VANCOUVER, BRITISH COLUMBIA--(Marketwire - Oct. 17, 2011) - Aura Minerals Inc. ("Aura Minerals" or the "Company") (News - Market indicators) is pleased to announce that an updated resource estimate has been completed for its wholly-owned Aranzazu Mine in Zacatecas State, Mexico.

Table 1 below presents the updated resource estimate for the Aranzazu Mine at a 0.5% Cu cut-off and Table 2 shows the resource estimate at a 0.8% Cu cut-off. The cut-off is based on copper grades only.

The 0.8% Cu cut-off is being used for resource definition of the Arroyos Azules, BW, and Mexicana zones, which are actively being mined. The 0.5% Cu cut-off will be used to continue to assess the potential of the project to be ramped up to a bulk underground operation. The updated resource estimate is based on (i) in-fill drilling of the deposit in order to increase the confidence level for the overall system and ensure a minimum of 25 metre centres for ongoing reserve estimates; and, (ii) deep drilling that has extended the mineralization at depth. Since the September 2010 resource estimate(1), the Company has completed an additional 56,665 metres of drilling in 224 drill holes prior to the May 20th cut-off date for the updated resource estimate. Since taking over the Aranzazu Mine in June 2008, the Company has completed a total of 108,052 metres of drilling in 471 drill holes.

Table 1 - Aranzazu Resource Estimate - 0.5% Cu only cut-off
Category Cut-off Grade Copper (%) Tonnes
('000)
Copper
(%)
Copper
('000 lbs)
Gold
(g/t)
Gold
('000 oz.)
Silver
(g/t)
Silver
('000 oz)
Measured 0.5 15,827 1.01 354,121 0.64 325 10.97 5,582
Indicated 0.5 16,463 1.20 436,367 0.44 233 16.12 8,529
Measured and Indicated 0.5 32,290 1.11 790,488 0.54 558 13.59 14,111
Inferred 0.5 10,976 1.04 251,099 0.45 94 14.09 4,971
Table 2 - Aranzazu Resource Estimate - 0.8% Cu only cut-off
Category Cut-off Grade Copper (%) Tonnes
('000)
Copper
(%)
Copper
('000 lbs)
Gold
(g/t)
Gold
('000 oz.)
Silver
(g/t)
Silver
('000 oz)
Measured 0.8 8,338 1.36 250,215 0.82 219 14.06 3,768
Indicated 0.8 9,432 1.63 338,523 0.56 171 21.45 6,504
Measured and Indicated 0.8 17,770 1.50 588,738 0.68 390 17.98 10,272
Inferred 0.8 5,808 1.40 178,902 0.58 94 17.64 3,295
Note: Micon International Limited has recommended that Aura Minerals use the mineral resource estimate contained in Table 2 as the stated mineral resource estimate for the Aranzazu Mine as this estimate recognizes the use of a 0.8% Cu cut-off as the grade at which the mineralization would meet the economic parameters as defined by Canadian Institute of Mining, Metallurgy and Petroleum (CIM) standards and definitions for resources.

The tonnes of measured and indicated resources for the updated 0.5% Cu cut-off and the 0.8% Cu cut-off estimates have increased by 29% and 25%, respectively, as compared to the September 2010 resources estimate and based on similar average copper, gold and silver grades.

Commenting on the updated resource estimate, Mr. Tom Ogryzlo, Interim CEO of Aura Minerals, stated, "We are very pleased with the results of the new resource update. We have seen a significant increase in measured resources over the previous resource estimate. With the wide and continuous mineralization system, suitable ground conditions and the fact that the Aranzazu Mine has a large and expanding resource base open along strike and at depth, the Company will be initiating a preliminary economic assessment study based on evaluating an expanded throughput rate of up to 5,000 tonnes per day ("tpd") and possibly beyond. A throughput rate beyond 5,000 tpd would require a new concentrator and plant location. Preliminary work has already started, but the bulk of the study will take place during the first and second quarters of 2012. The expansion would be based on a low cost bulk mining scenario such as long-hole open stoping."

Quality Assurance and Quality Control ("QA/QC") Procedures for the Aranzazu Mine

The resource estimation has been prepared by Aura Minerals, under the direction of William J. Lewis, B.Sc., P.Geo. of Micon International Limited, an independent Qualified Person for the purpose of National Instrument 43-101. A report under National Instrument 43-101, disclosing the updated resource for the Aranzazu Mine, is being prepared by Micon International Limited and will be filed by Aura Minerals on SEDAR within 45 days. Mr. Lewis has also reviewed and approved the contents of this news release as applicable.

The mineral resource for the Aranzazu Mine was estimated by ordinary kriging for copper, gold and silver constrained by seven 3D solid models based on a 0.30% Cu grade shell within the skarn complex. Block dimensions were 5 x 5 metres horizontal and 5 metres vertical. The deposit has been tested by 976 core holes and 234 reverse circulation holes drilled between 1960 and May 2011. Grade estimation was based on analyses of 33,703 two-metre composites from 1209 drill holes. Statistical analysis identified high-grade outlier composites and a total of 28 Cu, 36 Au and 59 Ag composites were capped. Capping reduced the total Cu metal content by approximately 2% and the total Au and Ag metal content by approximately 3%.

Exploration at the Aranzazu Mine ceased on May 12, 2011 and was conducted under the supervision of J. Britt Reid, P.Eng., who is the Company's qualified person as defined by National Instrument 43-101. Mr. Reid has also reviewed and approved the contents of this news release as applicable.

Aura Minerals drilled at the Aranzazu Mine using both core and reverse circulation drill rigs. The drilling was conducted by Layne de Mexico. The reverse circulation drill used a bit sized from 5.5 inches to 4.75 inches. The core program used HQ-sized core and then stepping down to NQ-sized core as required. Samples were collected on a 1.5-metre sample interval. The reverse circulation drill cuttings were split at the drill rig. The samples collected consisted of an approximate 25-percent split of the total material recovered from the interval sampled. This material was shipped directly to the Stewart Group de Mexico sample preparation facility in Zacatecas, Mexico, and processed using the same sample preparation protocol as used for the core samples discussed below. Assays were completed at the ISO 9001-2008-certified Eco Tech Laboratory Ltd., a subsidiary of the Stewart Group Ltd., in Kamloops, B.C., Canada.

Diamond drilling core was logged, photographed and then split in half using a Diamond core saw. Half the core has been retained off-site in a secure storage facility, and the other half was sampled, secured in sealed, labelled bags and then transported to the Stewart Mexico facility in Zacatecas, Mexico, and processed using the same preparation protocol discussed below. Assays were completed at the Eco Tech Stewart laboratory in Kamloops, B.C. The entire half-core and reverse circulation drill cuttings were crushed to 95 percent passing two millimetres, split and pulverized to 95 percent passing 150 mesh, split again, and a 150-gram sample sent for assay. Gold assays were determined by fire assay with an AA finish, over-limit assays are determined by fire assay with a gravimetric finish. Silver, copper, lead and zinc assays were determined by a four-acid digestion with an ICP-MS finish. Molybdenum assays were determined by aqua regia digestion followed by an ICP-OES finish. Silver over-limits were determined by a fire assay with a gravimetric finish. The Company systematically inserts certified standard samples, sample duplicates in a non-sequential order and blank samples in all batches of samples sent to Stewart Mexico and Eco Tech Stewart as a means of quality control. Additionally, Stewart Mexico and Eco Tech Stewart have their own stringent internal QA/QC protocols. Check samples were systematically sent to the ALS Chemex lab in Vancouver, Canada. Chain of custody of drill samples was maintained throughout the process with the use of numbered seal tags closing sample bags and third party professional transportation of samples to the laboratories. Each stage of sample handling was recorded in log sheets and receipts obtained from each party involved.

About Aura Minerals Inc.

Aura Minerals is a Canadian mid-tier gold production company focused on the exploration, development and operation of gold and base metal projects in the Americas. The Company's producing assets include the San Andres gold mine in Honduras, the Sao Francisco and Sao Vicente gold mines in Brazil and the copper-gold-silver Aranzazu Mine in Mexico. Other significant assets include the feasibility-stage Serrote Deposit at the copper-gold-iron ore Arapiraca Project in Brazil.

For further information, please visit Aura Minerals' web site at www.auraminerals.com.

Cautionary Statement

This news release contains "forward-looking statements" within the meaning of the applicable Canadian securities legislation. Except for statements of historical fact relating to the Company, information contained herein constitutes forward-looking statements, including any information as to the Company's strategy, plans or future financial or operating performance. Forward-looking statements are characterized by words such as "plan," "expect", "budget", "target", "project", "intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking statements are based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made, and are inherently subject to a variety of risks and uncertainties and other known and unknown factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These factors include, but are not limited to, the impact of general business and economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, fluctuating metal prices (such as gold, copper, silver, nickel and iron ore), currency exchange rates (such as the Canadian dollar, Brazilian Real, Mexican Peso and the Honduran Lempira versus the United States dollar), possible variations in ore grade or recovery rates, changes in accounting policies, changes in the Company's corporate resources, changes in project parameters as plans continue to be refined, changes in project development and production time frames, the possibility of project cost overruns or unanticipated costs and expenses, higher prices for fuel, steel, power, labour and other consumables contributing to higher costs and general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, final pricing for concentrate sales, unanticipated results of future studies, seasonality and unanticipated weather changes, costs and timing of the development of new deposits, success of exploration activities, successful completion of proposed acquisitions, permitting time lines, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, limitations on insurance coverage and timing and possible outcome of pending litigation and labour disputes, as well as those risk factors discussed or referred to in the Company's Annual Information Form, dated March 30, 2011, under the heading "Item 4.2 – Risk Factors". Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates, assumptions or opinions should change, except as required by applicable law. The reader is cautioned not to place undue reliance on forward-looking statements. The forward-looking information contained herein is presented for the purpose of assisting investors in understanding the Company's expected financial and operational performance and results as at and for the periods ended on the dates presented in the Company's plans and objectives and may not be appropriate for other purposes. The reader is also cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. There are currently no mineral reserves on the Aranzazu Mine.

(1) The September 2010 resource estimate is contained in the technical report dated October 25, 2010, and entitled "NI 43-101 Technical Report and Resource Estimate on the Aranzazu Property, Zacatecas State, Mexico" prepared for Aura Minerals by William J. Lewis, B.Sc., P.Geo of Micon International Limited.



Aura Minerals Inc.
Tom Ogryzlo
Interim Chief Executive Officer
(604) 669-4777
(604) 696-0212 (FAX)
info@auraminerals.com
www.auraminerals.com
Data and Statistics for these countries : Brazil | Canada | Honduras | Mexico | All
Gold and Silver Prices for these countries : Brazil | Canada | Honduras | Mexico | All

Aura Minerals Inc.

PRODUCER
CODE : ORA.TO
ISIN : CA05152Q3052
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Aura Minerals is a gold and copper development stage company based in Canada.

Aura Minerals produces gold, copper, silver in Brazil, in Honduras and in Mexico, and holds various exploration projects in Brazil.

Its main assets in production are SAN ANDRÉS (CHRISTO) MINE in Honduras, SAO FRANCISCO and SAO VINCENTE in Brazil and ARANZAZU in Mexico and its main exploration properties are CUMARU, INAJA, ARAPICARA and NORTH CARAJAS in Brazil.

Aura Minerals is listed in Canada. Its market capitalisation is CA$ 596.1 millions as of today (US$ 438.0 millions, € 393.7 millions).

Its stock quote reached its lowest recent point on September 18, 2015 at CA$ 0.06, and its highest recent level on June 19, 2020 at CA$ 93.39.

Aura Minerals has 36 590 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Aura Minerals Inc.
10/29/2018Protesters force Aura Minerals to suspend operations in Hond...
Annual reports of Aura Minerals Inc.
2006 Annual report
Financings of Aura Minerals Inc.
3/25/2011Announces Arrangement of US$25 Million Revolving Credit Faci...
3/7/2011Announces Debt Restructuring
Nominations of Aura Minerals Inc.
1/3/2012Announces Appointment of New Director
6/6/2011Announces the Appointment of Tom Ogryzlo as Interim CEO
Financials of Aura Minerals Inc.
3/24/2015Announces Year End 2014 Financial and Operating Results
3/10/2015Announces Fourth Quarter and Full Year 2014 Release Date -...
8/14/2013Announces Second Quarter of 2013 Financial and Operating Res...
5/13/2013Announces First Quarter of 2013 Financial and Operating Resu...
3/20/2013Announces Fourth Quarter and Full Year 2012 Financial and Op...
1/22/2013Reports Preliminary Fourth Quarter Operational Results and 2...
11/13/2012Announces Third Quarter 2012 Financial and Operating Results...
8/14/2012Announces Second Quarter 2012 Financial and Operating Result...
5/15/2012Announces First Quarter 2012 Financial and Operating Results
3/28/2012Announces Fourth Quarter and Full Year 2011 Financial and Op...
8/10/2011Announces Second Quarter 2011 Financial and Operating Result...
3/30/2011Announces Fourth Quarter and Full Year 2010 Financial and Op...
Project news of Aura Minerals Inc.
1/15/2015(Aranzazu)Announces Temporary Suspension of Operations at Aranzazu Min...
6/6/2013(Aranzazu)Provides an Update on the Aranzazu Project
2/1/2012(Sao Francisco)Files Technical Reports for Sao Francisco and Sao Vicente Go...
1/24/2012Provides 2011 Production Results and 2012 Guidance
2/10/2011(Aranzazu)Releases Additional Assay Results for the Copper-Gold-Silver...
2/9/2011(Aranzazu)Announces Commercial Production at Aranzazu, Significant Q4/...
4/30/2010(Sao Vincente)Closes Acquisition of the Sao Francisco and Sao Vicente Gold...
Corporate news of Aura Minerals Inc.
7/12/2016Aura Minerals Announces Second Quarter Release Date -- Augus...
6/23/2016Aura Minerals Announces the Completion of the Acquisition of...
5/11/2016Aura Minerals Announces Authorization for Transfer of Ernest...
5/10/2016Aura Minerals Announces Q1 2016 Financial and Operating Resu...
5/9/2016Aura Minerals Announces Resumption of Operations at the San ...
4/25/2016Aura Minerals Announces First Quarter Release Date -- May 10...
3/24/2016Aura Minerals Announces Fourth Quarter and Year End 2015 Fin...
12/21/2015Aura Minerals Announces Resumption of Operations at San Andr...
11/2/2015Aura Minerals Announces Third Quarter Release Date -- Novemb...
9/14/2015Aura Minerals Files Aranzazu Mine NI 43-101 Technical Report
8/11/2015Aura Minerals Announces Q2 2015 Financial and Operating Resu...
8/7/2015Aura Minerals Announces Updated Aranzazu Mine NI 43-101 PEA ...
7/31/2015Aura Minerals Announces Second Quarter Release Date -- Augus...
3/24/2015Aura Minerals Announces Year End 2014 Financial and Operatin...
3/10/2015Aura Minerals Announces Fourth Quarter and Full Year 2014 Re...
1/15/2015IIROC Trade Resumption - ORA
1/15/2015IIROC Trading Halt - ORA
11/12/2014Aura Minerals Announces Third Quarter of 2014 Financial and ...
10/20/2014Aura Minerals Announces Third Quarter Release Date and Confe...
5/27/2014Aura Minerals Announces Updated San Andres Mine NI 43-101 Sh...
5/13/2014Aura Minerals Announces First Quarter of 2014 Financial and ...
4/17/2014Aura Minerals Announces First Quarter Release Date and Confe...
3/26/2014Aura Minerals Announces Year End 2013 Financial and Operatin...
3/17/2014Aura Minerals Announces US$22.5 Million Gold Loan
10/17/2013Announces Third Quarter Conference Call Details
7/22/2013Announces Second Quarter Conference Call Details
5/3/2013Announces First Quarter Conference Call Details
3/11/2013Announces Fourth Quarter and Full Year 2012 Conference Call ...
2/25/2013Announces Update on Serrote- Bridge Loan from Banco ITAU- R$...
11/5/2012Announces Third Quarter 2012 Conference Call Details
10/22/2012Files Positive Feasibility Study on the Serrote Project
8/31/2012(Aranzazu)Files Preliminary Economic Assessment on the Aranzazu Projec...
8/8/2012Announces Second Quarter 2012 Conference Call Details
6/6/2012Announces Changes to Management
4/30/2012Announces First Quarter 2012 Conference Call Details
3/20/2012Announces Fourth Quarter and Full Year 2011 Conference Call ...
2/29/2012Provides Corporate Update
10/26/2011Announces Third Quarter Conference Call Details
8/3/2011Announces Second Quarter Conference Call Details
7/12/2011Awards Feasibility Study on Serrote Deposit to SNC-Lavalin I...
6/30/2011Announces Details of the Annual General Meeting of Sharehold...
6/21/2011Announces Corporate and Operational Review Conference Call D...
4/7/2011Releases Additional Assay Results from the Deeper Drill Test...
3/23/2011Yamana ACQUIRES SHARES OF AURA MINERALS
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (ORA.TO)
16.29+0.25%
TORONTO
CA$ 16.29
09/18 17:00 0.040
0.25%
Prev close Open
16.25 15.49
Low High
15.49 16.50
Year l/h YTD var.
8.37 -  16.29 74.04%
52 week l/h 52 week var.
8.26 -  16.29 88.11%
Volume 1 month var.
34,360 11.35%
24hGold TrendPower© : 27
Produces Copper - Gold - Silver
Develops
Explores for Copper - Gold - Iron
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202476.49%9.9610.00
202316.39%9.9910.00
2022-22.56%9.9410.00
2021-31.04%17.5010.00
2020-42.37%93.3911.30
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.02-0.35%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 8.91-2.73%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.59-3.26%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.05+10.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.06+0.00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
 12.67+0.88%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.34+6.25%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+2.70%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
 1.77-2.21%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 40.37-0.22%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.