Silver Standard Announces Positive Feasibility Study for Pitarrilla and Increases Reserves by Over 400%
Published : December 05, 2012
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Dec. 4, 2012) - Silver Standard Resources Inc. (News - Market indicators)(NASDAQ:SSRI) ("Silver Standard" or the "Company") announced today the results of the Feasibility Study for its 100% owned Pitarrilla Project ("Pitarrilla" or the "Project") located in the State of Durango, Mexico. The Feasibility Study was completed by M3 Engineering and Technology Corporation and Silver Standard.

Feasibility Study highlights1

  • Silver Mineral Reserves: Probable Mineral Reserves of 479 million ounces of silver, approximately 5.2x the 91.7 million ounces reported previously.
  • Long-life and high production: A 32-year project producing an average of 15 million ounces of silver per year during the first 18 years of production.
  • Robust project economics: An after-tax net present value (NPV) of $737 million at base case metal prices and $1.7 billion at spot prices. An after-tax internal rate of return (IRR) of 12.8% at base case metal prices and 21.2% at spot prices.
  • Capital expenditures: Total construction costs of $741 million, including $157 million of pre-production operating costs and $131 million of pre-production revenue.
  • Low technical risk: Utilizes standard truck-and-shovel open-pit mining methods and well-established flotation and leach processing methods.

"The completion of the Pitarrilla Feasibility Study represents a major milestone for the Company," said John Smith, President and CEO of Silver Standard. "In adopting an open-pit mining concept, we have defined one of Mexico's largest silver mines and substantially increased silver reserves. We are now actively engaged in activities to bring the project into construction. While recognizing Silver Standard's strong balance sheet, we are also looking to secure financing for the project. Our aim is to have the project ready for a construction decision in 2013."

1 See the Company's September 21, 2009 NI 43-101 Technical Report filed on SEDAR and the Company's website. NPV calculated using a 5% discount rate. All financial metrics and estimates are based on U.S. dollars. Base case metal prices: $27.50 per ounce silver in the final pre-production year and the first two years of production, and $25.00 per ounce silver thereafter; $0.90 per pound of lead and $0.95 per pound of zinc. Spot case metal prices: November 23, 2012, closing prices of $34.13 per ounce of silver, $0.99 per pound of lead and $0.87 per pound of zinc.

Economic analysis

The Pitarrilla Feasibility Study indicates strong economic returns and high leverage to silver prices. The metal price assumptions and key financial estimates for the project are presented in Table 1.

Table 1: Key financial estimates for the Pitarrilla Project
Financial
metrics
  Base
Case
Upside
Case
Downside
Case
Spot Price
Case
Silver Price $/oz $25.00 $30.00 $22.50 $34.13
Lead Price $/lb $0.90 $1.10 $0.80 $0.99
Zinc Price $/lb $0.95 $1.10 $0.85 $0.87
Diesel Price $/litre $0.80 $0.95 $0.70 $0.85
$MXN per $USD   12.50 12.50 12.50 12.96
Pre-tax NPV 5% $M $1,176 $1,972 $680 $2,552
After-tax NPV 5% $M $737 $1,316 $368 $1,741
Pre-tax IRR % 15.8% 20.8% 11.5% 25.3%
After-tax IRR % 12.8% 17.2% 9.1% 21.2%
Undiscounted Cash Flow $M $2,015 $3,187 $1,328 $3,948
Payback After COD Years Year 7.4 Year 4.8 Year 10.4 Year 3.8
Notes: (1) Base case silver price is $27.50 per ounce in the final pre-production year and the first two years of production, and $25 per ounce thereafter, (2) The MXN:USD exchange rate is assumed to equal $12.86 in the second half of 2013 and the first half of 2014, $12.58 in the second half of 2014 and the first half of 2015 and $12.50 thereafter, (3) COD means Commercial Operation Date.

Project overview

The Feasibility Study evaluates the development and construction of an open-pit mine, processing facilities, a tailings storage facility and supporting infrastructure. Pitarrilla will be one of the largest silver mines in Mexico, producing an estimated 333 million ounces of silver, 582 million pounds of lead and 1,669 million pounds of zinc over a 32 year project life. The mine will produce an average of 15 million ounces of silver per year during the first 18 years of production.

Pitarrilla will use a standard truck and shovel open-pit mining method. A fleet of trucks is expected to haul an average of over 175,000 tonnes of material per day over 20 years. The plant will use standard grind, float and agitated leach circuits to process 16,000 tonnes per day of flotation/leach ore or 12,000 tonnes per day of direct leach ore. The Project will produce lead and zinc concentrates and a silver doré.

Pitarrilla is located approximately 160 kilometres north-northwest of the city of Durango. A paved roadway extends to within 47 kilometres of the plant site. The Company has been advised by the Comision Federal De Electricidad, Mexico's national power utility, that it will provide power for the Project via a new powerline.

Mineral Resource estimate

This updated Mineral Resource estimate is based on all available data for the Pitarrilla deposit, including the results from over 15,000 meters of drilling performed at the Project during 2012.

Table 2: Pitarrilla Mineral Resource estimate (effective as of December 4, 2012)
  Cut-off Ag Tonnes Ag Pb Zn Ag Pb Zn
Category (g/t) (Mt) (g/t) (%) (%) (Moz) (Mlbs) (Mlbs)
Measured 20.00 23.62 85.56 - - 65 - -
30.00 20.31 95.42 - - 62 - -
40.00 16.90 107.62 - - 58 - -
Indicated 30.00 240.00 81.94 - - 632 - -
40.00 199.61 91.41 - - 587 - -
20.00 292.35 - 0.31 0.71 - 2,009 4,581
30.00 260.31 - 0.32 0.72 - 1,815 4,146
40.00 216.51 - 0.33 0.75 - 1,574 3,590
Measured + Indicated 30.00 260.31 82.99 0.32 0.72 695 1,815 4,146
40.00 216.51 92.68 0.33 0.75 645 1,574 3,590
Inferred 20.00 26.48 55.98 0.21 0.48 48 123 281
30.00 22.08 62.12 0.21 0.49 44 101 236
40.00 17.09 70.00 0.21 0.49 38 79 186

Notes:

  1. Jeremy D. Vincent, B.Sc. (Hons), P.Geo., is the Qualified Person for the reported Mineral Resources estimate.
  2. All Mineral Resource estimates have been classified in accordance with current Canadian Institute of Mining, Metallurgy and Petroleum (CIM) definition standards.
  3. Ag was estimated using Localised Uniform Conditioning (LUC). Pb and Zn were estimated using Ordinary Kriging (OK).
  4. Mineral Resource estimates of Pb and Zn are not classified as Measured to account for the added uncertainty introduced by the volume-variance effect when using different estimation techniques (Ag by LUC; Pb and Zn by OK).
  5. A silver cut-off grade of 30 g/t Ag is considered at this time to be the most likely economic cut-off grade for large-scale open- pit mining of the Pitarrilla deposit.
  6. Silver capping (top cut) grades used in the estimation ranged between 400 g/t Ag and 1,700 g/t Ag for the various oxide domains, and between 960 g/t Ag and 1,150 g/t Ag for the two transitional domains, and between uncapped and 1,200 g/t Ag for the various sulphide domains. Lead capping grades used in the estimation ranged between uncapped and 3.6% Pb for the various oxide domains, between 3.6% Pb and 3.8% Pb for the transitional domains, and between uncapped and 6.7% Pb in the various sulphide domains. Zinc capping grades used in the estimation ranged between 0.56% Zn and 4.8% Zn in the various oxide domains, between 6.4% Zn and 7.1% Zn in the transitional domains, and between uncapped and 17.7% Zn in the various sulphide domains.
  7. Detailed bulk density modeling was conducted taking into account lithological variability (including an analysis of voids), mineralization, and degree of oxidation.
  8. The drillhole database including collar, survey, assay, lithology, oxidation, and bulk density, used in the preparation of the Mineral Resources estimate was verified by Mr. Vincent by conducting detailed verification checks, including QA/QC of location and assay data.
  9. The reported Measured and Indicated Mineral Resources are regarded as sufficient for medium to long term production open pit planning and mine scheduling on a quarterly basis. Grade control drilling and a mine blending strategy to control grade variations are recommended for short-term mine planning.
  10. Mineral Resources situated below the current open-pit shell design are considered potentially economically viable in an underground mining scenario, and are therefore included in the total reported Pitarrilla Mineral Resources. A Preliminary Economic Assessment (PEA) or higher level study validating the economics of the underground mining scenario has not been undertaken at this time.
  11. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. While the classification categories of Mineral Resources used in this news release are recognized and required under Canadian regulations, the U.S. Securities and Exchange Commission (SEC) does not recognize them and U.S. companies are generally not permitted to disclose resources in documents they file with the SEC.
  12. The reported tonnes, grade, and metal content may not tally precisely due to rounding.

Mineral Reserve estimate

The Company has prepared an updated Mineral Reserve estimate for Pitarrilla. Under the estimate, Probable Mineral Reserves of silver have increased to 479 million ounces of silver at Pitarrilla, 5.2 times the 91.7 million ounces reported in the Company's September 21, 2009 NI 43-101 Technical Report.

Table 3: Pitarrilla Mineral Reserve estimate (effective as of December 4, 2012)
    Tonnage  Mined Grade Contained Metal
      Ag Pb Zn Ag Pb Zn
Category Process Type (Mt) (g/t) (%) (%) (Mozs) (Mlbs) (Mlbs)
Probable Direct Leach 43.4 91.5 0.169 0.422 127.5 161.6 403.9
Probable Flotation/Leach 113.2 96.5 0.341 0.929 351.2 851.8 2,317.7

Notes:

  1. Andrew W. Sharp, B.Eng, FAusIMM, is the Qualified Person for the reported Mineral Reserve estimate.
  2. All Mineral Reserves have been classified in accordance with current CIM definition standards.
  3. Mineral Reserves are contained within Measured and Indicated Resources with a pit design using metal prices for silver, lead and zinc of US$25/oz, US$0.90/lb, and US$0.95/lb, respectively.
  4. The pit designs are generated from appropriate mining costs, processing costs, metal recoveries and inter ramp pit slope angles (varying from 36° to 48°).
  5. The Mineral Reserves estimate uses a net smelter return (NSR) calculation to determine the cut-off. The Mineral Reserves estimate contains two ore types - direct leach ore and flotation/leach ore. There are two different cut-off values: the constant cut-off value for direct leach ore is $16.38/tonne, and for flotation/leach ore is $16.40/tonne.
  6. The NSR calculation method varies for the two ore types. For the two ore types combined, the overall average process recovery of silver, lead and zinc are 69.6%, 57.4% and 61.3% respectively.
    1. For flotation/leach ore, the NSR is estimated based on recoveries that vary by head grade for Ag, Pb and Zn and are also reduced in performance depending on the amount of oxidation present. Concentrate grades also vary by oxidation and head grades. NSR estimates are inclusive of transport costs, penalties and refinery charges. The NSR of this ore type is augmented by the addition of cyanide leach of the flotation tail, net of leach process costs and doré sales and refining costs.
    2. For direct leach ore, the NSR is estimated from the silver head grade, the silver recovered from the cyanide leach process and the applicable doré sales costs and refining costs. The cyanide leach silver recovery is directly estimated in the model from assays and metallurgical testing.
  7. No mining dilution is applied to the grade of the resource. Dilution intrinsic to the resource model is considered sufficient to represent the mining selectivity considered.
  8. The life of mine strip ratio is 5.96.
  9. Tonnage and grade measurements are in metric units. Contained silver ounces are reported as millions of troy ounces (Mozs). Contained lead and zinc are reported as millions of imperial pounds (Mlbs).
  10. The Reserve is 100% in-situ, as no mining of the ore has occurred.
  11. Tables may not sum due to rounding.

Mining and processing

Pitarrilla will use standard truck and shovel open-pit mining methods. The expected mining life is 20 years, including three pre-production years. The pit will be mined in five phases, starting with Breccia Ridge and Cordon Colorado. Over the life of the Project, a fleet of trucks is expected to haul approximately 1.1 billion tonnes of material and 157 million tonnes of ore, at a strip ratio of 5.96:1.

Pitarrilla's plant is expected to use standard crush, grind, float and agitated leach equipment to process 16,000 tonnes per day of float/leach ore or 12,000 tonnes per day of direct leach ore. The two ore types will utilize a common crushing and grinding circuit. Initially, highly-oxidized ore will be direct leached in an agitated leach circuit. Silver will then be extracted from the pregnant leach solution using the Merrill-Crowe process to produce silver-rich doré bars. Subsequently, the less oxidized and un-weathered sulphide ores will be processed in sequential lead and zinc flotation circuits to produce separate silver-bearing lead and zinc concentrates. Tailings from the flotation circuits will be processed in the agitated leach circuit to recover additional silver.

Over the Project's life, the plant is expected to produce an estimated 604,000 tonnes of lead concentrate, with grades averaging 43% lead and 9,500 g/t silver, and an estimated 1.5 million tonnes of zinc concentrate, with grades averaging 46% zinc and 604 g/t silver. The leach circuit will produce 118.5 million ounces of silver in silver- rich doré bars. Discussions and analysis to date indicate that the lead and zinc concentrates may be sold domestically or internationally to potential customers in Asia, Europe and North America.

Table 4: Average production schedule for the Pitarrilla Project
      Annual average Annual average Annual average
Production schedule   Units (years 1-9) (years 10-18) (life of project)
Total mined   Kt 74,631 35,457 33,039
Waste mined   Kt 64,206 29,250 28,293
Ore mined   Kt 10,425 6,207 4,745
Strip ratio     6.2 4.7 6.0
Silver grade mined   g/t 93 97 95
Lead grade mined   % 0.2 0.4 0.3
Zinc grade mined   % 0.5 1.4 0.8
Lead concentrate   Kt 17 42 18
Zinc concentrate   Kt 30 119 46
Silver recovery   % 66.7 83.1 69.6
Lead recovery   % 49.0 75.2 57.4
Zinc recovery   % 46.8 78.7 61.3
Silver produced   Koz 14,090 15,852 10,102
  - Doré   Koz 5,659 2,587 3,591
  - Concentrate   Koz 8,431 13,265 6,511
Lead produced   Klbs 15,044 43,639 17,633
Zinc produced   Klbs 30,355 136,947 50,572
Note: Life of project averages calculated over the 32-year life of the Project.

The potential to mine Mineral Resources located below the open pit was not evaluated in the Pitarrilla Feasibility Study, but may be evaluated later in the Project's lifecycle.

Capital cost

All Project costs incurred prior to the declaration of commercial production are considered capital costs. The leach circuit commences commissioning 26 months after the construction decision, and achieves commercial production within ten months. The total capital required to construct the mine is $741 million.

Table 5: Summary of anticipated capital costs (including contingency)
Capital costs Millions
Mine development and mobile equipment $155.7
Plant $308.3
Infrastructure $51.4
Direct costs $515.4
Indirect costs $80.9
Owners costs $37.3
Total indirect costs $118.2
Contingency $81.5
Construction capital $715.1
Pre-operating mine, plant and G&A $156.5
Pre-operating net revenue ($130.9)
Total pre-operating capital $740.6
Notes: (1) A contingency of 5% has been applied to mine equipment and to light vehicles. (2) A contingency of 15% has been applied to all other expenditures during the first two years of the pre-production period, with the exception of capitalized operating mining cost which has the 15% contingency applied only to the first year of pre-production. (3) The capital cost estimates are based on second quarter 2012 pricing and will be subject to inflation that may occur prior to the construction decision and during the construction period.

Capital costs incurred after the start of commercial production are considered sustaining capital costs. The sustaining capital for the project is expected to be $404 million, including a $25 million contingency. Sustaining capital for the plant is included in plant operating costs, with the exception of a planned $45 million flotation plant upgrade in year 16.

Table 6: Summary of sustaining capital costs  
Sustaining capital costs Millions
Plant and infrastructure $6.1
Flotation plant upgrade $44.5
Mine equipment $254.0
Mine equipment - major components $50.2
Tailings impoundment sustaining capital $37.3
Vehicles/topsoil/water management $11.8
Total sustaining capital $403.9
Notes: (1) A contingency of 5% has been applied to mine equipment and to light vehicles. (2) Sustaining capital for the plant is included in operating costs, with the exception of a planned $45 million expansion of the flotation plant in year 16.

Operating cost

Total operating costs on a per tonne of ore milled basis are presented in Table 7.

Table 7: Summary of operating costs per tonne of ore milled
Operating costs Cost per tonne of ore
Mine operations $10.04
Mill operations $15.45
General administration $1.80
Total operating cost $27.29
Notes: Unit costs are expressed as dollars per tonne of combined ore milled.

The total cash operating cost includes mine operations, process plant operations, general and administrative costs, smelting and refining charges, and transportation charges. Total cash costs (which also include direct process plant costs, administrative costs, and other charges) average $10.01 per ounce of payable silver (net of by-product revenues) over the Project's life. Total production costs (which also include depreciation and amortization, asset retirement obligations, and capitalized mine development and pre-operating costs) average $15.91 per ounce of payable silver over the Project's life. The cash costs are presented in Table 8.

Table 8: Total cash cost per payable ounce of silver  
    Annual
average
Annual
average
Annual
average
Operating costs   (years 1-9) (years 10-18)  (life of project)
Direct Mining Cost $/oz Payable $3.91 $2.77 $2.93
Direct Process Plant $/oz Payable $6.29 $6.32 $7.82
G&A $/oz Payable $0.67 $0.60 $0.81
Cash Operating Cost $/oz Payable $10.87 $9.69 $11.56
Shipping and Selling $/oz Payable $0.51 $1.60 $1.00
Treatment and Refining $/oz Payable $1.91 $4.26 $2.91
By-Product Credits $/oz Payable ($2.51) ($9.32) ($5.46)
Total Cash Cost $/oz Payable $10.78 $6.24 $10.01
Non-Cash Costs $/oz Payable $4.81 $8.37 $5.90
Total Production Cost $/oz Payable $15.59 $14.61 $15.91
Notes: (1) Non-cash costs include a period of depreciation and amortization of physical plant and equipment, asset retirement obligation assets, and capitalized mine development and pre-operating costs. The depreciation is compliant with IFRIC 20 relating to deferred stripping. (2) Life of project averages calculated over the full 32 year life of the Project.

Environmental, permitting and social responsibility

Pitarrilla has been designed to comply with Mexican mining regulations. An Environmental Impact Assessment (EIA) is expected to be completed and ready for submission to Mexico's environmental agency in the first half of 2013. Studies conducted at Pitarrilla during the EIA preparation process include characterization of the topography, geomorphology, geology, soils, water (surface water and groundwater), climate, air quality, and flora and fauna. Several environmental, land use, and operating permits and agreements are required before construction begins.

Silver Standard has implemented a community relations program that includes environmental, medical, educational, infrastructure development, and social support services. This year, the Company provided medical assistance to members of local communities, completed clean-up projects around local rivers, planted trees and completed construction projects to improve infrastructure (including the installation of livestock fences, improvements to a suspension bridge, improvements to a water well and the installation of a media room at a local high school).

Next steps

Going forward, Silver Standard is focused on a number of key activities to position the Project for a 2013 construction decision. The Company will use the Feasibility Study as the basis for further discussions with financial institutions and potential partners. The Company will also continue to obtain the remaining surface access rights necessary for the permitting, construction and operation of the Pitarrilla Project. Applications for the required mining or operating permits will be submitted after receiving clear title or access agreements to all required land. At the same time, the Company will continue optimizing the Project through further engineering design and process development work. Infrastructure for the Project, including access roads, a communications system and ground water resources, will also be developed during 2013.

Qualified Persons

The scientific and technical data contained in this news release pertaining to Pitarrilla has been reviewed and approved by the following Qualified Persons ("QP") under National Instrument 43-101 who consent to having their names included in this news release.

  • Andrew W. Sharp, BEng., FAusIMM: Mr. Andrew W. Sharp, the QP who completed the Mineral Reserve estimate, has been employed by the Company as Vice President of Technical Services since September, 2011.
  • Jeremy D. Vincent, B.Sc. (Hons), P.Geo.: Mr. Jeremy D. Vincent, the QP who completed the Mineral Resource estimate reported here, has been employed by the Company as Senior Geologist since September, 2011.
  • Kelly Boychuk, MBA, P. Eng.: Mr. Kelly G. Boychuk, the QP who reviewed the Tailings Design/Surface Geotechnical and Water Balance sections of the Feasibility Study, has been employed by the Company as Director of Project Engineering since May, 2012.
  • Trevor J. Yeomans, B.Sc. (Hons), ASCM, P. Eng.: Mr. Trevor J. Yeomans, the QP who completed the metallurgical sections of the Feasibility Study, has been employed by the Company as Director of Metallurgy since April, 2011.

Detailed report

A National Instrument 43-101 compliant technical report will be filed on SEDAR within 45 days of this news release and will be available at that time on the corporate website.

SOURCE: Silver Standard Resources Inc.

Cautionary Statements on Forward-Looking Information: Statements in this news release are forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward- looking information within the meaning of Canadian securities laws (collectively "forward-looking statements"). All statements, other than statements of historical fact, are forward-looking statements. Generally, forward-looking statements can be identified by the use of words or phrases such as; "expects", "anticipates", "plans", projects", "estimates", "assumes", "intends", "strategy", "goals", "objectives", "potential" or variations thereof, or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms or similar expressions. These forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied, including, without limitation, risks relating to: the interpretation of drill results and the geology, grade and continuity of the Company's mineral deposits; technological and operational difficulties or the delay, non-compliance or inability to obtain permits encountered in connection with development of the Pitarrilla Project; uncertainties related to title to the Company's mineral properties; the Company's ability to obtain the necessary surface rights for the lands required for successful project permitting, construction and operation of the Pitarrilla Project; changes in economic conditions or financial markets; changes in prices for the Company's mineral products or increases in input costs; uncertainty of production and cost estimates for the Pitarrilla Project; risks and uncertainties associated with new mining operations including start-up delays and operational issues; litigation, legislative, tax (including employee profit sharing arrangements), environmental and other judicial, regulatory, political and competitive developments in Canada, Mexico, the United States and other jurisdictions in which the Company may carry on business; labour relations matters; and foreign exchange rate fluctuations, as well as other factors described in the Company's most recent Form 20-F filed with the United States Securities and Exchange Commission and Canadian regulatory authorities.

This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements. The Company's forward-looking statements are based on what the Company's management considers to be reasonable assumptions, beliefs, expectations and opinions based on information currently available to management. We cannot assure you that actual events, performance or results will be consistent with these forward looking statements, and management's assumptions may prove to be incorrect. Assumptions have been made regarding, among other things, the Company's ability to carry on its exploration and development activities, the Company's ability to meet its obligations under its property agreements, the timing and results of drilling programs, the discovery of mineral resources and mineral reserves on the Company's mineral properties, the timely receipt of required approvals including obtaining the necessary surface rights for the lands required for successful project permitting, construction and operation of the Pitarrilla project, the price of the minerals the Company produces, the costs of operating and exploration expenditures, the Company's ability to operate in a safe, efficient and effective manner and the Company's ability to obtain financing as and when required and on reasonable terms. You are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. The Company's forward looking statements reflect current expectations regarding future events and operating performance and speak only as of the date hereof and the Company does not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations or opinions should change other than as required by applicable law. For the reasons set forth above, you should not place undue reliance on forward-looking statements.

Cautionary Note to U.S. Investors. Technical disclosure included herein has not been prepared in accordance with the requirements of United States securities laws. Without limiting the foregoing, the technical disclosure uses terms that comply with reporting standards in Canada and certain estimates are made in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects. National Instrument 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Canadian standards, including National Instrument 43-101, differ significantly from the requirements of the SEC, and mineral reserve and resource information contained in this news release may not be comparable to similar information disclosed by U.S. companies.

This news release uses the terms "Measured Mineral Resource" and "Indicated Mineral Resource." U.S. investors are advised that while such terms are recognized and required under Canadian regulations, the SEC does not recognize them. Under U.S. standards mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically produced or extracted at the time the reserve determination is made. U.S. investors are cautioned not to assume that any part or all of the Mineral Resources in these categories will ever be converted into Mineral Reserves.

This news release uses the term "Inferred Mineral Resources." U.S. investors are advised that while such term is recognized and required under Canadian regulations, the SEC does not recognize it. "Inferred Mineral Resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not generally form the basis of feasibility or other economic studies. U.S. investors are cautioned not to assume that any part or all of an Inferred Mineral Resource exists, or is economically or legally mineable.

To receive Silver Standard's news releases by e-mail, please register using the Silver Standard website, www.silverstandard.com.

The TSX has neither approved nor disapproved of the information contained herein.

Silver Standard Resources Inc.
(604) 484-8216 or N.A. Toll Free: (888) 338-0046
invest@silverstandard.com
www.silverstandard.com
Data and Statistics for these countries : Canada | Mexico | All
Gold and Silver Prices for these countries : Canada | Mexico | All

Silver Standard Resources Inc.

PRODUCER
CODE : SSO.TO
ISIN : CA82823L1067
CUSIP : 82823L 106
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Silver Standard is a silver producing company based in Canada.

Silver Standard produces silver, tin and zinc in Argentina, develops gold and silver in Peru, and holds various exploration projects in Peru.

Its main asset in production is PIRQUITAS in Argentina, its main asset in development is SAN LUIS PROJECT in Peru and its main exploration properties are CANDELARIA NEVADA and BERENGUELA in Peru, VETA COLORADA, PITARILLA, PENASCO QUEMADO and SAN AGUSTIN in Mexico, SUNRISE LAKE in Canada, CHALLACOLLO in Chile and DIABLILLOS and MAVERICK SPRINGS in Argentina.

Silver Standard is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 1.4 billions as of today (US$ 1.1 billions, € 961.5 millions).

Its stock quote reached its lowest recent point on September 04, 1998 at CA$ 1.01, and its highest recent level on August 02, 2017 at CA$ 12.01.

Silver Standard has 119 400 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Silver Standard Resources Inc.
11/25/2009Silver Standard, a different company
6/17/2008Follow up N° 10
Annual reports of Silver Standard Resources Inc.
2007 Annual Report
Financings of Silver Standard Resources Inc.
4/8/2011Announces Closing of Secondary Offering of Units of Pretivm ...
Option Grants of Silver Standard Resources Inc.
4/24/2014Announces Amendments to Stock Option Plan
4/29/2011Announces Amendments to Stock Option Plan
Nominations of Silver Standard Resources Inc.
5/10/2013Announces Election of Directors
1/9/2013announces the appointment of two new board members and manag...
1/5/2012Announces Appointment of Chief Financial Officer
8/15/2011Announces Senior Management Change
5/27/2010Announces the Appointment of John Smith as President and Chi...
5/15/2008Announces the Appointment of Peter Tomsett as Chairman of th...
7/18/2007Appoints New Vice President, Finance and CFO
6/5/2007Appoints Senior Vice President, Operations
Financials of Silver Standard Resources Inc.
7/7/2016to announce second quarter 2016 consolidated financial resul...
5/12/2016reports first quarter 2016 results
4/20/2016to announce first quarter 2016 consolidated financial result...
4/8/2016Mails and Files Meeting Materials for Upcoming Annual and Sp...
2/26/2016reports fourth quarter and year-end 2015 results
1/26/2016to announce fourth quarter and year-end 2015 consolidated fi...
11/6/2015reports third quarter 2015 results
10/6/2015to announce third quarter 2015 consolidated financial result...
8/6/2015Reports Second Quarter 2015 Results
7/7/2015to Announce Second Quarter 2015 Consolidated Financial Resul...
11/5/2014Reports Third Quarter 2014 Results
10/2/2014to Announce Third Quarter Consolidated Financial Results Nov...
8/6/2014Reports Second Quarter 2014 Results
2/21/2014Reports Fourth Quarter and Year-End 2013 Results
11/6/2013Reports Third Quarter 2013 Results
10/3/2013to announce third quarter 2013 consolidated financial result...
8/8/2013Reports Second Quarter 2013 Results
7/9/2013to announce second quarter 2013 consolidated financial resul...
5/9/2013Reports First Quarter 2013 Results
4/8/2013to announce first quarter 2013 consolidated financial result...
10/11/2012to Announce Third Quarter 2012 Consolidated Financial Result...
7/25/2012to Announce Second Quarter 2012 Consolidated Financial Resul...
5/9/2012Reports First Quarter 2012 Financial Results
4/19/2012to Announce First Quarter 2012 Consolidated Financial Result...
2/22/2012to Announce Fourth Quarter and Year-Ended 2011 Consolidated ...
8/11/2011Reports Second Quarter 2011 Results
5/11/2011Reports First Quarter 2011 Results
3/2/2011Reports Fourth Quarter and Year-End 2010 Results
5/11/2010Reports First Quarter 2010 Results
3/5/2010Reports Fourth Quarter and Year-End 2009 Results
3/2/20102009 Financial Results and Conference Call
11/6/2009Reports Third Quarter 2009 Results
8/6/2009Reports Second Quarter 2009 Results
3/11/2009Reports Fourth Quarter and Year-End 2008 Results
8/8/2008Reports Second Quarter 2008 Results
11/7/2007Reports Third Quarter 2007 Results
Project news of Silver Standard Resources Inc.
11/8/2016Corporate Exploration Update
10/6/2016signs option agreement to explore Fisher Gold Project contig...
9/19/2016(Diablillos)Announces Transaction on Diablillos and M-18 Projects
9/14/2016to Sell Parral Exploration Properties
7/14/2016provides Q2 2016 production results
9/25/2015Silver Standard completes the acquisition of the Valmy Prope...
2/7/2014(Challacollo)Completes Sale of Challacollo Project
2/4/2014to Purchase Marigold Mine
1/15/2014Provides 2013 Production Results and Issues 2014 Guidance
12/30/2013(San Agustin)completes sale of San Agustin project
12/20/2013(Challacollo)to sell Challacollo Project
11/6/2013(San Agustin)to sell San Agustin Project
1/8/2013provides 2012 production results and issues 2013 production ...
9/11/2012(Pirquitas)Reports Silver and Zinc Mineralized Intercepts From Three Ta...
7/25/2012(Pirquitas)Reports Significant Silver and Zinc Mineralization in the Co...
4/17/2012(Pirquitas)Provides Q1 2012 Pirquitas Operations and Corporate Update
3/1/2012(Pitarilla)Pitarrilla Project and Resource Update
2/27/2012Camino Minerals Corporation Signs Purchase Of Rights Agreeme...
1/12/2012(Pirquitas)Provides Update on 2011 Pirquitas Operations and Announces 2...
12/24/2011(Pirquitas)Files NI 43-101 Technical Report for Pirquitas Mineral Resou...
10/25/2011(Pirquitas)Pirquitas Ball Mill and Sales Contract Update
9/26/2011(Bowdens)Completes Sale of Bowdens Project
8/1/2011(Bowdens)Sells Bowdens Project
6/14/2011(Pirquitas)Pirquitas Operations Update
3/1/2011(San Luis Project)Consolidates the San Luis Project
7/29/2010Brucejack Drilling Intersects More Bonanza-Grade Gold Minera...
6/8/2010(Pirquitas)Pirquitas Mine and Exploration Project Update
6/2/2010(Snowfield (sulphurets))Snowfield Preliminary Assessment Results
5/11/2010Reports San Luis Feasibility Study
2/19/2010(Silvertip)to Sell Silvertip Project
12/10/2009(Pirquitas)Pirquitas Silver Mine Production Guidance for 2010
12/4/2009(Pirquitas)Pirquitas Silver Mine Achieves Commercial Production
10/26/2009(Snowfield (sulphurets))Final Snowfield Zone Drilling Update
10/13/2009(Snowfield (sulphurets))Brucejack Drilling Update
10/1/2009(Snowfield (sulphurets))Snowfield Infill Drilling Update
9/15/2009(Snowfield (sulphurets))Brucejack Drilling Cuts Bonanza Grades
9/14/2009(Snowfield (sulphurets))Drilling Expands Snowfield Zone
8/20/2009(Snowfield (sulphurets))Snowfield Drilling Reveals New Zone
8/5/2009(Snowfield (sulphurets))Snowfield and Brucejack Drilling Update
6/25/2009(Pitarilla)Breccia Ridge Underground Pre-Feasibility Study and Pitarril...
2/18/2009(Pirquitas)s Pirquitas Project
2/3/2009(Snowfield (sulphurets))Snowfield Gold Resources Now 4.4 Million Ounces M&I and 14.3...
12/11/2008(Maverick Springs)More High-Grade Silver Intersected at Maverick Springs
12/3/2008(Snowfield (sulphurets))Reports Final Drill Results From Snowfield
12/2/2008(San Luis Project)San Luis Gold Resources Increase by 31%
7/17/2008(Shafter)Sale of Shafter Silver Project to Aurcana Closes
7/16/2008(Pitarilla)Measured & Indicated Silver Resources Increase 143% at Pitar...
5/14/2008(Pirquitas)Increases Pirquitas Silver Reserves by 43%
5/9/2008(San Luis Project)San Luis Project Update and New Resource Estimate to be Prep...
3/11/2008(Snowfield (sulphurets))Snowfield Measured & Indicated Gold Resources Grow to 3.1 Mi...
1/10/2008(Snowfield (sulphurets))Drilling Identifies New Gold Zone at Snowfield
11/26/2007(Pirquitas)Increases Pirquitas Reserves by 27% and Updates Capex
11/16/2007(San Luis Project)San Luis' Initial Resource Estimate; Nearby Porphyry-Style B...
11/7/2007(Pitarilla)Infill Drilling Increases Pitarrilla's Indicated Silver Reso...
9/18/2007and Esperanza Announce Further High-Grade Results at San Lui...
8/28/2007(Pitarilla)Updates Pitarrilla Drilling in Mexico
8/15/2007(San Luis Project)and Esperanza Update San Luis Exploration
5/14/2007(San Luis Project)and Esperanza Extend San Luis' High-Grade to Depth
4/16/2007and Esperanza Report Further San Luis High-Grade Drill Resul...
2/28/2007Esperanza and Silver Standard Announce New San Luis High-Gra...
Corporate news of Silver Standard Resources Inc.
5/2/2017Provides First Quarter 2017 Corporate Exploration Update
3/31/2017Receives Extension on the Chinchillas Project Option Agreeme...
7/13/2016Silver Standard provides Q2 2016 production results
5/31/2016Silver Standard Completes Acquisition of Claude Resources
1/26/2016Silver Standard to announce fourth quarter and year-end 2015...
1/19/2016Silver Standard Posts Q4, FY15 Production; Guides FY16
1/15/2016Silver Standard Reports Fourth Quarter and 2015 Production R...
1/8/2016Shares Of Silver Standard Lower Despite Record Annual Gold A...
1/7/2016Silver Standard Reports Production Records at Marigold and P...
11/25/2015Hedge Funds Are Crazy About Silver Standard Resources Inc. (...
11/6/2015General
11/6/2015Silver Standard reports third quarter 2015 results
10/20/2015Marigold Produces its Three Millionth Gold Ounce
10/16/2015Why Silver Standard Resources (SSRI) Could Be Positioned for...
10/8/2015Silver Standard Provides Q3 2015 Production Results
10/1/2015Silver Standard Signs Agreement with Golden Arrow for Chinch...
9/29/2015Silver Standard Concludes Valmy Property Acquisition
9/21/2015Silver Standard Intersects High Grade Silver Mineralization ...
9/18/2015Silver Standard Discovers Higher Grade Mineralized Area at t...
8/14/2015Silver Standard Closes New $75M Revolving Credit Facility
8/12/2015Silver Standard (SSRI) to Buy Valmy Property at Marigold
8/11/2015Silver Standard Acquires Valmy Property at Marigold
8/10/2015Edited Transcript of SSO.TO earnings conference call or pres...
8/6/2015Silver Standard Reports Second Quarter 2015 Results
8/5/2015Silver Standard Announces Closing of New $75 Million Revolvi...
8/5/2015General
7/30/2015Why Silver Standard Resources (SSRI) Could Shock the Market ...
7/28/2015Why Fortuna Silver Mines (FSM) Could Be Positioned for a Slu...
7/20/2015Mid-Morning Market Update: Markets Mostly Flat; Morgan Stanl...
7/15/2015Why Silver Standard Resources (SSRI) Could Shock the Market ...
7/14/2015Silver Standard Appoints Paul Benson as President & CEO - An...
7/14/2015Silver Standard Announces the Retirement of John Smith and A...
7/10/2015Silver Standard Posts Q2 Production Data, Tweaks FY15 View -...
7/8/2015Silver Standard Provides Q2 2015 Production Results and Incr...
7/7/2015Silver Standard to Announce Second Quarter 2015 Consolidated...
7/6/2015Silver Standard Reports Expanded Marigold Exploration Progra...
4/27/2015Final Glance: Silver companies
4/27/2015Midday Glance: Silver companies
4/27/2015Early Glance: Silver companies
4/22/2015Midday Glance: Silver companies
4/22/2015Early Glance: Silver companies
4/21/2015Final Glance: Silver companies
4/14/2015Early Glance: Silver companies
4/13/2015Silver Standard Provides Q1 2015 Production Results
4/13/2015Silver Standard to Announce First Quarter 2015 Consolidated ...
4/10/2015Final Glance: Silver companies
4/10/2015Midday Glance: Silver companies
4/10/2015Early Glance: Silver companies
4/2/2015Early Glance: Silver companies
3/27/2015Final Glance: Silver companies
3/27/2015Midday Glance: Silver companies
3/26/2015Early Glance: Silver companies
3/16/2015General
3/16/2015Silver Standard reports fourth quarter and year-end 2014 res...
4/4/2014Completes Marigold Mine Acquisition
10/10/2013provides Q3 2013 operational results
7/11/2013provides Q2 2013 operational results
4/12/2013provides Q1 2013 operational results
2/13/2013Announces Closing of Over-Allotment of Convertible Senior No...
2/5/2013Provides Option Purchase Notice and Notice of Convertibility...
1/16/2013completes US$250,000,000 convertible senior notes offering
1/16/2013completes US$250,000,000 convertible senior notes offering
1/16/2013completes US$250,000,000 convertible senior notes offering
11/8/2012(Pirquitas)Reports Third Quarter 2012 Financial Results and Further Exp...
10/18/2012Provides Q3 2012 Operational Results
7/11/2012Announces Two Additional Long-Term Silver Concentrate Sales ...
3/26/2012Announces Two Long-Term Silver Concentrate Sales Contracts W...
2/14/2012(Pirquitas)Pirquitas Silver Concentrate Sales Update
8/8/2011Revised Time for the Second Quarter Conference Call and Webc...
3/31/2011Announces Pricing of Secondary Offering of Units of Pretivm ...
3/24/2011Announces Secondary Offering of Common Shares of Pretivm Res...
2/1/2011Announces Automatic Conversion of Convertible Promissory Not...
1/28/2011Announces Senior Management Changes
1/6/2011Announces Exercise of Over-Allotment Option in Connection Wi...
7/12/2010Brucejack Drilling Cuts Bonanza-Grade Gold Mineralization
4/27/2010Provides Update on Exploration Program
2/12/2010Announces Pricing of Public Offering of Common Shares
2/11/2010announces public offering of common shares
2/5/2010Files Amended Base Shelf Prospectus
12/1/2009Snowfield and Brucejack Gold Resources: M&I-23.80 Million Ou...
11/25/2009Sale of Canadian ABCP Notes
8/17/2009Closing of Public Offering of Common Shares
8/13/2009Exercise of Over-Allotment Option
8/12/2009pricing of public offering of common shares
8/11/2009public offering of common shares
2/24/2009Announces Pricing of Public Offering of Common Shares
2/23/2009announces public offering of common shares
2/11/2009San Agustin Option Expires
2/11/2009Files Preliminary Base Shelf Prospectus
8/25/2008All Resources Increase at Pitarrilla's Breccia Ridge Zone
8/8/2008Changes to Silver Standard's Board of Directors
2/27/2008 Closes Sale of US$138 Million of Convertible Notes
2/22/2008Prices US$120 Million Convertible Notes Offering
2/20/2008Offers US$120 Million of Convertible Notes
8/22/2007Provides Short-Term Investment Status
4/10/2007Total Pitarrilla Silver Resources Increase by 28%
12/19/2005Follow up N° 9
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (SSO.TO)NASDAQ (SSRI)
12.01-1.23%11.50+2.95%
TORONTO
CA$ 12.01
08/02 16:00 -0.150
-1.23%
Prev close Open
12.16 12.14
Low High
12.01 12.23
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  12.01 -%
Volume 1 month var.
122,908 -%
24hGold TrendPower© : 11
Produces Silver - Tin - Zinc
Develops Gold - Silver
Explores for Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.13+1.59%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65-1.49%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.94+2.18%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-1.07%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.37-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :