and the key mining parameters which inform the ore reserve estimates are set out in Annexure C

KATANGA MINING LIMITED
CONSOLIDATED ORE RESERVES
AND MINERAL RESOURCES 1, 2, 3, 4, 5, 6, 7, 8, 9
as at December 31, 2014

Ore Reserves

Mt

%TCu

%Tco

Proved

17.5

3.51

0.55

Probable

70.4

4.14

0.47

Proved & Probable

87.9

4.01

0.49





Mineral Resources




Measured

31.0

4.24

0.58

Indicated

241.5

3.94

0.45

Measured & Indicated

272.5

3.98

0.46

Inferred

168.2

2.41

0.31

 

More detailed ore reserve and mineral resource estimates are as follows:

KATANGA MINING LIMITED
PROVED AND PROBABLE ORE RESERVES 1, 2, 5, 6, 7, 9
as at December 31, 2014

Ore Reserves

Mt

%TCu

%TCo

KTO

27.0

3.50

0.54

T-17 Underground

11.3

3.65

0.62

Mashamba East Open Pit

5.9

3.00

0.36

KOV Open Pit

43.8

4.56

0.44

TOTAL

87.9

4.01

0.49

 

KATANGA MINING LIMITED
MEASURED AND INDICATED MINERAL RESOURCES 1, 2, 3, 4, 5, 6, 8, 9
as at December 31, 2014


Measured and Indicated Mineral Resources

Mt

%TCu

%TCo

KTO

59.7

4.65

0.58

Mashamba East Open Pit

75

1.8

0.38

T-17 Open Pit/T-17 Underground

13.6

3.89

0.61

KOV Open Pit/KOV Underground/KTE Underground

110.6

5.37

0.41

Kananga Mine

4.1

1.61

0.79

Tilwezembe Open Pit

9.5

1.89

0.6

TOTAL

272.5

3.98

0.46

 

KATANGA MINING LIMITED
INFERRED MINERAL RESOURCES 1, 2, 3, 4, 5, 6, 8, 9
as at December 31, 2014

Inferred Mineral Resources

Mt

%TCu

%TCo

KTO

11.0

5.00

0.59

Mashamba East Open Pit

65.3

0.76

0.10

T-17 Open Pit/T-17 Underground

5.2

4.21

0.98

KOV Open Pit/KOV Underground/KTE Underground

68.9

3.59

0.32

Kananga Mine

4.0

2.00

0.98

Tilwezembe Open Pit

13.8

1.75

0.60

TOTAL

168.2

2.41

0.31

Notes:


  1. The ore reserve and mineral resource estimates have been prepared in accordance with the classification criteria of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves prepared by the Joint Ore Reserves Committee of the Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia, as amended ("JORC Code").  If the definitions and classification standards adopted by the Canadian Securities Administrators' National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") had been used instead of those of the JORC Code, the estimates of mineral reserves and mineral resources would be substantially similar to the estimates of ore reserves and mineral resources presented here.
  2. The mineral resource estimates have been prepared by, or under the supervision of, Christiano Santos Goncalves, (MAusIMM CP (Geo) 306 079) and the ore reserve estimates have been prepared by, or under the supervision of, Jacobus Lotheringen, PrEng each of Golder Associates Africa Pty Ltd, who are each a qualified person under NI 43-101. 
  3. Mineral resources are inclusive of ore reserves.
  4. Mineral resources which are not ore reserves do not have demonstrated economic viability.
  5. For KTO, the ore reserve and mineral resource estimates are for KCC's entire interest in such ore reserves and mineral resources, whereas the Company owns 75% of KCC.  La Generale des Carrieres et des Mines and La Société Immobilière du Congo, state-owned mining companies in the Democratic Republic of Congo, own the remaining 25% of KCC. 
  6. Numbers may not add due to rounding.
  7. Unless otherwise noted, the Company's ore reserves are estimated using appropriate cut-off grades based on an assumed long term price of $6,500 per tonne of copper and long term price of $24,250 per tonne of cobalt. Ore reserves are estimated using appropriate process recoveries, operating costs and mine plans that are unique to each property and include estimated allowances for dilution and mining recovery.
  8. Unless otherwise noted, the Company's mineral resources are estimated using appropriate lithological interpretations, grade compositing and grade estimation techniques for copper and cobalt.
  9. The Company's normal data verification procedures have been used in collecting, compiling, interpreting and processing the data used to estimate ore reserves and mineral resources. Independent data verification has not been performed. However the data has been independently validated.

Qualified Person and Technical Report
This press release was prepared under the supervision of Tim Henderson, Technical Consultant, Katanga and a 'qualified person' as such term is defined in NI 43-101. Mr. Henderson has reviewed and approved the contents of this press release.

The Company's technical report entitled "An Independent Technical Report on the Material Assets of Katanga Mining Limited, Katanga Province, Democratic Republic of Congo" dated March 30, 2012 prepared by Golder Associates Africa (Pty) Ltd under the supervision of Mr. Willem van der Schyff as the "qualified person" is in compliance with NI 43-101 is filed under the Company's profile on SEDAR at www.sedar.com.

Cautionary Note to US Investors concerning estimates of Measured, Indicated and Inferred Mineral Resources
The above tables uses the terms "Measured, Indicated and Inferred Mineral Resources" using the ore reserves and mineral resource categories of the JORC Code.  We advise US investors that while these terms are recognized and required by Canadian regulations, the US Securities and Exchange Commission does not recognize them.  "Inferred mineral resources" have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility.  It cannot be assumed that all or any part of inferred mineral resources will ever be upgraded to a higher category.  In accordance with Canadian rules, estimates of inferred mineral resources cannot form the basis of feasibility or other economic studies.  US investors are cautioned not to assume that any part or all of the inferred mineral resource exists, or is economically or legally mineable.

About Katanga Mining Limited
Katanga Mining Limited operates a major mine complex in the Democratic Republic of Congo producing refined copper and cobalt. The Company has the potential to become Africa's largest copper producer and the world's largest cobalt producer. Katanga is listed on the Toronto Stock Exchange under the symbol KAT.

Forward Looking Statements
This press release may contain forward-looking statements, including, but not limited to, the depletion of ore reserves and mineral resources. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

All forward-looking statements reflect the Company's beliefs and assumptions based on information available at the time the statements were made. Actual results or events may differ from those predicted in these forward-looking statements. All of the Company's forward-looking statements are qualified by the assumptions that are stated or inherent in such forward-looking statements, including the assumptions listed below. Although the Company believes that these assumptions are reasonable, this list is not exhaustive of factors that may affect any of the forward-looking statements. The key assumptions that have been made in connection with the forward-looking statements include: there being no significant disruptions affecting the operations of the Company whether due to labour disruptions, supply disruptions, power disruptions, rollout of new equipment; damage to equipment or otherwise; permitting and development, being consistent with the Company's current expectations; continued recognition of the Company's mining concessions and other assets, rights, titles and interests in the Democratic Republic of Congo ("DRC"); political and legal developments in the DRC being consistent with its current expectations; prices for diesel, natural gas, fuel oil, electricity and other key supplies being approximately consistent with current levels; and labour and material costs increasing on a basis consistent with the Company's current expectations.

Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, the actual results of current exploration activities; actual results and interpretation of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of copper and cobalt; possible variations in ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of exploration, development or construction activities, delays due to strikes or other work stoppage, both internal and external to the Company, as well as those factors disclosed in the Company's current annual information form and other publicly filed documents. Although Katanga has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events, or otherwise, except in accordance with applicable securities laws.


Annexure A

Katanga Mining Limited Mineral Resource Reconciliation at December 31, 2014

Classification

Project Area

2014

2013

Variance

Mt

%TCu

%TCo

Mt

%TCu

%TCo

Mt

Measured

KTO

26.8

4.48

0.59

28.7

4.41

0.58

(1.9)

Mashamba East Open Pit

0.0

0.00

0.00

0.0

0.00

0.00

0.0

T-17 Open Pit/T-17 Underground

4.2

2.66

0.51

4.3

2.68

0.52

(0.1)

KOV Open Pit/KOV Underground/KTE Underground

0.0

0.00

0.00

0.0

0.00

0.00

0.0

Kananga Mine

0.0

0.00

0.00

0.0

0.00

0.00

0.0

Tilwezembe Open Pit

0.0

0.00

0.00

0.0

0.00

0.00

0.0

Subtotal

31.0

4.24

0.58

33.0

4.18

0.57

(2.0)

Indicated

KTO

32.9

4.78

0.58

32.9

4.78

0.58

0.0

Mashamba East Open Pit

75.0

1.80

0.38

75.0

1.80

0.38

0.0

T-17 Open Pit/T-17 Underground

9.4

4.44

0.65

9.4

4.44

0.65

0.0

KOV Open Pit/KOV Underground/KTE Underground

110.6

5.37

0.41

113.5

5.41

0.42

(2.9)

Kananga Mine

4.1

1.61

0.79

4.1

1.61

0.79

0.0

Tilwezembe Open Pit

9.5

1.89

0.60

9.5

1.89

0.60

0.0

Subtotal

241.5

3.94

0.45

244.4

3.98

0.45

(2.9)

Measured and Indicated

KTO

59.7

4.65

0.58

61.6

4.61

0.58

(1.9)

Mashamba East Open Pit

75.0

1.80

0.38

75.0

1.80

0.38

0.0

T-17 Open Pit/T-17 Underground

13.6

3.89

0.61

13.7

3.89

0.61

(0.1)

KOV Open Pit/KOV Underground/KTE Underground

110.6

5.37

0.41

113.5

5.41

0.42

(2.9)

Kananga Mine

4.1

1.61

0.79

4.1

1.61

0.79

0.0

Tilwezembe Open Pit

9.5

1.89

0.60

9.5

1.89

0.60

0.0

TOTAL

272.5

3.98

0.46

277.4

4.00

0.47

(4.9)

Inferred

KTO

11.0

5.00

0.59

11.0

5.00

0.59

0.0

Mashamba East Open Pit

65.3

0.76

0.10

65.3

0.76

0.10

0.0

T-17 Open Pit/T-17 Underground

5.2

4.21

0.98

5.2

4.21

0.98

0.0

KOV Open Pit/KOV Underground/KTE Underground

68.9

3.59

0.32

69.4

3.58

0.32

(0.5)

Kananga Mine

4.0

2.00

0.98

4.0

2.00

0.98

0.0

Tilwezembe Open Pit

13.8

1.75

0.60

13.8

1.75

0.60

0.0

TOTAL

168.2

2.41

0.31

168.7

2.41

0.31

(0.5)

 

Annexure B

Katanga Mining Limited Ore Reserve Reconciliation as at December 31, 2014


Mining operation

December 31, 2014 Reserve Estimate

December 31, 2013 Reserve Estimate

Variance

Mt

%TCu

Mt

Mt

%TCu

%TCo

Mt

KTO

27.0

3.50

0.55

28.9

3.48

0.56

(1.9)

T-17 Underground

11.3

3.65

0.62

10.9

3.50

0.61

0.4

T-17 Open Pit

0.0

0.00

0.00

0.2

2.93

0.44

(0.2)

Mashamba East Open pit

5.9

3.00

0.36

5.9

3.00

0.36

0.0

KOV Open Pit

43.8

4.56

0.44

48.9

4.49

0.42

(5.1)

Total

87.9

4.01

0.49

94.8

3.97

0.48

(6.9)










Notes: See notes 1, 2, 5 to 7 and 9 on page 3 of this press release relating to ore reserve estimates.

Annexure C

Ore Reserve Estimation: Key Mining Parameters

Reference Mining Costs Open Pit (USD $/t)

3.54

Reference Mining Costs Underground (USD $/t)

60.98

Reference Oxide Ore Processing (USD $/t)

18.75

Reference Sulphide Ore Processing (USD $/t)

7.24

Reference Mining Metal Price for Cu (USD $/t)

6,500

Reference Mining Metal Price for Co (USD $/t)

24,250

Operation

Mining Dilutions

Mining and Pillar Losses

Geological Losses

Cut-off Grade (Cu)

Processing Recoveries (Cu)

Processing Recoveries (Co)

KTO

5% to 10%

18% to 45%

5%

1.50%

90.5%

76.6%

KOV

9%

0%

0%

0.68%

85%

65%

T17 Underground

7.8%

8%

8%

1.20%

85%

65%

T17 Open Pit

Converted to underground

Mashamba East

9%

39%

5%

0.60%

85%

65%

 

SOURCE Katanga Mining Limited

For further information: Jeff Best, CEO, Tel: +41 (041) 766 71 10; Jacques Lubbe, CFO, Tel:+41 (041) 766 71 10
Data and Statistics for these countries : Australia | Switzerland | All
Gold and Silver Prices for these countries : Australia | Switzerland | All

Katanga Mining Limited

PRODUCER
CODE : KAT.TO
ISIN : CA4858471077
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Katanga is a copper development stage company based in United kingdom.

Katanga produces copper, cobalt in Congo Dem. Rep. of, develops cobalt and copper in Congo Dem. Rep. of, and holds various exploration projects in Congo Dem. Rep. of.

Its main asset in production is KAMOTO UNDERGROUND in Congo Dem. Rep. of, its main assets in development are KINSEVERE and KOV in Congo Dem. Rep. of and its main exploration properties are MASHAMBA EAST, LAILU, GREENFIELD, KAMOTO CONCENTRATOR, KANANGA, MUSONOIE and KOLWEZI in Congo Dem. Rep. of.

Katanga is listed in Canada and in United States of America. Its market capitalisation is CA$ 295.6 millions as of today (US$ 220.0 millions, € 195.0 millions).

Its stock quote reached its highest recent level on March 02, 2007 at CA$ 9.98, and its lowest recent point on April 03, 2020 at CA$ 0.05.

Katanga has 1 907 380 413 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Katanga Mining Limited
2/21/2019Suspended cobalt sales, higher costs fuel Katanga's Q4 loss
12/18/2018Glencore's Katanga says it agreed settlement in Canadian pro...
12/13/2017Shares in Toronto-listed Katanga Mining surge 50% on Congo m...
11/21/2017Top Glencore executive quits Katanga board after accounting ...
4/10/2008Announces Agreement on Transfer of Mashamba West and Dikuluw...
Annual reports of Katanga Mining Limited
2007 Annual Report
Nominations of Katanga Mining Limited
9/25/2013appoints new Chief Operating Officer
9/22/2011Announces Appointment of New CEO
5/9/2011(KAT.TO) Press release: Katanga Mining appoints new COO
4/7/2011APPOINTS NEW CFO
12/22/2009Appointment of CEO
11/5/2009(KAT.TO) Press Release: KAT Announces Appointment of New Dir...
5/29/2007Appoints Agent for Copper and Cobalt Marketing
Financials of Katanga Mining Limited
11/14/2014Announces 2014 Third Quarter Financial Results, Commitment o...
8/8/2014announces 2014 second quarter financial results
5/9/2011(KAT.TO) Press release: Katanga Mining announces First Quart...
2/11/2011 Katanga Mining announces 2010 Fourth Quarter and Year End R...
8/6/2010Q2 Financial Results
2/10/20102009 Fourth Quarter and Year-End Resuls
5/19/2009(KAT.TO) Press Release: KAT Announces First Quarter Results
Project news of Katanga Mining Limited
3/8/20162 dead, 5 missing after landslide at Congo copper mine
6/8/2011(KAT.TO) Press release: Interest Payment on Katanga Notes
8/12/2008(Kamoto Underground)Project Update & 2Q 2008 Financials
12/18/2007(Kamoto Underground) Successfully Produces First Copper Cathode
Corporate news of Katanga Mining Limited
6/7/2016Katanga Mining Announces Resignation of Chief Operating Offi...
5/13/2016Katanga Mining Announces 2016 First Quarter Results and Elec...
5/4/2016Katanga Mining Announces First Quarter 2016 Production Resul...
11/3/2015Katanga Mining Announces Third Quarter 2015 Production Resul...
11/3/2015Katanga Mining Announces Third Quarter 2015 Production Resul...
9/11/2015Katanga Mining Announces Suspension of Copper and Cobalt Pro...
9/11/2015IIROC Trade Resumption - KAT
9/11/2015IIROC Trading Halt - KAT
9/6/2015Katanga Mining Announces Review of Business
8/13/2015Katanga Mining Announces 2015 Second Quarter Financial Resul...
8/12/2015Katanga Mining announces 2015 second quarter results
2/12/2015Katanga Mining Announces 2014 Year End Financial Results and...
2/11/2015Katanga Mining announces 2014 year end financial results and...
2/11/2015Katanga Mining Announces 2014 Year End Operational Highlight...
2/11/2015Katanga Mining Annoucnes Ore Reserves and Mineral Resources
2/10/2015Katanga Mining Announces Ore Reserves and Mineral Resources
2/10/2015Katanga Mining Announces 2014 Year End Operational Highlight...
1/5/2015Katanga Mining Appoints New Chief Operating Officer
1/5/2015Katanga Mining Appoints New Chief Operating Officer
11/26/2014Katanga Mining Announces Execution of Extended and Increased...
11/26/2014announces execution of extended and increased loan facilitie...
11/26/2014Katanga Mining announces execution of extended and increased...
11/14/2014Katanga Mining Announces 2014 Third Quarter Financial Result...
11/3/2014Katanga Mining announces third quarter 2014 production resul...
11/3/2014announces third quarter 2014 production results and date for...
5/15/2014announces 2014 first quarter results and election of directo...
5/5/2014announces first quarter 2014 production results and date for...
2/10/2014announces 2013 year end operational highlights, and outlook
11/14/2013announces 2013 third quarter financial results and appoints ...
10/30/2013announces Q3 2013 production results and date for release of...
8/12/2013announces Q2 2013 production results and date for release of...
5/10/2013announces 2013 first quarter results and election of directo...
2/11/2013announces 2012 year end operational highlights, outlook and ...
11/14/2012Announces 2012 Third Quarter Results and Appoints New Direct...
10/30/2012Announces Q3 2012 Production Results and Date for Release of...
9/1/2011Completes Continuance to the Yukon Territory
8/22/2011Proceeds to Procure Long-Lead Items for the Phase 4 Expansio...
8/5/2011announces departure of CEO
3/31/2011ANNOUNCES FILING OF AIF AND INDEPENDENT TECHNICAL REPORT
6/8/2010Interest Payment on Katanga Notes
10/7/2009(KAT.TO) Press Release: KAT Announces Termination of Remaini...
9/23/2009KAT Completes Acquisition of KOL
9/8/2009(KAT.TO) Press Release: KAT Announces Accelerated Developmen...
8/28/2009(KAT.TO) Press Release: KAT Announces Signing of Share Purch...
7/27/2009Signing of Finalised Joint Venture Agreement
6/17/2009(KAT.TO) Press Release: KAT Extends Deadline for Ineligible ...
6/11/2009(KAT.TO) Press Release: KAT Completes US$172.3 Million Early...
6/2/2009(KAT.TO) Press Release: KAT Announces Exchange of US$265.3 M...
5/14/2009(KAT.TO) Press Release: KAT Comments on Trading of Common Sh...
2/11/2009(KAT.TO) Press Release: Convertible Loan Facility
1/12/2009(KAT.TO) Press Release: Loan Facility
1/12/2009(KAT.TO) Press Release: Authorized Share Capital
1/7/2009(KAT.TO) Press Release: Proxy Cut-off
12/24/2008(KAT.TO) Press Release: Convertible Loan Facility
11/26/2008Luilu plant resumes copper and cobalt metal production
11/21/2008(KAT:TO) Press Release: Kolwezi Concentrator Update 21 Nov 2...
11/12/2008(KAT.TO) Press Release: Damage to Luilu Transformer
11/4/2008KAT Project Update & 3Q Financials Call November 7
6/16/2008Announces Intended Resignation of CEO
6/12/2008Interest Payment on KAT Notes June 12
2/21/2008Receives Summary Findings of DRC Mining Contract Review
2/8/2008Announces Agreement on Transfer of Mashamba West and Dikuluw...
1/29/2008(KAT.TO) Press Release: KAT Progresses Consolidation of Join...
1/22/2008Operations Integrated
1/11/2008(KAT.TO) Press Release: KAT Completes Merger with Nikanor to...
12/10/2007Interest Payment on KAT Notes
11/27/2007 Starts Luilu Metallurgical Plant on Schedule
11/6/2007 Recommended Merger of Katanga and Nikanor to Create a Leadi...
11/5/2007 Announce Completion of US$150 Million Loan
11/2/2007Receives Shareholder Approval for Increase in Authorized Sha...
10/11/2007 Site Progress Update
10/4/2007Announces US$150 Million Loan Following Review of Strategic ...
9/6/2007Response to Withdrawal of Unsolicited Offer
8/29/2007Recommends No Action in Response to Unsolicited Offer
8/22/2007Sets Special Meeting Date
8/9/2007Continues to Protect Shareholders from Creeping Takeover Att...
8/2/2007Site Progress Update
7/18/2007Announces Concentrator Commissioning
7/17/2007Clarifies Interest Capitalization on Unsecured Subordinated ...
7/6/2007Statement Regarding Letter from CAMEC
6/28/2007Change in Shareholdings
5/22/2007Site Update from Katanga Mining Limited (KAT.TO)
5/18/2007Focused on Growth Strategy
5/15/2007Clarification Statement
5/10/2007Enacts Shareholder Rights Plan to Prevent Creeping Takeover
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (KAT.TO)Other OTC (KATFF)
0.155+0.00%0.117+0.00%
TORONTO
CA$ 0.155
06/05 14:19 -
0%
Prev close Open
0.155 0.160
Low High
0.155 0.160
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.155 -%
Volume 1 month var.
130,625 -%
24hGold TrendPower© : 23
Produces Cobalt - Copper
Develops Cobalt - Copper
Explores for Cobalt - Copper - Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/9/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202024.00%0.160.05
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.24+1.77%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.47-1.98%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.82-1.40%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.82-4.21%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.74+0.60%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :