Wallbridge Mining Company Ltd

Published : June 19th, 2012

Announces Updated Mineral

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Wallbridge Mining Announces Updated Mineral Resource for Broken Hammer


TORONTO, June 19, 2012 /CNW/ - Wallbridge Mining Company Limited (TSX: WM) today announced the updated mineral resource estimate for  the Broken Hammer Zone in Sudbury, Ontario, as prepared by Roscoe Postle Associates Inc. ("RPA").

Highlights:

  • The total Indicated Mineral Resource is 231,100 tonnes at a grade of 4.62 g TPM/t (1.90 g/t Pd, 2.01 g/t Pt, and 0.71 g/t Au), 0.92% copper, and 0.10% nickel and 6.35 g/t Ag.
  • Permitting and Closure plan on schedule for completion in Q4, 2012
  • Pre-feasibility study on schedule for completion in Q3, 2012
  • Production decision in Q4, 2012
  • Mineral deposit is open at depth (very little drilling below 100m depth)
  • 2011 bulk sample generated approximately $98 per tonne of net cash flow

"We have now reached our first milestone. The next key milestone for us is the Pre-Feasibility Study which is currently underway on our Broken Hammer deposit. We are excited to see that the results of our additional exploration efforts since 2005 and the successful 2011 bulk sample have not only generated some revenue and additional metal endowment to our Broken Hammer resource, but more importantly have increased the confidence level of our resource from Inferred to Indicated, thereby getting us closer to a production decision and creating a potential source of revenue". Said Marz Kord, President & CEO of Wallbridge

Wallbridge discovered the Broken Hammer Zone as a result of an ongoing grass roots exploration program on the North Range of the Sudbury Basin. In November 2005, Roscoe Postle Associates Inc. estimated the NI 43-101 compliant, inferred mineral resource to be 251,000 tonnes at a grade of 3.80 g/t total precious metals (1.56 g/t palladium, 1.62 g/t platinum and 0.61 g/t gold), 1.00% copper and 0.10% nickel. This resource estimate was prepared using a cut-off value of $CAN40/t, and the then prevailing, long-term metal price projections of $US800/oz for platinum, $US180/oz for palladium, $US400/oz for gold, $US 1.40/lb for copper, and $US5.00 for nickel.

RPA, in its initial report in 2005, recommended that Wallbridge should carry out a bulk sample to validate the inferred resources and confirm grades and grade continuity to improve the technical risks and economics of the project.

In 2008, preliminary discussions were held with several mills and a smelting facility to develop costs and plan the extraction and processing of a bulk sample.  With the economic downturn during the latter half of 2008 and the collapse of metal prices, the Company decided to defer plans for the bulk sample until such time as metal prices recovered.

This recommended bulk sampling program was initiated late in 2010 after metal prices had recovered.  Excavation and delivery of the 30,000 tonne bulk sample from the Broken Hammer Zone to Xstrata's Strathcona Mill was completed in March 2011.  A total of approximately 30,000 tonnes of mineralization and crusher pad material was shipped and was later processed at the Xstrata Nickel processing facility in July 2011.

The recoveries of the material were in line with typical Sudbury ore and the net proceeds from the bulk sample after all mining and processing costs was approximately $3 million representing a net return of approximately $98/Tonne of ore.

The success of bulk sample in 2011 prompted Wallbridge to initiate a prefeasibility study including an updated mineral resource estimate. The mineral resource update has been completed by Roscoe Postle & Associates, the details of which are in this Press Release. The prefeasibility study, which will incorporate the updated resource estimate, will be completed in Q3 of 2012 while permitting has been ongoing and on schedule for completion in 2012. A production decision will be made in 2012 for commercial production of Broken Hammer deposit in 2013.

Mineral Resource Estimate

The Updated Mineral Resource estimate was completed by RPA on June 13, 2012 and is in accordance with National Instrument 43-101 (NI 43-101).

Indicated Mineral Resource Estimate for the Broken Hammer Project

Tonnes       Cu
(%)
      Ni
(%)
      Pt
(g/t)
      Pd
(g/t)
      Au
(g/t)
      Ag
(g/t)
231,100       0.92       0.10       2.01       1.90       0.71       6.35
                                 
  1. Mineral Resource estimates were prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") definition standards for Mineral Resources and Mineral Reserves.

  2. The Qualified Person for this Mineral Resource estimate is Bruce Churchill, P. Geo.

  3. The resource model was prepared based on drill section interpretations using a cut-off of 1.00% copper equivalent (CuEq).

  4. Mineral Resources are estimated using average long-term metal prices of US$3.00/lb Cu, US$9.00/lb Ni, US$750/oz Pd, US$1,600/oz Pt, US$ 1,300/oz Au, and US$ 20.00/oz Ag and a US$:C$ exchange rate of 1:1.

  5. All aspects of the core sampling, assay procedures, and QA/QC program have been reviewed by RPA and were judged to be of industry standard and suitable for use in the estimation of Mineral Resources.

  6. 3D solids were constructed cooperatively between Wallbridge and RPA geologists, then reviewed and revised as necessary by RPA.

  7. The estimation employed statistical analysis and variography of metal values with construction of block models by domain.  Block cell size was 5*5*5 metres with level 3 sub-celling and then re-blocked to 3*3*3 metres for the pit optimization runs.  Grade interpolation to assign grade values to cells used Ordinary Kriging.

  8. Specific gravity determinations were completed by ALS Chemex on 300 sample pulps.  Where data was not available, values were assigned based on a regression of specific gravity versus sulphur.

  9. Preliminary pits used to constrain the mineral resources reported were constructed using Whittle software based on the metallurgical and cost assumptions provided by Wallbridge and based on the 30,000 tonne bulk sample mined and processed in 2011.

  10. Mineral Resources are reported at a pit discard cut-off value of C$11 per tonne NSR value.  NSR values were calculated based on metal prices, metallurgical recoveries, and all off-site payment terms and charges (including ore processing).  The resulting NSR value in each block is then compared to operating costs for crushing and administration, within the pit shell (which includes consideration for the mining costs).

  11. No minimum mining width was used.

  12. Resource classification considered geological and grade continuity and was based on drill hole spacing.

  13. RPA is not aware of any environmental, permitting, legal, title, taxation, socio-political or marketing issues that are material to the statement of the mineral resource estimate.

The full Resource Estimate report will be posted within 45 days from the date of this Press Release at www.sedar.com, with a link from the Wallbridge Mining Company website.

Marz Kord, P. Eng.,  the Qualified Person for the contents of this Press Release and Bruce Churchill, P. Geo., who is the Qualified Person responsible for the Resource Estimate have both reviewed the technical content of this press release.

About Wallbridge Mining

Wallbridge Mining Company Limited (WM:TSX) is an established metals company working to build sustainable growth for investors through discovery and development of mineral resources.

Wallbridge specializes in nickel, copper, platinum, palladium and gold projects in mining friendly jurisdictions of North America, with a particular focus on Sudbury, Ontario. Wallbridge's position in Sudbury offers unique large-scale discovery upside in Canada's premier mining district.

Wallbridge has a record of generating high potential projects and financing exploration through joint ventures or spin-out companies. Wallbridge has 48 exploration to pre-feasibility stage mineral projects. These include 12 joint ventures with partners Impala Platinum Holdings Limited, Lonmin Plc, Xstrata Nickel and a number of junior mining companies.

Wallbridge also holds significant equity interests in spin-out companies Duluth Metals Limited (DM:TSX) and Miocene Metals Limited (MII:TSV).

This document may contain forward-looking statements relating to operations of Wallbridge or its subsidiaries or to the environment in which they operate. Such statements are based on operations, estimates, forecasts and projections. They are not guarantees of future performance and involve risks and uncertainties that are difficult to predict and may be beyond Wallbridge's control. A number of important factors could cause actual outcomes and results to differ materially from those expressed in forward-looking statements, including those set forth in other public filings. In addition, such statements relate to the date on which they are made. Consequently, undue reliance should not be placed on such forward-looking statements. Wallbridge disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, save and except as may be required by applicable securities laws.

For further information:

Please visit the Company's website at www.wallbridgemining.com, or contact:

Wallbridge Mining Company Limited

Joshua Bailey, M.Sc., P.Geo
Vice President, Exploration
Tel: (705) 682-9297 ext. 240
Email: jbailey@wallbridgemining.com

Linda Zubal,
Director of Corporate Communications
Tel: (705) 682-9297 ext. 263
Email: lzubal@wallbridgemining.com

.
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Wallbridge Mining Company Ltd

EXPLORATION STAGE
CODE : WC7.F
ISIN : CA9323971023
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Wallbridge Mining is a copper and nickel exploration company based in Canada.

Wallbridge Mining holds various exploration projects in Canada.

Its main exploration properties are ROGERS CREEK, SUDBURY and HEFF OFFSET DIKE in Canada.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Wallbridge Mining Company Ltd
2007 Annual Report
Financings of Wallbridge Mining Company Ltd
1/18/2012Lonmin Plc Makes Private Placement in Wallbridge Mining
6/18/2010Extension of Expiry Term of Warrants
5/18/2010Distribution of Miocene Metals Special Warrants
4/28/2010Closing of Private Placements
4/14/2010Private Placement
1/6/2010Closings of Private Placements
12/15/2009Further Closings of Private Placement
11/27/2009Closings of Private Placement
8/6/2009Announces Final Closing of Private Placement
7/23/2009Announces Closings of Private Placements
1/23/2009Announces Private Placement
9/2/2008Announces Closing of Second Tranche of Private Placement
8/20/2008Announces Closing of Private Placement to Advance BC Propert...
3/26/2008Announces Closing of Private Placement
6/28/2007Completes Private Placement Financing with Lonmin Plc.
Nominations of Wallbridge Mining Company Ltd
7/20/2009Appoints Soever CEO, Holmes Chairman
9/4/2007Announces Corporate Appointment
Project news of Wallbridge Mining Company Ltd
9/17/2013Attractive Valuation due to Imminent Production and Strong A...
8/13/2013Provides Mid-Year Exploration Update
5/29/2012Announces Drilling Underway on Impala Platinum Parkin Offset
3/7/2012Initiates Geophysics on
10/14/2011Intersects 4.11% Nickel and 4.32 grams TPMs in Milnet 1500 Z...
5/19/2011Reports Significant Increase Grade and Tonnage from Broken
5/16/2011Intersects 30.33 g/t Total Precious Metals and 0.50% Copper ...
6/23/2010(Sudbury)Resumes drilling on Parkin PGE-copper-nickel with $1.3M comm...
2/23/2010(Sudbury)Drills Second Cut Through New Sulphide Zone on Parkin Offset...
12/9/2009(Rogers Creek)Intersects Porphyry Copper-Gold Mineralization at Rogers Cre...
11/13/2009(Sudbury)8.00 Grams Per Tonne Platinum+Palladium+Gold over 14.24 metr...
11/5/2009(Rogers Creek)To Expand Drill Program on Rogers Creek Copper-Gold-Molybden...
11/3/2009(Sudbury)Intersects 17.8 metres of Suphides on Parkin Property in Sud...
10/15/2009(Rogers Creek)Starts Drilling on Rogers Creek Porphyry Copper, Gold and Mo...
5/27/2009(Sudbury)Defines Highly Conductive Drill Targets on Sudbury Parkin Of...
3/2/2009(Sudbury)Intersects Copper, Nickel and Precious Metals in 8,600 Metre...
12/8/2008(Sudbury Currie Rose)and Lonmin Approve $1.5 million for 2009 Sudbury Camp Joint ...
7/2/2008(Sudbury Currie Rose)Initiates 2008 Summer Exploration Program in Sudbury
2/26/2008 Intersects Nickel-Copper Mineralization on JV Property in S...
8/7/2007Reports Progress of Broken Hammer Scoping Study
6/12/2006(Rogers Creek)starts summer program with three drills
Corporate news of Wallbridge Mining Company Ltd
9/29/2014Lonmin Commits $5.5 Million for Platinum Exploration on Wall...
7/15/2014Wallbridge provides update on Broken Hammer Mine production
5/9/2014Wallbridge Mining Announces Voting Results from its Annual a...
3/24/2014Wallbridge Enters Into Definitive Custom Milling Agreement
3/18/2014Wallbridge Announces Production Decision for Broken Hammer P...
9/18/2013s on its Broken
5/8/2013Annual General Meeting to be held at Strathcona Hotel in Tor...
5/7/2013s Broken Hammer Progress
3/26/2013Receives Notice of
1/18/2013Miocene Metals Announces Extension of Line of Credit from Wa...
1/18/2013Highlights Plans for 2013
7/31/2012Provides Mid-Year
6/19/2012Announces Updated Mineral
6/14/2012Announces Final Broken Hammer Bulk Sample Results
4/26/2012Reports on AGM and
4/5/2012Announces Impala Platinum
4/3/2012to Establish New Joint
4/2/2012Announces Closing of
3/29/2012Receives partial payment for Broken Hammer Bulk Sample
3/2/2012Provides Update on Winter
1/5/2012Highlights Plans for 2012
11/30/2011Expands Broken Hammer Zone
8/29/2011Builds Management Team for
8/26/2011Announces Miocene Exercise of Buy Back Option
8/8/2011Spin-Out Miocene Metals
8/5/2011to be featured on CEO Clips on The Documentary Channel
7/29/2011article on Wallbridge Mining as featured in the Northern Min...
7/21/2011Sells 950,000 shares of Duluth Metals to Raise $2.53 million
7/21/2011Announces $1.6M, 5,000m Drill Program with Implala Platinum ...
6/28/2011Completes Delivery of
5/17/2011Reports on Miocene Metals
5/5/2011to be Featured on BTV - Business Television
4/28/2011Extends Broken Hammer PGE Zone
4/26/2011Annual General Meeting to
3/24/2011Starts Drill Program to Expand Broken Hammer Copper- Platinu...
3/4/2011s Broken Hammer Bulk Sample Progress
3/3/2011Expands North Range
8/12/2010Confirms Copper, Gold and Molybdenum Mineralization on Mioce...
7/27/2010Reports on Activities in Sudbury, Duluth and British Columbi...
4/19/2010Extends Record Date for Special Warrant Dividend and Spin-ou...
4/15/2010Annual General Meeting to be held at Dynamic Earth in Sudbur...
3/31/2010Board Approves Special Warrant Dividend and Spin-out of BC P...
3/23/2010Acquires 15 Kilometer Trend of Porphyry Molybdenum Occurrenc...
1/28/2010Increases Shareholding in Duluth Metals Limited
12/10/2009Acquires Dominant Position in New Porphyry Copper-Gold-Molyb...
11/26/2009Adds Parviz Farsangi and Roland Horst to Board of Directors
11/24/2009& Lonmin Plc Approve $1.25 million 2010 Program for Sudbury ...
7/30/2009Confirms Conductor In Parkin Offset Dyke
7/13/2009Defines Large IP Target on Rogers Creek Porphyry Copper-Gold...
7/2/2009Starts Second Drill in 8,900 metre Sudbury Program
12/22/2008 Announces New Channel Sample Results from Their Frost Lake ...
9/22/2008Initiates Drilling on Parkin Offset Dyke
9/12/2008Discovers Porphyry Gold-Copper Mineralization on BC Property
9/9/2008Vends Kirkland Lake Gold Properties to Tanqueray
8/26/2008Signs $5M Joint Venture with Impala Platinum on Parkin Offse...
7/23/2008Begins Exploration on Copper-Zinc and Nickel Targets in Nort...
7/16/2008to Form $5M Joint Venture with Impala Platinum on Parkin Off...
7/8/2008Confirms Presence of Mineralization at Roger's Creek
4/28/2008and Champion Bear enter into Option and Joint Venture Agreem...
4/23/2008 Announces $2.7 Million Program for Xstrata Nickel JV Proper...
4/23/2008Annual General Meeting to be held at Science North.
4/1/2008Victory Nickel Acquires 8.4% of Wallbridge Mining
3/27/2008 Announces JV with Vale Inco and Xstrata Nickel
12/4/2007Uncovers Gold-Silver-Copper-Lead Mineralization in the Sudbu...
10/25/2007Continues Exploration on Hess and Ministic Offset Dyke Prope...
8/13/2007Continues $5.3 M Exploration Program in Sudbury
3/2/2007Updates Sudbury Exploration Progress
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
FRANKFURT (WC7.F)
0.068+6.25%
FRANKFURT
€UR 0.068
04/26 09:04 -
6.25%
Prev close Open
0.064 0.068
Low High
0.068 0.068
Year l/h YTD var.
0.040 -  0.068 13.33%
52 week l/h 52 week var.
0.040 -  0.109 -26.09%
Volume 1 month var.
8,000 70.00%
24hGold TrendPower© : 16
Produces
Develops
Explores for Copper - Gold - Molybdenum - Platinum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/8/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-9.33%
2023-37.50%0.160.07
2022-52.00%0.290.08
2021-48.13%0.530.23
2020-24.69%0.820.24
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :