Tahoe Resources Announces Updated NI 43-101 Resource
Published : May 07, 2012

50% Growth in Indicated Resource Fuels PEA for Expansion

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

VANCOUVER, BRITISH COLUMBIA--(Marketwire - May 7, 2012) - Tahoe Resources Inc. (News - Market indicators) is pleased to announce the completion of a new National Instrument (NI) 43-101 compliant resource estimate and an independent Preliminary Economic Assessment (PEA) for its 100% owned Escobal project in southeastern Guatemala. The PEA describes production expansion scenarios from the current 3,500 tonne per day (tpd) scenario to 4,500 and 5,500 tpd underground mine plans which are anticipated to produce metals concentrates with very high silver content.

Highlights

  • 50% increase in Indicated silver resource to 367.5 million ounces (Moz) at an average grade of 422 grams per tonne (g/t). Indicated silver grade falls 16% to 422 g/t, reflecting the growth of the Indicated segment of the resource. A total of 91% of all resource silver ounces is now in the Indicated category.
  • The Inferred silver resource amounts to 36.7 Moz at 254 g/t average grade.
  • In addition to increased throughput, the mine life grows from 18 to 19 years.
  • The 3,500 tpd capital expenditure (capex) estimate remains at $326.6 million.
  • Capex for expansion: It is estimated that $46 million will be required to expand the operation to 4,500 tpd by 2017 and that an additional $33 million will be required to expand to 5,500 tpd by 2020. All capex is expected to be financed by our current cash balance and projected future cash flow.
  • Incremental after-tax IRR for the 4,500 tpd and 5,500 tpd expansions is estimated to be 37% and 45%, respectively, at a silver price of $25.00 per ounce.
  • After-tax NAV of the Escobal project is estimated to increase by 7% to $2.99 billion.

"We are very pleased to see the projected NAV growth for the project. This comes from the larger resource and project expansions, offset by higher tax and royalty rates established in Guatemala this year, plus the impacts of increased benchmark smelting terms associated with higher silver prices," said Tahoe President and Chief Executive Officer Kevin McArthur. "Escobal is quickly becoming one of the top silver projects in the world. With estimated production of over 20 million ounces of silver per year for over ten years and estimated total cash costs of less than $5.00 per silver ounce, Tahoe will be a leader in silver when we begin production, expected early in 2014. We estimate that we have sufficient cash to fully finance the project, which is currently on-budget and on-track to meet our proposed mill commissioning in the second half of 2013."

Updated Mineral Resource Estimate

The Escobal vein has been drilled along a strike length of approximately 2,200 metres and a vertical extent of 1,000 metres. The resource estimate was updated by Mine Development Associates (MDA) incorporating data from approximately 23,000 samples from 350 Diamond drill holes totaling 121,639 metres.

The mineral resource estimate for the Escobal deposit contains 367.5 million ounces of silver in the Indicated category representing a 50% increase in Indicated silver ounces relative to the November 2010 resource estimate, and 36.7 million ounces of silver classified as Inferred, with significant amounts of gold, lead and zinc reported in both resource categories. What follows is a summary of the Indicated and Inferred resources, using a cut-off grade of 150 g/t silver equivalent:

Classification Tonnes
(M)
Silver
(g/t)
Gold
(g/t)
Lead
(%)
Zinc
(%)
Silver
(M oz)
Gold
(k oz)
Lead
(k t)
Zinc
(k t)
Indicated Resource 27.1 422 0.43 0.71 1.28 367.5 373 192 347
Inferred Resource 4.6 254 0.59 0.34 0.66 36.7 85 15 30
Notes: Average grades indicated. Effective date of the resource estimate is January 23, 2012.

MDA modeled and estimated the Escobal deposit resources by refining the geologic model, evaluating the drill data statistically, interpreting mineral domains on cross sections and level plans, analyzing the modeled mineralization statistically to establish estimation parameters, and estimating silver, lead, gold, and zinc grades into a three-dimensional block model using inverse distance cubed (ID3). In addition, they carried out verification procedures of the data going into the model.

The silver equivalent Indicated resources total 429.7 Moz at an average grade of 493 g/t and silver equivalent Inferred resources totaled 44.7 Moz at an average grade of 309 g/t. Calculation of silver equivalent is based on $25 per ounce silver, $1,300 per ounce gold, $0.95 per pound lead, and $0.90 per pound zinc.

Preliminary Economic Assessment

Mining & Processing

The Escobal project is based on an underground mine utilizing low-cost development and production methods, a processing plant employing crushing, grinding and differential flotation to produce lead and zinc concentrates, and a dry-stack tailings facility. Initial production, estimated to begin in 2014 at 3,500 tpd and ramped up to 4,500 tpd over the first three years of production, provides an economic benefit over the 3,500 tpd project defined in the November 2010 PEA. Analysis in the new PEA demonstrates that expansion of the processing facility to 5,500 tpd by 2020 provides additional economic benefit. The PEA concludes that expansion above the 4,500 tpd rate would benefit from ongoing exploration to further define appropriate capacity increases. The May 7, 2012 PEA describes the economic analysis of the two expansion cases.

The mine is being developed via two primary declines for the transportation of personnel, equipment, and materials, as well as transport of the mined resources to the surface for processing. Additional primary development will include two ventilation shafts and drifts connecting the primary declines. The primary declines will also serve as platforms for exploration and definition drilling.

It is estimated that over the life of the mine a total of 29.8 million tonnes at average grades of 383 g/t silver, 0.38 g/t gold, 0.62% lead, and 1.10% zinc, will be delivered to the mill for processing. This includes estimated dilution of 4.7 million tonnes at an average grade of 71 g/t silver, 0.12 g/t gold, 0.10% lead, and 0.22% zinc. A mine wide cut-off value of 150 g/t equivalent silver has been determined as optimal for the operation and approximately 95% of the resource above this cut-off is planned for extraction in the mine plan. 

Mineral processing will use differential flotation to produce lead and zinc concentrates for sale to third-party smelters. Test work completed to date on the sulfide resources demonstrates recoveries of 87% for silver, 75% for gold, 83% for lead, and 83% for zinc, with the majority of precious metals reporting to the lead concentrate. Based on current test results, the lead concentrates are expected to contain very high levels of silver, between 15,000 and 30,000 grams per concentrate tonne, with very little in the way of penalty elements. Concentrates will be bagged and delivered to port in sea containers.

Average total cash cost is expected to be less than $5.00 per silver ounce over the mine life, net of gold and base metal by-product credits.

Capital Costs

Capital costs for the Escobal project include all project costs commencing January 1, 2011. The project capital costs were compiled by M3 Engineering & Technology Corporation of Tucson, Arizona (M3). The initial estimated capital costs are summarized as follows:

Description 3,500 tpd 4,500 tpd 5,500 tpd
Underground Development $32.5 $40.9 $41.1
Mine Equipment & Underground Infrastructure $48.6 $68.3 $68.6
Process Plant & Tailings Facility $99.4 $102.8 $120.0
General Site Facilities $28.8 $28.8 $28.8
Power $11.8 $19.8 $22.8
Water $8.3 $8.3 $8.3
Freight/Duties/Utilities/Commissioning $26.8 $29.0 $33.1
Subtotal $256.2 $297.9 $322.7
Contingency $22.1 $24.4 $28.5
Owners Cost & EPCM $48.3 $50.5 $54.3
Total Capex $326.6 $372.8 $405.5

Additional capital requirements to expand the facilities above the 3,500 tpd rate include costs for the underground equipment and development required to access and extract the additional resources, additional flotation and other mill equipment, including an additional ball mill for production rates above 4,500 tpd, and power generation equipment and installation for the expansion cases. Sustaining capital over the remainder of the mine-life is estimated at $187.2 million for the 3,500 tpd case, $148.3 million for the 4,500 tpd case and $149.2 million for the 5,500 tpd case, including sustaining development of the additional resources.

Operating Costs

M3, working closely with Tahoe management personnel, compiled the operating cost estimates. Operating cost estimates per tonne of ore processed are included in the PEA as follows:

  Nov 2010    
  3,500 tpd 4,500 tpd 5,500 tpd
Mining $27.99 $29.03 $27.22
Processing $19.63 $19.54 $20.16
Site G&A $6.72 $6.67 $6.87
Total Operating Costs $54.34 $55.24 $54.25
       
Concentrate Treatment & Freight $17.06 $23.96 $23.96
Royalties $3.56 $13.02 $13.00
Taxes $11.86 $20.25 $20.18

Concentrate treatment cost estimates per dry straight tonne of concentrate are included in the PEA as follows:

  Nov 2010    
  3,500 tpd 4,500 tpd 5,500 tpd
Concentrate Shipping $100.00 $100.00 $100.00
Zinc concentrate treatment charges $275.00 $191.00 $191.00
Lead concentrate treatment charges $220.00 $300.00 $300.00

Refining charges on precious metal only apply to lead concentrates. Estimated lead concentrate refining charges per troy ounce contained in the concentrate are included in the PEA as follows:

  Nov 2010    
  3,500 tpd 4,500 tpd 5,500 tpd
Silver refining charges $0.50 $1.50 $1.50
Gold refining charges $8.00 $8.00 $8.00

Taxes and Royalties

In the first quarter of 2012, the new administration in Guatemalan and the Mining Industry Association agreed to general terms of a royalty agreement resulting in the industry voluntarily paying higher royalties on mineral production. Based on this agreement, royalties will increase from 1% to 4% of net revenues on precious metals and 3% on base metals. Royalties will be shared equally between the federal and local governments. The impact of this royalty increase has been included in the May 7, 2012 PEA.

The Guatemalan legislature passed new tax legislation which will take effect in 2013. The new legislation will change the current standard income tax on gross revenues from 5% to 7%. Alternatively, the company may elect to pay income taxes amounting to 25% of net income. It is expected that limitations on allowable deductions will lead to the 7% gross revenue alternative which has been included in the May 7, 2012 PEA.

Project Status and Timeline

Development of the underground mine began in May 2011, following receipt of government approvals. A total of 1,475 meters of underground development has been excavated as of March 31, 2012. Development of the process plant and surface support facilities/infrastructure commenced following government approval of the project EIS in October 2011. Committed costs for the project as of March 31, 2012 totaled $166 million of which $104 million (capitalized and expensed) has been spent through March 31, 2012. The project is on budget and schedule to commence mill commissioning in the second half of 2013 and to reach commercial production in early 2014. Application for the exploitation permit, required for production from Escobal, has been made and all necessary requirements for approval have been met. The permit is expected to be received in the first half of 2012. The Company is actively pursuing the recommendations included in the May 2012 PEA and is continuing Escobal project development for the 4,500 tpd case.

About Tahoe Resources

Tahoe's strategy is to develop the Escobal project into a profitable mining operation and to position itself as a leading silver producer with high quality, low cost assets in the Americas. Tahoe is listed on the TSX (THO) and NYSE (TAHO) and is a member of the S&P/TSX Composite and TSX Global Mining indices. Tahoe filed a PEA for the Escobal project on SEDAR in November 2010, which described a proposed 3,500 tpd operation. A PEA for expansion of the operation to 4,500 and 5,500 tpd, as described in this news release is available on SEDAR. Additional information is available on Tahoe's website: www.tahoeresourcesinc.com.

PEA Contributors

The Escobal PEA was conducted by M3 under the supervision of Conrad Huss, P.E., Daniel Roth, P.E., and Thomas L. Drielick, P.E. The updated resource estimate was completed by Mine Development Associates of Reno, Nevada under the supervision of Paul Tietz, C.P.G. Huss, Roth, Drielick and Tietz are Qualified Persons as defined by NI 43-101 and are independent of Tahoe Resources Inc. as defined in Section 1.5 of NI 43-101. Mr. Tietz verified the mineral resource data herein by conducting a site visit, which included verifying drill locations and survey data, reviewing sample handling, data collection procedures, and independent verification sampling; completing a full audit of the assay database and review of the QA/QC data; and analyzing core recovery and its relationship to metal grades. 

Metallurgical testing was performed at FLSmidth-Dawson Metallurgical Laboratories in Salt Lake City, Utah. Pakalnis & Associates of Vancouver, BC conducted the geotechnical analysis. Consultoria y Tecnologia Ambiental, S.A. of Guatemala City performed the environmental baseline work.

Qualified Person Statement

This news release has been reviewed by Conrad Huss, P.E, of M3, a Qualified Person as defined by NI 43-101.

Cautionary Note

The PEA for the Escobal project is preliminary in nature, in that it includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. The basis for the PEA is the Indicated mineral resources and Inferred mineral resources, which have an effective date of January 23, 2012. There is no prefeasibility or feasibility study in regards to the Escobal project.

Forward-Looking Statements

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation, and "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively referred to as "forward-looking information"). Wherever possible, words such as "plans," "expects," or "does not expect," "budget," "scheduled," "estimates," "forecasts," "anticipate" or "does not anticipate," "believe," "intend," and similar expressions or statements that certain actions, events or results "may," "could," "would," "might" or "will" be taken, occur or be achieved, have been used to identify forward-looking information. In particular, this news release describes future events and conditions related to Tahoe's strategy to develop the Escobal project and for positioning the company as a whole. Forward-looking information is based on management's reasonable assumptions, estimates, expectations, analyses and opinions on the date of this news release. These are based on management's experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, Tahoe's ability to carry on exploration and development activities, the timely receipt of required approvals, the price of silver and other metals, Tahoe's ability to operate in a safe, efficient and effective manner and Tahoe's ability to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Tahoe's actual results, programs and financial position could differ materially from those anticipated in such forward-looking statements as a result of numerous factors, many of which are beyond the Company's control. These factors include, but are not necessarily limited to, results of exploration activities and development of mineral properties, the interpretation of drilling results and other geological data, the uncertainties of resource and reserve estimations, receipt and security of mineral property titles, receipt of licenses to conduct mining activities, country risks, project cost overruns or unanticipated costs and expenses, the availability of funds, fluctuations in metal prices, currency fluctuations, and general market and industry conditions. There is no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on this information. Tahoe does not undertake to update any forward-looking information, except as, and to the extent required by, applicable securities laws. For more information about the risks and challenges of Tahoe's business, investors should review Tahoe's current AIF available at www.sedar.com.




Tahoe Resources Inc.
Ira M. Gostin
Vice President Investor Relations
775-448-5807
investors@tahoeresourcesinc.com
www.tahoeresourcesinc.com
Data and Statistics for these countries : Guatemala | All
Gold and Silver Prices for these countries : Guatemala | All

Tahoe Resources Inc.

EXPLORATION STAGE
CODE : THO.TO
ISIN : CA8738681037
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Tahoe Resources is a producing silver company based in Canada.

Its main exploration property is ESCOBAL in Guatemala.

Tahoe Resources is listed in Canada and in United States of America. Its market capitalisation is CA$ 1.5 billions as of today (US$ 1.1 billions, € 1.0 billions).

Its stock quote reached its highest recent level on September 24, 2010 at CA$ 9.96, and its lowest recent point on June 28, 2019 at CA$ 4.95.

Tahoe Resources has 312 300 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Tahoe Resources Inc.
8/2/2018Tahoe Resources posts quarterly loss on Guatemala mine dispu...
8/1/2017New report highlights Tahoe Resources’ sustainability effort...
Nominations of Tahoe Resources Inc.
8/29/2012Announces Appointment of New Auditor
5/3/2011Announces Addition to Board of Directors
Financials of Tahoe Resources Inc.
7/15/2016DECLARES SEVENTH MONTHLY DIVIDEND FOR 2016
5/12/2016Reports Strong Earnings in First Quarter 2016
11/12/2014Reports Solid Third Quarter
8/8/2013Reports 2013 Second Quarter Results
5/10/2013Reports 2013 First Quarter Results
5/10/2013Reports 2013 First Quarter Results
11/14/2012Reports 3rd Quarter 2012 Financial Results
8/3/2012Reports 2nd Quarter 2012 Financial Results
Project news of Tahoe Resources Inc.
3/11/2015Reports Strong First Production Year
2/17/2015Reports Strong First Production Year
5/1/2013(Escobal)Clarifies Reports Regarding Incidents Near Escobal Project
4/3/2013(Escobal)Escobal Project Receives Final Permit
6/28/2012(Escobal)Escobal Project Unaffected by Proposed Mining Reform
3/9/2012(Escobal)Reports 2011 Results and Updates Escobal Project
Corporate news of Tahoe Resources Inc.
7/29/2016Coverage Initiated on Industrial Metals and Minerals Stocks ...
7/7/2016TAHOE RESOURCES DECLARES SEVENTH MONTHLY DIVIDEND FOR 2016
7/7/2016TAHOE RESOURCES DECLARES SEVENTH MONTHLY DIVIDEND FOR 2016
7/5/2016TAHOE RESOURCES ACQUIRES 2% NSR ROYALTY AT BELL CREEK, SIGNS...
7/5/2016TAHOE RESOURCES ACQUIRES 2% NSR ROYALTY AT BELL CREEK, SIGNS...
6/13/2016TAHOE RESOURCES ANNOUNCES MANAGEMENT CHANGE
1/27/2016Returns and Price Variations in Recently Traded Equities -- ...
1/14/2016TAHOE REPORTS RECORD 2015 GOLD & SILVER PRODUCTION
1/14/2016TAHOE REPORTS RECORD 2015 GOLD & SILVER PRODUCTION
1/7/2016TAHOE RESOURCES DECLARES FIRST MONTHLY DIVIDEND FOR 2016
12/30/2015Today's Market Driven by Key Factors - New Research on Alcoa...
12/6/2015Tahoe Resources Inc (TAHO): Hedge Fund Sentiment Unchanged
12/6/2015Tahoe Resources Inc (TAHO): Hedge Fund Sentiment Unchanged
11/6/2015Assessing Free Cash Flows of Intermediate Gold Miners in 201...
11/4/2015Revised Record Date: Tahoe Resources Declares Eleventh Month...
11/4/2015Revised Record Date: Tahoe Resources Declares Eleventh Month...
11/4/2015TAHOE RESOURCES DECLARES ELEVENTH MONTHLY DIVIDEND FOR 2015
11/4/2015TAHOE RESOURCES DECLARES ELEVENTH MONTHLY DIVIDEND FOR 2015
10/30/2015Why Growth in Gold Production Is Important for Gold Miners
10/29/2015Evaluating Gold Production for Intermediate Gold Miners in 2...
10/29/2015Evaluating Gold Production for Intermediate Gold Miners in 2...
10/19/2015U.S. Global Investors' Frank Holmes and Ralph Aldis Intervie...
10/19/2015U.S. Global Investors' Frank Holmes and Ralph Aldis Intervie...
10/8/2015Tahoe Resources Declares Tenth Monthly Dividend For 2015
10/8/2015Tahoe Resources Declares Tenth Monthly Dividend For 2015
9/30/2015Comp: Is Barrick Gold’s High Debt a Cause for Concern?
9/3/2015TAHOE RELEASES STATEMENT REGARDING GUATEMALA
9/3/2015TAHOE RELEASES STATEMENT REGARDING GUATEMALA
9/3/2015TAHOE RESOURCES DECLARES NINTH MONTHLY DIVIDEND FOR 2015
9/3/2015TAHOE RESOURCES DECLARES NINTH MONTHLY DIVIDEND FOR 2015
8/12/2015Goldcorp’s FCF Growth Could Strengthen Its Balance Sheet
8/11/2015Tahoe Resources reports 2Q loss
8/11/2015Tahoe Resources reports 2Q loss
8/11/2015TAHOE RESOURCES REPORTS STRONG CASH FLOW IN Q2
8/11/2015TAHOE RESOURCES REPORTS STRONG CASH FLOW IN Q2
8/6/2015TAHOE RESOURCES DECLARES EIGHTH MONTHLY DIVIDEND FOR 2015
8/6/2015TAHOE RESOURCES DECLARES EIGHTH MONTHLY DIVIDEND FOR 2015
8/5/2015TAHOE RESOURCES ANNOUNCES KEVIN MCARTHUR TO ASSUME CEO ROLE
8/5/2015TAHOE RESOURCES ANNOUNCES KEVIN MCARTHUR TO ASSUME CEO ROLE
8/5/20157:56 am Tahoe Resources appoints Executive Chair Kevin McArt...
7/9/2015TAHOE RESOURCES DECLARES SEVENTH MONTHLY DIVIDEND FOR 2015
7/9/2015TAHOE RESOURCES DECLARES SEVENTH MONTHLY DIVIDEND FOR 2015
7/9/2015Declares Seventh Monthly Dividend For 2015
7/6/2015Goldcorp Reinstated At Outperform By Credit Suisse, Sees Cas...
6/30/2015Announces Closing Of Secondary Offering By Goldcorp Inc.
4/14/2015TAHOE RESOURCES TO APPEAL CONFINEMENT OF EMPLOYEE BY A LOWER...
4/14/2015TAHOE RESOURCES TO APPEAL CONFINEMENT OF EMPLOYEE BY A LOWER...
4/14/2015To Appeal Confinement Of Employee By A Lower Court In Guatem...
4/13/2015TAHOE RESOURCES TO PRESENT AT EUROPEAN GOLD FORUM
4/13/2015TAHOE RESOURCES TO PRESENT AT EUROPEAN GOLD FORUM
4/13/2015To Present At European Gold Forum
4/9/2015TAHOE RESOURCES DECLARES FOURTH MONTHLY DIVIDEND FOR 2015
4/9/2015TAHOE RESOURCES DECLARES FOURTH MONTHLY DIVIDEND FOR 2015
4/9/2015Declares Fourth Monthly Dividend For 2015
4/8/2015TAHOE RESOURCES ANNOUNCES IT HAS OBTAINED PROVISIONAL LISTIN...
4/8/2015TAHOE RESOURCES ANNOUNCES IT HAS OBTAINED PROVISIONAL LISTIN...
4/8/2015Announces It Has Obtained Provisional Listing Approval In Pe...
4/2/2015S&P Dow Jones Indices Announces Changes to the S&P/TSX Canad...
4/1/2015TAHOE RESOURCES AND RIO ALTO MINING ANNOUNCE COMPLETION OF M...
4/1/2015TAHOE RESOURCES AND RIO ALTO MINING ANNOUNCE COMPLETION OF M...
4/1/2015And Rio Alto Mining Announce Completion Of Merger
4/1/2015Tahoe Resources (TAHO) Falls: Stock Goes Down 5.4% - Tale of...
3/11/2015Tahoe Resources posts 4Q profit
3/11/2015TAHOE RESOURCES REPORTS STRONG FIRST PRODUCTION YEAR
3/11/2015TAHOE RESOURCES REPORTS STRONG FIRST PRODUCTION YEAR
3/11/2015Tahoe Resources Reports Strong First Production Year
3/5/2015TAHOE RESOURCES DECLARES THIRD MONTHLY DIVIDEND FOR 2015
3/5/2015TAHOE RESOURCES DECLARES THIRD MONTHLY DIVIDEND FOR 2015
3/2/2015Ubika Research Celebrates the 7th Company Acquired in its Go...
2/25/2015TAHOE ANNOUNCES RECEIPT OF SHAREHOLDER APPROVAL
2/25/2015TAHOE ANNOUNCES RECEIPT OF SHAREHOLDER APPROVAL
2/25/2015Announces Receipt Of Shareholder Approval
2/25/2015Tahoe Announces Receipt Of Shareholder Approval
2/17/2015TAHOE RESOURCES REPORTS STRONG FIRST PRODUCTION YEAR
2/17/2015TAHOE RESOURCES REPORTS STRONG FIRST PRODUCTION YEAR
2/17/2015Tahoe Resources Reports Strong First Production Year
2/11/2015TAHOE RESOURCES AND RIO ALTO MINING COMBINE
2/11/2015TAHOE RESOURCES AND RIO ALTO MINING COMBINE
2/9/2015Tahoe Resources and Rio Alto Mining Combine Creating a Leadi...
2/5/2015Tahoe Resources Declares Second Monthly Dividend For 2015
1/20/2015Tahoe Silver Production at High End of 2014 Expectations
1/8/2015TAHOE RESOURCES DECLARES FIRST MONTHLY DIVIDEND FOR 2015
1/8/2015TAHOE RESOURCES DECLARES FIRST MONTHLY DIVIDEND FOR 2015
12/1/2014CANADA STOCKS-TSX drops on global growth worries, energy sha...
12/1/2014CANADA STOCKS-TSX hit by weak global economic cues, energy s...
12/1/2014GUATEMALAN CONGRESS PROPOSES ROYALTY INCREASE
12/1/2014Guatemalan Congress Proposes Royalty Increase
11/12/2014Tahoe Resources posts 3Q profit
11/12/2014Tahoe Resources posts 3Q profit
11/12/2014TAHOE RESOURCES REPORTS SOLID THIRD QUARTER
11/12/2014TAHOE RESOURCES REPORTS SOLID THIRD QUARTER
11/5/2014TAHOE RESOURCES ANNOUNCES ESCOBAL MINERAL RESERVES
11/5/2014TAHOE RESOURCES ANNOUNCES ESCOBAL MINERAL RESERVES
11/5/2014(Escobal)Announces Escobal Mineral Reserves
10/16/2013Announces First Concentrate Shipment
7/18/2013to Clarify PEA Disclosure
7/10/2013Guatemala Proposes Temporary Moratorium on New Mining Licens...
6/4/2013Closes $50 Million Secured Credit Facility
9/19/2012(Escobal)Reports Civil Unrest From Outsiders at Escobal
6/5/2012Shares to be Released From Lock-Up on June 8, 2012
5/11/2012Reports 1st Quarter 2012 Results
5/8/2012Begins Trading on NYSE
5/7/2012Announces Updated NI 43-101 Resource
5/4/2012to Commence Trading on NYSE
6/20/2011Added to S&P/TSX Composite and Global Mining Indices
6/8/2011(Escobal)s Escobal Drilling -- Expands Known Mineralization
4/5/2011Announces Recommendations From ISS Group in Support of Matte...
2/16/2011Receives Environmental Permit to Commence Underground Develo...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (THO.TO)NYSE (TAHO)
4.95+0.00%3.64-3.96%
TORONTO
CA$ 4.95
06/28 17:00 -
0%
Prev close Open
4.95 4.89
Low High
4.85 5.08
Year l/h YTD var.
4.60 -  5.15 -0.402%
52 week l/h 52 week var.
2.90 -  5.15 30.95%
Volume 1 month var.
694,806 -%
24hGold TrendPower© : -30
Produces
Develops
Explores for Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2019-0.80%5.054.85
2018-17.25%7.272.88
2017-52.33%8.5010.28
20166.58%22.1310.60
2015-20.76%18.8710.02
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.71-1.66%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 3.68-1.60%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.19+0.31%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 1.66-4.05%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 1.07+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.02+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.11+0.48%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.03-2.83%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 6.59-2.23%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.06-7.14%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.14+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 2.22-1.33%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 26.32-1.35%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.06-1.59%Trend Power :