In the same category

VanEck Vectors Global Alternative Energy ETF

Published : October 13th, 2011

Announces Q3 Production Results and Commences Commercial Production at La Parrilla

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

First Majestic Announces Q3 Production Results and Commences Commercial Production at La Parrilla


First Majestic Silver Corp. ("First Majestic" or the "Company") is pleased to announce that total production at its three mines in Mexico for the third quarter ending September 30, 2011 reached 1,791,770 equivalent ounces of silver.

The total equivalent silver production for the quarter consisted of 1,708,865 ounces of silver, representing a small decrease of 4% from the prior quarter and a decrease of 6% compared to the same quarter in 2010. In addition, 1,891,991 pounds of lead was produced representing a 36% increase from the previous quarter and an increase of 52% compared to the same quarter in the previous year. Also, 409 ounces of gold was produced, representing an increase of 21% compared to the previous quarter and an increase of 27% compared to the third quarter of 2010.

As announced on September 20, 2011, the new 1,000 tpd La Parrilla flotation circuit began operations in early September. The Company is pleased to announce that this new circuit has been deemed commercial effective October 1, 2011. Incremental production, revenues and operating costs associated with this new flotation circuit was capitalized in the quarter ended September 30, 2011. Effective October 1, 2011, all revenues and costs will be treated as normal course operations and recorded in the Company's income statement rather than being capitalized as pre-production, or pre-operating. For the third quarter, ending September 30, 2011 pre-commercial production was 34,316 ounces of silver contained in lead concentrates produced at the new La Parrilla flotation circuit.

Keith Neumeyer, President & CEO of First Majestic states; "our focus in the third quarter paid off with the completion of the new flotation circuit at La Parrilla. With two major construction projects underway our operations staff deserve to be commended by coming close to budget this quarter. The way is now paved for a record fourth quarter and a great start to 2012".

Production Details Table:

Consolidated

Quarter Ended
September 30, 2011

Quarter Ended
June 30, 2011

%
Variance

Ore processed/tonnes milled

530,159

482,077

10%

Total production - ounces of silver equivalent

1,791,770

1,843,830

(3%)

Total commercial production - ounces silver equivalent

1,751,178

1,843,830

(5%)

Silver ounces produced

1,708,865

1,780,379

(4%)

Pre-commercial silver ounces produced

34,316

0

100%

Ag Grade (g/t)

188

198

(5%)

Ag Recovery (%)

53

58

(8%)

Pounds of lead produced

1,891,991

1,392,132

36%

Equivalent ounces from Lead

54,319

42,305

28%

Pb Grade (%)

2.0

1.9

5%

Pb Recovery (%)

88.4

86.5

2%

Gold ounces produced

409

337

21%

Equivalent ounces from Au

20,648

15,825

30%

Equivalent ounces from Fe

7,939

4,641

71%


Other Developments

The total ore processed during the quarter at the Company's three operating silver mines, the La Encantada Silver Mine, the La Parrilla Silver Mine and the San Martin Silver Mine, amounted to 530,159 tonnes milled representing a 10% increase over the previous quarter. The average head grade in the quarter for the three mines decreased by 5% over the previous quarter to 188 g/t of silver. The combined recoveries of silver decreased from 58% to 53% in the quarter.

The Company's underground development in the third quarter consisted of 10,992 metres, compared to 8,708 metres completed in the previous quarter. There were 18,558 metres of diamond drilling completed in the quarter compared with 12,446 metres of diamond drilling in the second quarter representing a 49% increase. This expanded exploration program is consisting of definition drilling to assist in mining activity and Reserve and Resource definition in the Company's three operating mines and at the Del Toro Silver Mine which is under construction.

At the La Encantada Silver Mine:

  • During the first nine months of the year, the La Encantada mine has experienced an increase in the manganese content which has affected the recoveries at the cyanidation plant. In order to compensate for these lower than budgeted recoveries, mill throughput was increased to an average of 4,259 tonnes per day for the quarter.
  • At the same time metallurgical tests had been underway in order to test the leaching of manganese, with positive results. The Company has retained Hazen Research, Inc. to construct a Pilot Plant in order to test and reconfirm internal lab tests. First Majestic is also working simultaneously on the engineering design for the installation of the required equipment at the plant. It is anticipated that these new additions to the plant will be completed within six months.
  • Four diamond drill rigs are active at La Encantada with two rigs operating underground defining Reserves while two rigs are drilling from surface exploring the regional geophysical anomalies previously discovered. A total of 4,381 metres have been drilled and 3,200 metres of underground development has been completed in the third quarter compared to 2,679 metres of drilling and 2,287 metres of development in the second quarter.


At the La Parrilla Silver Mine:

  • The completion of the new 1,000 tpd flotation circuit, which replaced the old 425 tpd flotation circuit, will allow silver production to ramp up substantially in the fourth quarter.
  • The 1,000 tpd cyanidation circuit (bringing the total mill capacity to 2,000 tpd) is in the final stage of construction and is expected to be operational in November. The new leaching tanks are now completed and the new counter current thickeners are 80% complete pending the installation of the mechanisms. All other areas of the circuit were 80% complete at the end of the quarter. Also, the new 115,000 Kw power line is expected to be completed at the end of October.
  • At the La Parrilla Silver Mine, there are four diamond drill rigs operating of which two are on surface and two are underground. The total metres drilled during the quarter amounted to 4,642 metres compared to 2,764 metres drilled in the previous quarter. Development completed in the quarter was 4,304 metres compared with 3,579 metres developed in the previous quarter.


At the San Martin Mine:

  • Installation of a new ball mill, replacing an older and smaller mill was completed in the quarter. Total mill capacity has now reached 950 tpd allowing for increased silver production and lower costs. In addition, two new induction furnaces and two new filter presses were installed. These mill improvements which were all completed in the third quarter are expected to have a positive impact on overall production, quality of dor� and total costs.
  • Development and exploration programs continued in the La Esperanza vein. The first production area, which is higher grade then the Zuloaga vein, is currently being developed. During the quarter, an auxiliary ramp was completed to allow for the continuation of the exploration program to the West and to depth as it appears the ore body is open in both directions.
  • The early results of the exploration drilling program at the Rosarios / Huichola veins have also returned very positive results. Six drill rigs are currently active within the San Martin property. During the quarter, a total of 6,542 metres of diamond drilling was completed plus 1,964 metres of development compared with 4,488 metres of drilling and 1944 metres of development in the second quarter.


At the Del Toro Project:

  • Ground breaking commenced in April for the construction of a new 1,000 tpd flotation mill and work continued in the third quarter for preparation of the foundation construction which is expected to begin in the fourth quarter.
  • Municipal government approval was received for the construction of a water treatment facility for the town of Chalchihuites. This water treatment facility will be used to treat the raw sewage coming from the town as well as supply water to the mill. A contractor has been assigned to build this water treatment plant and work is expected to be completed by mid-2012.
  • The Company previously received approvals for the construction of a new road from the main highway to the mine site from the local Ejido. Construction of this new three kilometre long road was completed during the quarter allowing for heavy equipment and vehicles to by-pass the town.
  • Two drill rigs have been drilling from an underground cross cut 176 metres below surface for the past six months. Eight holes were completed from this station showing extremely encouraging results. Construction of a second cross cut, an additional 60 metres deeper, was completed in the quarter. One of the two drill rigs is currently being moved to this new station in order to test the dip and extension of the ore bodies to depth. The other rig will continue drilling infill holes in the upper part of the mine.
  • As at quarter end, six holes were completed for a total of 2,993 metres. Drilling continues in order to infill previous holes, test for additional Resources and upgrade previously defined Measured and Indicated Resources and prepare for the release of an updated Pre-feasibility study later this year.
  • The Company acquired a neighbouring property during the quarter called Dolores. This property was a small producing mine where high grade ore was being shipped to La Parrilla by the previous owner. Underground development and diamond drilling is currently underway at this newly acquired mining claim.
  • Development has continued past the 7th level (176 metres from surface) where the two drill rigs were stationed. The ramp is now 1,680 metres in length or 240 metres in vertical distance from surface. A third cross cut will be constructed for an additional drill station once the ramp advances an additional 150 metres. This main ramp will ultimately act as an access to the three main ore bodies which will be developed over the next twelve months during the construction of the new mill.
  • Approximately 80% of the mill equipment has been ordered and is expected to begin arriving onsite during the first quarter of 2012. Also, the new power line from the town of Vicente Guerrero and Chalchihuites is in permitting process.
  • A bulk metallurgical test of 5,000 tonnes of ore will be conducted at the La Parrilla mill in October to reconfirm metallurgical parameters.


At the La Luz Silver Project:

  • The permit for the restoration of the old historic buildings at the Santa Ana Hacienda has been received and the construction of the previously announced Thematic and Cultural Park which will include a mining museum has begun. In addition, cleaning of the impressive underground workings is underway to rehabilitate this historic mine for public access. This new cultural facility and mining museum will form a 'Sustainable Development Project' which will provide permanent long term jobs to the local communities.
  • To date, the Baseline Study and the Geo-hydrologic Study have been completed. The Environmental Impact Statement, the Risk Study, and the Change of Use of Land Studies are expected to be completed during the fourth quarter.
  • A metallurgical test is underway to define the final flow sheet diagram for a flotation plant which will pave the way for final permitting.
  • A total of 100 hectares of surface rights was purchased during the quarter in order to secure an area where the plant and the mine access will be located.


First Majestic is a producing silver company focused in Mexico and is aggressively pursuing its business plan to become a senior silver producer through the development of its existing assets and the pursuit through acquisition of additional assets that contribute to achieving its corporate growth objectives.

FOR FURTHER INFORMATION contact
info@firstmajestic.com, visit our website at www.firstmajestic.com or call our toll free number 1.866.529.2807.

FIRST MAJESTIC SILVER CORP.
"signed"
Keith Neumeyer, President & CEO

SPECIAL NOTE REGARDING FORWARD-LOOKING INFORMATION

This news release includes certain "Forward-Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When used in this news release, the words "anticipate", "believe", "estimate", "expect", "target", "plan", "forecast", "may", "schedule" and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral reserve and resource estimates and estimates of future production and costs of production at our properties; estimated production rates for silver and other payable metals produced by us, the estimated cost of development of our development projects; the effects of laws, regulations and government policies on our operations, including, without limitation, the laws in Mexico which currently have significant restrictions related to mining; obtaining or maintaining necessary permits, licences and approvals from government authorities; and continued access to necessary infrastructure, including, without limitation, access to power, land, water and roads to carry on activities as planned.

These statements reflect the Company's current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: fluctuations in the spot and forward price of silver, gold, base metals or certain other commodities (such as natural gas, fuel oil and electricity); fluctuations in the currency markets (such as the Canadian dollar and Mexican peso versus the U.S. dollar); changes in national and local government, legislation, taxation, controls, regulations and political or economic developments in Canada, Mexico; operating or technical difficulties in connection with mining or development activities; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding); risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom the Company does business; inability to obtain adequate insurance to cover risks and hazards; and the presence of laws and regulations that may impose restrictions on mining, including those currently enacted in Mexico; employee relations; relationships with and claims by local communities and indigenous populations; availability and increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development, including the risks of obtaining necessary licenses, permits and approvals from government authorities; diminishing quantities or grades of mineral reserves as properties are mined; the Company's title to properties; and the factors identified under the caption "Risk Factors" in the Company's Annual Information Form, under the caption "Risks Relating to First Majestic's Business".

Investors are cautioned against attributing undue certainty to forward-looking statements or information. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.


Copyright � 2011 FIRST MAJESTIC SILVER CORP. (TSX: FR) All rights reserved. For more information visit our website at http://www.firstmajestic.com/ or send email to investor@firstmajestic.com ..


 

VanEck Vectors Global Alternative Energy ETF

PRODUCER
CODE : FR.TO
ISIN : CA32076R1029
CUSIP : 32076R1029
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

First Majestic is a silver producing company based in Canada.

First Majestic produces silver, gold, lead and zinc in Mexico, and holds various exploration projects in Canada and in Mexico.

Its main assets in production are LA PARRILLA SILVER MINE, LA ENCANTADA (FIRST MAJESTIC SILVER), SAN MARTIN and LA ENCANTADA SILVER MINE in Mexico and its main exploration properties are REAL DE CATORCE, DEL TORO and CUITABOCA in Mexico and PITT ISLAND, PINCOURT, DOMPIERRE and DESJARDINS in Canada.

First Majestic is listed in Canada, in Germany and in United States of America. Its market capitalisation is 465.4 millions as of today (US$ 340.6 millions, € 313.9 millions).

Its stock quote reached its lowest recent point on November 02, 2001 at 0.01, and its highest recent level on May 17, 2024 at 9.99.

First Majestic has 47 442 200 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of VanEck Vectors Global Alternative Energy ETF
8/13/2018First Majestic shares hammered after reporting $40 million-l...
1/21/2009Follow up N° 1
Annual reports of VanEck Vectors Global Alternative Energy ETF
Files Form 40-F Annual Report
2008 Annual report
2007 Annual Report
Financings of VanEck Vectors Global Alternative Energy ETF
8/20/2009Tranche of Non-Brokered Private Placement Closes
8/12/2009Non-Brokered Private Placement and Debt Settlement
Nominations of VanEck Vectors Global Alternative Energy ETF
4/4/2014Appoints VP of Technical Services
12/24/2013Announces Retirement of Robert Young from Board of Directors
1/5/2012Appoints Chief Information Officer
12/30/2011Names Douglas Penrose as Chairman
Financials of VanEck Vectors Global Alternative Energy ETF
2/25/2016First Majestic Announces Financial Results for Q4 and Year E...
2/3/2014Fourth Quarter and Year End Financial Results to be Released...
11/12/2013Reports Third Quarter Financial Results
10/31/2013Third Quarter Financial Results to be Released on November 1...
7/15/2013Second Quarter Financial Results to be Released on August 13...
5/15/2013Reports First Quarter Earnings of $26.5 million on Revenues ...
5/7/2013Quarter Financial Results to be Released on May 15th
11/14/2012Earns $24.9M in Third Quarter; Revenues of $63.6M, an Increa...
11/7/2012Third Quarter Financial Results to Be Released on November 1...
8/7/2012Second Quarter Financial Results to be Released on August 14...
5/10/2012Reports Strong Earnings of $26.4M in Q1 2012, Up 10% Compare...
5/4/2012First Quarter Financial Results to Be Released on May 10th
3/5/2012Announces New Record Earnings & Cash Flows for 2011
2/24/2012to Announce Fourth Quarter and Year End 2011 Financial Resul...
10/26/2011Third Quarter Financial Results to be Released on November 9...
8/3/2011Second Quarter Financial Results to be Released on August 11...
5/17/2011Earns a Record $23.9 million in First Quarter of 2011
5/11/2011Quarter Financial Results to Be Released on May 16, 2011-Con...
3/1/20112010 Audited Financial Results show Record Earnings & Cash F...
3/23/2010Year End & Fourth Quarter Financial Results
11/12/2009Record Third Quarter Financial Results
8/14/2009Second Quarter Financial Results
8/15/2008Second Quarter Financial Results
5/16/2008CORRECTION- MISSING TEXT - Record First Quarter Financial Re...
4/18/20082007 Year End Financial Results
Project news of VanEck Vectors Global Alternative Energy ETF
1/14/2014becomes a Senior Silver Producer; Produces 10.64M Ounces of ...
12/4/2013(Del Toro)Dor=E9 Production Commences at the Del Toro SilverMine
4/9/2013(Del Toro)Del Toro Silver Mine Flotation Circuit Deemed Commercial
1/9/2013Achieved Record Production of 2.6M Silver Eqv. Ounces (2.3M ...
9/27/2012Mine Videos - Just Released
1/24/2012(Del Toro)-La Parrilla Mill Expansion to 2,000 tpd Completed: Del Toro...
1/12/2012Achieved Record Production of 1.96M Silver Ounces (2.1M Silv...
10/13/2011(La Parrilla Silver Mine)Announces Q3 Production Results and Commences Commercial Pro...
9/22/2011(La Parrilla Silver Mine)First Stage of Expansion at the La Parrilla Processing Plant...
9/13/2011(La Parrilla Silver Mine)Mill Capacity at La Parrilla to Reach 2,000 tpd Following Po...
3/1/2011(San Martin)2010 Audited Financial Results show Record Earnings & Cash F...
4/8/2010(La Encantada (first Majestic Silver))La Encantada Achieves Commercial Production
11/26/2009(La Encantada (first Majestic Silver))La Encantada Opening Ceremony & Production of First Silver P...
10/13/2009(La Encantada (first Majestic Silver))La Encantada Expansion Nearing Completion
10/6/2009Third Quarter Production Results
2/17/2009(La Parrilla Silver Mine)La Parrilla Silver Mine Updates NI 43-101 Resource
1/20/2009(San Martin)San Martin Updated NI 43-101 Report Increasing Reserves/Reso...
7/17/2008(San Juan Silver Mine)Major Intersection At San Juan Silver Mine Drill Hole Inters...
4/29/20081st Quarter Production Results
4/23/2008(San Martin Silver Mine)Commissioning of Flotation Circuit at the San Martin Silver ...
4/1/2008(La Parrilla Silver Mine)Discovery of New High Grade Ore Shoot on the Vacas Vein at t...
1/8/2008(La Encantada Silver Mine)La Encantada Silver Mine Update and New NI 43-101 Resource
7/2/2007(La Parrilla Silver Mine)La Parilla Technical Report
Corporate news of VanEck Vectors Global Alternative Energy ETF
7/27/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
7/25/2016Second Quarter Financial Results to be Released on August 10
7/20/2016Here’s Why These Five Stocks Are on the Move on Wednesday
7/12/2016First Majestic Produces 4.7 Million Silver Eqv. Ounces in Se...
1/29/2016Silver Could Spike $10 In A Day In Global Collapse Scenario
11/28/2015How Top Traders Are Shifting Western Asst High Incm Opprtnty...
10/14/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
10/14/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
10/13/2015A Silver Lining in October 2015?
10/2/2015First Majestic Completes Acquisition of Silvercrest
10/1/2015First Majestic Completes Acquisition of SilverCrest
9/25/2015First Majestic and SilverCrest Announce Shareholder Approval...
9/15/2015Leading Independent Advisory Firms ISS and Glass Lewis Recom...
8/27/2015First Majestic and SilverCrest Announce Receipt of Interim O...
8/27/2015First Majestic and SilverCrest Announce Receipt of Interim O...
8/11/2015First Majestic reports 2Q loss
8/11/2015First Majestic Reports Second Quarter Financial Results and ...
8/10/2015Why Earnings Season Could Be Great for First Majestic Silver...
7/30/2015Second Quarter Financial Results to be Released on August 11
7/30/2015First Majestic Silver: Second Quarter Financial Results to B...
7/27/2015First Majestic Announces Friendly Acquisition of Silvercrest...
7/27/2015announces friendly acquisition of Silvercrest Mines
7/9/2015First Majestic Produces 3.8 Million Silver Eqv. Ounces in Q2...
4/23/2015NYSE stocks posting largest percentage decreases
4/23/2015First Quarter Financial Results to be Released on May 7
4/23/2015First Majestic Silver Corp. First Quarter Financial Results ...
4/22/2015First Majestic Silver Corp. Announces Closing of C$30 Millio...
4/20/2015NYSE stocks posting largest percentage decreases
4/13/2015NYSE stocks posting largest percentage decreases
4/13/2015First Majestic Produces 3.9 Million Silver Eqv. Ounces in Q1...
4/9/2015NYSE stocks posting largest percentage decreases
4/6/2015First Majestic Silver Corp. Announces C$30 Million Bought De...
4/6/2015Announces C$30 Million Bought Deal Financing
4/6/2015First Majestic Announces Promotion of Martin Palacios to Chi...
4/6/2015First Majestic Announces Acquisition of Shares of First Mini...
4/1/2015NYSE stocks posting largest percentage increases
4/1/2015First Majestic Updates Mineral Reserve and Resource Estimate...
3/31/2015Announces New La Guitarra NI 43-101 Technical Report
3/31/2015First Majestic Announces New La Guitarra NI 43-101 Technical...
3/11/2015First Majestic Renews Share Repurchase Program
3/11/2015First Majestic Renews Share Repurchase Program
8/22/2014to List on the Mexican Stock Exchange
10/24/2013Appeal Against First Majestic Dismissed
9/30/2013Applies to Dismiss Appeal of Positive Judgment for US$93.84 ...
7/10/2013Produces a New Quarterly Record of 3.27 Million Silver Eqv. ...
7/2/2013Payment of CDN$14.85 million Received in Court Litigation
5/2/2013Announces Completion of La Guitarra's Expansion to 500 tpd
4/26/2013Receives Positive Judgment for US$89.6 in Court Litigation
4/17/2013Earns Socially Responsible Business Distinction Award for Fi...
4/15/2013Produces Another Quarterly Record 2.73 Million Silver Eqv. O...
3/11/2013Announces Share Repurchase Program
2/19/2013Elects Not to Exercise Right to Match Coeur's Offer for Orko
2/14/2013Considering Superior Offer from Coeur to Acquire Orko Silver
1/25/2013(Del Toro)Production Commences at the Del Toro Silver Mine
10/10/2012Produces a Record 2.44 Million Silver Equivalent Ounces in T...
9/26/2012New Look! New Features! First Majestic Bullion Store
9/6/2012Keith Neumeyer's Interview With Minesite.com
8/27/2012Announces Appointment of VP of Exploration
8/21/2012(Del Toro)Updated Del Toro NI 43-101 Technical Report & Final Permit R...
8/16/2012Recognized as a Leader in Corporate Social Responsibility
7/17/2012Produces 2.1 Million Silver Equivalent Ounces in Second Quar...
7/3/2012Completes Acquisition of Silvermex Resources
6/26/2012mex Securityholders Approve Plan of Arrangement With First M...
5/22/2012(Del Toro)Del Toro NI 43-101 Technical Report & Pre-Feasibility Study
4/16/2012First Quarter Production Results and Full Commencement of Co...
4/3/2012Announces Friendly Acquisition of Silvermex Resources
3/30/2012Files Form 40-F Annual Report
10/7/2011Third Quarter Production Results to Be Released on October 1...
8/11/2011Record Earnings of $30.6 million in Second Quarter
7/7/2011Another Record Quarter of Silver Production
4/8/2011Silver Production Up 25%; Reaches 97% Pure Silver and Mainta...
8/16/2010Record Earnings and Cash Flows. Purest Silver Producer with ...
4/22/20102nd Year Running for Mexican Distinction as a "Socially Resp...
4/12/2010Production Increases by 30% to 1,619,403 Equivalent Ounces S...
1/12/2010Production Increases by 18%, Reaches New Record
11/13/2009Completes Acquisition of Normabec Mining Resources; Normabec...
9/14/2009to Acquire Normabec Mining Resources
8/13/2009Joins OTCQX
6/26/2009offering for purchase 0.999 fine 1oz. silver rounds, and 5oz...
3/5/2009Closing of $21.2 Million Offering
11/19/2008Operations Update
9/11/2008Many Positive Developments Underway
7/15/20082nd Quarter Production Shows Continued Ramp-up
3/25/2008Closing of $45,475,000 Offering
1/17/2008Another Record Quarter of Silver Production
12/14/2007TSX Conditional Approval
12/5/2007Update on the Chalchihuites Group of Properties
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (FR.TO)OTHER OTC (FRMSF)
9.81+1.34%
TORONTO
CA$ 9.81
05/24 17:00 0.130
1.34%
Prev close Open
9.68 9.78
Low High
9.67 9.91
Year l/h YTD var.
5.74 -  10.95 22.93%
52 week l/h 52 week var.
5.74 -  10.95 29.25%
Volume 1 month var.
543,158 -%
24hGold TrendPower© : -17
Produces Lead - Silver - Zinc
Develops
Explores for Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/27/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202420.66%9.9910.04
2023-27.93%9.9510.07
2022-23.32%9.9610.00
2021-13.88%30.7512.74
20209.63%9.8610.08
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.05+0.43%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 8.91-2.73%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.59-3.26%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.05+10.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.06+0.00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
 12.67+0.88%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.34+6.25%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.18+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
 1.77-2.21%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 40.37-0.22%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :
VanEck Vectors Global Alternative Energy ETF profile | VanEck Vectors Global Alternative Energy ETF news | VanEck Vectors Global Alternative Energy ETF market Indicators | VanEck Vectors Global Alternative Energy ETF projects and resources | VanEck Vectors Global Alternative Energy ETF valuation | Go to VanEck Vectors Global Alternative Energy ETF properties | VanEck Vectors Global Alternative Energy ETF corporate presentation | VanEck Vectors Global Alternative Energy ETF annual report | VanEck Vectors Global Alternative Energy ETF management | VanEck Vectors Global Alternative Energy ETF interactive charts | VanEck Vectors Global Alternative Energy ETF free charts | VanEck Vectors Global Alternative Energy ETF TORONTO | VanEck Vectors Global Alternative Energy ETF OTHER OTC | VanEck Vectors Global Alternative Energy ETF FRANKFURT
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.