Heron Resources Ltd

Published : June 28th, 2016

ASX/TSX-Heron delivers robust Feasibility Study for Woodlawn Project

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

ASX/TSX-Heron delivers robust Feasibility Study for Woodlawn Project

d8aa42c0-8d7d-4797-9775-4a020ecf03fe.pdf

Heron Resources Limited

Suite 702, 191 Clarence St, Sydney NSW 2000, AUSTRALIA

[email protected]

+61 2 9119 8111 / +61 8 6500 9200

ASX/TSX Release

29 June 2016

ABN: 30 068 263 098

Heron Resources delivers robust Feasibility Study for Woodlawn Project

Study supports project viability with compelling commercial case for immediate development

Expedited program launched to secure project funding and bring project online to meet global zinc supply shortfall

Heron Resources Limited ("Heron", "Company", ASX:HRR and TSX:HER) is pleased to announce the results of its Feasibility Study (FS) for its 100% owned and fully permitted high-grade Woodlawn Zinc-Copper Project in New South Wales, Australia. The A$11 million study supports the viability of the Starter Case to deliver quality zinc, copper and lead concentrates to market over a significant Reserves-based mine life. This study underpins the Board's decision to advance an accelerated program to secure project finance and bring the Woodlawn Project into production in 2018.

* Results reported using Mineral Reserves as estimated for the FS at an 8% post-tax real discount rate (approximately. 10% post-tax nominal), with AUD/USD FX 0.71, and with flat real commodity prices of US$1.01/lb Zn, US$3.00/lb Cu, US$0.91/lb Pb, US$17.80/oz Ag and US$1,200/oz Au. Other assumptions are detailed later in this release. ** C1 and C3, refer to page 17 for definitions. All currency amounts are in Australian dollars unless otherwise noted.

Key Outcomes:

  • Attractive project characteristics

    • Initial 9.3 year mine life based upon the combined underground and tailings Mineral Reserves ("Starter Case")

    • Mineral Reserves-only life-of-mine (LOM) Production Target of 284kt Zn, 67kt Cu, 87kt Pb, 7.5Moz Ag and 28koz Au

    • Campaign processing rate of up to 1.0Mtpa from underground mining, and up to 1.5Mtpa from reclaiming tailings, processed through a standard single-sulphide flotation facility

    • Steady-state (2020-2023) annual Production Target of 40kt Zn, 10kt Cu, 12kt Pb, 900koz Ag and 4koz Au contained within zinc, copper, and lead concentrates

    • Utilising existing local and regional infrastructure to achieve significant reductions in development costs o Close proximity to large service and employment centres (Sydney, Wollongong, Canberra, Goulburn) o Strong local community and regulator support

    • Project is on granted Special Mining Lease SML20 - fully 'permitted' and 'mine ready'

    • Inferred Mineral Resources defined in both the underground and tailings projects demonstrate excellent potential to extend mine life to more than 11.5 years

  • Mineral Resources & Mineral Reserves

    • Starter Case based on 51% Proven Reserves and 49% Probable Reserves

    • Underground mine plan focused on the shallower areas of the deposit reflecting the success of the recent Preliminary Economic Assessment (PEA) & FS drilling programs. There is a high level of confidence based on historic data for extensions to this mineralisation both at-depth and along strike

    • Conservative approach taken to the underground Mineral Reserve calculation, excluding all moderate- to higher-risk remnant mining areas. These remnant areas hold future potential which will be reconsidered post mine access with re-assessment from underground

    • Two separate production sources (underground and tailings) provide operational flexibility and reduces risk

    • 20 years of historical operational data removes 'greenfield' unknowns

  • Robust economics

    • C1 costs of -US$0.06/lb zinc and C3 of US$0.34/lb expected to place the Project firmly in the lower half of the cost curve (refer to page 17 for definitions)

    • Attractive capital cost metrics based on annual metal Production Targets and Reserves-based mine life

    • Life extension case (PEA equivalent mine plan) shows excellent consistency with previously published PEA

    • Significant leverage to the price outlook for zinc, which comprises approximately 48% of total payable metal value

  • Expedited development and financing pathway to meet market opportunity

    • Evaluating options for immediate sourcing of long lead-time items and other alternative second hand equipment procurement options to enhance development timing and reduce costs

    • Rapid development schedule of 15 months from commencement of construction until completion of wet commissioning

    • First production targeted early 2018 to meet projected favourable zinc market conditions

  • Excellent exploration upside

    • Drill program to commence imminently to test high-priority near mine targets

    • Highly successful exploration drilling programs over the last 18 months

    • Significant exploration potential on SML20 remains including near-surface targets that have the scope to materially increase the Mineral Resources

    • Deeper underground extensions to be targeted with underground drilling post-commissioning

    • Significant medium grade base metal stringer mineralisation identified (metallurgical evaluation commenced)

    • Regional 'Massive Sulphide District' discovery potential within Heron's 682 square kilometres of regional tenure

The complete NI 43-101 Technical Report in support of the FS study will be published on Heron's web site and SEDAR www.sedar.com (TSX:HER) within 45 days of this news release. While summarised here, this Technical Report will contain expanded information with respect to key assumptions, parameters and risks associated with the results of the FS.

Heron Resources Managing Director and CEO, Mr. Wayne Taylor, said:

"The study presents a very compelling case for the development of the Woodlawn Project and confirms Heron's position as one of the most advanced Australian near term zinc producers. The resource and embedded low operating and competitive development costs due to existing site infrastructure all combine to make Woodlawn a clear choice amongst its peers.

From the outset it has been our aim to deliver a Reserve base that allows us to bring the project online quickly to take advantage of the significant opportunity that exists due to favourable zinc market fundamentals. The resulting economics place us in an ideal position to secure funding and target first production in 2018 with significant project upside still to be quantified.

I would like to recognise the tireless efforts of our employees and consultants who have helped deliver this study on time and under budget. It has been an enormous task which has been met with hard work and enthusiasm and is a credit to the individuals involved."

Please refer to page 23 for important Cautionary and Forward Looking Statements that are to be read in conjunction with this release.

Project Overview

The Woodlawn deposit is a high-grade, Volcanogenic Massive-Sulphide (VMS) deposit situated in New South Wales, Australia, approximately 50km northeast of Canberra, and 250km southwest of Sydney (Figure 1).

The Woodlawn deposit was discovered in 1970 with open-pit operations commencing in 1978 and underground operations in 1987. The operation was closed in March 1998 primarily due to corporate issues within then owners, Denehurst Ltd. Between 1978 and 1998 the operation reported production of 13.8Mt @ 9.1% Zn, 1.6% Cu, 3.6% Pb, 0.5g/t Au and 74g/t Ag. In 1999, Tri Origin Exploration Ltd (subsequently becoming TriAusMin Ltd) acquired the mineral rights to the site from the Denehurst Administrator.

Heron acquired its interest in the Woodlawn Project through the merger with TriAusMin Ltd which was completed in August 2014. Since this time the Company has advanced the project through the completion of a Preliminary Economic Assessment (PEA) in April 2015 covering the combined development of the underground and reclaimed tailings projects. The PEA summary results provided the commercial basis for advancing the project through this FS.

The Woodlawn Project consists of two production sources, comprising underground and tailings ore, which will be processed through a single sulphide flotation plant. The Woodlawn Project benefits from an existing granted mining lease (SML20) and major statutory project approvals. The mineral rights and production are 100%-owned by Heron. The Woodlawn site layout including location of the proposed plant is illustrated in Figure 2.

The Woodlawn mining lease, SML 20, and surrounding larger (179 sq km) exploration license, EL 7257, contain the previously producing Currawang Mine located 9km to the north-west of Woodlawn, and the Cowley Hills Mine located 2km to the north. A further 503 square kilometres are held by Heron under exploration licenses within the district covering the highly prospective Woodlawn felsic volcanics, the host of the VMS mineralisation.

Figure 1: Woodlawn location map

Figure 2: Woodlawn Site Layout

Read the rest of the article at www.publicnow.com

Heron Resources Ltd

EXPLORATION STAGE
CODE : HRR.AX
ISIN : AU000000HRR6
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Heron Res. is a nickel and cobalt development stage company based in Australia.

Heron Res. holds various exploration projects in Australia.

Its main exploration properties are BIG FOUR HERON - GOONGARRIE, BIG FOUR - GOONGARRIE, SIBERIA NORTH, BULONG - MAIN, BULONG - EAST, HAMPTON (KNP PROJECT), BIG FOUR PLACER - GOONGARRIE, GOONGARRIE HILL - GOONGARRIE, GOONGARRIE SOUTH - GOONGARRIE, HIGHWAY - GOONGARRIE, SCOTIA - GOONGARRIE, JUMP-UP DAM, LAVERTON NICKEL and MT ZEPHYR in Australia.

Heron Res. is listed in Australia. Its market capitalisation is AU$ 18.7 millions as of today (US$ 13.5 millions, € 12.6 millions).

Its stock quote reached its highest recent level on April 13, 2007 at AU$ 1.47, and its lowest recent point on April 03, 2020 at AU$ 0.02.

Heron Res. has 415 010 016 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financials of Heron Resources Ltd
11/1/2016Heron Resources September 2016 Quarterly Report
Project news of Heron Resources Ltd
11/25/2015Woodlawn Phase II drilling program completed – High grade in...
9/5/2007IN-FILL DRILLING RESULTS JUMP-UP DAM PROJECT
Corporate news of Heron Resources Ltd
7/29/201629 Jul 2016: Quarterly Activities Report - June 2016
7/25/2016Heron lodges full Woodlawn Feasibility Study on SEDAR
7/14/2016Lapse and Cancellation of Unlisted Options
7/11/2016Ceasing to be a substantial holder for AYC
7/1/2016Project Update - Clarification
6/30/2016Project Update
6/28/2016ASX/TSX-Heron delivers robust Feasibility Study for Woodlawn...
6/28/2016Media-Heron delivers robust Feasibility Study for Woodlawn P...
6/28/2016TSX-Heron delivers Woodlawn Project Feasibility Study
6/6/2016Herons Woodlawn Zinc-Copper Project Feasibility Study is on ...
6/2/201601 Jun 2016: Cleansing Statement
5/31/201630 May 2016: Alchemy Signs Farm In Agreement over Projects i...
5/31/2016Farm-In Agreement with Alchemy Resources
2/2/2016Heron Resources Announces Quarterly Update on High Grade Woo...
2/1/2016Heron Resources Announces Quarterly Update on High Grade Woo...
1/28/2016Heron Resources December 2015 Quarterly Report
1/20/2016Lapse and Cancellation of Unlisted Options
12/22/2015High Grade Lisa Lens Intercept Completes the Phase II Drilli...
12/22/2015Heron's High Grade Lisa Lens Intercept Completes the Phase I...
12/3/2015Heron Constitution
12/1/2015Release of Woodlawn Retreatment Project Report (NI43-101)
12/1/2015Release of Woodlawn Retreatment Project 2015 Mineral Resourc...
11/25/2015Woodlawn Phase II Drilling Program Completed - High Grade In...
10/29/2015Unaudited Interim Financial Report for 3 months ended 30 Sep...
10/29/2015Management's Discussion and Analysis for 3 Months ended Sep ...
10/20/2015Heron Confirms 10Mt (M+I) of High Grade Tailings at 6.2% ZnE...
10/7/2015Woodlawn Drilling Update - 27.7m @ 23.4% ZnEq from 401m dept...
10/7/2015Heron Resources: Woodlawn Drilling Update: 27.7m at 23.4% Zn...
9/21/2015Kate Lens Definition Drilling continues to impress: 26.6m of...
9/21/2015Heron Resources Limited - Kate Lens Definition Drilling Cont...
9/9/2015Woodlawn Feasibility Study on Track
9/9/2015Heron Resources Announces Woodlawn Feasibility Study on Trac...
9/8/2015Appendix 3Y - Wayne Taylor
9/7/2015Appendix 3Y - Robertson
8/29/2015Annual Financial Report, MD&A and Quarterly Financial
8/29/2015Appendix 4G and Corporate Governance Statement
8/19/2015Heron Resources Appoints Mr. Mark Sawyer as Non-Executive Di...
8/17/2015Appendix 3B New issue announcement
8/17/2015Issue of Placement Shares - Sec 708A Cleansing Notice
8/17/2015Stage 1 Equity Funding Package of $6.8M Completed with Green...
8/17/2015Heron Resources Completes Stage 1 Equity Funding Package of ...
8/12/2015Woodlawn Zinc-Copper Project Fly-through released
8/12/2015Heron's Woodlawn Zinc-Copper Project Fly-Through Released
8/4/2015Wide Kate Lens Up-dip Intercept: 34.0m @ 20.8% ZnEq
7/24/2015Heron Announces Equity Funding Package of up to $20M with Gr...
7/21/2015Excellent Drilling Results Continue at Woodlawn - Kate Lens ...
7/20/2015Excellent Drilling Results Continue at Woodlawn - Kate Lens ...
7/6/2015Woodlawn Phase II Drilling Continues to Deliver: 7.1m @ 40.6...
7/6/2015Woodlawn Phase II Drilling Continues to Deliver: 7.1m at 40....
4/22/2015Preliminary Economic Assessment Delivers Strong Business Cas...
4/18/2015Unaudited Interim Financial Report for 3 and 9 months ended ...
4/18/2015Heron Management's Discussion and Analysis March 2015 Quarte...
4/13/2015Appendix 3X: Initial Director's Interest Notice
4/9/2015Heron appoints Non-Executive Director
4/8/2015Heron Appoints Non-Executive Director
3/13/2015Woodlawn Phase 1 Drilling Program Successfully Completed - O...
2/26/2015Woodlawn Mining Lease Renewed for 15 Years
2/18/2015Woodlawn Drilling Update - High Grade Results from new Lisa ...
2/13/2015Heron Half Year Financial Report
2/13/2015General Meeting Results
2/13/2015Management's Discussion and Analysis for 3 & 6 Months ended ...
2/10/2015Woodlawn Zinc Copper Project Successful Metallurgical Test W...
2/3/2015Woodlawn Drilling Update Further Shallow High-Grade Results
1/27/2015Advancing the Woodlawn Project
1/14/2015Woodlawn Drilling Update - G Lens Delivers Strong Results an...
12/22/2014Woodlawn High Grade Assays and New Massive Sulphide Intercep...
12/16/2014Appendix 3X Initial Director's Interest Notice
12/16/2014Notice of initial substantial holder
12/13/2014Notification of date of General Meeting
12/13/2014Update on Board Spill Meeting
12/8/2014Kate Lens Delivers Highest Grade Intercept 26% Zn+Pb + 2% Cu...
11/26/2014Appendix 3Y Change of Director's Interest Notice
11/24/2014Nominations to Heron Board - Section249N and 249P
11/21/2014Chairman's Response
11/21/2014Results of Meeting
12/1/2009A quarterly communication
6/12/2009Receipt of request to put resolutions at general meeting
11/23/2007And CVRD Inco Approve Program & Budget for KNP Pre Feasibili...
11/20/2007Completes placement
11/16/2007HERON COMPLETES SHARE PLACEMENT
9/17/2007Volume 2, Issue 2, September 2007
8/29/2007RESOURCE ESTIMATE BOYCE CREEK NICKEL LATERITE PROJECT
7/16/2007announces Mining Leases Granted for Jump up Dam Project
5/31/2007An announcement from Heron Resources
4/5/2007Completion of A$27.8 million share placement
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (HRR.AX)
0.045+0.00%
AUSTRALIA
AU$ 0.045
05/27 11:00 -
0%
Prev close Open
0.045 0.045
Low High
0.045 0.045
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.045 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -5
Produces
Develops
Explores for Cobalt - Nickel
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/1/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
20220.00%0.050.05
2021-8.16%0.080.04
2020-48.96%0.110.02
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :