| | Published : June 14th, 2011 | Announces Significant Resource Upgrade, Ollachea Project, Peru |
|
Article
|
Comments
|
Comment this article
|
Rating
|
♥
Follow Company
|
|
|
|
Jun 14, 2011
Minera IRL Announces Significant Resource Upgrade, Ollachea Project, Peru
London and Toronto, 14 June 2011: Minera IRL Limited ("Minera IRL" or the "Company"), (TSX:IRL) (AIM:MIRL) (BVL:MIRL) the Latin American focused gold mining, development and exploration company, is pleased to announce a significant resource upgrade at the contiguous Minapampa and Minapampa East Zones, Ollachea Project, Southern Peru.
Highlights:
- Total Indicated Resource in the contiguous Minapampa and Minapampa East zones has been increased to 10.7 million tonnes grading 4.0g/t gold containing 1.4 million ounces, an increase of almost 20% in this category. An additional inventory of 3.3 million tonnes at a grade of 3.0g/t gold containing 0.3 million ounces remains in the Inferred category
- Included within the above resource envelope, the higher grade core Indicated Resource has increased to 4.8 million tonnes grading 5.5g/t gold containing 0.8 million ounces
- This upgrade largely reflects the positive in-fill drilling at Minapampa East where 0.2 million ounces at a grade of 3.9g/t gold was elevated to the Indicated category
- The updated Indicated Resource will be used to establish Minable Reserves in the Pre-feasibility Study scheduled for completion in July
- Drilling is continuing at the Concurayoc zone, approximately 300 meters to the west of Minapampa, where a maiden resource estimate is scheduled for release in the third quarter
"The in-fill drilling at Minapampa East has been most encouraging demonstrating strong continuity of the lenses at significantly higher grades than expected." said Courtney Chamberlain, Executive Chairman of Minera IRL. "We now have a robust resource over a strike of 900 meters in the Indicated Category containing 1.4 million ounces which is the basis for the Pre-feasibility study which is nearing completion. Taking into account the Concurayoc zone, where drilling is continuing, we are confident that our global resource inventory will exceed 2 million ounces in the near future. Beyond this, exploration upside is excellent with gold mineralization open-ended along strike in both directions as well as down-dip. Much of this will be explored by drilling from the planned underground exploration drive."
This update supersedes the Ollachea resource announcement of November 2010. Subsequent in-fill drilling at Minapampa East has resulted in the contained ounces in the Indicated category increasing by nearly 20% to 1.4 million ounces. In the process both tonnage and grade has increased. This increase was also assisted by an increase in the dry in-situ bulk density from 2.80 tonnes per cubic meter to 2.83 tonnes per cubic meter. |
Indicated Mineral Resource applying a 2.0g/t gold cut-off
Zone |
Metric tonnes
(Millions) |
Grade - g/t gold |
Contained ounces
(Millions) |
Minapampa |
9.3 |
4.0 |
1.2 |
Minapampa East |
1.4 |
3.9 |
0.2 |
Total |
10.7 |
4.0 |
1.4 |
Inferred Mineral Resource applying a 2.0g/t gold cut-off
Zone |
Metric tonnes
(Millions) |
Grade - g/t gold |
Contained ounces
(Millions) |
Minapampa |
2.4 |
3.0 |
0.2 |
Minapampa East |
0.9 |
3.0 |
0.1 |
Total |
3.3 |
3.0 |
0.3 |
Included within the above resource envelope, the higher grade core Indicated Resource, using a 3.5g/t gold cut-off, has increased to 4.8 million tonnes grading 5.5g/t gold containing 0.8 million ounces..
This Canadian National Instrument NI43-101 compliant resource estimate was carried out by consultancy Coffey Mining over the Minapampa Zone and a contiguous strike extension known as Minapampa East. The estimate was based upon 88 Diamond drill holes for 31,980 meters at Minapampa and 32 Diamond drill holes for 14,424 meters at Minapampa East, for a combined 120 drill holes totalling 46,404 meters. The resource estimates apply a 2g/t gold bottom cut and top cutting as appropriate for each of the seven discrete gold-mineralized horizons, or "lenses" that have been defined to date.
Several of the most easterly holes drilled at Minapampa East, beyond which steep terrain precludes further drilling from surface, returned strong gold intersections including DDH11-148 with 7 meters grading 20.7g/t gold and DDH11-152 with 3 meters grading 27.2g/t gold. This augers well for future exploration of the eastern extension of the deposit from the planned underground exploration drive.
Resource Estimate Authorship and Methodology
The mineral resource estimate was prepared by Mr Doug Corley, Member of the Australian Institute of Geoscientists, Associate Resource Geologist in Resource Modelling with Coffey Mining Pty Ltd.
On the basis of the confidence levels of the key criteria that were considered during the resource estimation, the mineral resource estimates provided in this press release have been classified and reported in accordance with CIM guidelines and National Instrument NI.43-101.
The upgraded Ollachea resource estimate was based on 120 Minera Kuri Kullu S.A. (a subsidiary of Minera IRL) Diamond drill holes totalling some 46,404 meters.
Minera Kuri Kullu senior exploration geologists and Minera IRL senior resource staff worked together in expediting representative 3-D geological-grade wireframe models defining the principal mineralized lenses at a lower cut of 1 g/t gold. The resulting in-situ geological-grade model, depicting the seven principal mineralized horizons discovered at Ollachea to date, was subsequently provided to Coffey Mining as a "guide" interpretation of the main mineralized components of the Ollachea orogenic gold deposit.
Prior to this, Mr Doug Corley conducted a field visit to the project site where he had the opportunity to interact with project geologists and related staff and to study the geology and associated mineralization in order to become familiar with the geological demeanour as well as continuity of grade distribution inherent to the Ollachea deposit.
Resource estimation methodology included completion using Ordinary Kriging for gold. The estimation was constrained within mineralized interpretations that were created with the assistance of the Minera Kuri Kullu and Minera IRL geological staff. The seven potentially economic gold mineralized domains were interpreted using closely spaced north-south oriented, vertical transversal sections based on a combination of detailed geological observations and gold grade information.
Competent Persons Statement
The preparation of the technical information contained herein was supervised by Donald McIver, VP Exploration of the Company, MSc Exploration and Economic Geology, a Fellow of the Australian Institute of Mining and Metallurgy (AUSIMM), who is recognized as a Qualified Person for the purposes of National Instrument 43-101, and who has reviewed and approved the technical information in this press release |
For more information please contact:
Minera IRL
Trish Kent, Vice President, Corporate Relations
|
+511 4181230 |
Collins Stewart (Nominated Adviser & Broker, London)
Adam Miller
John Prior
|
+ 44 (0)20 7523 8350 |
finnCap (Co-broker, London)
Geoff Nash (Corporate Finance)
Matthew Robinson (Corporate Finance)
Joanna Weaving (Corporate Broking)
|
+ 44 (0)20 7600 1658 |
RBC Capital Markets (Co-broker, London)
Stephen Foss
Martin Eales
|
+44 (0)20 7653 4000 |
Bankside Consultants (Financial PR, London)
Simon Rothschild
Louise Mason |
+ 44 (0)20 7367 8888
|
Minera IRL Limited is the AIM traded and TSX and BVL listed holding company of precious metals mining and exploration companies focused in Latin America. Minera IRL is led by an experienced senior management team with extensive industry experience, particularly in operating in South America. The Group operates the Corihuarmi Gold Mine and the emerging Ollachea Gold Project in Peru as well as the advanced Don Nicolas Project in Argentina. For more information, please visit www.minera-irl.com.
The Toronto Stock Exchange neither approves nor disapproves the information contained in this News Release.
Some of the statements contained in this release are forward-looking statements, such as estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties.
While these forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our business, actual results will almost always vary, sometimes materially, from any estimates, predictions, projections, assumptions or other future performance suggestions herein. Except as required by applicable law or regulation, Minera IRL Limited does not intend to update any forward-looking statements to conform these statements to actual results.
Competent Persons Statement
The preparation of the technical information contained herein was supervised and reviewed by Courtney Chamberlain, Executive Chairman of the Company, BSc and MSc Metallurgical Engineering, a Fellow of the Australian Institute of Mining and Metallurgy (AUSIMM) and Donald McIver, VP Exploration of the Company, MSc Exploration and Economic Geology, a Fellow of the Australian Institute of Mining and Metallurgy (AUSIMM), who are recognized as a Qualified Person for the purposes of National Instrument 43-101, and who has reviewed and approved the technical information in this press release.
Quality Assurance and Quality Control Procedures Disclosure
The Company has implemented and maintains a Minera IRL quality assurance/quality control (QA/QC) protocol on its projects to ensure best industry practice in sampling and analysis of exploration and resource definition samples. The insertion of field duplicates, certified standards and blank samples into the sample stream form part of the MIRL procedure (these act as an independent check on contamination, precision and accuracy in the analytical laboratory).
Assay results are reported once rigorous QAQC procedures have been approved.
Independent Audit Programs
Towards maintaining compliancy with international standards as they pertain to the minerals industry resource evaluation and estimation procedure, MIRL regularly contracts the services of industry experts to conduct detailed audits of established QAQC procedures.. | |
|
| |
Synergy Asociados | Av. Arequipa 4035 Miraflores | 628 6300 | lima | 051 | Peru |
|
Minera IRL
|
|
PRODUCER |
CODE : MIRL.L |
ISIN : JE00B1HNYF12 |
|
| |
ProfileMarket IndicatorsVALUE : Projects & res.Press releasesAnnual reportRISK : Asset profileContact Cpy |
Minera IRL is a gold producing company based in Peru. Minera IRL develops gold and silver in Argentina and in Peru, and holds various exploration projects in Peru. Its main asset in production is CORIHUARMI in Peru, its main assets in development are GOLDEN ZONE PROPERTY in Peru and DON NICOLAS in Argentina and its main exploration properties are PAN DE AZUCAR, DUTCH FLAT, WINNEMUCCA MOUNTAIN, AWAKENING, CHERT CLIFF, SUMMIT PROJECT, ESCONDIDO and EAST SANTA CRUZ in Argentina, CATA PRETA, OVERLAND PASS, SCRAPER, WHITE CANYON MINE, SOUTH ESTELLE, UTAH CLIPPER, CRESTVIEW, LAURA PROPERTY, WHITE HORSE NORTH, RED HILLS PROPERTY, PETE'S SUMMIT, GUILD PROJECT, CLARA MORO and FOUR METALS PROPERTY in Brazil, HUAQUIRCA, VECA PROJECT, BETHANIA, OLLACHA and QUILAVIRA in Peru, FRONTERA in Chile and OXFORD LAKE, COTE ARCHIE LAKE, BOLO and DEL ORO in Canada. Minera IRL is listed in Canada and in United Kingdom. Its market capitalisation is GBX 809.0 millions as of today (US$ 1.2 billions, € 1.1 billions). Its stock quote reached its highest recent level on January 07, 2011 at GBX 96.00, and its lowest recent point on August 28, 2015 at GBX 0.25. Minera IRL has 231 130 000 shares outstanding. |
Annual reports of Minera IRL |
Project news of Minera IRL |
9/8/2015 | IRL resumes Peru gold mine operations after deal with locals |
9/7/2015 | Local activists occupy Minera IRL's gold mine in Peru, share... |
9/7/2015 | Local activists occupy Minera IRL's gold mine in Peru, share... |
12/24/2013 | descubre Trincheras de 3 g/t de Oro en 200 metros de Don Nic... |
5/22/2013 | Announces Final Community Endorsement of Environmental and S... |
4/2/2013 | Announces Underground Exploration Drill Results, Ollachea Pr... |
2/13/2013 | Announces Successful Completion of Exploration Drive at Olla... |
10/17/2012 | (Don Nicolas)Announces Approval of EIA and Granting of Development Permit... |
9/6/2012 | Discovers New Mineralized System at Don Nicolas Project, Arg... |
7/18/2012 | Confirms Ollachea Resource Estimate |
7/10/2012 | (Don Nicolas)and Communities Sign Social License Agreement for Don Nicola... |
5/16/2012 | (Don Nicolas)Commences Permitting on Don Nicolas Project |
2/14/2012 | Announces Successful Feasibility Study for Don Nicolas Proje... |
4/1/2011 | (Corihuarmi)Minera IRL Announces 2010 Year-End Results |
3/30/2011 | (Escondido)Minera IRL Announces Exploration Update, Escondido Project, ... |
3/3/2011 | (Escondido)Announces Exploration Update, Escondido Project, Argentina |
2/22/2011 | (Pan De Azucar)Announces Scout Drilling Results, Pan de Azucar Prospect, Ar... |
|
Corporate news of Minera IRL |
12/23/2015 | December 23, 2015 Minera IRL Limited Reports Resignation of ... |
12/16/2015 | December 16, 2015 Minera IRL Limited Reports EGM Results |
12/16/2015 | December 16, 2015 Minera IRL Limited Reports EGM Results |
12/7/2015 | December 07, 2015 Minera IRL Limited Announces Adjourned EGM... |
12/7/2015 | December 07, 2015 Minera IRL Limited Announces Adjourned EGM... |
12/7/2015 | December 07, 2015 Minera IRL Limited Announces Adjourned EGM... |
12/7/2015 | December 07, 2015 Minera IRL Limited Announces Adjourned EGM... |
12/7/2015 | December 07, 2015 Minera IRL Limited Announces Adjourned EGM... |
12/7/2015 | December 07, 2015 Minera IRL Limited Announces Adjourned EGM... |
12/7/2015 | December 07, 2015 Minera IRL Limited Announces Adjourned EGM... |
12/7/2015 | December 07, 2015 Minera IRL Limited Announces Adjourned EGM... |
12/7/2015 | December 07, 2015 Minera IRL Limited Announces Adjourned EGM... |
12/7/2015 | December 07, 2015 Minera IRL Limited Announces Adjourned EGM... |
11/27/2015 | November 27, 2015 Minera IRL Limited Reports on Extraordinar... |
11/27/2015 | November 27, 2015 Minera IRL Limited Reports on Extraordinar... |
11/22/2015 | November 21, 2015 Minera IRL Limited Reports on Ollachea Com... |
11/22/2015 | November 21, 2015 Minera IRL Limited Reports on Ollachea Com... |
11/22/2015 | Minera IRL Limited Reports on Ollachea Community Announcemen... |
11/20/2015 | November 20, 2015 Minera IRL Limited: Update on Developments... |
11/20/2015 | November 20, 2015 Minera IRL Limited: Update on Developments... |
11/20/2015 | Minera IRL Limited: Update on Developments With Ollachea Com... |
10/30/2015 | October 30, 2015 Minera IRL Limited Announces Cease Trade Or... |
10/30/2015 | October 30, 2015 Minera IRL Limited Announces Cease Trade Or... |
10/28/2015 | October 28, 2015 Minera IRL Limited Announces Delisting of O... |
10/28/2015 | Minera IRL Limited Announces Delisting of Ordinary Shares Fr... |
10/23/2015 | October 23, 2015 Minera IRL Limited: Notice of EGM and Posti... |
10/23/2015 | October 23, 2015 Minera IRL Limited: Notice of EGM and Posti... |
10/23/2015 | Minera IRL Limited: Notice of EGM and Posting of Circular |
10/22/2015 | October 22, 2015 Minera IRL Limited Responds to Unauthorized... |
10/22/2015 | October 22, 2015 Minera IRL Limited Responds to Unauthorized... |
10/22/2015 | Minera IRL Limited Responds to Unauthorized Press Release |
10/21/2015 | October 21, 2015 Minera IRL Limited Provides Corporate and O... |
10/21/2015 | October 21, 2015 Minera IRL Limited Provides Corporate and O... |
10/21/2015 | Minera IRL Limited Provides Corporate and Operational Update |
10/9/2015 | October 09, 2015 Minera IRL Limited Announces That a Group o... |
10/9/2015 | October 09, 2015 Minera IRL Limited Announces That a Group o... |
10/1/2015 | October 01, 2015 Minera IRL Limited Announces Resignation of... |
9/29/2015 | September 29, 2015 Minera IRL Limited Announces Delay to Pub... |
9/29/2015 | September 29, 2015 Minera IRL Limited Announces Delay to Pub... |
9/25/2015 | CORRECTION: Trading Suspended - Minera IRL Limited (Symbol: ... |
9/25/2015 | September 25, 2015 Minera IRL Limited Responds to Reports of... |
9/25/2015 | September 25, 2015 Minera IRL Limited Responds to Reports of... |
9/25/2015 | Minera IRL Limited Responds to Reports of Unauthorized Press... |
9/21/2015 | September 21, 2015 Minera IRL Limited Announces Process of R... |
9/21/2015 | September 21, 2015 Minera IRL Limited Announces Process of R... |
9/21/2015 | Minera IRL Limited Announces Process of Removing Former Comp... |
9/21/2015 | September 21, 2015 Minera IRL Limited Announces Suspension o... |
9/21/2015 | September 21, 2015 Minera IRL Limited Announces Suspension o... |
9/21/2015 | Minera IRL Limited Announces Suspension of Trading on AIM |
9/21/2015 | IIROC Trading Halt - IRL |
9/9/2015 | September 09, 2015 Minera IRL Limited Announces Lifting of B... |
9/7/2015 | September 07, 2015 Minera IRL Limited Announces Temporary Su... |
9/7/2015 | September 07, 2015 Minera IRL Limited Announces Temporary Su... |
9/7/2015 | Minera IRL Limited Announces Temporary Suspension of Operati... |
9/3/2015 | September 03, 2015 Minera IRL Limited: Appointment of Non-Ex... |
9/3/2015 | September 03, 2015 Minera IRL Limited: Appointment of Non-Ex... |
9/3/2015 | Minera IRL Limited: Appointment of Non-Executive Chairman to... |
8/27/2015 | August 27, 2015 Minera IRL Limited Reports AGM Voting Result... |
8/27/2015 | August 27, 2015 Minera IRL Limited Reports AGM Voting Result... |
8/24/2015 | August 24, 2015 Minera IRL Limited Announces Management Chan... |
8/24/2015 | August 24, 2015 Minera IRL Limited Announces Management Chan... |
8/24/2015 | Minera IRL Limited Announces Management Change |
8/17/2015 | August 17, 2015 Minera IRL Limited: Community Suspension of ... |
8/17/2015 | Minera IRL Limited: Community Suspension of Development Acti... |
7/22/2015 | July 22, 2015 Posting of Circular, Notice of AGM and Propose... |
7/22/2015 | July 22, 2015 Posting of Circular, Notice of AGM and Propose... |
7/22/2015 | Posting of Circular, Notice of AGM and Proposed Consolidatio... |
7/14/2015 | July 14, 2015 Minera IRL Announces Appointment of Eric Olson... |
7/14/2015 | July 14, 2015 Minera IRL Announces Appointment of Eric Olson... |
7/14/2015 | Minera IRL Announces Appointment of Eric Olson as Chief Oper... |
4/21/2015 | April 21, 2015 Minera IRL Announces Passing of Founding Dire... |
4/21/2015 | April 21, 2015 Minera IRL Announces Passing of Founding Dire... |
4/21/2015 | Minera IRL Announces Passing of Founding Director Courtney C... |
4/1/2015 | April 01, 2015 Minera IRL Provides Corporate Update |
4/1/2015 | April 01, 2015 Minera IRL Provides Corporate Update |
4/1/2015 | Minera IRL Provides Corporate Update |
3/6/2015 | March 06, 2015 Minera IRL CEO Taking Leave of Absence, Execu... |
3/6/2015 | March 06, 2015 Minera IRL CEO Taking Leave of Absence, Execu... |
3/6/2015 | Minera IRL CEO Taking Leave of Absence, Executive Chairman A... |
1/21/2015 | January 21, 2015 Minera IRL Announces Director Resignation |
1/21/2015 | January 21, 2015 Minera IRL Announces Director Resignation |
1/21/2015 | Minera IRL Announces Director Resignation |
1/21/2015 | Minera IRL Announces Director Resignation |
12/23/2014 | December 23, 2014 Minera IRL Provides Update on Ollachea Fin... |
12/23/2014 | December 23, 2014 Minera IRL Provides Update on Ollachea Fin... |
12/23/2014 | Minera IRL Provides Update on Ollachea Financing Negotiation... |
12/23/2014 | Minera IRL Provides Update on Ollachea Financing Negotiation... |
11/13/2014 | November 12, 2014 Minera IRL Reports Third Quarter 2014 Resu... |
11/13/2014 | November 12, 2014 Minera IRL Reports Third Quarter 2014 Resu... |
11/13/2014 | Minera IRL Reports Third Quarter 2014 Results |
11/13/2014 | Minera IRL Reports Third Quarter 2014 Results |
9/30/2014 | Minera IRL Provides Update on Ollachea Financing Negotiation... |
9/30/2014 | Minera IRL Provides Update on Ollachea Financing Negotiation... |
8/13/2014 | Minera IRL Reports Second Quarter 2014 Results |
8/13/2014 | Minera IRL Reports Second Quarter 2014 Results |
7/30/2014 | Minera IRL Announces Sale of Don Nicolas Interest to CIMINAS |
7/30/2014 | Minera IRL Announces Sale of Don Nicolas Interest to CIMINAS |
7/21/2014 | Minera IRL Identifies New Zones of Gold Mineralization at th... |
7/21/2014 | Minera IRL Identifies New Zones of Gold Mineralization at th... |
6/30/2014 | Provides Update on Ollachea Financing Negotiations and Exist... |
6/30/2014 | Minera IRL Receives Construction Permit to Build the Ollache... |
6/30/2014 | Minera IRL Provides Update on Ollachea Financing Negotiation... |
6/30/2014 | Minera IRL Receives Construction Permit to Build the Ollache... |
6/30/2014 | Minera IRL Provides Update on Ollachea Financing Negotiation... |
6/4/2014 | Minera IRL Reports Positive Ollachea Project Optimization Re... |
6/4/2014 | Minera IRL Reports Positive Ollachea Project Optimization Re... |
5/14/2014 | Minera IRL Reports First Quarter 2014 Results |
5/14/2014 | Minera IRL Reports First Quarter 2014 Results |
5/9/2014 | Minera IRL Provides Notice of First Quarter 2014 Results and... |
5/9/2014 | Minera IRL Provides Notice of First Quarter 2014 Results and... |
4/3/2014 | Minera IRL Announces Notice of Annual General Meeting, Direc... |
4/3/2014 | Minera IRL Announces Notice of Annual General Meeting, Direc... |
3/31/2014 | Minera IRL Reports Year-End 2013 Financial Results |
3/31/2014 | Minera IRL Reports Year-End 2013 Financial Results |
3/24/2014 | March 24, 2014 Minera IRL Provides Notice of Fourth Quarter ... |
3/24/2014 | March 24, 2014 Minera IRL Provides Notice of Fourth Quarter ... |
3/24/2014 | Minera IRL Provides Notice of Fourth Quarter and Year-End 20... |
2/17/2014 | Provides Company UpdateCc: |
2/17/2014 | Informaci=F3n Actualizada de Minera IRLCc: |
2/10/2014 | anuncia cambios en el Directorio y Gerencia de la Compa=F1=E... |
11/29/2013 | participa del Mines and Money y es nominada a dos premios in... |
11/29/2013 | will be attending Mines and Money |
11/14/2013 | Anuncia los Resultados Financieros para el Tercer Trimestre ... |
9/30/2013 | Application of the Takeover Code |
9/26/2013 | Recibe la Aprobaci=F3n para el Desarrollo del Proyecto de Or... |
9/26/2013 | Receives Approval to Develop the Ollachea Gold Project |
8/19/2013 | Announces $80 million Financing for the Don Nicolas Gold Pro... |
8/19/2013 | Anuncia Financiamiento de $80 millones par |
5/14/2013 | Anuncia los Resultados Financieros Para el Primer Trimestre ... |
5/9/2013 | Anuncia Tres Nuevos Sistemas de Vetas de Oro en Patagonia |
4/2/2013 | Anuncia los Resultados de la Perforaci=F3n |
3/28/2013 | Anuncia sus Resultados Financieros del ejercicio del a=F1o ... |
3/28/2013 | Announces 2012 Year-End Results |
2/13/2013 | Anuncia la Exitosa Finalizaci=F3n de |
11/5/2012 | Anuncia los Resultados Financieros para el Tercer Trimestre ... |
10/17/2012 | Anuncia la Aprobaci=F3n del EIA y el Otorgamiento del Permis |
9/6/2012 | Descubre Nuevo Sistema Minera |
8/24/2012 | Notice of Annual General Meeting |
8/24/2012 | Notificaci=F3n de Asamblea General Anual de Minera IRL Limit... |
8/13/2012 | Anuncia los Resultados Financieros para el Segundo Trimestre... |
7/18/2012 | Confirma el Estimado de Recursos de Ollachea |
7/10/2012 | y Comunidades Firman un Acuerdo de Lic |
6/22/2012 | Sr. Diego Benavides de Minera IRL COMUNIDAD DE OLLACHEA |
6/7/2012 | and Ollachea Community Sign a Thirty Year Surface Rights Agr... |
6/7/2012 | y la Comunidad de Ollachea Firman un |
5/16/2012 | Inicia Proceso de Permisos en el Proyecto Don Nicol=E1s |
5/10/2012 | Anuncia sus Resultados Financieros al Primer Trimestre del 2... |
3/30/2012 | Announces 2011 Year-End Results |
3/30/2012 | Anuncia sus Resultados Financieros del Ejercicio del a=F1o 2... |
3/5/2012 | anuncia Cierre de Oferta de Acciones Comunes por aproximadam... |
3/5/2012 | Announces Closing of Approximately C$33.1 Million Offering |
2/17/2012 | Announces Commencement of Ollachea Exploration Tunnel |
2/17/2012 | Anuncia el Inicio de la Constru |
2/14/2012 | Anuncia el Resultado Exitoso del Estudio d |
11/29/2011 | Realiza el pago de la =FAltima cuota del Contrato de Op |
8/31/2011 | El Directorio de Minera IRL Aprueba la Cons |
6/14/2011 | Announces Significant Resource Upgrade, Ollachea Project, Pe... |
6/14/2011 | Anuncia Significativo Aumento =?ISO-8859-1?Q?de_Recursos_en_... |
5/13/2011 | Anuncia los Resultados Financieros para el Primer Trimestre ... |
|
|