In the same category
Silvermet Announces Record Production and Sales in 2012
Published : April 10, 2013
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Debt | Market | Recovery | Silver | Turkey | Zinc |

TORONTO, ONTARIO--(Marketwired - April 10, 2013) -

THIS NEWS RELEASE IS INTENDED FOR DISTRIBUTION IN CANADA ONLY AND IS NOT AUTHORIZED FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES.

Silvermet Inc. ("Silvermet" or the "Company") (News - Market indicators) is pleased to announce financial and operating results for 2012.

Highlights (in US$)

  • 2012 was the highest year of production and sales since the start of operations in 2009.
  • Silvermet continues to generate positive cash flow with a strengthening working capital balance, no debt, relatively stable zinc prices and smelter treatment charges.
  • 2012 sales in Dry Metric Tonnes ("DMT") increased by 35% to 20,153 DMT of zinc concentrate, containing 29.6 million pounds of zinc, compared to the 21.9 million pounds of zinc sold in 2011.
  • 2012 revenues increased by 26% to $22.1 million (at 100%) compared to $17.6 million in 2011.
  • Cash costs declined by 10% to $0.57 per pound in 2012 from $0.63 per pound in 2011.
  • Zinc recovery rates increased to 75% in 2012 from 67% in 2011.
  • 2012 production increased by 29% to 19,706 DMT zinc concentrate (containing 67% zinc) compared to 2011 production of 15,328 DMT.
  • 2012 EBITDA increased by 37% to $4.6 million (at 100%) compared to $3.4 million in 2011, reflecting primarily increased zinc concentrate shipments.
  • During 2012, Silvermet repurchased and cancelled 4,918,000 common shares under the TSX Venture Exchange approved Normal Course Issuer Bid at an average price of C$0.075.
  • Silvermet is debt free, cash flow positive and profitable.
 
The following table summarizes comparative annual results and reconciles net income, an IFRS measure, to EBITDA.
 
    For the year ended December 31,  
    2012   2012     2011   2011  
(all amounts in US$)   100%   49%     100%   49%  
                     
Revenue $ 22,106,236 $ 10,832,056   $ 17,576,278 $ 8,612,376  
EBITDA(1) $ 4,619,522 $ 2,010,865   $ 3,359,682 $ 1,553,949  
Depreciation       346,962         349,688  
Stock option expense       313,954         80,067  
Finance expense       -         153,710  
Finance income       (208,100 )       (230,255 )
Other expense (income)       204,781         (600,050 )
Income tax       418,414         311,762  
Net income     $ 934,854       $ 1,489,027  
(1)  EBITDA is a non-IFRS measure, does not have a standardized meaning prescribed by IFRS and may not be comparable to similar terms and measures presented by other issuers. EBITDA comprises earnings before income taxes, interest expense (income) and financing expense (including accretion of liabilities), amortization expense, foreign exchange loss (gain), other expenses including gain on dilution and stock option expense. The Company believes it is appropriate to exclude stock option expense, gain on dilution and accretion of liabilities from EBITDA as a measure of operating performance that excludes non-recurring items.

The previously announced expansion plans in the Adana and Izmir regions of Turkey are progressing well. Each plant is planned to have annual EAFD processing capacity of 110,000 DMT and is estimated to cost $70 million to construct, for a total investment of $140 million. The two new facilities will have significantly higher EBITDA margins than the existing Iskenderun plant, with the use of improved technology. When all three facilities are in production, the total EAFD processing capacity will increase from the current 60,000 DMT per annum to 280,000 DMT and annual zinc concentrate production will increase to 100,000 DMT containing approximately 150 million pounds of zinc.

The US$49 million project finance loan from EBRD will provide 70% of the estimated US$70 million cost for the new Adana zinc plant, with the joint venture partners contributing the remaining US$21 million (Silvermet's 49% share - US$10.3 million). Silvermet is presently evaluating various funding alternatives, including the use of cash on hand for part of this funding.

Construction of each plant is estimated to require 18 months. At present, it is anticipated that permitting approval for the first plant in Adana, Turkey will be received in Q2, 2013 with construction to begin shortly thereafter pending closing of the financing agreement with EBRD. Construction of the Izmir plant is expected to follow six months later.

With various announced zinc mine closures, most zinc industry analysts are forecasting a tightening of zinc concentrate supply in the coming years. The resulting downward pressure on smelter charges and upward trend on zinc prices is expected to coincide with the commissioning of the new plants.

About Silvermet:

Silvermet's principal business activity is the recycling of electric arc furnace dust ("EAFD"), a waste product created by steel mills, through a Waelz kiln to produce a zinc concentrate that is sold to smelters throughout the world. The Company owns 49% of Befesa Silvermet Turkey ("BST"), which operates a Waelz kiln facility located in Iskenderun, Turkey.

Additional Information:

Additional information can be accessed at the Company's website www.silvermet.ca or through the Company's public filings at www.sedar.com.

Caution concerning forward-looking statements: The information in this release may contain forward-looking information under applicable securities laws. This forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those implied by the forward-looking information. Factors that may cause actual results to vary include, but are not limited to, inaccurate assumptions concerning the exploration for and development of mineral deposits, political instability, currency fluctuations, unanticipated operational or technical difficulties, changes in laws or regulations, the risks of obtaining necessary licenses and permits, changes in general economic conditions or conditions in the financial markets and the inability to raised additional financing. Readers are cautioned not to place undue reliance on this forward-looking information. The Company does not assume the obligation to revise or update this forward-looking information after the date of this release or to revise such information to reflect the occurrence of future unanticipated events except as may be required under applicable securities laws. The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Silvermet Inc.
Stephen G. Roman
Chairman, President & CEO
1 (416) 203-8336
info@silvermet.ca
or
Silvermet Inc.
Ian D. Atacan
Chief Financial Officer
1 (416) 203-8336
iatacan@silvermet.ca
www.silvermet.ca
Data and Statistics for these countries : Canada | Turkey | All
Gold and Silver Prices for these countries : Canada | Turkey | All

Silvermet Inc.

EXPLORATION STAGE
CODE : SYI.V
ISIN : CA8284251086
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Silvermet is a zinc and silver exploration company based in Canada.

Silvermet holds various exploration projects in Canada and in Turkey.

Its main exploration properties are MUSKOX and LUMBY LAKE in Canada and WAELZ KILN in Turkey.

Silvermet is listed in Canada and in United States of America. Its market capitalisation is CA$ 17.1 millions as of today (US$ 13.4 millions, € 11.3 millions).

Its stock quote reached its highest recent level on April 13, 2007 at CA$ 0.63, and its lowest recent point on October 09, 2015 at CA$ 0.02.

Silvermet has 142 100 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Silvermet Inc.
2007 Annual report
Financings of Silvermet Inc.
6/24/2008FRAME MINING CORPORATION EXERCISES WARRANTS
Nominations of Silvermet Inc.
6/19/2008APPOINTS W.S. (STEVE) VAUGHAN AS A DIRECTOR
6/4/2008APPOINTS REIN LEHARI AS CHIEF FINANCIAL OFFICER
Financials of Silvermet Inc.
11/5/2012Reports 2012 Third Quarter Results and Provides an Update on...
Project news of Silvermet Inc.
4/10/2013Announces Record Production and Sales in 2012
1/10/2008(Muskox)REPORTS ON MUSKOX 2007 DRILL RESULTS AND LAKEFIELD MINERALOG...
Corporate news of Silvermet Inc.
3/16/2015to Extend Normal Course Issuer Bid
5/29/2013Reports 2013 Q1 Results
3/11/2013to Extend Normal Course Issuer Bid
6/27/2011Announces 2011 Q1 Results
5/4/2011Reports Significantly Improved Results for 2010
8/14/2008ANNOUNCES RETIREMENT OF THE CHAIRMAN
6/11/2008Announces Change to Board of Directors
6/5/2008RECEIVES SNC LAVALINS CAPITAL
2/29/2008Advancing to Production
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (SYI.V)OTHER OTC (SYIFF)
0.120+4.35%0.350-2.78%
TSX-V
CA$ 0.120
12/22 15:10 -
4.35%
Prev close Open
0.115 0.115
Low High
0.115 0.120
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.120 -%
Volume 1 month var.
63,500 -%
24hGold TrendPower© : 27
Produces
Develops
Explores for Chromium - Cobalt - Copper - Gold - Nickel - Palladium - Platinum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :