Noront
Resources Ltd. ("Noront" or the
"Company") (TSXV:NOT.V)
is pleased to provide an updated mineral resource
estimate for the Eagle's Nest deposit, located at its McFaulds
Lake Property in the James Bay Lowlands.
The NI 43-101 Resource estimate for Eagle's Nest deposit has
significantly increased and is now estimated to contain:
Main Zone
- Measured
and Indicated resource of 11.0million tonnes
grading 1.78% Ni, 0.98% Cu, 0.99 gpt Pt and
3.41 gpt Pd and 0.20 gpt
Au;
-
- Inferred
resource of 9.0 million tonnes grading 1.10%
Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au;
-
East Zone
- Inferred
resource of 1.6 million tonnes grading 0.31%
Ni, 0.09% Cu, 0.12 gpt Pt and 0.45gpt Pd and
0.04 gpt Au;
-
Noront's
President and CEO, Wes Hanson, states: "For a second consecutive year
the Company has realized a resource increase at Eagle's Nest. Drilling
at Eagle's Nest in 2010 was undertaken to improve the geological confidence
of the mineral resource disclosed in March 2010 and to increase the inferred
resource at depth. This updated resource estimate confirms that both
objectives were successfully accomplished. The East Zone, approximately 200 metres east of Eagle's Nest, is indicative of the
potential for future resource increases within the Eagle's Nest Complex. Our
winter exploration continues as planned with two drills currently operating.
One drill is testing targets at AT12, the second
drill is testing targets at the Western Intrusive Complex. We are also
expanding the ground based geophysical survey to assist in prioritizing previously
identified airborne targets within the Eagle's Nest Complex."
The updated mineral resource is based on the exploration drilling
completed during the 2010 field season, and updates the previous NI 43-101
compliant resource estimate for the Eagle's Nest Deposit announced on March
9, 2010.
During 2010, the Company drilled 20,200 metres
at Eagle's Nest. The drilling was focused on improving the confidence
and classification of previous resources estimates through in-fill drilling.
In addition, the 2010 program also aimed at expanding the deposit at depth
based on a drilling program. Despite challenges in the deep drilling program,
the Company was successful in both objectives.
The extent of the mineralization now extends to a depth of
approximately 1,650 metres from surface. The
Eagle's Nest resource includes inferred resource along strike and down dip
below 1,100 metres providing significant potential
for further resource growth. It is anticipated that the nickel grade of the
inferred resource will increase during further delineation drilling. Due to
the depth of this inferred resource, further drilling on this target will be
more effective from an advanced exploration program utilizing an underground
exploration ramp.
Micon
International Limited ("Micon") Qualified
Persons responsible for the resource estimate are Charley Murahwi,
P.Geo.,
MAusIMM and Alan J. San Martin, MAusIMM.
The work was supervised by Richard Gowans, P.Eng. All are Qualified Persons under the definitions of
NI 43-101. The current resource estimate for Eagle's Nest is summarized as:
|
Tonnes
|
Ni %
|
Cu %
|
Pt g/t
|
Pd g/t
|
Au g/t
|
Main Zone
|
|
|
|
|
|
|
Measured
|
5,346,000
|
2.08
|
1.07
|
1.04
|
3.55
|
0.20
|
Indicated
|
5,643,000
|
1.50
|
0.89
|
0.94
|
3.27
|
0.20
|
Total M&I
|
11,000,000
|
1.78
|
0.98
|
0.99
|
3.41
|
0.20
|
Inferred
|
8,966,000
|
1.10
|
1.14
|
1.16
|
3.49
|
0.30
|
|
|
|
|
|
|
|
East Zone
|
|
|
|
|
|
|
Inferred
|
1,615,000
|
0.31
|
0.09
|
0.12
|
0.45
|
0.04
|
Eagle`s Nest Main Zone resources are reported at a 0.50% nickel cutoff
within a geological limit defined by a nickel cutoff grade of 0.25%. The East
Zone is reported within a geological limit defined by a 0.25% nickel cut-off
grade with no cut-off grade used to report the resource. Total tonnages are
rounded to the nearest hundred thousand and individual categories are rounded
to the nearest thousand tonnes.
The revised resource estimate was compared with the previous Eagle's
Nest estimate to demonstrate the growth of the resource both in tonnages and
contained metal by resource classification. This comparison is summarized
below:
Eagle's Nest Increase From March 9, 2010 Estimate
|
Tonnes
|
Ni
|
Cu
|
Pt
|
Pd
|
Total M&I
|
58%
|
38%
|
62%
|
20%
|
58%
|
Inferred
|
110%
|
62%
|
173%
|
202%
|
115%
|
Note- metal increase based on metal included within resource estimate
The updated resource is based on 116 holes (58,300 metres)
which define the mineralization envelope. The limits of the resource
were determined by the natural break in the mineralization at 0.25% Ni. The
Eagle's Nest Main Zone extends approximately 125 metres
along strike, 1,650 metres down-dip, and averages
40 metres in thickness. A block model was
constructed and grades estimated using inverse distance to the third power
interpolation with composite samples 1.5 metres in
length.
Micon is
currently in the process of completing a NI 43-101 compliant Technical Report
supporting the estimate disclosed herein which will be filed with SEDAR and
made available on the Company's website within 45 days of the date hereof.
This resource estimate reported in this press release includes the
Eagle's Nest Deposit and the newly reported East Zone. Micon
is in the process of compiling a resource estimate for the Eagle Two deposit.
The Company is currently drilling targets identified at AT-12 and AT-4
and will report results from these programs when
available. The Company has all essential supplies on site to continue
exploration through until the end of May.
The estimate of mineral resources may be materially affected by
environmental, permitting, legal, title, taxation, socio-political, marketing
or other relevant issues. There is no guarantee that Noront
will be successful in obtaining any or all of the requisite consents, permits
or approvals, regulatory or otherwise for the project or that the project
will be placed into production.
INDEPENDENT QUALITY CONTROL AND ANALYTICAL PROTOCOL
A thorough quality control program has been in effect for the McFaulds Lake Project, which includes grouping samples
into batches of 35 into which are added 2, certified reference material
standards, 2 field and pulp duplicates also form part of the quality control
program. It can be said with confidence that all assays are reported in
this Press Release have passed the strict quality control guidelines as set
out by Noront's Qualified Person.
All samples taken since the August 2008 Resource Estimate, and used in
this resource update, were analyzed by Activation Laboratories Ltd. ("Actlabs") of Ancaster,
Ontario. The samples submitted to Actlabs
were analyzed for multi-elements, including Ni and Cu using a four acid
digestion and by ICP analysis. The samples that received base metal
values greater than the upper limit for the method underwent further analysis
using ICP-OES. For the Au, Pd and Pt, the assay methodology was Fire
Assay on a 30 gram aliquot with an ICP finish. Silver was analyzed
using a 3-acid digest with an ICP analysis. For more information on
assay methodology please visit the Actlabs website
at http://www.actlabsint.com.
Preparation of this press release has been supervised by Noront's senior management and reviewed by Jeremy Niemi, P.Geo., Vice President, Geology, who is a Qualified Person
under Canadian Securities Administrators guidelines.
The contents of this press release have been read and approved by Mr.
Richard Gowans of Micon,
who is a Qualified Person under Canadian Securities Administrators
guidelines.
About Noront:
Noront Resources Ltd. is focused on its significant
and multiple, high-grade nickel-copper-platinum-palladium, chromite, gold and vanadium discoveries in an area known
as the "Ring of Fire", an emerging multi-metals district located in
the James Bay Lowlands of Ontario, Canada. Noront
is the dominant land holder at the Ring of Fire and continues to delineate
and prove up its discoveries with NI 43-101 technical and economic reports and
an aggressive and well financed drill plan for 2010. All material information
on Noront can be found on the Company's website at www.norontresources.com
or at SEDAR at www.sedar.com
Wesley (Wes) Hanson
President & Chief Executive Officer
FORWARD LOOKING STATEMENTS
This release contains "forward-looking statements" within
the meaning of applicable Canadian securities legislation, including
predictions, projections and forecasts. Forward-looking statements
include, but are not limited to, statements that address activities, events
or developments that the Company expects or anticipates will or may occur in
the future, including such things as future business strategy, competitive
strengths, goals, expansion, growth of the Company's businesses, operations,
plans and with respect to exploration results, the timing and success of
exploration activities generally, permitting time lines, government
regulation of exploration and mining operations, environmental risks, title
disputes or claims, limitations on insurance coverage, timing and possible
outcome of any pending litigation and timing and results of future resource
estimates or future economic studies.
Often, but not always, forward-looking statements can be identified by
the use of words such as "plans", "planning",
"planned", "expects" or "looking forward",
"does not expect", "continues", "scheduled",
"estimates", "forecasts", "intends",
"potential", "anticipates", "does not
anticipate", or "belief", or describes a "goal", or
variation of such words and phrases or state that certain actions, events or
results "may", "could", "would",
"might" or "will" be taken, occur or be achieved.
Forward-looking statements are based on a number of material factors
and assumptions, including, the result of drilling and exploration
activities, that contracted parties provide goods and/or services on the
agreed timeframes, that equipment necessary for exploration is available as
scheduled and does not incur unforeseen break downs, that no labour shortages or delays are incurred, that plant and
equipment function as specified, that no unusual geological or technical
problems occur, and that laboratory and other related services are available
and perform as contracted. Forward-looking statements involve known and
unknown risks, future events, conditions, uncertainties and other factors
which may cause the actual results, performance or achievements to be
materially different from any future results, prediction, projection,
forecast, performance or achievements expressed or implied by the
forward-looking statements. Such factors include, among others, the
interpretation and actual results of current exploration activities; changes
in project parameters as plans continue to be refined; future prices of gold;
possible variations in grade or recovery rates; failure of equipment or
processes to operate as anticipated; the failure of contracted parties to
perform; labour disputes and other risks of the
mining industry; delays in obtaining governmental approvals or financing or
in the completion of exploration, as well as those factors disclosed in the
Company's publicly filed documents. Although Noront
has attempted to identify important factors that could cause actual actions,
events or results to differ materially from those described in
forward-looking statements, there may be other factors that cause actions,
events or results not to be as anticipated, estimated or intended. There can
be no assurance that forward-looking statements will prove to be accurate, as
actual results and future events could differ materially from those
anticipated in such statements. Accordingly, readers should not place undue
reliance on forward-looking statements.
Neither TSX Venture Exchange nor its Regulation Services Provider (as
that term is defined in the policies of the TSX Venture Exchange) accepts
responsibility for the adequacy or accuracy of this release.
|
|