TORONTO, ONTARIO--(Marketwire - April 24, 2012) - High River Gold Mines Ltd. (News - Market indicators) ("High River" or the "Company") today reported the results of the recently completed mineral reserve and resource estimates prepared for Berezitovy and High River's properties in Burkina Faso. Nord Gold N.V., High River's controlling shareholder, had updated "competent person reports" prepared for such properties by Wardell Armstrong International ("WAI"), which included updated mineral reserve and resource estimates. WAI is currently preparing technical reports compliant with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") in respect of such estimates. The Company expects to file the completed reports in forty-five days. The mineral resources and reserves have been estimated and classified according to the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (2004). The "qualified person" in charge of the preparation of the technical reports is Dr. Phil Newall, BSc (ARSM), PhD (ACSM), CEng, FIMMM, Director with WAI.

Highlights

The updated reserves and resources estimates as of January 1, 2012 for:

  • Berezitovy mine in Russia 
    • 18,351 kilotonnes of ore, with 1.63 g/t of gold grade resulting in 963 koz of proven and probable gold reserves; 21,148 kilotonnes of ore, with 1.58 g/t gold grade resulting in 1,076 koz of measured and indicated gold resources; 6,208 kilotonnes of ore, with 1.24 g/t gold grade resulting in 247 koz of inferred gold resources
  • Taparko-Bouroum mine including Nairy, Baola, F12, Welcome Stranger, Yeou and Ankouma in Burkina Faso
    • 7,190 kilotonnes of ore, with 2.72 g/t of gold grade resulting in 629 koz of proven and probable gold reserves; 9,468 kilotonnes of ore, with 2.48 g/t of gold grade resulting in 756 koz of  indicated gold resources; 8,654 kilotonnes of ore, with 1.87 g/t of gold grade resulting in 520 koz of inferred gold resources
  • Bissa development project, including Bouly, Gougré, Liliga, Bissa Sud and Zinigma in Burkina Faso
    • 30,611 kilotonnes of ore, with 1.83 g/t of gold grade resulting in 1,803 koz of proven and probable gold reserves; 75,834 kilotonnes of ore, with 1.23 g/t of gold grade resulting in 2,991 koz of measured and indicated gold resources; 63,332 kilotonnes of ore, with 0.95 g/t of gold grade resulting in 1,938 koz of inferred gold resources
  • Labola project
    • 1,231 kilotonnes of ore, with 1.22 g/t of gold grade resulting in 48,136 oz of inferred gold resources 

Note: Mineral resources are reported inclusive of any reserves.

Mineral Resource/Reserve Estimates

Mineral resources and reserves have been estimated and classified according to the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (2004) (the "JORC Code"). The JORC Code is an acceptable foreign code under NI 43-101.

Berezitovy

The Berezitovy resource model has been derived from geostatistical studies. Key drillhole spacings for the allocation of measured resources were 30m x 30m (along-strike x down-dip) and 60m x 60m for indicated resources. The extent of inferred resources was limited to 120m but contained within the defined mineralised zones.

The final block model was used as the basis for resource evaluation. Summary results of the evaluation of the un-mined, in-situ resources are shown in the table for three different cut-off grade levels: 0.3g/t, 0.5g/t and 0.7g/t Au.

Berezitovy Resource Estimate (WAI, 01 January, 2012)
(in accordance with guidelines of the JORC Code (2004))
Ore Type Sulphide
Cut Off Grade (g/t) 0.3 0.5 0.7
Measured Tonnes (kt) 10,275 9,669 8,510
Au (g/t) 1.66 1.74 1.89
Metal kg 17,046 16,791 16,094
koz 548 540 517
Indicated Tonnes (kt) 12,410 11,479 9,755
Au (g/t) 1.38 1.45 1.60
Metal kg 17,066 16,685 15,644
koz 549 536 503
Measured + Indicated Tonnes (kt) 22,685 21,148 18,266
Au (g/t) 1.50 1.58 1.74
Metal kg 34,112 33,476 31,738
koz 1,097 1,076 1,020
 
Inferred Tonnes (kt) 7,362 6,208 4,627
Au (g/t) 1.11 1.24 1.45
Metal kg 8,150 7,679 6,729
koz 262 247 216
Notes: 1. Mineral Resources are not reserves until they have demonstrated economic viability based on a feasibility study or pre-feasibility study. 2. Mineral Resources are reported inclusive of any reserves.3. Grade represents estimated contained metal in the ground and has not been adjusted for metallurgical recovery.
 
As a continuation of mineral resource modelling of the Berezitovy deposit, WAI has undertaken a pit optimisation using the Mineral Resource Block Model prepared by WAI and updated in January 2012. The model was depleted to contain only those mineral Resources that have not been extracted as of January 1, 2012. WAI used NPV Scheduler® software for the optimisation, applying the conceptual financial and technical parameters shown in the following table.
 
WAI Pit Optimisation Parameters
Parameter Units Value
Metal Price (Au) US$/oz 1,250
Metal Price (Au) US$/g 40.19
Selling Cost US$/g 3.2
Production Rate ktpa 2.0Mtpa
Discount Rate % 10
Dilution % 6
Mining Recovery Factor % 97
Mining Cost (Ore and Waste) US$/t 2.05
Processing Cost (per t of processed ore) US$/t 15.00
Gold Recovery % 89
Final Pitwall Angle Degrees 55
 
The results of the WAI pit optimisation as calculated by NPV Scheduler® are presented in the table below.
 
Berezitovy Open Pit Ore Reserves (WAI, 01 January 2012)
(in accordance with the guidelines of the JORC Code (2004))
      Proven   Probable Proven + Probable   Pit Summary
Ore Type COG   Ore
kt
  Au
g/t
  Au
kg
  Au
kOz
  Ore
kt
  Au
g/t
  Au
kg
  Au
kOz
Ore
kt
  Au
g/t
  Au
kg
  Au
kOz
  Waste
kt
  Stripping Ratio
t/t
Sulphide (In-situ) 0.50   9,102   1.71   15,531   499   5,332   1.91   10,189   328 14,433   1.78   25,721   827   38,656   2.7
Sulphide (Stockpiles) 0.50                   3,917   1.08   4,245   136 3,917   1.08   4,245   136        
Total     9,102   1.71   15,531   499   9,249   1.56   14,435   464 18,351   1.63   29,966   963        
Note: Mining Factors of 6% Dilution and 97% Mining Recovery applied
*Waste is given inclusive of Inferred material

Taparko

The criteria for defining resource categories were derived from the geostatistical studies. Key drillhole spacings for the allocation of indicated resources were 20m x 20m (along strike and down dip). Key drillhole spacings for the allocation of inferred resources were 80m x 80m (along strike and down dip).

The final block models were cut against the topographic/pit surveys dated January 1, 2012 and used as the basis for resource evaluation. Summary results of the evaluation of the in-situ resources for all resources are shown in the table below for four different cut-off grade levels: 0.5, 1.0, 1.5 and 2.0g/t Au.

Taparko Resource Estimate (WAI, 01 January 2012)
(in accordance with the guidelines of the JORC Code (2004))
Cut Off Grade 0.5 1.0 1.5 2.0
Indicated Tonnage (kt) 5,583 5,055 4,180 3,170
Au (g/t) 2.84 3.05 3.43 3.96
Metal kg 15,835 15,437 14,324 12,555
oz 509,078 496,286 460,526 403,647
Measured +Indicated Tonnage (kt) 5,583 5,055 4,180 3,170
Au (g/t) 2.84 3.05 3.43 3.96
Metal kg 15,835 15,437 14,324 12,555
oz 509,078 496,286 460,526 403,647
 
Inferred Tonnage (kt) 2,013 1,803 1,485 1,125
Au (g/t) 2.67 2.89 3.24 3.72
Metal kg 5,379 5,218 4,818 4,194
t oz 172,946 167,752 154,881 134,817
Notes:
1. Mineral Resources are not reserves until they have demonstrated economic viability based on a Feasibility study or pre-feasibility study.
2. Mineral Resources are reported inclusive of any reserves.
3. The contained Au represents estimated contained metal in the ground and has not been adjusted for metallurgical recovery.
 
As a continuation of mineral resource modelling of Taparko deposit, WAI has undertaken a pit optimisation using the Mineral Resource Block Model prepared by WAI and updated in January 2012. The model was depleted to contain only those mineral resources, which have not been extracted as of 01 January 2012. WAI used NPV Scheduler® software for the optimisation, applying the conceptual financial and technical parameters shown in the following table.
 
WAI Pit Optimisation Parameters
 
Parameter Units Value
Metal Price (Au) US$/oz 1,250
Metal Price (Au) US$/g 40.19
Production Rate ktpa 1,750
Discount Rate % 10
Dilution % 5
Mining Recovery Factor % 97
Mining Cost* (Ore and Waste) US$/t 1.9
Processing Cost (per t of processed ore) US$/t 13.1
G&A US$M 17.5
Gold Recovery % 90
Final Pitwall Angle Degrees 45
Note: additional cost of US$4.6/t was included into mining cost for F12 deposit as the ore from the deposit has to be transported from the F12 mine site to the main processing plant at Taparko.
 
The results of the WAI pit optimisation for Taparko as calculated by NPV Scheduler® are presented in the table below.
 
Taparko Open Pit Ore Reserves (WAI, 01 January 2012)
(in accordance with the guidelines of the JORC Code (2004))
Open Pit (Area) GT 2N2K 3/5 Total
Cut Off Grade (g/t) 0.67 0.67 0.67 -
Proven Tonnage (kt) - - - -
Au (g/t) - - - -
Metal kg - - - -
koz - - - -
Probable Tonnage (kt) 993 1,187 2,779 4,959
Au (g/t) 4.18 1.66 2.86 2.83
Metal kg 4,149 1,976 7,945 14,071
koz 133 64 255 452
Proven + Probable Tonnage (kt) 993 1,187 2,779 4,959
Au (g/t) 4.18 1.66 2.86 2.83
Metal kg 4,149 1,976 7,945 14,071
koz 133 64 255 452

F12 and Welcome Stranger

The criteria for defining resource categories were derived from the geostatistical studies. Key drillhole spacings for the allocation of indicated resources at F12 were 20m x 20m (along-strike x down-dip). Inferred resources were allocated to blocks within the mineralised zone wireframes within 50m of a composite sample. All of the modelled resources at Welcome Stranger were classified as inferred due to high very short scale variability between paired holes.

The final block models were used as a basis for resource evaluation. Summary results of the evaluation of the in-situ resources are shown in the tables below for four different cut-off grade levels: 0.5, 0.6, 0.8 and 1.0g/t Au.

F12 Resource Estimate (WAI, 01 January 2012)
(in accordance with the guidelines of the JORC Code (2004))
Cut Off Grade 0.5 0.6 0.8 1.0
Measured Tonnage (kt) 0 0 0 0
Au (g/t) 0 0 0 0
Metal kg 0 0 0 0
oz 0 0 0 0
Indicated Tonnage (kt) 2,364 2,217 1,836 1,326
Au (g/t) 2.52 2.63 2.91 3.36
Metal kg 5,948 5,829 5,345 4,449
oz 191,240 187,416 171,845 143,031
Measured + Indicated Tonnage (kt) 2,364 2,217 1,836 1,326
Au (g/t) 2.52 2.63 2.91 3.36
Metal kg 5,948 5,829 5,345 4,449
oz 191,240 187,416 171,845 143,031
 
Inferred Tonnage (kt) 646 604 550 442
Au (g/t) 2.74 2.88 3.04 3.34
Metal kg 1,772 1,738 1,669 1,477
oz 56,956 55,889 53,665 47,490
Notes:
1. Mineral Resources are not reserves until they have demonstrated economic viability based on a Feasibility study or pre-feasibility study.
2. Mineral Resources are reported inclusive of any reserves.
3. The contained Au represents estimated contained metal in the ground and has not been adjusted for metallurgical recovery.
 
Welcome Stranger Resource Estimate (WAI, 01 January 2012)
(in accordance with the guidelines of the JORC Code (2004))
Cut Off Grade 0.5 0.6 0.8 1.0
Measured Tonnage (kt) 0 0 0 0
Au (g/t) 0 0 0 0
Metal kg 0 0 0 0
oz 0 0 0 0
Indicated Tonnage (kt) 0 0 0 0
Au (g/t) 0 0 0 0
Metal kg 0 0 0 0
oz 0 0 0 0
Measured + Indicated Tonnage (kt) 0 0 0 0
Au (g/t) 0 0 0 0
Metal kg 0 0 0 0
oz 0 0 0 0
 
Inferred Tonnage (kt) 210 199 181 162
Au (g/t) 5.03 5.26 5.67 6.12
Metal kg 1,054 1,045 1,023 989
oz 33,875 33,601 32,900 31,799
Notes:
1. Mineral Resources are not reserves until they have demonstrated economic viability based on a Feasibility study or pre-feasibility study.
2. Mineral Resources are reported inclusive of any reserves.
3. The contained Au represents estimated contained metal in the ground and has not been adjusted for metallurgical recovery.
 
The results of the WAI pit optimisation for F12 only was calculated by NPV Scheduler®, using the same parameters as Taparko. The results are presented in the table below.
 
Boroum F12 Open Pit Ore Reserves (WAI, 01 January 2012)
(in accordance with the Guidelines of the JORC Code (2004))
Open Pit (Area) F12
Cut Off Grade (g/t) 0.82
Proven Tonnage (kt) -
Au (g/t) -
Metal kg -
oz -
Probable Tonnage (kt) 2,087
Au (g/t) 2.42
Metal kg 5,049
oz 162,324
Proven + Probable Tonnage (kt) 2,087
Au (g/t) 2.42
Metal kg 5,049
oz 162,324
Note: 5% dilution and 97% mining recovery applied

Nairy

Criteria for defining resource categories were derived from the geostatistical studies. Key drillhole spacings for the allocation of indicated resources were 40m x 40m (along strike x down dip) and for inferred resources were 80m x 80m (along-strike x down-dip). The final block model was used as the basis for resource evaluation. Summary results of the evaluation of the in-situ resources are shown in the table below, for four different cut-off grade levels: 0.4g/t, 1.0g/t, 1.5g/t and 2.0g/t Au.

Nairy Mineral Resource Estimate (WAI, 01 January 2012)
COG JORC Classification   Volume   Tonnes   Density   Au   Contained Metal
(m3)   (t)   (t/m3)   (g/t)   (kg)   (troy oz)
0.4 Indicated   401,549   1,084,182   2.7   1.23   1,334   42,874
0.4 Inferred   884,092   2,387,048   2.7   0.99   2,363   75,978
1.0 Indicated   186,423   503,341   2.7   1.87   941   30,262
1.0 Inferred   331,417   894,826   2.7   1.56   1,396   44,880
1.5 Indicated   91,904   248,142   2.7   2.54   630   20,264
1.5 Inferred   122,769   331,477   2.7   2.15   713   22,913
2.0 Indicated   62,387   168,444   2.7   2.92   492   15,814
2.0 Inferred   48,585   131,180   2.7   2.82   370   11,893

Baola

Criteria for defining resource categories were derived from the geostatistical studies. Key drillhole spacings for the allocation of indicated resources were 40m x 40m (along strike x down dip) and for inferred resources were 80m x 80m (along-strike x down-dip). The final block model was used as the basis for resource evaluation. Summary results of the evaluation of the in-situ resources are shown in the table below, for four different cut-off grade levels: 0.4g/t, 1.0g/t, 1.5g/t and 2.0g/t Au.

Baola Mineral Resource Estimate (WAI, 01 January 2012)
COG JORC Classification   Volume   Tonnes   Density   Au   Contained Metal
(m3)   (t)   (t/m3)   (g/t)   (kg)   (troy oz)
0.4 Indicated   232,359   627,370   2.7   0.74   464   14,926
0.4 Inferred   332,252   897,081   2.7   1.06   951   30,572
1.0 Indicated   30,943   83,547   2.7   1.31   109   3,519
1.0 Inferred   132,902   358,835   2.7   1.65   592   19,036
1.5 Indicated   5,999   16,196   2.7   2.00   32   1,041
1.5 Inferred   69,824   188,524   2.7   2.02   381   12,244
2.0 Indicated   2,260   6,103   2.7   2.48   15   487
2.0 Inferred   27,417   74,027   2.7   2.50   185   5,950

Yeou

Criteria for defining resource categories were derived from the geostatistical studies. Key drillhole spacings for the allocation of inferred resources were 40m x 50m (along-strike x down-dip). The final block model was used as the basis for resource evaluation. Summary results of the evaluation of the in-situ resources are shown in the table below, for four different cut-off grade levels: 0.4g/t, 1.0g/t, 1.5g/t and 2.0g/t Au.

Yeou Mineral Resource Estimate (WAI, 01 January 2012)
COG JORC Classification   Volume
(m
3)
  Tonnes
(t)
  Density
(t/m
3)
  Au
(g/t)
  Contained Metal
  (kg)   (troy oz)
0.4 Inferred   426,790   1,066,052   2.50   2.39   2,550   81,980
1.0 Inferred   333,567   821,087   2.46   2.87   2,357   75,765
1.5 Inferred   211,808   523,880   2.47   3.76   1,968   63,286
2.0 Inferred   144,568   359,517   2.48   4.62   1,663   54,459

Ankouma

Criteria for defining resource categories were derived from the sample spacing. Key drillhole spacings for the allocation of Inferred resources were 40m x 40m (along-strike x down-dip). The final block model was used as the basis for resource evaluation. Summary results of the evaluation of the in-situ resources are shown in the table below, for four different cut-off grade levels: 0.5g/t, 1.0g/t, 1.5g/t and 2.0g/t Au.

Ankouma Mineral Resource Estimate - Total Resources (WAI, 01 January 2012)
COG JORC Classification   Volume
(m
3)
  Tonnes
(t)
  Density
(t/m
3)
  Au
(g/t)
  Contained Metal
  (kg)   (troy oz)
0.5 Inferred   708,507   1,815,679   2.56   1.26   2,296   73,825
1.0 Inferred   352,915   896,641   2.54   1.78   1,599   51,417
1.5 Inferred   161,162   396,308   2.46   2.37   941   30,254
2.0 Inferred   63,619   159,579   2.51   3.27   522   16,792

Bissa

Criteria for defining resource categories were also derived from the geostatistical studies. Key drillhole spacings for the allocation of measured resources were 20m x 20m (along strike and down dip), forindicated resources were 40m x 40m (along strike and down dip), for inferred resources were 80m x 80m (along strike and down dip).

The final block model was used as the basis for resource evaluation. A summary of the results of the evaluation of the in-situ resources are shown in the table below, for four different cut-off grade levels: 0.3g/t, 0.5g/t, 1.0g/t and 1.5g/t.

Bissa Mineral Resource Estimate (WAI, 01 January 2012)
(in accordance with the guidelines of the JORC Code (2004)
)
Ore Type Laterite/Saprolite/Transition/Fresh
Cut Off Grade (g/t) 0.3 0.5 1.0 1.5
Measured Tonnage (kt) 2,208 1,964 1,396 1,082
Au (g/t) 2.24 2.47 3.17 3.73
Metal kg 4,947 4,851 4,425 4,038
oz 159,039 155,966 142,251 129,814
Indicated Tonnage (kt) 72,194 61,789 26,741 12,573
Au (g/t) 1.09 1.21 1.84 2.56
Metal kg 78,691 74,765 49,203 32,187
oz 2,529,989 2,403,742 1,581,923 1,034,838
Measured + Indicated Tonnage (kt) 74,402 63,753 28,137 13,656
Au (g/t) 1.12 1.25 1.91 2.65
Metal kg 83,638 79,616 53,628 36,225
oz 2,689,028 2,559,708 1,724,174 1,164,652
 
Inferred Tonnage (kt) 25,249 19,651 7,042 2,852
Au (g/t) 0.91 1.05 1.66 2.33
Metal kg 22,977 20,634 11,689 6,645
oz 738,714 663,393 375,807 213,639
Notes:
1. Mineral Resources are not reserves until they have demonstrated economic viability based on a Feasibility study or pre-feasibility study.
2. Mineral Resources are reported inclusive of any reserves.
3. The contained Au represents estimated contained metal in the ground and has not been adjusted for metallurgical recovery.

As a continuation of mineral resource modelling at Bissa, WAI has undertaken a pit optimisation using the Mineral Resource Block Model prepared by WAI. The model was depleted to contain only those mineral resources that have not been extracted as of 01 January 2012. WAI used NPV Scheduler® software for the optimisation applying the conceptual financial and technical parameters shown in the following table.

WAI Pit Optimisation Parameters
Parameter Units Value
Metal Price (Au) US$/oz 1,250
Metal Price (Au) US$/g 40.19
Production rate ktpa 4,000
Discount Rate % 10
Dilution % 6
Mining Recovery Factor % 97
Mining Cost (Fresh Ore) US$/t 1.65
Mining Cost (Weathered Ore) US$/t 1.65
Mining Cost (Waste) US$/t 1.65
Ore Processing Cost (per t of processed ore) US$/t 13
Gold Recovery (Weathered and Fresh ore) % 90
G&A US$M/yr 18
Final Pitwall Angle Degrees Various for 4 regions

The results of the WAI pit optimisation as calculated by NPV Scheduler® are presented in the table below.

Bissa Open Pit Ore Reserves (WAI, 01 January 2012)
(in accordance with the Guidelines of the JORC Code (2004))
Ore/Rock Type Ore (kt) Au (kg) Au (g/t)
Weathered Proven 114 294 2.57
Weathered Probable 10,742 18,655 1.74
Fresh Proven 1,365 4,031 2.95
Fresh Probable 16,807 30,304 1.80
       
Weathered Proven and Probable 10,856 18,949 1.75
Fresh Proven and Probable 18,172 34,335 1.89
Total Proven and Probable 29,028 53,284 1.84
Waste* (kt) 156,989    
Notes:
COG=0.9g/t Au
Mining Factors of 6%
Dilution and 97% Mining Recovery applied.
*Waste is given inclusive of Inferred material, which is also treated as waste

Bouly

Criteria for defining resource categories were derived from geostatistical studies. Key drillhole spacings for the allocation of indicated resources were based on a sample spacing of less than 80m x 35m along and across strike and with a minimum of 8 samples required from a minimum of 2 drillholes. Inferred resources were those resources which were estimated but did not fulfil the criteria for indicated classification. The grades in the final resource block model were derived from drill hole sample composites based on Ordinary Kriging for Au. The following table shows the WAI resource estimate for Bouly, dated 01 January 2012.

Bouly Mineral Resource Estimate (WAI, 01 January 2012)
(in accordance with the guidelines of the JORC Code (2004))
Measured Tonnage (kt) 0
Au (g/t) -
Metal kg 0
oz 0
Indicated Tonnage (kt) 9,037
Au (g/t) 0.84
Metal kg 7,625
oz 245,139
Measured + Indicated Tonnage (kt) 9,037
Au (g/t) 0.84
Metal kg 7,625
oz 245,139
Inferred Tonnage (kt) 32,150
Au (g/t) 0.75
Metal kg 24,127
oz 775,673
Notes:
1. Cut-off grade of 0.6 g/t.
2. Mineral Resources are not reserves until they have demonstrated economic viability based on a Feasibility study or pre-feasibility study.
3. Mineral Resources are reported inclusive of any reserves.
4. The contained Au represents estimated contained metal in the ground and has not been adjusted for metallurgical recovery.

Gougre

Criteria for defining resource categories were derived from the geostatistical studies. Key drillhole spacings for the allocation of indicated resources were 40m x 40m (along strike and down dip) and for inferred resources, 80m x 80m (along strike and down dip). No measured resources were assigned at Gougre.

The final block model was used as the basis for resource evaluation. Summary results of the evaluation of the in-situ resources are shown in the table below, for four different cut-off grade levels: 0.5g/t, 1.0g/t, 1.5g/t and 2.0g/t Au.

Gougre Mineral Resource Estimate (WAI, 01 January 2012)
(in accordance with the guidelines of the JORC Code (2004))
Cut Off Grade 0.5 1.0 1.5 2.0
Measured Tonnage (kt) - - - -
Au (g/t) - - - -
Metal kg - - - -
oz - - - -
Indicated Tonnage (kt) 3,044 2,468 1,669 1,080
Au (g/t) 1.90 2.16 2.60 3.07
Metal kg 5,785 5,335 4,338 3,314
oz 185,997 171,509 139,473 106,554
Measured + Indicated Tonnage (kt) 3,044 2,468 1,669 1,080
Au (g/t) 1.90 2.16 2.60 3.07
Metal kg 5,785 5,335 4,338 3,314
oz 185,997 171,509 139,473 106,554
 
Inferred Tonnage (kt) 3,121 1,862 947 528
Au (g/t) 1.39 1.83 2.41 2.96
Metal kg 4,352 3,410 2,282 1,566
t oz 139,922 109,644 73,367 50,360
Notes:
1. Mineral Resources are not reserves until they have demonstrated economic viability based on a Feasibility study or pre-feasibility study.
2. Mineral Resources are reported inclusive of any reserves.
3. The contained Au represents estimated contained metal in the ground and has not been adjusted for metallurgical recovery.

As a continuation of mineral resource modelling of the Gougré deposit, WAI has undertaken a pit optimisation using the mineral resource Block Model prepared by WAI and updated in January 2012. The model was depleted to contain only those mineral resources that have not been extracted as of 01 January 2012. WAI used NPV Scheduler® software for the optimisation, applying the conceptual financial and technical parameters provided in the below table.

WAI Pit Optimisation Parameters
Parameter Units Value
Metal Price (Au) US$/oz 1,250
Metal Price (Au) US$/g 40.19
Selling Cost US$/g 3.2
Production Rate ktpa 750
Discount Rate % 11.2
Dilution % 6
Mining Recovery Factor % 97
Mining Cost (Ore and Waste) US$/t 6.53
Processing Cost (per t of processed ore) Oxide US$/t 13.79
Processing Cost (per t of processed ore) Sulphide US$/t 21.22
Gold Recovery % 95
Final Pitwall Angle Degrees 45

The results of the WAI pit optimisation and subsequent ore reserve estimate are presented in the table below. Only the measured and indicated mineral resources were utilised in the optimisation. The table also includes a mining schedule for the Gougre deposit.

Gougré Open Pit Ore Reserves (WAI, 01 January 2012)
(in accordance with the guidelines of the JORC Code (2004))
Parameter Unit Year Total
1 2 3
Rock Mined kt 7,119 4,653 175 11,947
Probable Ore Oxide kt 99.4 - - 99.4
g/t 1.44 - - 1.44
Transition kt 301.9 4.0 - 305.8
g/t 1.85 2.47 - 1.86
Sulphide kt 348.9 745.9 83.3 1,178.1
g/t 1.62 1.82 1.89 1.76
Total Probable Ore kt 750 750 83 1,583
Contained Metal g/t 1.69 1.82 1.89 1.76
kg 1,267 1,364 158 2,789
koz 40.73 43.86 5.08 89.66
Waste* kt 5,852 3,289 17 9,159
Strip t/t 7.80 4.39 0.21 5.78
Notes: Mining Factors of 6% Dilution and 97% Mining Recovery applied
Cut-off-grade: Oxide 0.57g/t, Sulphide 0.78g/t.
*Waste is given inclusive of Inferred material

Liliga

Criteria for defining resource categories were derived from the geostatistical studies. Key drillhole spacings for the allocation of inferred resources were 80m x 80m (along-strike x down-dip). The final block model was used as the basis for resource evaluation. Summary results of the evaluation of the in-situ resources are shown in the table below, for four different cut-off grade levels: 0.4g/t, 1.0g/t, 1.5g/t and 2.0g/t Au.

Liliga Mineral Resource Estimate (WAI, 01 January 2012)
COG JORC Classification Volume
(m
3)
Tonnes
(t)
Density
(t/m
3)
Au
(g/t)
Contained Metal
(kg) (troy oz)
0.4 Inferred 1,626,583 4,391,775 2.7 1.47 6,456 207,562
1.0 Inferred 952,293 2,571,191 2.7 1.99 5,117 164,505
1.5 Inferred 512,956 1,384,981 2.7 2.67 3,698 118,890
2.0 Inferred 299,740 809,298 2.7 3.34 2,703 86,905

Bissa Sud

Criteria for defining resource categories were derived from the geostatistical studies. Key drillhole spacings for the allocation of inferred resources were 80m x 80m (along-strike x down-dip). The final block model was used as the basis for resource evaluation. Summary results of the evaluation of the in-situ resources are shown in the table below, for four different cut-off grade levels: 0.4g/t, 1.0g/t, 1.5g/t and 2.0g/t Au.

Bissa Sud Mineral Resource Estimate (WAI, 01 January 2012)
COG JORC Classification Volume
(m
3)
Tonnes
(t)
Density
(t/m
3)
Au
(g/t)
Contained Metal
(kg) (troy oz)
0.4 Inferred 241,451 651,917 2.7 0.88 574 18,444
1.0 Inferred 62,324 168,275 2.7 1.39 234 7,520
1.5 Inferred 17,539 47,356 2.7 1.89 90 2,878
2.0 Inferred 5,954 16,075 2.7 2.38 38 1,230

Zinigma

Criteria for defining resource categories were derived from the geostatistical studies. Key drillhole spacings for the allocation of inferred resources were 66m x 55m (along-strike x down-dip). The final block model was used as the basis for resource evaluation. Summary results of the evaluation of the in-situ resources are shown in the table below, for four different cut-off grade levels: 0.5g/t, 1.0g/t, 1.5g/t and 2.0g/t Au.

Zinigma Mineral Resource Estimate (WAI, 01 January 2012)
 (in accordance with the guidelines of the JORC Code (2004))
Cut Off Grade 0.5 1.0 1.5 2.0
Measured Tonnage (kt) - - - -
Au (g/t) - - - -
Metal kg - - - -
oz - - - -
Indicated Tonnage (kt) - - - -
Au (g/t) - - - -
Metal kg - - - -
oz - - - -
Measured + Indicated Tonnage (kt) - - - -
Au (g/t) - - - -
Metal kg - - - -
oz - - - -
 
Inferred Tonnage (kt) 3,687 1,854 839 361
Au (g/t) 1.17 1.60 2.06 2.51
Metal kg 4,317 2,959 1,725 904
oz 138,792 95,150 55,465 29,071
Notes:
1. Mineral Resources are not reserves until they have demonstrated economic viability based on a Feasibility study or pre-feasibility study.
2. Mineral Resources are reported inclusive of any reserves.
3. The contained Au represents estimated contained metal in the ground and has not been adjusted for metallurgical recovery.

Labola

Estimated resources for the Labola deposit were classified as inferred resources due to the limited sampling density, uncertainties regarding QA/QC and lack of data regarding dry density measurements. The grades in the final resource block model were derived from all drilling sample composites and were based on the IDW3 estimate. The mineral resource estimate is shown in the table below.

Labola Inferred Resource Estimate (WAI, 01 January 2012)
(in accordance with the guidelines of the JORC Code (2004))
Cut Off Grade (g/t) Inferred
Tonnes (kt)   Density (t/m3)   Au Grade (g/t)   Metal Au (oz)
0.4 1,231   2.4   1.22   48,136
0.6 905   2.4   1.48   42,927
1.0 481   2.4   2.09   32,272
2.0 163   2.4   3.43   17,950
3.0 68   2.4   4.84   10,552
4.0 35   2.4   6.17   7,027

Data Verification

Dr. Phil Newall is a "qualified person" as defined by NI 43-101 and as a qualified person completed the verification of data on which the above mineral reserve and resource estimates were based. This verification included an assessment of QA/QC data, sample preparation and assay methodologies, core recoveries, density data, data inputs, survey data and validation of historic exploration data used in the estimate. Data were validated by using field checks, statistical methods and evaluating written protocols.

High River has implemented QA/QC procedures at all projects to ensure best industry practice in sampling and analysis of the drill core samples.

The Berezitovy mine has its own dedicated onsite core storage shed and preparation facility. All sample analysis at Berezitovy is undertaken in the on-site laboratory (process plant) which is adequate for the level of prospecting work. The laboratory uses a range of Standard Reference standards supplied by Rocklabs. The standard ore sample assays 1.65ppm Au (tolerance +/- 0.08ppm Au) and the tailings sample assays 0.71ppm Au (tolerance +/- 0.03ppm Au).

At Taparko mine, core from all mineralized intersections is stored in well-organized racks at the mine. For the Bissa development project, High River has a dedicated facility in the town of Kongoussi which includes core storage and sample preparation.

The primary analytical laboratory used by High River for the Taparko, Bouroum, Bissa and the other projects in Burkina Faso is Abilab in Ouagadougou. The Abilab laboratories do not have recognised accreditation, but are part of the ALS Laboratory Group and implement quality assurance and quality control measures generally meeting international industry standards. Reverse circulation and core pulp samples were also submitted to ALS Chemex, Sudbury and SGS, Ouagadougou laboratories for check assaying. High River partly relied on the laboratory internal quality control measures, and also implemented strict external quality control measures consisting of inserting an appropriate frequency of control samples (blanks, field standards and certified reference standards).

Assay data for the Bouly project was acquired from the BIGS Global Laboratory in Ouagadougou in 2010. The SGS Laboratory in Ougadougou was used for external quality control. High River has a written procedure for collecting, handling, labelling and assaying drilling samples, which conforms to industry best practice. High River's internal quality control procedures specify use of field duplicates, blanks and certified reference standards to measure any bias in sampling or assaying.

None of the laboratories contracted by High River for sample analyses has any relationship to, or interest in, High River or any of its projects.

Qualified Person

Dr. Phil Newall, BSc (ARSM), PhD (ACSM), CEng, FIMMM, Director with WAI is the qualified person responsible for supervising the preparation of this press release and the scientific and technical information contained in this press release. Dr. Newall is independent of High River.

Cautionary Note

The grades presented in the above tables are not meant to imply recoverable gold. Mineral resources and reserves have been estimated and classified according to the JORC Code. High River is not aware of any known environmental, permitting, legal, title, taxation, socio-economic, marketing or other relevant issues that could potentially affect the estimate of mineral resources or reserves. The mineral resources and reserves may be affected by subsequent assessments of mining, environmental, processing, permitting, taxation, socio-economic and other factors.

About High River

High River is an unhedged gold company with interests in producing mines, development and advanced exploration projects in Russia and Burkina Faso. Two underground mines, Zun-Holba and Irokinda, are situated in the Lake Baikal region of Russia. Two open pit gold mines, Berezitovy in Russia and Taparko-Bouroum in Burkina Faso, are also in production. Finally, High River has a 90% interest in a development project, the Bissa gold project in Burkina Faso, and a 50% interest in an advanced exploration project with NI 43-101 compliant resource estimates, the Prognoz silver project in Russia.

This release contains forward-looking statements. Wherever possible, words such as "intends", "expects", "scheduled", "estimates", "anticipates", "believes", and similar expressions or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, have been used to identify these forward-looking statements. Although the forward-looking statements contained in this release reflect management's current beliefs based upon information currently available to management and based upon what management believes to be reasonable assumptions, High River cannot be certain that actual results will be consistent with these forward-looking statements. A number of factors could cause events and achievements to differ materially from the results expressed or implied in the forward-looking statements. These factors should be considered carefully and prospective investors should not place undue reliance on the forward-looking statements. Forward-looking statements necessarily involve significant known and unknown risks, assumptions and uncertainties that may cause High River's actual results, events, prospects and opportunities to differ materially from those expressed or implied by such forward-looking statements. Although High River has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors and risks that cause actions, events or results not to be anticipated, estimated or intended, including those risk factors discussed in the Company's 2011 Annual Information Form. There can be no assurance that the forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, prospective investors should not place undue reliance on forward-looking statements. Any forward-looking statements are made as of the date of this release, and High River assumes no obligation to update or revise them to reflect new events or circumstances, unless otherwise required by law.



High River Gold Mines Ltd.
Yury Lopukhin
CFO
011 7 495 981 0910 ext. 6821
info@hrg.ca
www.hrg.ca
Data and Statistics for these countries : Burkina Faso | Russia | All
Gold and Silver Prices for these countries : Burkina Faso | Russia | All

High River Gold Mines Ltd.

PRODUCER
CODE : HRG.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

High River Gold is a gold producing company based in Canada.

High River Gold produces gold, silver in Burkina Faso and in Russia, develops gold in Burkina Faso, and holds various exploration projects in Burkina Faso.

Its main assets in production are BURYATZOLOTO (ZUN-HOLMA), BEREZITOVY, SOMITA and IROKINDA in Russia and TAPARKO in Burkina Faso, its main asset in development is BOUROUM in Burkina Faso and its main exploration properties are NOVOPHIRSOVSKOYE and PROGNOZ in Russia and BISSA GOLD in Burkina Faso.

High River Gold is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 1.2 billions as of today (US$ 1.1 billions, € 882.8 millions).

Its stock quote reached its highest recent level on March 07, 2008 at CA$ 3.50, and its lowest recent point on November 14, 2008 at CA$ 0.04.

High River Gold has 840 219 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of High River Gold Mines Ltd.
2007 Annual Report
2006 Annual Report
2005 Annual Report
Financings of High River Gold Mines Ltd.
12/2/2009Closing of Private Placement
6/19/2009Announces Closing of Private Placement and Update on TSX Del...
Nominations of High River Gold Mines Ltd.
1/24/2013Announces Change to the Board of Directors
5/15/2012Announces Appointment of Chief Executive Officer and Chief F...
3/5/2012Announces Resignation of Chief Executive Officer
12/10/2009Appointment to the Board of Directors and the Audit Committe
10/21/2009 Appointment of Chief Executive Officer
9/30/2009Announces Appointment of New Board Member
Financials of High River Gold Mines Ltd.
8/14/2012Financial Results for the Second Quarter Ended June 30, 2012
5/16/2012Financial Results for the First Quarter Ended March 31, 2012
2/24/2012Announces Release of Nord Gold Financial Statements
8/15/2011Reports Second Quarter 2011 Results
8/13/2010Reports Second Quarter 2010 Results
5/13/2010Reports First Quarter 2010 Results
8/15/2009Reports Second Quarter 2009 Results
12/18/2008Reports Third Quarter 2008 Results
Project news of High River Gold Mines Ltd.
1/22/2013Announces Production Results for Q4 2012
10/11/2012Announces Production Results for Q3 2012
7/18/2012Announces Production Results for Q2 2012
4/24/2012Announces Production Results for Q1 2012
1/18/2012Announces Preliminary Production Results for 2011
7/4/2011(Bissa Gold)Announces the Granting of Mining License for Bissa Gold Proj...
2/18/2011(Prognoz)Provides an Update on the Bankruptcy Procedures of Prognoz S...
1/31/2011(Berezitovy)Reports Updated Resource and Reserve Statements
1/31/2011(Taparko)Reports Updated Resource and Reserve Statements
1/31/2011(Bouroum)Reports Updated Resource and Reserve Statements
1/31/2011(Bissa Gold)Reports Updated Resource and Reserve Statements
1/28/2011(Taparko)Announces Release of Royal Gold Security
9/11/2009(Irokinda)Reports Two Accidental Deaths at Irokinda Mine
6/22/2009(Bissa Gold)Reports Updated NI 43-101Compliant Resource Estimate for Bis...
12/4/2008(Prognoz)Advises That Closing of Prognoz Acquisition Not Extended and...
11/10/2008(Taparko)Re-Starts Mill at Taparko-Bouroum and Provides Update on Str...
9/30/2008(Prognoz)Advises That Closing of Prognoz Acquisition Transaction Has ...
3/31/2008(Taparko)2008 Technical report
7/11/2007Discovers New High Grade Gold Zone at Simkar
5/1/2007Announces New Acquisition in Southeastern Peru, Vetaspata --...
3/28/2007High Grade Gold intersected at Quintana Gold Mine, Colombia ...
Corporate news of High River Gold Mines Ltd.
3/13/2013Nord Gold N=2EV=2E and High River Gold Min
12/11/2012Acknowledges Expiry of Offer by Nord Gold
10/31/2012Mails Directors' Circular; Board Recommends Shareholders Acc...
10/22/2012Acknowledges Bid by Nordgold; Advises Shareholders to Wait f...
9/27/2012Announces Updated Reserve and Resource Estimate and Files Te...
7/31/2012Provides Update on Nord Gold Offer
7/20/2012Announces Amended and Restated AIF and Amended Technical Rep...
7/18/2012Responds to Nord Gold Press Release and Establishes Special ...
6/8/2012(Berezitovy)Files Technical Reports for Berezitovy and Burkina Faso Prop...
5/24/2012Announces Date of Annual General Meeting
4/24/2012(Berezitovy)Announces Updated Reserve and Resource Estimates for Berezit...
4/13/2012Second Default Status Report
3/31/2012Reports 2011 Results
3/28/2012First Default Status Report
3/1/2012Announces Default Pursuant to National Policy 12-203
2/24/2012(Prognoz)Provides an Update on the Bankruptcy Procedures of Prognoz S...
12/29/2011(Berezitovy)Announces Amended Q2 2011MD&A and Berezitovy Technical Repor...
9/2/2011(Prognoz)Provides an Update on the Bankruptcy Procedures of Prognoz S...
6/7/2011Reaches Settlement With Senet CC
1/24/2011Shareholders Approve Continuing to Yukon
6/8/2010Announces the Beginning of the Bankruptcy Procedures of Prog...
5/28/2010Announces Change to the Board of Directors and Inclusion in ...
4/20/2010Reports 2009 Results
4/14/2010First Default Status Report
4/1/2010Late Filing of Annual Filings and Provides Operational and F...
12/1/2009Clearance of PIF in Connection With CDN$57 Million Financi
11/3/2009Announces Change of Auditor
10/27/2009Announces Proposed $57 Million Financing
10/8/2009Change to the Board of Directors
9/23/2009 Change to the Board of Directors
9/21/2009 Resignation of Chief Executive Officer
9/15/2009Announces New Investor Relations Contact
9/1/2009Announces Resignation of VP Exploration
7/23/2009New Chief Financial Officer
7/16/2009Provides Q2/2009 Update on Operations and Financial Status
6/26/2009Mailing of Offer
6/17/2009Enters Into Support Agreement With Severstal
6/9/2009Provides Update on Improved Severstal Offer and Announces Pr...
5/22/2009Provides Update on Strategic Alternatives
5/19/2009Provides Update on Operations and Financial Status
3/6/2009Provides Update on Operations
2/2/2009Provides Update on Operations
1/2/2009Provides Update on Operations, Financial Status, and Personn...
12/14/2008Second Default Status Report
12/1/2008First Default Status Report
11/19/2008Announces Late Filing of Interim Financial Statements
9/22/2008Comments on Share Price Decline
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (HRG.TO)FRANKFURT (HRG.F)
1.39+0.72%1.03+0.49%
TORONTO
CA$ 1.39
03/14 14:56 0.010
0.72%
Prev close Open
1.38 1.40
Low High
1.39 1.40
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  1.39 -%
Volume 1 month var.
1,900 -%
24hGold TrendPower© : -8
Produces Gold
Develops
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/17/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.32%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.89-1.36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.72%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.36-3.28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.64+2.69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+6.25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.67-0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03-2.94%Trend Power :