Pacific Rim Mining Corp

Published : April 10th, 2007

Balsamo Gold Zone on Pacific Rim Mining's El Dorado Project Continues to Yield High Gold Grades and

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Re:        2007 News Releases - Tuesday, April 10, 2007
Title:     Balsamo Gold Zone on Pacific Rim Mining's El Dorado Project Continues to Yield High Gold Grades and Take Shape

PMU News Release #07-05

Exploration drilling at the Balsamo gold zone on Pacific Rim Mining Corp.'s ("Pacific Rim" or "the Company") El Dorado gold project in El Salvador has yielded further bonanza gold grades including 42.18 g/t gold over 2.2 meters in drill hole P07-541, which adds vertical dimension to the growing deposit. A list of the most recent, material drill results is provided below.

Exploration drilling at the Balsamo gold zone continues to define a significant area of gold mineralization, which contains some of the highest grades and vein widths yet encountered within the El Dorado project. The north-south striking Balsamo gold zone has now been traced over a strike length of 400 meters and a vertical dimension of up to 250 meters. The upper elevations of this gold zone have been loosely defined and it remains open along strike and to depth.

Four drills are currently drilling at Balsamo and a fifth drill rig will be added within the next few weeks in order to delineate the gold zone as quickly as possible. The Company's objective is to have completed sufficient drilling at Balsamo to complete a resource estimate of the deposit before the end of 2007 and expand the current El Dorado resource. Because of its higher gold grades, wide vein widths, growing dimension and proximity to planned infrastructure, the Balsamo gold zone has the potential to positively impact the economics of the El Dorado operation being considered in the Company's El Dorado feasibility study, which will be completed once the Balsamo deposit has been delineated.

"El Dorado continues to expand with each drill phase," states Tom Shrake, President and CEO. "The grades and widths at the Balsamo discovery are very similar to the Minita deposit, as is its basic geometry. Both deposits are also controlled by identical intersecting fault systems. Like the South Minita deposit, Balsamo is completely blind, with no evidence of the vein on surface. These factors open up a large area within the El Dorado project for similar buried deposits, and we are imminently launching a detailed aeromagnetic survey to aid in the search for other blind deposits within the El Dorado project."

Latest El Dorado Project Drill Results

Hole No. Vein or System
Tested
UTM
Northing/Easting
Drill hole azimuth /dip
(degrees)
From
(meters down hole)
To
(meters down hole)
Intersection
(meters)
True Width
(meters)
Gold (g/t) Silver (g/t)
P07-540 Balsamo 300100 / 534879 263 / 52 325.05 325.45 0.4 0.4 10.31  
P07-541 Balsamo 300212 / 534852 270 / 65 361 362.6 1.6 1.4 11.86  
        374.8 376.2 2.8 2.2 42.18  
        398.2 398.9 0.7 0.6 38.44  
P07-545 Balsamo 300100 / 534879 258 / 70 No significant results
P07-546 Balsamo 300463 / 534946 281 / 48 210.10 211.95 1.85 1.75 9.08  
        215.2 215.95 0.75 0.7 16.29  
P07-547 Balsamo 301526 / 534852 256 / 50 No significant results
P07-548 Balsamo 300203 / 534734 275 / 45 211.00 214.75 3.75 3.6 8.41  
      including 211.00 212.95 1.95 1.9 13.10  
P07-549 Balsamo 300124 / 534767 292 / 70 310.85 314.35 3.50 2.80 14.95  
      including 313.2 314.35 1.15 1.10 19.60  
        323.95 327.15 3.20 2.35 14.79  
P07-550 Balsamo 300097 / 534955 260 / 68 No significant results
P07-551 Balsamo 300473 / 534778 260 / 60 305.20 305.45 0.25 0.20 16.08  
P07-552 Balsamo 300123 / 534765 270 / 50 No significant results
    301586 / 534793    

Readers are directed to the Company's website www.pacrim-mining.com and SEDAR filings www.sedar.com for complete drill results from the El Dorado project, details of the El Dorado resource and reserve calculations, and complete National Instrument 43-101 disclosure.

About Pacific Rim Mining Corp.
Pacific Rim is a growth-oriented, revenue-generating, environmentally and socially responsible gold exploration company with operational and exploration assets in North, Central and South America. The Company is expanding and developing its advanced-stage, high grade El Dorado gold project in El Salvador and is actively exploring a pipeline of grassroots gold projects. Pacific Rim's goal is to become a low cost, intermediate level gold producer.

On behalf of the board of directors,

"Thomas C. Shrake"

Thomas C. Shrake
President and CEO

Inquiries regarding this news release or Pacific Rim Mining can be directed to
Barbara Henderson, VP Investor Relations, at (604) 689-1976 or 1-888-775-7097.

NI 43-101 Disclosure
Pacific Rim's exploration work on the El Dorado project is supervised by William Gehlen a Certified Professional Geologist with the AIPG (No. 10626), an employee of Pacific Rim and a Qualified Person as defined in NI 43-101. Mr. Gehlen has verified that the results presented above have been accurately summarized from the official assay certificates provided to the Company. Pacific Rim's sampling procedures follow the Exploration Best Practices Guidelines outlined by the Mining Standards Task Force and adopted by The Toronto Stock Exchange. Samples have been assayed using fire assay with a gravimetric finish on a 30-gram split. Quality control measures, including check- and sample standard-assaying, are being implemented. Samples were assayed by Inspectorate America Corporation in Reno, Nevada USA, an ISO 9002 certified laboratory, independent of Pacific Rim Mining Corp.

The July 2006 El Dorado resource estimate was prepared by Mr. Steve Ristorcelli, P.Geo. of Mine Develoment Associates, Reno, Nevada. Mr. Ristorcelli is an independent Qualified Person as defined in NI 43-101. The resource estimate conforms to current CIM Standards on Mineral Resources and Reserves. A technical report in support of the updated El Dorado resource estimate presented above was filed with SEDAR on July 31, 2006. The report was co-authored by Mr. Steve Ristorcelli, P.Geo. and Mr. Peter Ronning, P.Eng., each of whom are independent Qualified Persons as defined in NI 43-101.

The January 2005 El Dorado pre-feasibility study is supported by a technical report prepared for Pacific Rim Mining Corp. by SRK Consulting (US) Inc. of Denver Colorado, entitled "Pre-Feasibility Study, El Dorado Project, El Salvador", dated January 21, 2005 and publicly available on SEDAR (www.sedar.com). The primary author of the report is Mr. William F. Tanaka, a Qualified Person independent of Pacific Rim, as defined in NI 43-101. Mr. Tanaka is a member of the Society of Mining Engineers (SME) and the Australasian Institute of Mining and Metallurgy (mAUSIMM).

Cautionary Note Regarding Forward-Looking Information
Information set forth in this document includes forward-looking statements. By their nature, forward-looking statements are subject to numerous risks and uncertainties, some of which are beyond Pacific Rim's control, including but not limited to: the timeframe and outcome of delineation of the Balsamo discovery and its potential impact on the El Dorado project; the eventual scope of the El Dorado feasibility study; the timeframe for completion of the El Dorado feasibility study; anticipated drilling plans for the El Dorado project; the nature of future results and potential for new discoveries at the El Dorado project; statements of the Minita deposit's economic potential; the timing and nature of economic analyses at the El Dorado project; the execution and outcome of current or future exploration activities; significant fluctuations in metal prices; general market and industry conditions; and other factors detailed in the Company's filings with Canadian regulatory agencies and the U.S. Securities and Exchange Commission.

Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements. Pacific Rim's actual results, programs and financial position could differ materially from those expressed in or implied by these forward-looking statements.

Cautionary Note to U.S. Investors - The United States Securities and Exchange Commission permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. This news release may include such terms as "measured," "indicated," and "inferred" "resources" that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. U.S. Investors are urged to consider closely the disclosure in our Form 20-F, File No. 001-31328, which may be secured from us, or from the SEC's website at www.sec.gov/edgar.shtml.

The TSX and the AMEX have neither reviewed nor accept responsibility for the adequacy or accuracy of this release.

Copyright © 2007 PACIFIC RIM MINING CORP. (PMU) All rights reserved. For more information visit our website at http://www.pacrim-mining.com/ or send email to info@pacrim-mining.com ..
Message sent on Tue Apr 10, 2007 at 8:13:06 AM Pacific Time
Data and Statistics for these countries : El Salvador | All
Gold and Silver Prices for these countries : El Salvador | All

Pacific Rim Mining Corp

PRODUCER
CODE : PMU.TO
CUSIP : 694915208
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Pacific Rim Mining is a gold and silver development stage company based in Canada.

Pacific Rim Mining holds various exploration projects in El Salvador.

Its main assets in production are DENTON RAWHIDE and DENTON-RAWHIDE in USA and its main exploration properties are SANTA RITA, ZAMORA AND CERRO COLORADO, EL DORADO PROJECT - BALSAMO, EL DORADO EL SALVADOR, EL DORADO PROJECT - SOUTH MINITA, EL DORADO PROJECT - MINITA, EL DORADO PROJECT - NANCE DULCE, EL DORADO PROJECT - COYOTERA and EL DORADO PROJECT - NUEVA ESPERANZA in El Salvador.

Pacific Rim Mining is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 14.8 millions as of today (US$ 13.9 millions, € 10.2 millions).

Its stock quote reached its highest recent level on December 31, 2003 at CA$ 2.39, and its lowest recent point on October 11, 2013 at CA$ 0.04.

Pacific Rim Mining has 210 952 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Pacific Rim Mining Corp
10/4/2012Closes Private Placement Financing
4/20/2011Financing Increased
4/7/2011Undertaking Financing
1/14/2010Closes Private Placement Financing
8/28/2009Resolution to Extend Expiration Date of Warrants Passed at P...
2/29/2008 Closes Private Placement Financing
Nominations of Pacific Rim Mining Corp
3/7/2012Announces Changes to Board of Directors
Financials of Pacific Rim Mining Corp
7/25/2013Announces Fiscal 2013 Year End Results
12/11/2012Announces Fiscal 2013 Second Quarter Results
9/7/2012Announces Fiscal 2013 First Quarter Results
7/27/2012Announces Fiscal 2012 Year End Results
3/5/2012Announces Fiscal 2012 Third Quarter Results
12/13/2011Announces Fiscal 2012 Second Quarter Results
9/15/2011Announces Fiscal 2012 First Quarter Results
7/27/2011Announces Fiscal 2011 Year End Results
3/16/2010Announces Fiscal 2010 Third Quarter Results
12/7/2009Announces Fiscal 2010 Second Quarter Results
9/10/2009Announces Fiscal 2010 First Quarter Results
12/15/2008Announces Fiscal 2009 Second Quarterly Results
9/12/2008Announces Fiscal 2009 First Quarterly Results
3/11/2008Announces Fiscal 2008 Third Quarter Results
12/11/2007 Announces Fiscal 2008 Second Quarter Results
9/11/2007Announces Fiscal 2008 First Quarter Results
3/13/2007Pacific Rim Announces Fiscal 2007 Third Quarter Results
Project news of Pacific Rim Mining Corp
7/3/2008(El Dorado El Salvador)Suspends Further Drilling in El Salvador Until Mining Permit...
1/23/2008Surface Trenching at Santa Rita Project Reveals High Grade G...
1/17/2008(El Dorado El Salvador)El Dorado Gold Project M&I Resources Top 1.4 Million Gold Eq...
8/2/2007(El Dorado Project - South Minita)'s Balsamo Gold Deposit Delineation Nearing Completion; Anot...
4/10/2007(El Dorado - Pacific Rim)Balsamo Gold Zone on Pacific Rim Mining's El Dorado Project ...
3/27/2007Zamora Project Yields High Grade Gold in Surface Trenching
Corporate news of Pacific Rim Mining Corp
12/2/2013Shareholders Approve Plan of Arrangement and Final Court App...
11/27/2013OceanaGold and Pacific Rim Mining Complete Plan of Arrangeme...
11/12/2013ISS And Glass Lewis Recommend Pacific Rim Mining Shareholder...
10/28/2013Mails Information Circular in Connection With Special Meetin...
10/8/2013OceanaGold Agrees to Acquire Pacific Rim Mining
9/16/2013Announces Results of Annual General Meeting of Shareholders
6/7/2013Adopts Advance Notice and Majority Voting Policies
6/7/2013Adopts Advance Notice and Majority Voting Policies
5/6/2013Announces Termination of the Hog Ranch Option Agreement and ...
4/1/2013Statement Filed in Arbitration Case Against El Salvador; Pac...
3/13/2013Announces Fiscal 2013 Third Quarter Results
10/25/2012Negotiates Set Fee Structure for Final Phase of ICSID Arbitr...
9/25/2012OceanaGold Corporation Takes Placement in Pacific Rim Mining...
6/4/2012World Bank Tribunal Allows Pacific Rim Subsidiary to Continu...
6/4/2012World Bank Tribunal Allows Pacific Rim Subsidiary to Continu...
4/30/2012Provides a Progress Report on Activities in El Salvador and ...
6/14/2011Finalizes Hog Ranch Property Joint Venture Acquisition
5/2/2011CAFTA Hearing on Jurisdiction Objection Underway
3/30/2011Signs Letter of Intent to Acquire Majority Interest in Hog R...
3/22/2011Upcoming CAFTA Hearings Delayed
8/19/2010Notifies NYSE Amex of its Intent to Delist
8/3/2010ICSID Tribunal Rejects Government of El Salvador's Prelimina...
5/31/2010Cafta Hearing On Preliminary Objection Underway
3/4/2010Provides Update on Exploration Focus and CAFTA Proceedings
2/11/2010NYSE Amex Accepts Pacific Rim Mining's Compliance Plan
12/11/2009Undertaking Financing
11/19/2009CAFTA Proceedings Begin as Tribunal Constituted
11/12/2009Receives NYSE Amex Notification
7/24/2009Announces Fiscal 2009 Year End Results
2/12/2009Defers Completion of El Dorado Fesibility Study
12/9/2008Files Notice of Intent to Seek CAFTA Arbitration
9/19/2008Announces Head Office Cutbacks
7/22/2008Announces Fiscal 2008 Year End Results
2/14/2008 Financing Increased to 6,711,000 Units
2/6/2008Undertaking Financing
11/7/2007Denton-Rawhide Land Sale Closing Date Extended
10/25/2007 Contact Information Update
7/23/2007Announces 2007 Year-End Results
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (PMU.TO)FRANKFURT (PRM.F)
0.070+0.00%9.92+0.43%
TORONTO
CA$ 0.070
12/02 15:48 -
0%
Prev close Open
0.070 0.070
Low High
0.070 0.070
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.070 -%
Volume 1 month var.
100,000 -%
24hGold TrendPower© : 24
Produces Gold - Silver
Develops
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/20/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.31%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :