Avnel Announces Definitive Feasibility Study Results for Kalana Main Project

bc8b856f-2972-46a8-93b1-034e6261fad7.pdf



Avnel Announces Definitive Feasibility Study Results for Kalana Main Project


ST. PETER PORT, GUERNSEY, MARCH 30, 2016 - Avnel Gold Mining Limited ("Avnel" or the "Company") (TSX:AVK) is pleased to announce results from a definitive feasibility study for its Kalana Main Project in south-western Mali with an effective date of March 1, 2016 (the "DFS"). The Company is reporting a maiden Mineral Reserve of 1.96 million ounces of gold and an updated Measured plus Indicated Mineral Resource estimate of 3.06 million ounces of gold for the Kalana Main project. The key performance indicators reported in this news release are based upon 100% ownership of the Kalana Main Project. All amounts are in United States dollars ("$") unless specified otherwise.


Feasibility Study Highlights


Project Economics (base case gold price of $1,200 per ounce)


  • After tax 8% NPV: $196 million

  • After tax IRR: 38%

  • Payback period: 1.2 years from start of commercial production


Mine Production


  1. During first 5 years:

    • Average annual production of 148,000 ounces at a total cash cost of $507/oz and an average on-site all-in-sustaining cost ("AISC") of $595/oz

    • Average mill head grade of 3.6 g/t Au with gold recovery of 94.6%

    • Average annual throughput of 1.35 million tonnes milled


  2. Over 18 year life of mine ("LOM"):

    • Total production of 1.82 million ounces with gold recovery of 92.7%

    • Average annual production of 101,000 ounces at a total cash cost of $695/oz and an on-site AISC of $784/oz


      Mineral Reserves


      Maiden Mineral Reserve declared of 1.96 million ounces:

    • 21.0 million tonnes of ore at a grade of 2.80 g/t Au containing 1.92 million ounces declared

    • 0.7 million tonnes of existing tailings at a grade of 1.80 g/t Au containing 0.04 million ounces to be hydraulically mined and processed prior to commissioning the new mill


      Capital Expenditure


    • Initial net capital expenditure of $163 million; gross initial capital expenditure of $196 million (including contingency) and working capital of $8 million offset by $41 million from gold production prior to commercial production

    • Sustaining capital expenditure of $123 million


Project Construction Schedule


Key project milestones after start of construction:


  • Month 16: Commence pre-strip

  • Month 17: Commence processing tails through new carbon-in-leach ("CIL") section of the plant

  • Month 22: Commence hot commissioning of mill

  • Month 25: Commercial production


    Mineral Resources


    Updated March 2016 Mineral Resource for the Kalana Main deposit utilizing a $1,400/oz gold price:

  • In situ Measured plus Indicated Resource of 23.0 million tonnes grading 4.14 g/t Au containing 3.06 million ounces at a 0.90 g/t Au cut-off

  • In situ Inferred Resource of 1.7 million tonnes grading 4.51 g/t Au containing 0.24 million ounces at a 0.90 g/t Au cut-off

  • The diluted (internal and external) Measured plus Indicated Resource of 35.7 million tonnes

    grading 2.78 g/t Au containing 3.20 million ounces

  • Tailings of 0.7 million tonnes at a grade of 1.80 g/t Au containing 0.04 million ounces


Kalana Project


The Kalana Project is owned by Société d'Exploitation des Mines d'Or de Kalana, S.A. ("SOMIKA"). Avnel has an 80% equity interest in SOMIKA and the Malian Government holds a beneficial interest in the remaining 20%, which has anti-dilution and free-carry rights. SOMIKA owns and operates the Kalana Gold Mine, a small, Soviet-era, underground gold mine, and holds the rights to the Kalana Exploitation Permit, a combined exploitation and exploration permit that is subject to the 1999 Mining Code and is unique in Mali. The permit covers a surface area of 387.4 km2 and was last renewed in 2003 for a term of 30 years. This permit is host to 29 exploration targets, including the Kalana Main Project, the Company's flagship development-stage project, which is the subject of the DFS.


Kalana Main Definitive Feasibility Study


The DFS was led by Snowden Mining Consultants Pty Ltd. ("Snowden") with the support of several leading consulting firms, all of whom have extensive experience in Mali, including Mr. Ivor Jones of Denny Jones Pty. Ltd. ("Denny Jones"), DRA Projects (Pty) Ltd. ("DRA"), and Epoch Resources. The key performance indicators reported in this news release are based upon 100% ownership of the Kalana Main Project. The assumptions used in the economic evaluation are set out in Table 1 below and the results of the economic evaluation are summarised in Table 2.

Table 1: Assumptions used in the Economic Evaluation

Economic Assumptions

Unit

Value

Plant Throughput (saprolite)

Mtpa

1.5

Plant Throughput (fresh rock)

Mtpa

1.2

Gold Price

$/oz

1,200

Discount Rate

%

8%

Diesel Fuel Price

$/litre

1.0

Corporate Tax Rate

%

30%

ZAR/USD Exchange Rate

x

15

Refining, Transport, and Insurance Costs

$/oz

4

Stamp Duty on Gold Sale

%

0.6%

Net Smelter Royalty

%

3.0%


Table 2: Summary of Economic Analysis

Financial Summary Unit Value

LOM Tonnage Material Mined kt 228,795

LOM Tonnage Ore Mined kt 20,999

LOM Tonnage Ore Processed kt 21,759

LOM Feed Grade Processed g/t Au 2.80

LOM Gold Recovery % 93%

LOM Gold Production Oz Au 1,821,383

Production Period years 18.0

Pre-production Capital Costs $M 196

LOM Sustaining Capital Costs

(including mine closure and community investment)

$M 123

*Pre-Tax 8% NPV $M 266

*Post-Tax 8% NPV $M 196

Pre-Tax IRR % 44%

Post-Tax IRR % 38%

Undiscounted Payback Period years 1.2


*West African peers commonly use a 5% NPV which would compute to a Pre-tax NPV of $345 million and a Post-tax NPV of $257 million


Also included in these after-tax estimates are management fees paid to Avnel for the operation of the Kalana Main Mine (the "Mine Management Fee"). As per the Company's Operator Agreement with SOMIKA, the Mine Management Fee is calculated as 0.75% of turnover (gross revenue) and 2.5% of brut exploitation excess (or "EBE", which is equivalent to Earnings Before Interest, Taxes, and Depreciation or "EBITDA") as calculated in accordance with Le Système Comptable Ouest Africain ("SYSCOA").


Excluded from this analysis is SOMIKA's repayment of existing inter-company loans, accrued interest, and accrued Mine Management and Engineering Fees associated with the underground Kalana Gold Mine to Avnel. Avnel estimates that these amounts to approximately $115 million.

A sensitivity analysis was conducted on the Project model, to evaluate its robustness to variation in performance and financial input parameters. The NPV (at 8% discount rate) and IRR sensitivities are presented in Table 3.


Table 3: NPV and IRR Sensitivities

Post-Tax NPV

Post-Tax IRR

Scenario

Variation

($M)

(%)

Base Case

0

196

38%

Recovery Rate

-5%

156

33%

Gold Production

-10%

115

28%

Gold Price

-10%

115

28%

Gold Price

+10%

275

46%

All Operating Costs

+15%

132

32%

All Capital Costs

+10%

172

32%

Gold Recovery & Operating Costs

+5%, +10%

194

39%

Gold Price, Operating Costs & Capital Costs

+5%, +5%, +5%

203

37%

Gold Production, Gold Price & Operating

Costs

-5%, +10%, +10%

190

38%


Mining


The DFS' mine plan provides for 18 years of production from the Kalana Main deposit from a single open-pit with 12 stages as shown in Figure 1. A total of 228 million tonnes will be mined with LOM waste-to-ore ratio of 9.9:1 including the pre-strip. Production schedules are included in the appendix.


The deposit contains high grade mineralized zones that will be extracted by selective mining using 5m benches. Bulk mining of the waste zones will be conducted on 10m benches.


The mine area consists of a weathered zone to an average depth of 60 m below surface which is amenable to free digging. The mining schedule targets the areas of saprolite that will generate higher cash flow early in the mine life. The pre-strip of six months will provide ore stockpiles to enable higher grade ore to be processed in the early years of the mine life.


Mining will be conducted by the owner whilst maintenance of the open pit mining machinery will initially be carried out by the original equipment manufacturer to ensure fleet availability. The maintenance plan provides for a five-year handover period to the owner after completion of the initial capital purchase of the full fleet component.


As part of the DFS, Snowden examined the impact of a lower gold price of $1,000 per ounce on the mine plan and design schedule and cash flow. At this lower price, the mine plan would allow mining of all the current planned pit stages with the exception of stage 12 (see Figure 1). Stages 1 to 11 contain 60% of the reserve ore tonnes, 65% of the reserve gold ounces but only 54% of the waste tonnes. Approximately 50% of stages 1 to 11 are in the softer saprolite material which is mainly free- dig and requiring limited drilling and blasting.

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Georgia | Guernsey | Mali | All
Gold and Silver Prices for these countries : Georgia | Guernsey | Mali | All

Avnel Gold Mining Ltd.

EXPLORATION STAGE
CODE : AVK.TO
ISIN : GB00B09Y5410
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Avnel Gold Mining is a gold producing company based in United kingdom.

Its main exploration properties are KALANA GOLD MINE and FOUGADIAN PERMIT in Mali.

Avnel Gold Mining is listed in Canada. Its market capitalisation is CA$ 162.1 millions as of today (US$ 133.0 millions, € 111.4 millions).

Its stock quote reached its highest recent level on December 13, 2006 at CA$ 1.25, and its lowest recent point on December 19, 2008 at CA$ 0.02.

Avnel Gold Mining has 376 989 984 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Avnel Gold Mining Ltd.
Announces 2007 Annual Results - Period Ended December 31, 20...
Nominations of Avnel Gold Mining Ltd.
11/25/2013appoints Dr. Olivier Féménias as Vice President Geology
5/23/2013announces election of directors
8/5/2008Announces Appointment of Chief Financial Officer
3/27/2008Announces Appointment of Chief Operating Officer
10/16/2007Announces Appointment of VP Exploration
Financials of Avnel Gold Mining Ltd.
8/14/2008Announces Second Quarter 2008 Results
5/15/2008Announces First Quarter 2008 Results - Period ended March 31...
11/14/2007Announces Third Quarter 2007 Results
8/13/2007Announces Second Quarter 2007 Results - Period ended June 30...
5/14/2007Announces First Quarter 2007 Results
Project news of Avnel Gold Mining Ltd.
3/24/2014Avnel Announces new mineral resource estimate preliminary ec...
1/21/2011(Kalana Gold Mine)- KALANA UPDATE
3/26/2008(Fougadian Permit) has commenced drilling program on the major gold anomaly di...
Corporate news of Avnel Gold Mining Ltd.
5/26/2016Avnel Reports Results of Annual General Meeting
5/11/2016Avnel Reports Files First Quarter 2016 Financial Statements ...
5/6/2016Avnel Gold Files NI 43-101 Technical Report for the Kalana M...
3/30/2016Avnel Announces Definitive Feasibility Study Results for Kal...
3/30/2016Avnel Announces Filing of AIF and Year-End Consolidated Fina...
10/5/2015Avnel Reports That Measured Plus Indicated Resource Increase...
9/15/2015Avnel Successfully Concludes its 30,143 m Over 181 Holes Dri...
8/12/2015Avnel Reports Second Quarter 2015 Financial Results
7/20/2015Avnel Drills 174.0 g/t over 3 m, 6.0 g/t over 15 m, and 7.8 ...
7/16/2015Avnel Drills 174.0 g/t over 3 m, 6.0 g/t over 15 m, and 7.8 ...
4/17/2015Avnel Gold Mining Limited Announces C$12 Million Bought Deal...
4/17/2015IIROC Trade Resumption - CWT.UN; AVK
4/16/2015IIROC Trading Halt - AVK
3/31/2015Avnel Confirms Commencement of Drilling at Kalana Main and A...
3/30/2015Avnel Appoints Mr. Andrew King and Mr. Keith McCandlish to t...
3/26/2015Avnel Reports that Diluted Pit-Constrained Indicated Resourc...
3/26/2015Reports That Diluted Pit-Constrained Indicated Resources Inc...
2/5/2015Avnel Gold Announces Commencement of Definitive Feasibility ...
11/13/2014Avnel Gold Provides Kalana Main PFS Update and Reports Third...
11/13/2014Avnel Gold Provides Kalana Main PFS Update and Reports Third...
10/30/2014TSX Delisting Review - Avnel Gold Mining Limited (Symbol: AV...
10/15/2014Avnel Gold Reports that Indicated Resources Increased 55% to...
7/17/2014Avnel Announces Closing of Approximately C$9.9 Million Priva...
7/7/2014TSX Delisting Review - Avnel Gold Mining Limited (Symbol: AV...
6/26/2014Avnel Announces Proposed Private Placement of up to C$13.5 M...
5/23/2014Avnel Gold Announces 2014 AGM Results
5/14/2014Avnel Gold Mining Limited (AVK: TSX) announces first quarter...
4/1/2014Avnel Gold Mining (TSX:AVK) Files NI 43-101 Technical Report...
3/31/2014Avnel Gold Mining Limited (AVK: TSX) Announces 2013 Annual R...
3/24/2014Announces New Mineral Resource Estimate and Preliminary Econ...
3/24/2014Avnel Announces New Mineral Resource Estimate and Preliminar...
10/16/20072007 Toronto Resource Investment Conference
10/15/2007 Receives Recommendations for Extensive Drill Program to Inv...
9/17/2007Announces Strategic Review
7/18/2007Announces Exceptional Soil Geochemistry Results at its Fouga...
4/2/2007Production at the Kalana Gold mine increases
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (AVK.TO)
0.430-2.27%
TORONTO
CA$ 0.430
09/15 14:58 -0.010
-2.27%
Prev close Open
0.440 0.440
Low High
0.430 0.440
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.430 -%
Volume 1 month var.
200,500 -%
24hGold TrendPower© : 24
Produces
Develops
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/25/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.08+0.50%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 8.91-2.73%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.59-3.26%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.05+10.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.06+0.00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
 12.67+0.88%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.34+6.25%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+2.70%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
 1.77-2.21%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 40.37-0.22%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :
Take advantage of rising gold stocks
  • Subscribe to our weekly mining market briefing.
  • Receive our research reports on junior mining companies
    with the strongest potential
  • Free service, your email is safe
  • Limited offer, register now !
Go to website.