First Majestic Silver Corp.: Another Record Quarter of Silver Production
Published : July 07, 2011
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

VANCOUVER, BRITISH COLUMBIA--(Marketwire - July 7, 2011) - First Majestic Silver Corp. (News - Market indicators)(NYSE Amex:AG)(FRANKFURT:FMV)(WKN:A0LHKJ) -

Highlights

  • Silver production increases by 16% to a quarterly record of 1,780,379 ounces
  • Silver ounces amount to 97% of total equivalent silver production of 1,843,830 ounces
  • Total processed ore in the quarter increased by 6% to a record 482,075 tonnes

First Majestic Silver Corp. ("First Majestic" or the "Company") is pleased to announce that production in the second quarter of 2011 reached 1,843,830 equivalent ounces of silver, representing an 11% increase over the 1,656,165 equivalent ounces of silver produced in the second quarter of 2010. Production during the quarter consisted of 1,780,379 ounces of silver, making First Majestic's second quarter production 97% pure silver, the highest in the silver mining industry.

Silver production in the second quarter of 2011 represents a 16% increase compared to the second quarter of the prior year of 1,538,798 ounces, and a 1% increase over the 1,769,208 silver ounces produced in the first quarter of 2011. In addition to the 1,780,379 ounces of pure silver, the Company produced 1,392,132 pounds of lead, representing a 7% decrease from the second quarter of the previous year, and 337 ounces of gold, representing a decrease of 38% compared to the second quarter of 2010.

Company guidance for 2011 released on January 11, 2011 stated, "Silver Production is anticipated to exceed 7.5 million ounces of silver in 2011". Results of the second quarter are within this guidance. As previously announced, the increasing production for the balance of the year will be achieved once the two-stage mill expansion project at La Parrilla begins to come on-line over the next three quarters. Firstly, the expanded flotation circuit is expected to reach 800 tpd during the third quarter compared to the current rate of 425 tpd. Secondly, the expanded cyanidation circuit is anticipated to reach 800 tpd, up from the current 425 tpd, within the first quarter of 2012.

During the second quarter of 2011 the total ore processed at the Company's three operating silver mines, the La Encantada Silver Mine, the La Parrilla Silver Mine and the San Martin Silver Mine, amounted to 482,075 tonnes milled in the quarter representing a 6% increase over the previous quarter of 456,505 tonnes and an increase of 19% over the 404,350 tonnes milled in the second quarter of 2010.

Productions Details Table:

  Quarter Ended
June 30, 2011
Quarter Ended
June 30, 2010
% Change
+/-
Total Silver ounces produced 1,780,379 1,538,798 16%
Total Equivalent silver ounces produced 1,843,830 1,656,165 11%
Total Ore processed/tonnes milled 482,075 404,350 19%
Total Pounds of lead produced 1,392,132 1,494,532 -7%
Total Gold ounces produced 337 541 -38%

During the quarter, total underground development amounted to 8,708 metres at the Company's three operating mines including the Del Toro Silver Mine. This compares to 7,025 metres of underground development completed in the first quarter of 2011 and 5,063 metres of underground development completed in the second quarter of 2010. Development activities continue to focus on increasing the reserves and resources and the preparation of new mining areas in advance of the expanding production levels anticipated in the future. The Company's development budget for 2011 was increased to US$21.7 million compared to the $12.3 million invested in 2010.

Diamond drilling programs companywide during the second quarter amounted to 12,446 metres over 48 holes consisting primarily of definition drilling, representing an increase of 402% compared to the 3,090 metres executed during the second quarter of 2010. A total of 18,237 metres have been drilled in the first half of 2011 over 91 holes.

Some of the achievements from the second quarter included:

At the La Encantada Silver Mine:

  • The cyanidation plant, which was initially inaugurated with a rated capacity of 3,500 tpd has been able to reach an average throughput of 3,926 tpd during the second quarter of 2011, for a total of 333,710 tonnes processed in the quarter.
  • Preparation of new areas within the mine continues in order to increase production of fresh ore to 1,500 tpd by the end of 2011.
  • A complete upgrade of the haulage level was completed and the two production shafts including the hoists received a complete repair and upgrade.
  • Diamond drilling with three drill rigs is currently focusing on upgrading Measured and Indicated Resources to Reserves and extending areas of previously defined Resources.
  • During the quarter, extensive metallurgical tests were undertaken by two independent labs in the United States and the Company's own lab at the La Encantada operation. A new process appears to improve metallurgical recoveries substantially and is currently being evaluated further to define the economic parameters of adding this additional process.

At the La Parrilla Silver Mine:

  • Accelerated development continues at the four mines which make up the La Parrilla mining complex. This increased activity is preparing the mines for increased production planned in the flotation circuit for the second half of the year and in the cyanidation circuit for the first quarter of 2012. During the quarter a total of 3,579 metres of underground development were completed.
  • The plant expansion program launched in December 2010 has made substantial advances. The new crushing area is nearing completion; the new ball mill for the sulphides circuit is installed; the expansion of the flotation circuit and the new thickeners and filters are all on schedule for completion during the third quarter.
  • The cyanidation circuit is also advancing significantly and is on time to be completed by year end. Eight of the older leach tanks are being replaced with six much larger new tanks; a new larger power line and new substation are progressing; a new counter current washing circuit is under construction; a new Merrill Crowe facility with the latest induction furnaces are now being installed, and; a new state of the art laboratory is under construction. This expansion once completed will result in the total mill capacity reaching 1,600 tpd, from the current 850 tpd, effectively doubling the current output of the La Parrilla operation from approximately 1.8 million ounces produced in 2010 to over 3.0 million ounces of silver equivalent production for 2012.

At the San Martin Silver Mine:

  • During the quarter the 3.5 kilometre road was completed to the La Esperanza area and the first 150 metres of ramp was built reaching the Esperanza vein at 100 metres in depth. Development following the vein is now underway. As at the end of the quarter, 50 metres along strike had been completed. The grade within the structure is currently averaging 350 g/t Ag with an average width of 1.40 metres over the 50 metres.
  • In addition to the continuing underground drill program launched in late 2009, to drill short systematic holes into the foot wall of the Zuloaga vein, the Company now has five drill rigs operating at San Martin which has reinitiated the surface drilling program that was suspended in 2008 and had indicated evidence of economic ore in the Rosarios and La Huichola veins.

At the Del Toro Silver Mine:

  • Ground breaking commenced in April for the construction of a new 1,000 tpd flotation mill. Foundation construction is expected to commence later in August.
  • Municipal government approval was received for the construction of a water treatment facility for the town of Chalchihuites. This water treatment facility will be used to treat the raw sewage coming from the town as well as supply water to the mill.
  • The Company received approvals for the construction of a new road from the main highway to the mine site from the local Ejido. Construction of this new three kilometre long road was also completed during the quarter allowing for heavy equipment and vehicles to by-pass the town.
  • Construction of an underground drill station was completed in February where two drill rigs have been drilling since. As at quarter end, five holes were completed for a total of 2,401 metres. Drilling continues in order to upgrade previously define Measured and Indicated Resources to Reserves and also infill previous holes to test for additional Resources. Furthermore, the dip and extension of the ore bodies is being explored at depth. The drill program is extremely encouraging and showing good success.
  • Development is continuing past the 7th level (176 metres from surface) where the two drill rigs are stationed and is now 1,350 metres in length or 210 metres in vertical distance from surface. This ramp will continue for another 300 metres where a second cross cut will be constructed for an additional drill station. Also, this main ramp will act as an access to the three main ore bodies which will be developed over the next twelve months during the construction of the new mill.
  • A new mining claim with past production of high grade ore was purchased during the quarter from a local miner. This adjacent claim consists of four hectares and is expected to increase the potential of the Del Toro project.

At the La Luz Silver Project:

  • The construction of a Thematic and Cultural Park which will include a mining museum, announced previously, is underway. The final plan for the project will be presented to the federal environmental and heritage authorities for approval in the third quarter. Meanwhile, cleaning and rehabilitation of the historic Santa Ana Hacienda and other old buildings commenced in the first quarter of 2011. In addition, cleaning of the impressive underground workings is underway to rehabilitate this historic mine for public access. This new cultural facility and mining museum will bring needed employment to the local community and will also form part of the 'Sustainable Development Project' which will provide permanent jobs to the local communities.
  • During the quarter, the Environmental Assessment works continued with the completion of the Baseline study. By the end of the third quarter, the Environmental Impact Statement, the Risk Study, and the Change of Use of Land Studies are expected to be completed.
  • A Geo-hydrology study was completed in the quarter to study the various and alternate water supply sources in the region.
  • A metallurgical test is underway to define the final flow sheet diagram for a flotation plant and permitting.

First Majestic is a producing silver company focused in Mexico and is aggressively pursuing its business plan to become a senior silver producer through the development of its existing assets and the pursuit through acquisition of additional assets that contribute to achieving its corporate growth objectives.

FIRST MAJESTIC SILVER CORP.

Keith Neumeyer, President & CEO

Cautionary Note Regarding Forward Looking Statements

This press release contains "forward-looking statements", within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of First Majestic Silver Corp. Forward-looking statements include, but are not limited to, statements with respect to the future price of silver and other metals, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, hedging practices, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, timing and possible outcome of pending litigation, title disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of First Majestic Silver Corp. to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the integration of acquisitions; risks related to international operations; risks related to joint venture operations; actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of metals; possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors discussed in the section entitled "Description of the Business - Risk Factors" in First Majestic Silver Corp.'s Annual Information Form for the year ended December 31, 2010, available on www.sedar.com, and Form 40-F on file with the United States Securities and Exchange Commission in Washington, D.C. Although First Majestic Silver Corp. has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. First Majestic Silver Corp. does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws.



First Majestic Silver Corp.
Keith Neumeyer
President & CEO
(604) 688-3033 or Toll Free: 1-866-529-2807
(604) 639-8873 (FAX)
info@firstmajestic.com
www.firstmajestic.com
Data and Statistics for these countries : Mexico | All
Gold and Silver Prices for these countries : Mexico | All

First Majestic Silver Corp.

PRODUCER
CODE : FR.TO
ISIN : CA32076R1029
CUSIP : 32076R1029
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

First Majestic is a silver producing company based in Canada.

First Majestic produces silver, gold, lead and zinc in Mexico, and holds various exploration projects in Canada and in Mexico.

Its main assets in production are LA PARRILLA SILVER MINE, LA ENCANTADA (FIRST MAJESTIC SILVER), SAN MARTIN and LA ENCANTADA SILVER MINE in Mexico and its main exploration properties are REAL DE CATORCE, DEL TORO and CUITABOCA in Mexico and PITT ISLAND, PINCOURT, DESJARDINS and DOMPIERRE in Canada.

First Majestic is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 1.5 billions as of today (US$ 1.1 billions, € 1.0 billions).

Its stock quote reached its lowest recent point on November 02, 2001 at CA$ 0.01, and its highest recent level on December 22, 2017 at CA$ 9.99.

First Majestic has 164 340 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of First Majestic Silver Corp.
8/13/2018First Majestic shares hammered after reporting $40 million-l...
1/21/2009Follow up N° 1
Annual reports of First Majestic Silver Corp.
Files Form 40-F Annual Report
2008 Annual report
2007 Annual Report
Financings of First Majestic Silver Corp.
8/20/2009Tranche of Non-Brokered Private Placement Closes
8/12/2009Non-Brokered Private Placement and Debt Settlement
Nominations of First Majestic Silver Corp.
4/4/2014Appoints VP of Technical Services
12/24/2013Announces Retirement of Robert Young from Board of Directors
1/5/2012Appoints Chief Information Officer
12/30/2011Names Douglas Penrose as Chairman
Financials of First Majestic Silver Corp.
2/25/2016First Majestic Announces Financial Results for Q4 and Year E...
2/3/2014Fourth Quarter and Year End Financial Results to be Released...
11/12/2013Reports Third Quarter Financial Results
10/31/2013Third Quarter Financial Results to be Released on November 1...
7/15/2013Second Quarter Financial Results to be Released on August 13...
5/15/2013Reports First Quarter Earnings of $26.5 million on Revenues ...
5/7/2013Quarter Financial Results to be Released on May 15th
11/14/2012Earns $24.9M in Third Quarter; Revenues of $63.6M, an Increa...
11/7/2012Third Quarter Financial Results to Be Released on November 1...
8/7/2012Second Quarter Financial Results to be Released on August 14...
5/10/2012Reports Strong Earnings of $26.4M in Q1 2012, Up 10% Compare...
5/4/2012First Quarter Financial Results to Be Released on May 10th
3/5/2012Announces New Record Earnings & Cash Flows for 2011
2/24/2012to Announce Fourth Quarter and Year End 2011 Financial Resul...
10/26/2011Third Quarter Financial Results to be Released on November 9...
8/3/2011Second Quarter Financial Results to be Released on August 11...
5/17/2011Earns a Record $23.9 million in First Quarter of 2011
5/11/2011Quarter Financial Results to Be Released on May 16, 2011-Con...
3/1/20112010 Audited Financial Results show Record Earnings & Cash F...
3/23/2010Year End & Fourth Quarter Financial Results
11/12/2009Record Third Quarter Financial Results
8/14/2009Second Quarter Financial Results
8/15/2008Second Quarter Financial Results
5/16/2008CORRECTION- MISSING TEXT - Record First Quarter Financial Re...
4/18/20082007 Year End Financial Results
Project news of First Majestic Silver Corp.
1/14/2014becomes a Senior Silver Producer; Produces 10.64M Ounces of ...
12/4/2013(Del Toro)Dor=E9 Production Commences at the Del Toro SilverMine
4/9/2013(Del Toro)Del Toro Silver Mine Flotation Circuit Deemed Commercial
1/9/2013Achieved Record Production of 2.6M Silver Eqv. Ounces (2.3M ...
9/27/2012Mine Videos - Just Released
1/24/2012(Del Toro)-La Parrilla Mill Expansion to 2,000 tpd Completed: Del Toro...
1/12/2012Achieved Record Production of 1.96M Silver Ounces (2.1M Silv...
10/13/2011(La Parrilla Silver Mine)Announces Q3 Production Results and Commences Commercial Pro...
9/22/2011(La Parrilla Silver Mine)First Stage of Expansion at the La Parrilla Processing Plant...
9/13/2011(La Parrilla Silver Mine)Mill Capacity at La Parrilla to Reach 2,000 tpd Following Po...
3/1/2011(San Martin)2010 Audited Financial Results show Record Earnings & Cash F...
4/8/2010(La Encantada (first Majestic Silver))La Encantada Achieves Commercial Production
11/26/2009(La Encantada (first Majestic Silver))La Encantada Opening Ceremony & Production of First Silver P...
10/13/2009(La Encantada (first Majestic Silver))La Encantada Expansion Nearing Completion
10/6/2009Third Quarter Production Results
2/17/2009(La Parrilla Silver Mine)La Parrilla Silver Mine Updates NI 43-101 Resource
1/20/2009(San Martin)San Martin Updated NI 43-101 Report Increasing Reserves/Reso...
7/17/2008(San Juan Silver Mine)Major Intersection At San Juan Silver Mine Drill Hole Inters...
4/29/20081st Quarter Production Results
4/23/2008(San Martin Silver Mine)Commissioning of Flotation Circuit at the San Martin Silver ...
4/1/2008(La Parrilla Silver Mine)Discovery of New High Grade Ore Shoot on the Vacas Vein at t...
1/8/2008(La Encantada Silver Mine)La Encantada Silver Mine Update and New NI 43-101 Resource
7/2/2007(La Parrilla Silver Mine)La Parilla Technical Report
Corporate news of First Majestic Silver Corp.
7/27/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
7/25/2016Second Quarter Financial Results to be Released on August 10
7/20/2016Here’s Why These Five Stocks Are on the Move on Wednesday
7/12/2016First Majestic Produces 4.7 Million Silver Eqv. Ounces in Se...
1/29/2016Silver Could Spike $10 In A Day In Global Collapse Scenario
11/28/2015How Top Traders Are Shifting Western Asst High Incm Opprtnty...
10/14/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
10/14/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
10/13/2015A Silver Lining in October 2015?
10/2/2015First Majestic Completes Acquisition of Silvercrest
10/1/2015First Majestic Completes Acquisition of SilverCrest
9/25/2015First Majestic and SilverCrest Announce Shareholder Approval...
9/15/2015Leading Independent Advisory Firms ISS and Glass Lewis Recom...
8/27/2015First Majestic and SilverCrest Announce Receipt of Interim O...
8/27/2015First Majestic and SilverCrest Announce Receipt of Interim O...
8/11/2015First Majestic reports 2Q loss
8/11/2015First Majestic Reports Second Quarter Financial Results and ...
8/10/2015Why Earnings Season Could Be Great for First Majestic Silver...
7/30/2015Second Quarter Financial Results to be Released on August 11
7/30/2015First Majestic Silver: Second Quarter Financial Results to B...
7/27/2015First Majestic Announces Friendly Acquisition of Silvercrest...
7/27/2015announces friendly acquisition of Silvercrest Mines
7/9/2015First Majestic Produces 3.8 Million Silver Eqv. Ounces in Q2...
4/23/2015NYSE stocks posting largest percentage decreases
4/23/2015First Quarter Financial Results to be Released on May 7
4/23/2015First Majestic Silver Corp. First Quarter Financial Results ...
4/22/2015First Majestic Silver Corp. Announces Closing of C$30 Millio...
4/20/2015NYSE stocks posting largest percentage decreases
4/13/2015NYSE stocks posting largest percentage decreases
4/13/2015First Majestic Produces 3.9 Million Silver Eqv. Ounces in Q1...
4/9/2015NYSE stocks posting largest percentage decreases
4/6/2015First Majestic Silver Corp. Announces C$30 Million Bought De...
4/6/2015Announces C$30 Million Bought Deal Financing
4/6/2015First Majestic Announces Promotion of Martin Palacios to Chi...
4/6/2015First Majestic Announces Acquisition of Shares of First Mini...
4/1/2015NYSE stocks posting largest percentage increases
4/1/2015First Majestic Updates Mineral Reserve and Resource Estimate...
3/31/2015Announces New La Guitarra NI 43-101 Technical Report
3/31/2015First Majestic Announces New La Guitarra NI 43-101 Technical...
3/11/2015First Majestic Renews Share Repurchase Program
3/11/2015First Majestic Renews Share Repurchase Program
8/22/2014to List on the Mexican Stock Exchange
10/24/2013Appeal Against First Majestic Dismissed
9/30/2013Applies to Dismiss Appeal of Positive Judgment for US$93.84 ...
7/10/2013Produces a New Quarterly Record of 3.27 Million Silver Eqv. ...
7/2/2013Payment of CDN$14.85 million Received in Court Litigation
5/2/2013Announces Completion of La Guitarra's Expansion to 500 tpd
4/26/2013Receives Positive Judgment for US$89.6 in Court Litigation
4/17/2013Earns Socially Responsible Business Distinction Award for Fi...
4/15/2013Produces Another Quarterly Record 2.73 Million Silver Eqv. O...
3/11/2013Announces Share Repurchase Program
2/19/2013Elects Not to Exercise Right to Match Coeur's Offer for Orko
2/14/2013Considering Superior Offer from Coeur to Acquire Orko Silver
1/25/2013(Del Toro)Production Commences at the Del Toro Silver Mine
10/10/2012Produces a Record 2.44 Million Silver Equivalent Ounces in T...
9/26/2012New Look! New Features! First Majestic Bullion Store
9/6/2012Keith Neumeyer's Interview With Minesite.com
8/27/2012Announces Appointment of VP of Exploration
8/21/2012(Del Toro)Updated Del Toro NI 43-101 Technical Report & Final Permit R...
8/16/2012Recognized as a Leader in Corporate Social Responsibility
7/17/2012Produces 2.1 Million Silver Equivalent Ounces in Second Quar...
7/3/2012Completes Acquisition of Silvermex Resources
6/26/2012mex Securityholders Approve Plan of Arrangement With First M...
5/22/2012(Del Toro)Del Toro NI 43-101 Technical Report & Pre-Feasibility Study
4/16/2012First Quarter Production Results and Full Commencement of Co...
4/3/2012Announces Friendly Acquisition of Silvermex Resources
3/30/2012Files Form 40-F Annual Report
10/7/2011Third Quarter Production Results to Be Released on October 1...
8/11/2011Record Earnings of $30.6 million in Second Quarter
7/7/2011Another Record Quarter of Silver Production
4/8/2011Silver Production Up 25%; Reaches 97% Pure Silver and Mainta...
8/16/2010Record Earnings and Cash Flows. Purest Silver Producer with ...
4/22/20102nd Year Running for Mexican Distinction as a "Socially Resp...
4/12/2010Production Increases by 30% to 1,619,403 Equivalent Ounces S...
1/12/2010Production Increases by 18%, Reaches New Record
11/13/2009Completes Acquisition of Normabec Mining Resources; Normabec...
9/14/2009to Acquire Normabec Mining Resources
8/13/2009Joins OTCQX
6/26/2009offering for purchase 0.999 fine 1oz. silver rounds, and 5oz...
3/5/2009Closing of $21.2 Million Offering
11/19/2008Operations Update
9/11/2008Many Positive Developments Underway
7/15/20082nd Quarter Production Shows Continued Ramp-up
3/25/2008Closing of $45,475,000 Offering
1/17/2008Another Record Quarter of Silver Production
12/14/2007TSX Conditional Approval
12/5/2007Update on the Chalchihuites Group of Properties
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (FR.TO)OTHER OTC (FRMSF)
9.00-3.02%
TORONTO
CA$ 9.00
04/22 17:00 -0.280
-3.02%
Prev close Open
9.28 8.62
Low High
8.51 9.14
Year l/h YTD var.
5.74 -  10.95 12.78%
52 week l/h 52 week var.
5.74 -  10.95 -7.41%
Volume 1 month var.
1,455,064 23.80%
24hGold TrendPower© : -17
Produces Lead - Silver - Zinc
Develops
Explores for Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/27/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202418.58%
2023-32.71%9.9510.07
2022-23.32%9.9610.00
2021-13.88%30.7512.74
20209.63%9.8610.08
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.72-0.19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.87-3.12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56+0.18%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-4.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.79-0.32%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.86+0.54%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.13+0.58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :