SilverCrest Mines

Published : April 01st, 2015

Announces Update to Santa Elena Pre-Feasibility Study; Pre-Tax Base Case NPV (5%) of $144 Million, R

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

SilverCrest Announces Update to Santa Elena Pre-Feasibility Study;
Pre-Tax Base Case NPV (5%) of $144 Million, Replaces Reserves and Renews 8 Year Mine Life

VANCOUVER, BC - March 31, 2015 � SilverCrest Mines Inc. (�SilverCrest� or the �Company�) is pleased to announce that it has filed a Technical Report prepared in compliance with National Instrument 43-101 Standards of Disclosure for Mineral Projects  (�NI 43-101�) titled, �Update to Santa Elena Pre-Feasibility Study, Sonora, Mexico� (the �UPFS�), for its operating Santa Elena mine. The UPFS updates the Santa Elena Pre-Feasibility Study and Open Pit Resource Update, dated effective April 30, 2013, as amended March 4, 2014 (the �2013 PFS�). Summaries of the updated Reserves and Resources, Life of Mine Plan (�LOMP�), operating costs, sustaining capital costs and project economics are presented in tables below. All dollar amounts are expressed in U.S. dollars unless otherwise specified. The effective date of this Technical Report is December 31, 2014 and is available on the Company�s website, www.silvercrestmines.com and under the Company�s profile on SEDAR at www.sedar.com.

The Base Case economic analyses use a range of metal prices per ounce for gold and silver.  For gold prices, the range is defined as $1,250 (2015), $1,275 (2016) and $1,300 (2017 � 2022) and for silver prices the range is defined as $18 (2015), $19 (2016), $20 (2017) and $21 (2018 � 2022). On this basis, the following economic highlights for a continued 8 year mine life beginning January 2015 are:

  • Total operating revenue of $555 million from estimated sales of 12.6 million ounces of silver and 270,700 ounces of gold.
  • Total operating costs of $349 million.
  • Estimated cash operating costs averaging $11.59 per silver equivalent (�AgEq�) ounce (Ag:Au average ratio of 64.5:1 based on sold ounces for LOMP).
  • Total sustaining capital costs of $31 million including LOMP underground drilling programs and 2015 surface exploration expenditures.
  • Total pre-tax undiscounted cash flow of $163 million including estimated closure cost deductions of $6 million.
  • Pre-tax Base Case pre-tax NPV (5%) of $144 million.
  • Post-tax Base Case post-tax NPV (5%) of $119 million.

Metal price sensitivities were completed including spot price as $1,193/oz Au and $16.16/oz Ag (representing spot price in December, 2014) which showed a pre-tax NPV (DCF @ 5%) of $84.3 million.

J. Scott Drever, Chief Executive Officer, stated; �We are extremely pleased with the results of the reserve and economic update for the Santa Elena mine. The study confirms our expectations that the transition from the open pit heap leach operation to a conventional mill and underground operation represents a very attractive project with robust economics even at current reduced metal prices. The renewal of an 8 year mine life gives SilverCrest a strong corporate cash flow that provides a solid foundation for continued systematic and aggressive growth. We look forward to a year of continuing operational and financial improvements in 2015 with expansion of our annual metals production at Santa Elena.�  

MINERAL RESERVES AND RESOURCE ESTIMATES AT DECEMBER 31, 2014

Update to Mineral Reserve and Resource are shown in the table below. Only Indicated Resources were used in estimating the Mineral Reserves related to the UPFS mine plan, schedule and economic analyses. In summary, Total updated Probable Reserves at Santa Elena are 7.45 million tonnes grading 1.23 gpt Au and 78.4 gpt Ag, containing 295,000 ounces of gold and 18.76 million ounces of silver. This represents an overall minimal decrease of 10% in contained gold and 5% in contained silver over previous Probable Reserves stated in the 2013 PFS even after reserve depletion by mining and decreased metal prices. Updated Indicated Resources (exclusive of Probable Reserves) are estimated at 1.12 million tonnes grading 1.39 gpt Au and 89.7 gpt Ag, containing 50,000 ounces of gold and 3.22 million ounces of silver. This represents a 57% decrease in contained gold ounces and 59% decrease in contained silver ounces over previous Indicated Resources. Updated Inferred Resources are estimated at 0.56 million tonnes grading 1.69 gpt Au and 106.5 gpt Ag, containing 31 thousand ounces of gold and 1.9 million ounces of silver. This represents a 57% decrease in contained gold ounces and 74% decrease in contained silver ounces. The differences in UPFS Reserves and Resources from the 2013 PFS are based on:

  • A minimal decrease of overall Probable Reserves even after mining depletion over the last 1� years and  changes in metal price (cut off grade analysis) from the 2013 PFS of $1,450 per ounce of gold to $1,300 and from $28 per ounce of silver to $19.50.  
  • Underground Probable Reserves have increased 8% in contained ounces of gold and 8% in contained ounces of silver subsequent to the 2013 PFS and 2014 underground mining depletion.
  • Newly-defined El Cholugo underground Probable Reserve of an estimated 252,000 tonnes grading 2.58 gpt Au and 147.0 gpt Ag. This high grade zone is immediately adjacent to current underground development and has been exposed on several levels for easy access and planned mining in 2016. This zone is open in most directions and is a 2015 priority for further resource expansion with potential for conversion to reserves.
  • An 85% decrease in open pit Probable Reserves due to depletion from mining from April, 2013 and some transfer to underground reserves. Open pit was shut down in April, 2014 and reopened in January, 2015.
  • An 18% increase in leach pad Probable Reserves with continuation of open pit mining in 2013 and 2014 and partial leaching (300 day leach cycle) of ore.
  • Indicated and Inferred Resources decreased based on conversion to Reserves, lower base case metal prices, updated geological modelling with detailed infill drilling, and changes in geostatistical parameters (smaller search radius) based on more exploration and production data, including infill drilling data generated in 2013 and 2014.
  • Reserve replacement for a renewal of an 8 year mine life, even after mining depletion from 2013 and 2014.
SANTA ELENA RESERVES (DECEMBER 31, 2014)
CLASSIFICATION
TONNES
AU GPT
AG GPT
CONTAINED
AU OZ
CONTAINED
AG OZ
 
SANTA ELENA UNDERGROUND DILUTED AND RECOVERABLE RESERVES*
PROBABLE
3,981,557
1.67
115.0
214,000
14,724,000
 
SANTA ELENA OPEN PIT RESERVES**
PROBABLE
121,706
2.75
117.0
11,000
458,000
 
SANTA ELENA LEACH PAD RESERVES (PAD ORE)***
PROBABLE
3,344,652
0.65
33.3
70,000
3,582,000
 
TOTAL SANTA ELENA RESERVES
PROBABLE
7,447,915
1.23
        78.4
295,000
18,764,000
 
SANTA ELENA RESOURCES (DECEMBER 31, 2014) ****
INDICATED
1,117,033
1.39
89.7
50,000
3,220,000
INFERRED
564,074
1.69
106.53
31,000
1,932,000

Note: All numbers are rounded. Underground and Leach Pad Reserves and Resources are based on LOMP metal price trends of $19.50/oz silver, $1,300/oz gold and metallurgical recoveries of 92% Au and 67.5% Ag. All Mineral Resources and Reserves conform to NI 43-101 and Canadian Institute of Mining, Metallurgy and Petroleum definitions for Resources and Reserves. Inferred Resources have been estimated from geological evidence and limited sampling and must be treated with a lower level of confidence than Indicated Resources.
* Underground Probable Reserve is based on a cutoff grade of 2.49 gpt AuEq with an estimated average 10% dilution and 90% mine recovery. Average true thickness of the designed stopes is 10 metres.
** Open Pit Reserve is based on a cutoff grade of 0.20 gpt AuEq in a constrained pit shell with applied capping of 8 gpt Au and 300 gpt Ag.
*** Leach Pad Reserve is based on production and drill hole data for volumetrics and grade model using a cutoff grade of 0.5 gpt AuEq. No capping was applied.
****Mineral Resources exclude Mineral Reserves and are based on a 1.5 gpt AuEq cut off grade using assumptions for prices and recoveries as stated in note above. Capping was applied at 12 gpt Au and 700 gpt Ag.

LOMP

The Santa Elena mine life with update to Reserves is scheduled to continue for 8 years at nominal milling rate of 3,000 tonnes per day with reduced throughput in the last two years upon depletion of leach pad reserves. The mine schedule is based on mining long hole stopes (89% by reserve volume) early in the mine life at attractive lower costs with small reserve being mined using cut and fill stopes (11% by reserve volume) being mined towards the end of the mine schedule. The 2013 PFS showed long hole and cut and fill stopes were 69% and 31% by volume, respectively. The average width of proposed optimized stopes is 10 metres, which is advantageous for lower cost bulk mining methods. SilverCrest envisions a continued blending strategy during operations at variable rates for mill feed to achieve optimum throughput. A summary of the mine and production schedule is presented below with proposed initial blending strategy.

Aspect of operations
2015
2016
2017
2018
2019
2020
2021
2022
Total
Life of Mine
Total Tonnes Underground
462,200
543,000
521,100
535,400
493,700
497,600
434,300
494,300
3,981,600
Total Tonnes Leach Pad
502,300
543,200
565,100
550,800
592,500
588,600
2,200
-
3,344,700
Total Tonnes Open Pit
121,700
-
-
-
-
-
-
-
121,700
Total Tonnes Processed
1,086,200
1,086,200
1,086,200
1,086,200
1,086,200
1,086,200
436,500
494,300
7,448,000
Total Gold Ounces Sold*
45,000
45,500
37,200
35,800
29,400
38,300
23,500
16,000
270,700
Total Silver Ounces Sold*
2,048,400
2,111,400
1,750,000
1,888,800
1,487,200
1,492,100
953,500
914,800
12,646,200

Note: All numbers rounded.
*Ounces based on sold, not insitu Reserve.

LOMP OPERATING COSTS

The operating cost estimates stated below were compiled using Santa Elena mine site operating experience, SilverCrest financial and operational reports, recent contractor quotes, other local producing mines and industry estimations in Mexico to a Pre-Feasibility level.

Mining Method
Open Pit
Underground
Long Hole
Average
Underground
Cut & Fill
Average
Leach Pad
Reprocess
Process Method
CCD Mill
CCD Mill
CCD Mill
CCD Mill
Mining Cost/T ore1
$    9.90
$    28.71
$    50.00
$     0.002
Processing Cost/T3
$  24.49
$    24.49
$    24.49
$   24.49
General & Administration/T4
$    5.29
$      5.29
$      5.29
$     5..29

1 Long hole stopes are 89% of designed stopes by volume and cut & fill stopes are 11% of designed stopes by reserve volume. Includes adjustment for exchange ratio impact in the mining costs and excludes ore development costs.
2 Mining cost of spent ore on leach pad is covered under processing costs.
3 Processing cost includes crushing, milling, site refining and dry stack tailings disposal.
4 Estimated based on current operations and may vary on an annual basis. A 4% annual inflation rate has been applied to general and administrative costs.

Ore development costs are estimated at $36/T ore and represent approximately 6% of total underground ore planned to be mined during LOMP.

LOMP SUSTAINING CAPITAL COSTS

The sustaining capital cost estimates stated below are based on internal estimates for remaining capital expenses over life of mine. 

Sustaining Capital Cost Table Including Exploration Drilling Expense
Site infrastructure
                 $                       2,066,200
Mill sustaining capital
                 $                       1,785,000
Underground waste development expenses
                 $                     16,086,600
Underground equipment and infrastructure
                 $                       6,236,300
Underground and 2015 surface drilling
                 $                       4,783,300
Total capital costs
                 $                     30,957,400

Note: All numbers rounded.

UPFS ECONOMIC ANALYSES

UPFS economic analyses were completed for both pre-tax and post-tax. Base Case pre-tax and post-tax results are stated as follows:

Aspects of Santa Elena UPFS Economic Analyses
(Base Case)
Production
             Gold Ounces Sold - post refiner credit1
              270,700
             Silver Ounces Sold - post refiner credit
         12,646,200
Revenue                                                                                                      $(000)
              Gross Sales2
     $       554,530
Operating Expenses3
              Total Operating Costs4
     $       348,900
              Freight & Refining
     $           5,750
              Closure Costs
     $           6,000
Sustaining Capital Expenses
              Underground & Surface Drilling5
     $           4,780
              Sustaining Capital Costs6
     $         26,170
Pre-Tax Undiscounted Cash Flow
              Total Cash Flow
     $       162,930
Pre-Tax Financial Results
              Pre-Tax NPV, DCF @ 5%
     $       143,840
Post-Tax Financial Results
              Post-Tax NPV, DCF @ 5%
     $       119,170

Note: All numbers rounded.
1 Sandstorm to be delivered an estimated 54,000 ounce of gold over remaining LOMP.
2 The financial model adopted a range of realized spot prices from 2015 to 2022. Gold prices ranged from $1,250 to $1,300 per ounce and silver prices ranged from $18 to $21 per ounce.
3
Excludes 0.5% governmental environmental fee of an estimated $3 million.
4 Approximate operating cost per AgEq ounce sold varies between $9 and $16 over the life of mine.
5 All LOMP underground drilling costs and only 2015 surface program costs included.
6 Excludes sunk costs, up to December 31, 2014.

The economic analyses considers SilverCrest delivering 54,133 ounces of gold to Sandstorm Gold Ltd. (�Sandstorm�) at an average price of $412 per ounce ($350 to $450 per ounce with annual 1% inflationary increases) under the Sandstorm Purchase Agreement (the �Purchase Agreement�) executed on May 14, 2009. The Purchase Agreement included an option for Sandstorm to participate in the Santa Elena underground mine, which Sandstorm had elected to exercise in February 2014. The Purchase Agreement only applies to the original Santa Elena concessions and excludes recent regional acquisitions.

UPFS RECOMMENDATIONS

Further optimization of the mine schedule is warranted to investigate continued grade optimization versus stoping costs (long hole or cut and fill), potential to expand and accelerate increased underground production with a second ramp and expand resources with subsequent reserves.  Mineralization at Santa Elena is open in most directions with excellent potential to further increase resources and reserves for increased production and mine life. Further infill and expansion drilling is recommended. El Cholugo zone located immediately adjacent to the Main Mineralized Zone is a priority target in 2015 for potential resource and reserve expansion. Silver recoveries in the new plant facility need further metallurgical work to potentially increase recovery rates. Recommended budget for further work is estimated at $5 million to be spent over several years.

The Qualified Person for the Technical Report and who has reviewed and approved the content of this news release is N. Eric Fier, CPG, P.Eng, Chief Operating Officer of the Company.

SilverCrest Mines Inc. (NYSE MKT: SVLC; TSX: SVL)
is a Canadian precious metals producer headquartered in Vancouver, BC. SilverCrest�s flagship property is the 100%-owned Santa Elena Mine, located 150 kilometres northeast of Hermosillo, near Banamichi in the State of Sonora, Mexico. The mine is a high-grade, epithermal silver and gold producer, with a current reserve estimated life of mine of 8 years and average operating cash costs of $12 per ounce of silver equivalent (64.5:1 Ag:Au based on ounces sold). SilverCrest anticipates the 3,000 tonnes per day conventional mill facility at the Santa Elena Mine should recover an average of 1.6 million ounces of silver and 33,800 ounces of gold per annum over the current reserve life. Exploration programs continue to result in discoveries at Santa Elena and have advanced the definition of a large polymetallic deposit at the La Joya property in Durango State, Mexico.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This news release contains
�forward-looking statements� within the meaning of Canadian securities legislation and the United States Securities Litigation Reform Act of 1995. These include, without limitation, statements with respect to: the economic viability of a project; strategic plans and expectations for the development of the Company�s operations and properties; estimates of mineral reserves and mineral resources; the amount of future production of gold and silver over any period; the amount of expected grades and ounces of metals and minerals; expected processing recoveries; expected cash operating costs and outflows; life of mine; and prices of metals and minerals.

These forward-looking statements relate to analyses and other information that are based on, without limitation, the following estimates and assumptions: presence of and continuity of metals at the Company�s projects; cost of production and productivity levels at the Santa Elena Mine; availability and costs of mining equipment and skilled labour; accuracy of the interpretations and assumptions used in calculating reserve and resource estimates; operations not being disrupted or delayed by unusual geological or technical problems; and ability to develop and finance projects.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements, including, without limitation: risks related to precious and base metal price fluctuations; risks related to the fluctuations in the price of consumed commodities; risks related to fluctuations in the currency markets (particularly the Mexican peso, Canadian dollar and United States dollar); risks related to the inherently dangerous activity of mining, including conditions or events beyond our control, and operating or technical difficulties in mineral exploration, development and mining activities; uncertainty in the Company�s ability fund the exploration and development of its mineral properties; uncertainty as to actual capital costs, operating costs, production and economic returns, and uncertainty that development activities will result in profitable mining operations; risks related to reserves and mineral resource figures being estimates based on interpretations and assumptions which may result in less mineral production under actual conditions than is currently estimated and to diminishing quantities or grades of mineral reserves as properties are mined; and risks related to governmental regulations and obtaining necessary licenses and permits.


Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the forward-looking statements. The Company�s forward-looking statements are based on beliefs, expectations and opinions of management on the date the statements are made. For the reasons set forth above, investors should not place undue reliance on forward-looking statements. The Company undertakes no obligation to update or revise any forward-looking statements, except as otherwise required by applicable law.

Contact: Fred Cooper
Telephone: (604) 694-1730 ext. 108
Fax: (604) 694-1761
Toll Free: 1-866-691-1730
Email: info@silvercrestmines.com
Website: www.silvercrestmines.com
Suite 501 - 570 Granville Street, Vancouver, BC Canada V6C 3P1


Data and Statistics for these countries : Canada | Mexico | All
Gold and Silver Prices for these countries : Canada | Mexico | All

SilverCrest Mines

PRODUCER
CODE : SVL.V
ISIN : CA8283651062
CUSIP : 828365
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

SilverCrest Mines is a silver and gold producing company based in Canada.

SilverCrest Mines develops silver, gold and zinc in El Salvador, and holds various exploration projects in Mexico.

Its main asset in production is SANTA ELENA in Mexico, its main asset in development is EL ZAPOTE in El Salvador and its main exploration properties are SILVER ANGEL, CRUZ DE MAYO and LA JOYA DURANGO in Mexico.

SilverCrest Mines is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 287.2 millions as of today (US$ 259.0 millions, € 188.5 millions).

Its stock quote reached its lowest recent point on December 17, 2002 at CA$ 0.08, and its highest recent level on March 02, 2012 at CA$ 3.17.

SilverCrest Mines has 107 952 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of SilverCrest Mines
6/1/2010Greg McCoach - Mining Speculator June 2010
6/1/2010Corporate Presentation - June 2010
3/31/2010 Funding In Place, Construction on Schedule for 2010 Product...
1/1/2010Why invest in SilverCrest Mines?
6/10/2009Corporate report June 2009
3/31/2008New Recommendation
11/22/2006Corporate Presentation
In the News and Medias of SilverCrest Mines
3/14/2012Scott Drever=2C President of SilverCrest Interview on BNN
9/22/2008Objective Capital research
10/25/2007Analysis by David and Eric Coffin
11/17/2006Follow up N° 4
Annual reports of SilverCrest Mines
2009 Annual Report
2008 annual report
Annual Report 2006
Financings of SilverCrest Mines
5/20/2011Closes $30 Million Bought Deal Financing
4/28/2011Announces CAD$30.0 Million Bought Deal Common Share Financin...
3/20/2008Completes Private Placement; Amends $3.0 Million Macquarie F...
3/13/2008Announces First Closing Of Private Placement
Option Grants of SilverCrest Mines
3/29/2008 Engages Marketing Consultant and Grants Stock Options
Nominations of SilverCrest Mines
6/13/2013Reports Results of AGM Announces Officer and Director Appoin...
1/31/2013Appoints Vice President, Corporate Development
2/15/2011SilverCrest Appoints of Mr. Brent McFarlane Vice President, ...
Financials of SilverCrest Mines
8/13/2015Announces Q2, 2015 Financial Results; Operating Cash Flow of...
11/14/2013Reports Q3, 2013 Financial Results Cash Flow from Operations...
8/15/2013Reports Q2, 2013 Financial Results Cash Flow from Operations...
8/15/2013Reports Q2, 2013 Financial Results
5/15/2013Reports Q1, 2013 Financial Results Cash Flow from Operations...
3/14/2013Announces 2012 Financial Results Cash Flow from Operations o...
11/14/2012Reports Q3, 2012 Financial Results Cash Flow From Operations...
8/15/2012Reports Q2=2C 2012 Financial Results
5/15/2012Reports Q1 2012 Financial Results Cash Flow from Operations ...
4/10/2012Announces 2011 Financial Results Cash Flow from Operations o...
11/29/2011Reports $5.1 Million Third Quarter Cash Flow from Operation...
8/30/2011Announces Second Quarter Earnings of $790,000 and Cash Flow ...
8/2/2011Form 40-F Registration Statement Effective
Project news of SilverCrest Mines
2/25/2014(Santa Elena)Receives US$10 Million Commitment from Sandstorm Gold for Un...
1/14/2014Evrim Options Ermita=F1o Property to SilverCrest Mines
12/24/2013Files La Joya Preliminary Economic Assessment Report
10/21/2013Announces Positive La Joya Preliminary Economic Assessment ...
10/15/2013Announces Q3 Record Silver Production 202,736 Ounces Silver-...
9/5/2013(Santa Elena)Reports Additional Drill Results at Santa Elena Mine; Anothe...
7/25/2013(Santa Elena)Announces Santa Elena Expansion Pre-Feasibility Study; Base...
7/17/2013Announces Q2 Record Silver Production 194,022 Ounces Silver ...
5/29/2013(Santa Elena)Announces Updated Santa Elena Reserves and Resources; Silver...
4/24/2013Announces Q1 Production 153,481 Ounces Silver & 7,225 Ounces...
3/28/2013Files La Joya Technical Report Updated Resources & Positive ...
1/29/2013Announces Updated La Joya Resources
1/16/2013Exceeds 2012 Production Market Guidance Announces Q4 Results...
1/14/2013(Santa Elena)Expands Santa Elena Deposit; More High Grade Intercepts 13m ...
1/7/2013(Santa Elena)Discovers Bonanza Grades and New Zone at Santa Elena 15.6m ...
11/13/2012(Santa Elena)Drilling Update for Santa Elena Mine
11/7/2012Pays Out Gold Hedge Facility Gold and Silver Production Now ...
10/16/2012Announces Q3 Production 151,368 Ounces Silver & 7,184 Ounces...
7/23/2012Announces Q2 Production 139=2C850 Ounces Silver & 8=2C584 Ou...
7/6/2012(Santa Elena)=E2??s Santa Elena Mine Expansion Continues on Schedule
4/19/2012Announces Q1 Silver and Gold Production 134=2C528 Silver Ou...
3/20/2012(La Joya Durango)Reports 58m @ 164.7 gpt Ag Eq* at La Joya
2/16/2012(La Joya Durango)Reports Coloradito Target Results at La Joya Property=3B Pot...
1/23/2012(La Joya Durango)s Corporate Resources Silver Equivalent Inferred Resources ...
1/23/2012(Cruz De Mayo)s Corporate Resources Silver Equivalent Inferred Resources ...
1/23/2012(Cruz De Mayo)s Corporate Resources Silver Equivalent Inferred Resources ...
1/23/2012(Santa Elena)s Corporate Resources Silver Equivalent Inferred Resources ...
1/12/2012(Santa Elena)Reports Record Production in Q4 at Santa Elena=3B =E2?=A2 Si...
1/5/2012(La Joya Durango)Announces Initial Resources at La Joya Property=3B +100 mill...
11/30/2011(La Joya Durango)Commences Phase II Drilling at La Joya=3B Phase II Surface S...
10/14/2011(Santa Elena)Reports Increased Santa Elena Production in Q3 Silver Produc...
9/22/2011(Santa Elena)Begins Drilling at Cruz de Mayo, Reports on Santa Elena Nort...
9/22/2011(Cruz De Mayo)Begins Drilling at Cruz de Mayo, Reports on Santa Elena Nort...
8/10/2011(La Joya Durango)Video Tour of La Joya Mine Project, Durango Mexico
7/13/2011(Santa Elena)Declares Commercial Production at Santa Elena Mine; Pours 74...
6/7/2011(La Joya Durango)Reports Additional La Joya Drill Results, More High Grade Si...
4/26/2011(Santa Elena)Files NI 43-101 Technical Report for Santa Elena Reserve Up...
4/13/2011(Santa Elena)Santa Elena Mine Commissioning Phase Update, Silver And Gold...
4/12/2011(Santa Elena)Announces Santa Elena Expansion Plan Net Present Value of US...
3/13/2011(La Joya Durango)Reports La Joya Initial Drill Results; Up to 19.2 Metres of ...
1/6/2011(Santa Elena)Santa Elena Mine Start-Up Phase Update
12/1/2010(La Joya Durango)Acquires New Major Mexico Property
8/14/2009(Santa Elena)to Acquire 100% of the Santa Elena Project
6/9/2009(Santa Elena)Announces Agreement With MacQuarie Bank Limited For US12.5 M...
8/15/2008Receives Environmental Impact Assessment Approval; NI43-10...
6/30/2008(Santa Elena)Santa Elena prefeasibility study completed
6/26/2008(Santa Elena)Pre-Feasibility Results at Santa Elena, Mexico
6/5/2008(Santa Elena)Main Zone Expansion Drilling 11.2 metres (36.73 feet) gradin...
5/21/2008(Santa Elena) Submits Environmental Impact Assessment; Receives Land Use ...
4/8/2008(Santa Elena)Continues to Expand Main Zone at Santa Elena, Mexico
2/21/2008(Santa Elena)Updates Progress at the Santa Elena Project, Mexico
1/9/2008(Santa Elena)Continues to Intercept High Grade Gold and Silver at the San...
1/4/2008(Santa Elena)Resource Expansion at Santa Elena and Cruz de Mayo
12/20/2007(Santa Elena)Secures Surface Rights for Santa Elena Project, Mexico
11/29/2007(Santa Elena)Intercepts 32.9 Metres of 367 gpt (10.7 Ounces) Silver & Sil...
11/15/2007(Cruz De Mayo)SilverCrest Announces Resource Increase Indicated Resources ...
10/18/2007(Santa Elena)SilverCrest Intercepts 51.4 Metres of 1.53 gpt Gold and 126 ...
9/26/2007(Santa Elena) Continues to Expand Santa Elena Deposit, Northern Mexico
9/11/2007(Santa Elena)Mobilizes Second Drill Rig to Santa Elena Project, Mexico
9/6/2007(Santa Elena)Significantly Expands Mineralization at Santa Elena Project,...
7/26/2007(Cruz De Mayo)Reports Final RC Drill Results and Preliminary Metallurgy at...
7/5/2007(Cruz De Mayo)Reports More Silver at Cruz de Mayo, Mexico
5/24/2007(Cruz De Mayo)Reports New Silver Discovery at Cruz de Mayo, Mexico
5/10/2007(Cruz De Mayo)Updates Progress at the Santa Elena Project, Mexico
Corporate news of SilverCrest Mines
2/24/2014Graduates to Toronto Stock Exchange Trading Commences Februa...
2/20/2014Announces $20 Million Bought Deal
2/17/2014(Santa Elena)Confirms U/G High Grades at Santa Elena 11.6m @ 5.83 gpt Au ...
12/14/2013Announces Grant of Stock Options
11/19/2013SilverSeek LIVE! Wed. Nov, 20th @ 2PM EST -- David Morgan (S...
10/21/2013Announces Positive La Joya Preliminary Economic Assessment B...
7/12/2013Arranges $40 Million Credit Facility with Scotiabank
5/27/2013Completes Exercise of La Joya West Option
5/27/2013Completes Exercise of La Joya West Option
4/25/2013Announces 2013 Annual Meeting and Adoption of Corporate Gove...
4/8/2013(Santa Elena)Continues to Expand Santa Elena Deposit More High Grade Inte...
10/30/2012Closes $34.5 Million Prospectus Offering, Over-Allotment Opt...
10/5/2012Announces Increase in Bought Deal to $30 Million
10/5/2012Announces $26.1 Million Bought Deal
9/27/2012Reports High Grade Surface Sampling and Additional Drill Res...
8/22/2012ANNOUNCES TRADING ON NYSE MKT TO COMMENCE AUGUST 27=2C 2012
7/17/2012Reports 50m @ 151.8 gpt Ag Eq* at La Joya Main Mineralized...
6/29/2012Reports Annual General Meeting Results
5/7/2012Reports 127.4m @ 65.6 gpt Ag Eq* at La Joya Expands Main M...
2/21/2012Files NI43=2D101 Resource Report for La Joya Property
1/30/2012Presenting At the Silverseek Online Forum
1/9/2012Retires Bank Debt Ahead of Schedule
10/7/2011Commences Trading on OTCQX
6/17/2011Announces Appointment of New Director, Reconfirmation of Sha...
5/31/2011Files Form 40-F Registration Statement with SEC
7/29/2010Initial Gold & Silver Production Imminent
5/6/2010& Goldsource Appoint Director of Communications
9/22/2009Analyst Coverage by Jennings Capital
7/13/2009New office
6/24/2009Eric Fier on Newsmakers
11/17/2008At Hard Assets Conference, San Francisco
9/24/2008New Video Tour: Underground Silver Deposits at Santa Elena
7/13/2008Report
7/10/2008Signs Agreement For $3.0 Million Feasibility Finance Facilit...
4/21/2008Initiation Report
3/1/2008Announces US$3.0 Million Feasibility Finance Facility & Prop...
9/19/2007Intercepts 10.1 Metres of 6.53 gpt Gold and 218.7 gpt Silve...
3/8/2007Completes Second Phase Drill Program at Cruz de Mayo, Mexico
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (SVL.V)Other OTC (STVZF)
2.66-0.37%1.89-4.55%
TSX-V
CA$ 2.66
02/21 17:00 -0.010
-0.37%
Prev close Open
2.67 2.69
Low High
2.63 2.71
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  2.66 -%
Volume 1 month var.
493,509 -%
24hGold TrendPower© : 27
Produces Gold - Silver
Develops Gold - Silver - Zinc
Explores for Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.66+0.39%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.18+0.74%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.62+5.07%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64+1.15%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.85-2.10%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.84+0.00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.56-0.82%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :