Chart usGOLD   Chart usSILVER  
 
Food for thought
Oh what a tangled web we weave,w When first we practise to deceive."
Sir Walter Scott  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1359.60-27.44
Silver 22.25-0.41
Platinum 1451.52-31.48
Palladium 735.25-1.25
WORLD MARKETS
DOWJONES 15354120
NASDAQ 349934
NIKKEI 15138101
ASX 516016
CAC 40 400122
DAX 839828
HUI 246-10
XAU 97-3
CURRENCIES (€)
AUS $ 1.3162
CAN $ 1.3193
US $ 1.2827
GBP (£) 0.8461
Sw Fr 1.2479
YEN 132.4800
CURRENCIES ($)
AUS $ 1.0284
CAN $ 1.0279
Euro 0.7796
GBP (£) 0.6594
Sw Fr 0.9728
YEN 103.1300
RATIOS & INDEXES
Gold / Silver61.11
Gold / Oil14.16
Dowjones / Gold11.29
COMMODITIES
Copper 3.320.02
WTI Oil 96.020.86
Nat. Gas 4.060.13
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
( 0 vote, 0/5 ) Print article
     
Tweet

 

 

 

 

Rainy River Announces Significant Infill Drilling Results

TORONTO, ONTARIO--(Marketwire - Nov. 16, 2010) - Rainy River Resources Ltd. (TSX VENTURE:RR) ("Rainy River" or the "Company") is pleased to announce drill results from the Rainy River Gold Project in Northwestern Ontario.

Highlights

 
--  Infill drilling continues to return significant high grade intercepts
    and an important new discovery on the west side of the 17 Zone (448 g/t
    Au over 1.5 metres). 
--  The ODM Zone continues to show good continuity of high grade (32.7 g/t
    Au over 9.0 metres) and wide intervals of lower grade gold
    mineralization (2.2 g/t Au over 30 metres).

 

Results from all holes are summarized in Table 1: Summary of Results, at the end of this release.

To view the images accompanying this press release, please click on the following link:
http://media3.marketwire.com/docs/rr1116.pdf

New 17 Zone Mineralization

Two drill holes, NR10-576 and NR10-580, intersected the west flank of the 17 Zone at a depth of approximately 365 metres. Drill Hole NR10-580 was drilled 75 metres up-dip from NR10-576. The structure encountered is interpreted to be a westerly plunging fold situated along a footwall fault to the ODM-17 Zone. These results indicate a new gold zone within an area that has seen limited exploration below 300 metres depth.

 
NR10-576:      448 g/t (13.06 oz/ton) gold over 1.5m from 555.5m to 557.0m  
               and 1.8 g/t gold over 9.8m from 460.2m to 470.0m and 2.81 g/t
               gold over 10.5m from 534.5m to 545.0m                        
                                                                            
NR10-580:      8.7 g/t gold over 17.5m including 88.9 g/t gold (2.59 oz/ton)
               over 1.5m from 382.5m to 400.0m

 

Other notable results from the 17 zone include:

 
NR10-589:      1.4 g/t gold over 19.5m from 276.5m to 296.0m and 1.3 g/t    
               gold over 7.5m from 353.0m to 360.5m                         
                                                                            
NR10-583:      1.0 g/t gold over 19.5m from 417.5m to 437.0m and 0.8 g/t    
               gold over 13.5m from 491.0m to 504.5m

 

ODM Zone Drilling

Infill drilling in the ODM Zone within conceptual open pit depths returned the following intercepts:

 
NR10-578:      32.7 g/t gold over 9.0m from 314.0m to 323.0m drill depth,   
               including 187.7 g/t (5.47 oz/ton) over 1.5m                  
                                                                            
NR10-560:      7.9 g/t gold over 2.0m from 482.0m to 484.0m drill depth.    
               This hole also intersected mineralization in the Cap zone    
               with 1.4 g/t gold over 7.5m from 69.0m to 76.5m              
                                                                            
NR10-571:      2.5 g/t gold over 9.0m from 278.0m to 287.0m drill depth     
                                                                            
NR10-559:      1.1 g/t gold over 15.0m from 303.5m to 318.5m drill depth and
               1.4 g/t gold over 13.5m from 327.5m to 341.0m drill depth.   
               This hole also intersected mineralization in the Cap zone    
               with 8.3 g/t gold over 1.5m from 12.5m to 14.0m              
                                                                            
NR10-586:      2.2 g/t gold over 30.0m from 455.0m to 485.0m including 19.4 
               g/t gold over 1.0m. An intercept of 6.4 g/t gold over 1.5m   
               was also reported from the Cap zone between 119.0m and 120.5m
               drill depth

 

433 Zone Drilling

Recent results from the infill drilling within the 433 Zone returned several mineralized intersections, including:

 
NR10-561:      2.4 g/t gold returned over 18.0m from 368.0m to 386.0m drill 
               depth, including 15.2 g/t gold over 1.5m                     
                                                                            
NR10-562:      0.9 g/t gold over 31.5m from 377.0m to 408.5m drill depth    
                                                                            
NR10-564:      5.6 g/t gold over 1.5m from 278.5 to 280.0m, 1.4 g/t gold    
               over 16.5m from 296.5m to 313.0m and 0.83 g/t gold over 16.5m
               from 329.5m to 346.0m                                        
                                                                            
NR10-565:      2.0 g/t gold returned over 19.8m from 252.2m to 272.0m drill 
               depth, including a higher grade interval of 18.1 g/t gold    
               over 1.5m

 

Commentary

"These recent infill results have delivered some very high grade intersections in the ODM, 17 and 433 Zones, all at relatively shallow depths," commented Raymond Threlkeld, President and CEO. "Work has begun to prepare the updated NI 43-101 resource estimate using the latest information from the infill program and structural interpretation work completed by our consultants. Year to date the company has drilled over 96,000 metres at the Rainy River Gold Project which is a major accomplishment and a credit to the exploration team we've assembled."

Qualified persons

Rainy River's exploration program in Richardson Township is being supervised by Kerry Sparkes, P.Geo. Vice-President Exploration, a Qualified Person as defined by National Instrument 43-101. Garett Macdonald, P.Eng., is the person responsible for the content of this news release. The Company continues to implement a rigorous QA/QC program to ensure best practices in sampling and analysis of drill core. The procedures of the QA/QC program are detailed on Rainy River's website at
www.rainyriverresources.com.

About Rainy River

Rainy River is a Canadian precious metals exploration company whose key asset is the Rainy River Gold Project. With approximately $70 million in its treasury the Company is well funded to conduct a dual-focused drilling program consisting of: 1) definition diamond drilling of the main gold resources in preparation for scoping and prefeasibility studies, and 2) selective diamond drill testing of high-priority gold targets defined primarily by RC drilling within the large gold system centered in Richardson Township. The Company's property is extremely well located in the southwestern corner of Northern Ontario near the U.S. border. It is accessed by a network of roads and is close to hydro-electric infrastructure. The Rainy River district has a skilled labour force and is one of the lowest-cost areas for mineral exploration and development. Ontario has low political risk and, according to the annual Fraser Institute global survey of the mining industry, has consistently ranked as one of the top jurisdictions embracing mineral development.

RAINY RIVER RESOURCES LTD.

Raymond Threlkeld, President & CEO

This release includes certain statements that may be deemed to be "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at
www.sedar.com for further information.

 
Table 1: Summary of Results
 
----------------------------------------------------------------------     
                    VERTICAL
                       DEPTH   FROM     TO  LENGTH      Au
HOLE-ID    SECTION        (m)    (m)    (m)     (m)    g/t        ZONE     
----------------------------------------------------------------------     
NR10559     425300        12   12.5   14.0     1.5    8.26         CAP     
            425309       256  279.5  281.0     1.5    1.39      ODM HW     
            425309       259  282.5  284.0     1.5    1.76      ODM HW     
            425312       284  303.5  318.5    15.0    1.12         ODM     
            425313       305  327.5  341.0    13.5    1.38         ODM     
----------------------------------------------------------------------     
NR10560     425574        25   26.0   27.0     1.0    1.43         CAP     
            425574        68   69.0   76.5     7.5    1.40         CAP     
            425575       129  138.0  139.5     1.5    3.28         CAP     
            425588       443  482.0  484.0     2.0    7.87  17-ODM GAP  NEW
----------------------------------------------------------------------     
NR10561     425675       146  145.0  146.0     1.0    4.67          HS     
            425684       377  368.0  386.0    18.0    2.39         433     
     INCL   425684       376  375.5  377.0     1.5   15.23         433     
----------------------------------------------------------------------     
NR10562     425633       393  377.0  408.5    31.5    0.90         433     
            425640       528  530.0  531.5     1.5    2.25      433 FW     
----------------------------------------------------------------------     
NR10564     425702       211  211.0  212.5     1.5    2.96          HS     
            425703       255  256.5  258.0     1.5    1.92          HS     
            425704       277  278.5  280.0     1.5    5.85         433     
            425705       302  296.5  313.0    16.5    1.40         433     
            425706       334  329.5  346.0    16.5    0.83         433     
----------------------------------------------------------------------     
NR10565     425750       154  164.0  165.5     1.5    1.09          HS     
            425751       241  252.2  272.0    19.8    1.97         433     
     INCL   425751       236  254.0  255.5     1.5   18.12         433     
----------------------------------------------------------------------     
NR10569     425524        81   78.0   94.1    16.1    0.54         CAP     
            425537       384  420.0  421.5     1.5    3.05  17-ODM GAP  NEW
            425541       440  486.0  487.5     1.5    3.16  17-ODM GAP  NEW
----------------------------------------------------------------------     
NR10570     425778       290  294.5  300.5     6.0    0.45         433     
----------------------------------------------------------------------     
NR10573     425846        60   72.5   74.0     1.5    5.96          HS     
            425846        67   78.5   86.0     7.5    0.80          HS     
            425845        88  105.5  111.5     6.0    1.32          HS     
            425842       188  228.5  243.5    15.0    0.47         433     
            425842       211  264.5  266.0     1.5    5.25         433     
----------------------------------------------------------------------     
NR10574     425797        84   94.0   96.5     2.5    3.28          HS     
            425796       111  125.0  126.5     1.5    1.93          HS     
            425795       132  150.5  152.0     1.5    1.64          HS     
            425796       169  188.0  200.0    12.0    0.87          HS     
            425797       204  218.0  254.0    36.0    0.74         433     
            425808       329  384.0  385.0     1.0    4.59      433 FW     
----------------------------------------------------------------------     
NR10576     425786       405  437.0  444.5     7.5    2.94          17     
     INCL   425786       403  437.0  438.5     1.5   10.89          17     
            425788       427  460.2  470.0     9.8    1.81          17     
     INCL   425788       423  460.2  461.0     0.8    7.55          17     
            425792       470  512.0  515.0     3.0    5.35          17     
            425795       493  534.5  545.0    10.5    2.81          17     
     INCL   425795       493  539.0  540.5     1.5    8.62          17     
            425796       508  555.5  557.0     1.5  448.56          17     
----------------------------------------------------------------------     
NR10577     425799       471  522.5  530.0     7.5    1.56          17     
            425811       524  585.5  594.5     9.0    1.92          17     
----------------------------------------------------------------------     
NR10578     425350        13   14.0   15.5     1.5    2.01         CAP     
            425355       293  314.0  323.0     9.0   32.74         ODM     
     INCL   425354       291  315.5  317.0     1.5  187.69         ODM     
----------------------------------------------------------------------     
NR10580     425763       331  362.5  364.0     1.5    1.18          17     
            425764       337  370.0  371.5     1.5    1.02          17     
            425765       346  380.5  381.0     0.5    1.16          17     
            425766       355  382.5  400.0    17.5    8.72          17     
     INCL   425765       348  382.5  383.0     0.5    7.56          17     
      AND   425766       359  394.0  395.5     1.5   88.94          17     
            425775       432  470.5  481.0    10.5    0.77          17     
----------------------------------------------------------------------     
NR10581     425449        91   94.5   96.0     1.5    7.21         CAP     
            425450       142  148.5  151.5     3.0    6.97         CAP     
            425450       163  169.5  178.5     9.0    0.93         CAP     
            425468       421  468.0  469.5     1.5    5.55         ODM     
            425469       431  480.0  481.5     1.5    2.64         ODM     
            425470       443  493.5  495.0     1.5    3.01         ODM     
            425476       487  547.5  549.0     1.5    7.77         ODM     
----------------------------------------------------------------------     
NR10583     425804       369  404.0  405.5     1.5    1.18          17     
            425806       389  417.5  437.0    19.5    0.98          17     
            425816       451  491.0  504.5    13.5    0.81          17     
----------------------------------------------------------------------     
NR10586     425426        66   69.5   71.0     1.5    1.15         CAP     
            425427        76   80.0   81.5     1.5    1.46         CAP     
            425428        84   89.0   90.5     1.5    1.13         CAP     
            425428       104  110.0  111.5     1.5    1.25         CAP     
            425428       105  111.5  113.0     1.5    1.28         CAP     
            425429       112  119.0  120.5     1.5    6.35         CAP     
            425452       391  432.5  434.0     1.5    3.45         ODM     
            425455       423  455.0  485.0    30.0    2.23         ODM     
     INCL   425455       423  472.7  485.0    12.3    3.94         ODM     
     INCL   425455       423  477.0  481.0     4.0    9.14         ODM     
     INCL   425455       429  477.0  478.0     1.0   19.36         ODM     
----------------------------------------------------------------------     
NR10589     425684       252  276.5  296.0    19.5    1.39          17     
            425690       311  353.0  360.5     7.5    1.34          17     
----------------------------------------------------------------------

 




Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

CONTACT INFORMATION:

Rainy River Resources Ltd.
Liz Caridi
Director of Investor Relations and Corporate Governance
(604) 639-4497
lcaridi@rainyriverresources.com
www.rainyriverresources.com


.

Tweet

Rainy River Resources, Ltd.

EXPLORATION STAGE
CODE : RR.V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Rainy River Resources, Ltd.
8/30/2012Rainy River surprises with new capex plan on 4 million ounce...
4/21/2012Rainy River shareprice slides 10% on capital cost speculatio...
4/19/2012Rainy River sees promise in new Ontario gold district
10/19/2010Rainy River Announces Infill Drill Results, Including 25.1 g...
6/17/2010Rainy River Resources Ltd
1/20/2010Rainy River strikes gold in Ontario
1/19/2010Rainy River gold discovery thrills analysts
Annual reports of Rainy River Resources, Ltd.
2008 Annual report
Annual Report 2007
Financings of Rainy River Resources, Ltd.
11/13/2012Announces $75 Million Bought Deal Financing
1/7/2011Closes $75 Million Bought Deal Financing
12/15/2010Rainy Riv Announces C$65.0 Million Bought Deal Private Place...
9/8/2010Closes Flow-Through Share Financing
8/17/2010Announces Flow-Through Share Financing
2/19/2010Announces Increased Size of Private Placement
11/2/2009Closes Flow-Through Share Financing
10/7/2009Announces Flow-Through Share Financing
8/2/2007Closes $35 Million Bought Deal Financing
Option Grants of Rainy River Resources, Ltd.
2/17/2010Grants Stock Options
2/12/2009Announces Grant and Repricing of Stock Options
11/14/2008Grants Stock Options
8/25/2008Grants Stock Options
Nominations of Rainy River Resources, Ltd.
10/28/2010Appoints Kerry Sparkes as Vice President, Exploration
6/17/2010Appoints Two Independent Directors
5/18/2010Announces Appointment of Nicholas
4/9/2010Announces Appointment of Director of Environment and Sustain...
12/11/2009Appoints Garett Macdonald as Vice President Operations
10/7/2009Appoints Liz Caridi as Director of Investor Relations & Corp...
2/4/2009Announces New Management Appointments
4/23/2007Appoints Dale C. Peniuk, CA to Board
Project news of Rainy River Resources, Ltd.
4/3/2011(Rainy River)2011 Exploration Program Expanded to 170,000 Metres
2/24/2011(Rainy River)Announces Updated Mineral Resource Statement
2/4/2011(Ti-pa-haa-kaa-ning (tpk))and Northern Superior Announce Final Phase 1 Results and Com...
1/11/2011(Rainy River)Announces High-Grade Infill Drilling Results
12/6/2010(Rainy River)Announces Significant Infill Drilling Results
11/30/2010(Rainy River)Announces Successful Down-Dip Drilling Study
11/16/2010Announces Significant Infill Drilling Results
10/26/2010(Rainy River)Infill Drilling at Rainy River Returns 58.0 g/t Gold Over 3....
10/25/2010and Northern Superior Initiate Diamond Drilling at TPK With ...
10/19/2010(Rainy River)Announces Infill Drill Results, Including 25.1 g/t Gold Over...
8/31/2010(Rainy River)Infill Drilling Returns 407.9 g/t Gold (11.9 oz/ton) Over 4....
7/20/2010Intersects 51.2 g/t Gold Over 1.5 Metres in ODM17 Zone
6/9/2010(Rainy River)Intersects 128.5 g/t (4.13 oz/t) Gold Over 5.5 Metres in 433...
5/20/2010(Rainy River)Provides Drilling Update
4/20/2010(Rainy River)Identifies Strong New Gold Targets by RC Drilling
3/24/2010(Rainy River)Announces High-Grade Gold Results and Continued Exploration ...
12/16/2009(Rainy River)Intersects More High-Grade Gold
11/9/2009(Rainy River)Intersects High Grade Gold Near Surface in Cap Zone
10/6/2009Announces Results From Ten New Drill Holes
9/8/2009(Rainy River)Announces Results of Infill and Exploration Drilling and Pro...
7/13/2009(Rainy River)43-101 Report Filed on SEDAR
5/27/2009(Rainy River)Receives Gold Resource Update: Indicated Resources Increase ...
5/7/2009(Rainy River)CEO Clips Is Featuring Rainy River Resources Ltd=2E on the B...
3/30/2009(Rainy River)Massive Pyrite Intersection Carries Robust Gold and Silver
3/26/2009(Rainy River)Adds to Land Package
3/25/2009(Rainy River)Further Increases Land Position
3/11/2009(Rainy River)Discovers Another Strong Gold Zone With Drill Hole NR09-329 ...
1/27/2009(Rainy River)Reports Further Drill Results From Main Resource Area; Two D...
1/20/2009Confirms Two New High-Grade Gold Zones With First Holes Test...
9/16/2008(Rainy River)Robust Gold Intersection Recorded on the Bayfield "Burns Blo...
9/9/2008(Rainy River)New High Grade Gold Discovery for Rainy River
7/9/2008(Burns Block (rainy River))First Round of Drilling in Rainy's Off Lake Area Confirms Re...
6/19/2008(Burns Block (rainy River))Further Increases Land Position
6/2/2008(Burns Block (rainy River))Reports Wide, Near-Surface Gold Interval From 17/ODM Zone
5/27/2008Reports Wide, High-Grade Gold Intersection in 433 Zone
4/23/2008(Burns Block (rainy River))Reports Further Drill Results From Richardson Township: 433 ...
2/13/2008(Burns Block (rainy River))Positive Metallurgical Report for Rainy River's 17/ODM Zone
1/29/2008(Burns Block (rainy River))433 Zone Drilling Update; Rainy Records Another Impressive G...
11/28/2007(Burns Block (rainy River))Two Deep Holes Below 400 M level in Rainy's 17/ODM Zone Inte...
11/5/2007Intersects a 4.0-Metre Wide Semi-Massive Sulphide Horizon Gr...
10/15/2007(Burns Block (rainy River))Discovers New Gold Zone in Step-Out Drill Hole
9/11/2007(Burns Block (rainy River))Continues to Intersect Strong Gold Values in ODM and 17 Zone...
5/29/2007(Burns Block (rainy River))Intersects 55.7 Metres of 4.01 g/t Gold in "ODM Zone" and 10...
5/17/2007Intersects 28.9 Meters Grading 5.19 g/t Gold in 433 Zone ODM...
5/2/2007Diamond Drilling to Commence on Block "B" in May, NW Ontario
5/24/2006demonstrates excellent continuity at 230m level and remains ...
Corporate news of Rainy River Resources, Ltd.
9/9/2010Signs Formal Option Agreement wi
8/26/2010South Zone Returns 7.83 g/t Gold Over 3.0 Metres
8/19/2010Announces Board Approval of Increased Exploration Budget
5/31/2010Announces Retirement of Nelson B
5/12/2010and Fort Frances Chiefs Secretar
3/18/2010Reports AGM Results
2/25/2010Announces Closing of $55 Million Private Placement
2/22/2010Announces Final 2009 Drill Results
12/10/2009Provides Update on 2009 Exploration Activities, Corporate De...
12/1/2009Drilling Continues to Expand Resource Potential
6/23/2009Announces Retirement of Nelson W=2E Baker as CEO and Preside...
6/16/2009Resources Ltd=2E: Infill Drilling Between ODM/17 and HS/433 ...
6/4/2009Completes Buy-Out of NSR Royalty
5/13/2009Announces Buy-Out of NSR Royalty
4/24/2009Reports AGM Results
3/18/2009Cancels 725,000 Director Options
12/1/2008Announces Buyout of Royalty and Bonus Payment
8/18/2008Announces Normal Course Issuer Bid
7/29/2008Defines Two Major New Gold-in-Till Anomalies and Adds to Glo...
6/12/2008Resources Investor Relations Services
6/10/2008Resources Ltd=2E: More Wide Gold Intervals Near Surface in 1...
4/30/2008CORRECTION FROM SOURCE: Rainy River to Drill New Goldbearing...
3/18/2008's 433 Gold Zone Demonstrates Strong Continuity Along Strike...
1/21/2008Reports Results of 11 Drill Ho =?ISO-8859-1?Q?les=20Complete...
12/17/2007and Western Warrior Enter Into =?ISO-8859-1?Q?=20Option=20Ag...
12/10/2007Launches Ground Based Geophysical Surveys Designed to Penetr...
12/3/2007 and Bayfield Ventures Sign Option Agreement on Burns Block ...
11/13/2007 Drilling on ODM/17 Zone Continues to Intersect Strong Gold ...
10/1/2007Metallurgical Testing, High Sensitivity Airborne Gradiometer...
9/27/2007President Updates Ongoing Rainy River Drill Program, NW Onta...
8/28/2007Project Update
7/17/2007CORRECTION FROM SOURCE: Deep Intersection in Rainy's 17 Zone...
7/17/2007Deep Intersection in Rainy's 17 Zone Returns 16.5 m Grading ...
4/30/2007Drilling to Commence in May on Rainy River Claim, NW Ontario
2/22/2007to Test New Gold-Bearing Base =?ISO-8859-1?Q?Metal=20Target...
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (RR.V)Other OTC (RRFFF.PK)
7.75-4.67%1.99-5.24%
TSX-V
CA$ 7.75
09/27 15:59 -0.380
-4.67%
Prev close Open
8.13 8.49
Low High
7.75 8.49
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  7.75 -%
Volume 1 month var.
287,798 -%
24hGold TrendPower© : -44
Produces
Develops
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2011-40.61%9.9210.03
2010214.46%9.6010.60
2009277.27%4.201.23
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Get Investor Information
High Desert Gold
Select
& click