UEX Corp

Published : November 30th, 2011

Announces Shea Creek Drilling Budget of $6 Million for 2012

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Uranium |

Re:        News - Wednesday, November 30, 2011
Title:     UEX Announces Shea Creek Drilling Budget of $6 Million for 2012

UEX Corporation ("UEX") is pleased to announce an approved 2012 exploration budget for the Shea Creek Project ("Shea Creek") of $6 million, for which UEX will be responsible for its 49% share, or $2.94 million.

Shea Creek Project

Shea Creek hosts the Kianna, Anne, Colette and 58B deposits, and is the most advanced of the ten 49%-owned Western Athabasca uranium projects joint-ventured with project operator, AREVA Resources Canada Inc. The Shea Creek deposits form part of a world-class uranium system in which mineralization has been defined over a strike length exceeding three kilometres along the Saskatoon Lake graphitic conductor in the northern part of the project. Most areas of mineralization continue to be open and have high potential for both expansion and discovery of new zones (see UEX's news releases of September 28, 2011 and October 31, 2011).

Effective December 31, 2009, UEX reported a combined National Instrument 43-101 ("N.I. 43-101") compliant mineral resource estimate for the Kianna, Anne and Colette deposits of 63.6 million pounds U3O8 in the Indicated Mineral Resource category and an additional 24.5 million pounds U3O8 in the Inferred Mineral Resource category at a cut-off of 0.3% U3O8 (see UEX news release dated May 26, 2010). Results from the 2010 and 2011 drilling, which include the discovery of the 58B Deposit and the expansion of the Kianna and Colette deposits, are not included in this resource estimate.

2012 Shea Creek Exploration

The 2012 exploration program is planned to commence in April 2012 utilizing two drills. Exploration will comprise at least 25 drill holes which will test areas of open mineralization and untested portions of the Shea Creek corridor along the Saskatoon Lake graphitic conductor, to which the deposits are spatially related.

The following areas will be targeted (see Figure 1):
  • North Colette: Several drill holes are planned to test the open extensions of thick intercepts of unconformity mineralization encountered in the 2011 program, which included intervals of 1.28% eU3O8 over 26.0 metres in drill hole SHE-66-2 and 1.22% eU3O8 over 27.9 metres in drill hole SHE-66-3. Mineralization in these drill holes is open to the east and north. Drilling will test the extent of this zone and test for higher grade areas of mineralization within it, as well as evaluate the potential for underlying fault-associated basement mineralization, such as is seen at the Kianna Deposit.
  • Kianna Deposit: Continued testing of basement mineralization discovered in 2011 which lies north of the main Kianna basement zone is planned. Drilling in 2011 has identified a new zone which extends from the north side of the Kianna main basement zone and may join with a second steeply dipping mineralized structure to the north. This new zone, which lies outside of the Kianna resource estimate, has returned broad intercepts of mineralization including 1.28% eU3O8 over 25.1 metres in drill hole SHE-130-4 and 0.81% eU3O8 over 32.0 metres in drill hole SHE-130-12, for which true widths have not yet been determined. The 2012 drilling will target these areas, as well as explore the continuity of higher grade portions of unconformity and basement mineralization to the south.
  • 58B Deposit: The 58B Deposit lies between Kianna and Colette, and to date sufficient drilling has not been completed to estimate a resource. Drilling in 2012 will further test basement mineralization where multiple high-grade veins have been intersected, including 6.53% U3O8 over 1.6 metres in drill hole SHE-133-5. Drilling will also test the extent and continuity of overlying unconformity mineralization.
  • Area between the 58B and Kianna deposits: The partial definition of the 58B Deposit in 2010 highlighted the significant exploration potential of the Shea Creek mineralization trend along the Saskatoon Lake Conductor. The 700-metre strike length between the Kianna and 58B deposits remains sparsely tested. The possibility exists for the discovery of unconformity mineralization in this area and to potentially connect the Kianna and 58B deposits. Drilling in 2012 is planned for the area immediately south of the 58B Deposit.
Further information regarding UEX's projects, including maps and cross sections, is available on UEX's website www.uex-corporation.com.

This news release has been reviewed and approved by R. Sierd Eriks, P.Geo., UEX's Vice President of Exploration, and Erwin Koning, P.Geo., AREVA's District Geologist, West Athabasca Region, who are each Qualified Persons as defined by National Instrument 43-101.

About UEX

UEX is a Canadian uranium exploration and development company actively involved in 18 uranium projects, including six that are 100% owned and operated by UEX, one joint venture with AREVA that is operated by UEX, as well as ten joint-ventured with AREVA and one under option from JCU (Canada) Exploration Company, Limited, which are operated by AREVA. The 18 projects, totaling 328,151 hectares (810,879 acres), are located in the eastern, western and northern perimeters of the Athabasca Basin, the world's richest uranium belt, which accounts for approximately 18% of the global primary uranium production. UEX is currently developing several uranium deposits in the Athabasca Basin which include the Kianna, Anne, Colette and 58B deposits at its 49%-owned Shea Creek Project, a joint venture with AREVA in the western Athabasca Basin, and the Horseshoe, Raven and West Bear deposits located at its 100%-owned Hidden Bay Project in the eastern Athabasca Basin.

UEX's two major projects have N.I. 43-101 compliant mineral resources as follows:

UEX Corporation - Indicated Mineral Resources (1) (2) (3) (4) (5)
Project Tonnes Grade
U3O8 (%)
Total
U3O8 (lbs)
UEX's share
U3O8 (lbs)
Shea Creek 1,872,600 1.540 63,572,000 31,150,280
Hidden Bay 10,293,600 0.155 35,044,000 35,044,000
TOTAL INDICATED     98,616,000 66,194,280


UEX Corporation - Inferred Mineral Resources (1) (2) (3) (4) (5)
Project Tonnes Grade
U3O8 (%)
Total
U3O8 (lbs)
UEX's share
U3O8 (lbs)
Shea Creek 1,068,900 1.041 24,525,000 12,017,250
Hidden Bay 1,109,200 0.111 2,715,000 2,715,000
TOTAL INFERRED     27,240,000 14,732,250

Notes:
(1) The mineral resource estimates comply with the requirements of N.I. 43-101 and classifications comply with CIM definition standards.
(2) The Shea Creek mineral resources were estimated at a cut-off of 0.30% U3O8.
(3) The Hidden Bay mineral resources were estimated at a cut-off of 0.05% U3O8.
(4) Please refer to the technical report on the Kianna, Anne and Colette deposits dated effective May 26, 2010, available online under UEX's profile at www.sedar.com.
(5) Please refer to the technical report on the Horseshoe and Raven deposits dated effective July 15, 2009, available online under UEX's profile at www.sedar.com.


A summary of UEX's mineral reserves are as follows:

UEX Corporation - Total Probable Mineral Reserves (1) (2) (3)
Deposit Tonnes Grade
U3O8 (%)
Total
U3O8 (lbs)
UEX's share
U3O8 (lbs)
West Bear 72,374 0.94 1,492,261 1,492,261

Notes:
(1) The mineral reserve estimates comply with the requirements of N.I. 43-101 and classifications comply with CIM definition standards.
(2) The West Bear mineral reserves were based on an estimated processing cut-off grade of 0.18% U3O8.
(3) Please refer to the technical report on the West Bear Deposit dated effective February 24, 2010, available online under UEX's profile at www.sedar.com.


FOR FURTHER INFORMATION PLEASE CONTACT

Graham C. Thody
President & CEO
(604) 669-2349

Forward-Looking Information

This news release may contain statements that constitute "forward-looking information" for the purposes of Canadian securities laws. Such statements are based on UEX's current expectations, estimates, forecasts and projections. Such forward-looking information includes statements regarding UEX's mineral resource and mineral reserve estimates, outlook for our future operations, plans and timing for exploration activities, and other expectations, intention and plans that are not historical fact. The words "estimates", "projects", "expects", "intends", "believes", "plans", or their negatives or other comparable words and phrases are intended to identify forward-looking information. Such forward-looking information is based on certain factors and assumptions and is subject to risks, uncertainties and other factors that could cause actual results to differ materially from future results expressed or implied by such forward-looking information. Important factors that could cause actual results to differ materially from UEX's expectations include uncertainties relating to interpretation of drill results and geology, additional drilling results, continuity and grade of deposits, participation in joint ventures, reliance on other companies as operators, public acceptance of uranium as an energy source, fluctuations in uranium prices and currency exchange rates, changes in environmental and other laws affecting uranium exploration and mining, and other risks and uncertainties disclosed in UEX's Annual Information Form and other filings with the applicable Canadian securities commissions on SEDAR. Many of these factors are beyond the control of UEX. Consequently, all forward-looking information contained in this news release is qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking information. Except as required by applicable law, UEX disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.

FIGURE 1
2012 Shea Creek Drill Targets



Associated File: http://www.uex-corporation.com/i/pdf/UEX-News-Release-2012-Shea-Creek-Drilling-Budget-No.pdf
630 KB in size, approx. 1 minute, 58 seconds to download at 56.6Kbps

Copyright � 2011 UEX CORPORATION (TSX - UEX) All rights reserved. For more information visit our website at http://www.uex-corporation.com/ or send email to info@uex-corporation.com ..

Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

UEX Corp

EXPLORATION STAGE
CODE : UEX.TO
ISIN : CA9026661061
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

UEX is a gold and copper exploration company based in Canada.

UEX holds various exploration projects in Canada.

Its main exploration properties are BLACK LAKE, RIOU LAKE, BEATTY RIVER, DOUGLAS, NORTHERN ATHABASCA PROJECTS, WESTERN ATHABASCA PROJECTS, FOND DU LAC, SHEA CREEK, HIDDEN BAY, ALEXANDRA, BRANDER LAKE PROJECTS and JAMES CREEK PROJECTS in Canada.

UEX is listed in Canada and in Germany. Its market capitalisation is CA$ 158.0 millions as of today (US$ 126.3 millions, € 110.7 millions).

Its stock quote reached its lowest recent point on August 15, 2003 at CA$ 0.05, and its highest recent level on November 09, 2007 at CA$ 9.30.

UEX has 319 240 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of UEX Corp
5/18/2016Closes $7.25 Million Combined Flow-Through and Hard Dollar P...
6/5/2013Announces Closing of Private Placement
5/25/2013Announces $3.175 Million Private Placement
2/23/2012Announces $3 Million Private Placement
Nominations of UEX Corp
12/19/2013Announces the Appointment of Roger Lemaitre as President and...
4/29/2011appoints Ed Boney as Chief Financial Officer
5/27/2010Appoints Walter Segsworth and David Rhys to its Management A...
Financials of UEX Corp
11/6/2013Third Quarter 2013 Financial Results and MD&A
Project news of UEX Corp
1/7/20142014 Joint Venture Exploration Programs Commence
6/4/2013(Shea Creek)Announces Additional $2.0 Million Drilling Budget for Shea C...
4/10/2013(Shea Creek)Secures Right to Fund $18 Million in Additional Drilling at ...
3/20/2013(Shea Creek)/AREVA Announce $3.1 Million Budget for Shea Creek Spring/Su...
2/13/2013(Black Lake)Regarding Uracan's Option for Black Lake Project in the Atha...
4/26/2012(Shea Creek)/AREVA 2012 Shea Creek Drilling Program Underway
2/16/2012(Hidden Bay)Commences Winter 2012 Hidden Bay Drilling Program
11/30/2011(Shea Creek)Announces Shea Creek Drilling Budget of $6 Million for 2012
8/9/2011(Hidden Bay)Commences 18,000 Metre Summer Drilling Program at Hidden Bay
2/24/2011(Western Athabasca Projects)/AREVA 2011 Western Athabasca Basin Drilling Programs Underw...
2/18/2010(Hidden Bay)Receives West Bear Preliminary Feasibility Study Reporting P...
1/27/2010(Shea Creek)2010 Western Athabasca Basin Drilling Programs Underway with...
1/6/2010(Hidden Bay)Reports Results of Summer 2009 Exploration on the Hidden Bay...
7/23/2009(Hidden Bay)Reports Significantly Expanded Resource Estimates for the Ho...
2/25/2009(Shea Creek)2009 Drill Program Underway at Shea Creek with Three Drills
1/12/2009(Shea Creek)/AREVA Drilling in the Prospective Corridor at Shea Creek Co...
1/5/2009Reports N.I. 43-101 Compliant Mineral Resource Estimate for ...
9/29/2008(Hidden Bay)reports N.I. 43-101 compliant mineral resource for Horseshoe...
6/18/2008/AREVA Drilling Outlines New Zone of High-grade Mineralizati...
1/17/2008(Hidden Bay) Launches Largest Winter Drilling Program at Hidden Bay with...
1/15/2008(Shea Creek)UEX/AREVA Launch Largest Drill Program to Date at Shea Creek...
12/5/2007(Shea Creek)/AREVA Plan $20.3 Million Program at Shea Creek for 2008 Whi...
12/4/2007(Shea Creek)/AREVA Report Additional High-Grade Basement-Hosted Minerali...
11/14/2007/AREVA Report High-Grade Basement-Hosted Mineralization in t...
10/18/2007Report Second-Best Hole Ever at the Anne Deposit Intersectin...
9/4/2007(Shea Creek)/AREVA to Commence Shea Creek Drilling Program with Three Dr...
8/21/2007(Black Lake)Extends Uranium Mineralization at Black Lake Hole BL-140 Int...
7/23/2007Reports Best Hole Ever from West Bear Deposit: Hole UEX-206 ...
7/12/2007Drilling Extends Mineralization at Kianna Deposit: SHE-115-1...
6/14/2007 Plans to Initiate Final Feasibility Study at Raven and Hors...
2/8/2006(Beatty River)2006 winter exploration commences at Beatty River Uranium pr...
Corporate news of UEX Corp
8/18/2016Research Reports Initiated on Uranium Miners Stocks U3O8, UE...
7/11/2016Paul Bay Continuity Confirmed and Down-Dip Drilling Underway
6/24/2016High Grade Zone Extended at Christie Lake
6/13/2016Drill Turning at Christie Lake
6/8/2016UEX Corporation Reports Results of Annual General Shareholde...
5/25/2016Highest Grade Hole at Christie Lake Project – 9.3% U3O8 over...
5/17/2016UEX Closes $7.25 Million Combined Flow-Through and Hard Doll...
5/2/2016UEX Places “Flow-Through” Shares and Overallotment Option; A...
4/28/2016UEX Announces $4.0 Million “Flow-Through” Private Placement
4/13/2016UEX intersects 4.27% eU3O8 over 10.2 m at Christie Lake
1/22/2016UEX Closes $2.0 Million Private Placement
1/19/2016Final Option Agreement Signed - Drill Program to Commence Im...
1/19/2016UEX Corporation: Final Option Agreement Signed-Drill Program...
12/22/2015UEX Announces $2.0 Million Private Placement
10/26/2015UEX Signs LOI on Advanced Stage Athabasca Uranium Project
9/21/2015Uranium companies could take the cake
4/21/2015UEX Announces $2.5 Million Private Placement
4/10/2015New Radioactive Fault at Wolf Lake Returns Probe Peak of 12,...
2/27/2015Promising Hydrothermal Clay Alteration Expanded at Dwyer Lak...
6/5/2014UEX/AREVA Report Drilling Results from Laurie and Mirror Riv...
4/2/2014(Black Lake)Uracan/UEX report uranium mineralization on the Black Lake P...
11/28/2013(Shea Creek)Reports 31.5 Metres Grading 0.80% eU3O8, Including 4.05% eU3...
8/6/2013(Shea Creek)Reports 22.3 Metres Grading 0.85% eU3O8, including 5.93% eU3...
6/4/2013(Shea Creek)Announces Completion and Filing of Shea Creek Technical Repo...
3/21/2013(Beatty River)Announces Completion of Beatty River Earn-in
8/8/2012/AREVA Drilling Continues to Outline Thick Mineralization at...
6/8/2012Board Re-elected and Mark Eaton Re-Appointed Chairman
5/31/2012/AREVA Drilling Continues to Outline Thick Unconformity Mine...
5/7/2012Terminates Shareholder Rights Plan
5/1/2012(Hidden Bay)Reports Summer-Fall 2011 Drilling Results for the Raven and ...
2/17/2012Announces $8 Million Bought Deal
12/16/2011Comments by David Talbot on UEX Corporation in the Energy Re...
12/7/2011Adopts Shareholder Rights Plan
12/6/2011(Shea Creek)/AREVA Drilling Expands Mineralization Northward from the Ki...
6/24/2011Board Re-elected
4/28/2011appoints Nan Lee as Vice-President of Project Development
3/17/2010Significant Unconformity Intersections at Shea Creek's 58B A...
9/23/2009CEO Stephen Sorensen to Retire; Board Names Current Chairman...
6/10/2009Stepout Drilling Expands Mineralization at Raven and Horsesh...
11/26/2008Announces Minimum $16.5 Million Budget for 2009
4/9/2008 reports final results of 2007 Horseshoe and Raven drilling,...
3/26/2008Eaton Joins UEX Board
1/22/2008UEX Commences 2008 Winter Exploration Program at Black Lake ...
1/14/2008UEX Earns Full 49% Interest in AREVA's Western Athabasca Ura...
12/14/2007Interim Resource Estimate for the West Bear Deposit Adds 223...
7/11/2007Commences Summer/Fall 2007 Drilling Programs at the Raven an...
4/23/2007on Riou Lake and Northern Athabasca Uranium Projects 2007 Ge...
2/28/2007Commences 2007 Winter Exploration Program at Black Lake Uran...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (UEX.TO)FRANKFURT (UXO.F)
0.495+16.47%0.385+2.67%
TORONTO
CA$ 0.495
08/24 16:59 0.070
16.47%
Prev close Open
0.425 0.400
Low High
0.440 0.500
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.495 -%
Volume 1 month var.
9,418,620 -%
24hGold TrendPower© : 44
Produces
Develops
Explores for Uranium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/7/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202230.26%0.510.24
202146.15%0.600.25
2020108.00%0.280.07
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.27+2.08%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56+3.70%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.49-1.19%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.89-1.00%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+0.00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.96+1.02%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :