Barkerville Gold Mines Reports Remaining 2011 Drill Results
Vancouver, BC -- Barkerville Gold Mines Ltd. (TSXV: BGM) (the "Company") reports results from the remaining drill holes completed in 2011. These results are part of the 57,742 metre 2011 drill program focusing on Cow Mountain and Barkerville Mountain.

Jack Miller, Acting CEO comments, "The significant gold intercepts in multiple areas within our large land package are very encouraging. The next step will be updated resource estimates. All of the 2011 results along with historical information are being reviewed to help define future development exploration programs for the area."

Significant Diamond drill hole intercepts received from the remaining holes completed in 2011 are given in Tables 1, 2 and 3 while highlights are given below.

1. Cow Mountain
Drilling in this area targeted potential mineralized areas in and around the existing historical Gold Quartz resource estimate issued in 2006 on Cow Mountain. Highlights from the remaining 51 of 167 holes completed in 2011 are given below (see Table 1 for a more detailed list of significant intercepts).

DDH# FROM TO WIDTH Au Ag
FEET METRE g/T oz/t g/T
CM11-70A 107.3 137.8 30.5 9.3 1.276* 0.037* N/S
180.8 196.8 16 4.9 7.635* 0.223* N/S
399.6 423.2 23.6 7.2 3.972* 0.116* N/S
610.2 629.9 19.7 6 13.51* 0.394* N/S
846.4 851.6 5.2 1.6 1.039 0.03 N/S
CM11-137 68.9 91.5 22.6 6.9 1.216 0.035 N/S
99.7 108.3 8.6 2.6 34.92 1.018 8.5
121.3 127 5.7 1.7 26.37 0.769 3.0
153.3 158.8 5.5 1.7 3.678 0.107 N/S
HOLE ABANDONED DUE TO CUTTING INTO A SHAFT
CM11-112 224.6 238.7 14.1 4.3 2.435* 0.071* N/A
550.6 557.9 7.3 2.2 8.289 0.242 N/A
CM11-117 178.2 187 8.8 2.7 1.697* 0.049* 3.7*
318.9 320.2 1.3 0.4 23.9 0.697 1.1
361.8 368 6.2 1.9 9.790* 0.286* N/A
404.6 406.8 2.2 0.7 1.408 0.041 N/A
HOLE ABANDONED DUE TO CUTTING INTO A STOPE
CM11-127 209.3 217 7.7 2.3 5.799 0.169 N/A
338 347.7 9.7 3.0 1.134* 0.033* N/A
380.5 389.3 8.8 2.7 1.649 0.048 N/A
591.9 593.1 1.2 0.4 6.101 0.178 N/A
637.7 657.5 19.8 6.0 1.641* 0.048* N/A
688.8 692.8 4.0 1.2 16.4 0.478 1.1
CM11-128 456.2 458.6 2.4 0.7 6.211 0.181 N/A
914.6 917 2.4 0.7 1.123 0.033 N/A
924.5 933.7 9.2 2.8 2.751* 0.082* N/A
945.3 952.5 7.2 2.2 10.16* 0.296* N/A
CM11-132 448.2 462.6 14.4 4.4 8.414* 0.245* N/S
including
458 462.6 4.6 1.4 22.96 0.67 3.3
601.2 614.4 13.2 4.0 6.763* 0.197* 1.5*
including
610.2 614.4 4.2 1.3 17.62 0.514 2.1
CM11-153 449.5 456.2 6.7 2.0 14.84 0.433 1.0
722 727 5.0 1.5 2.09 0.061 N/A
CM11-146 409.2 411.5 2.3 0.7 12.07 0.352 1.0
457 464.5 7.5 2.3 1.291 0.038 N/A
468.3 469.6 1.3 0.4 6.297 0.184 1.1
478.4 482 3.6 1.1 14.96 0.436 N/A
483.4 491 7.6 2.3 7.458* 0.218* N/A
CM11-148 151.4 187 35.6 10.9 8.544* 0.249* N/A
including
161.4 187 25.6 7.8 11.32* 0.330* 1.0*
including
161.4 177.2 15.8 4.8 17.65* 0.515* 1.6*
325.5 353.4 27.9 8.5 3.285* 0.096* N/A
including
325.5 337 11.5 3.5 6.411* 0.187* N/A
444 455.9 11.9 3.6 4.315* 0.126* N/A
1099 1100 1 0.3 7.879 0.23 2.4
CM11-145 54.3 66.4 12.1 3.7 1.234* 0.036* N/A
83.7 84.4 0.7 0.2 1.02 0.03 N/A
96.2 122.3 26.1 8.0 5.875* 0.171* N/A
including
96.2 103.2 7.0 2.1 14.72 0.429 1.9
156.3 157.3 1.0 0.3 2.764 0.081 N/A
CM11-131 467.4 472 4.6 1.4 2.985 0.087 N/S
481 494.8 13.8 4.2 15.16* 0.442* N/S
520.7 537.8 17.1 5.2 10.14* 0.296* 1.1
including
481 485.4 4.4 1.3 33.51 0.977 5.8
520.7 537.8 17.1 5.2 10.14* 0.296* 1.1
920 924.5 4.5 1.4 4.112 0.12 5.5
1192.5 1193.6 1.1 0.3 3.734 0.109 N/S
1510.7 1513.4 2.7 0.8 32.14 0.937 N/S
Note: N/S - no significant assay; * weighted arithmetic average
All the intercepts described above may not be true width due to the geological complexity of the area. This issue may be resolved during future 3D geological modeling.


2. Barkerville Mountain
Drilling in this area predominately targeted a section of the BC Vein located between the Bonanza Ledge gold deposit and the Goldfinch Fault zone on Barkerville Mountain. Highlights from the remaining 6 of 29 holes completed in 2011 are given below (see Table 2 for a more detailed list of significant intercepts).

DDH# From To Width Au Ag True
Feet Metre g/T oz/t g/T Width (ft)
BCV11-26 385.8 404.6 18.8 5.7 13.04* 0.380* 6.3* 15.0
Including  
385.8 388.1 2.3 0.7 85.47 2.493 38.7  
BCV11-29 393.6 423.0 29.4 9.0 14.95* 0.436* 1.5 24.0
Including  
393.6 402.6 9.0 2.7 23.79* 0.694* 1.7*  
Note: * weighted arithmetic average

The BC Vein has been identified by drilling over a strike length of 2.2 km, varying in depth up to 293 metres and in thickness up to 36 metres. Since 1999, 230 drill holes have been completed on and around the BC Vein.


3. Water Monitoring Holes
These holes were drilled as part of the water monitoring program for the Cow Mountain and Barkerville Mountain areas. They are away from any existing resource estimates. As a routine check, all holes are logged and assayed if the rock looks interesting. Highlights from the remaining 22 holes completed in 2011 are given below (see Table 3 for a more detailed list of significant intercepts).

DDH# FROM TO WIDTH Au Ag
FEET METRE g/T oz/t g/T
CMW11-01 125.4 129 3.6 1.1 12.5 0.365 N/A
CMW11-01A 68.4 69.7 1.3 0.4 14 0.408 N/A
74.7 76 1.3 0 5.3 0.155 N/A
CMW11-03 186 190.6 4.6 1.4 4.75 0.139 N/A
235.2 246 10.8 3.3 3.81* 0.111* N/A
Including
235.2 237.3 2.1 0.6 10 0.292 N/A
730.6 734.1 3.5 1.1 18.2 0.531 N/A
CMW11-03A 105.5 125.3 19.8 6.0 5.31* 0.155* 17.5*
CMW11-04 232.6 236.6 4.0 1.2 27.5 0.802 1.6
316 318.5 2.5 0.8 4.95 0.144 N/A
446 456.5 10.5 3.2 2.45 0.071 1.0
BMW11-07 447.2 448.8 1.6 0.5 3.72 0.108 1.2
460.9 462.5 1.6 0.5 16.95 0.494 2.1
490.8 496 5.2 1.6 1.845 0.054 2.5
Note: N/S - no significant assay; * weighted arithmetic average
All the intercepts described above may not be true width due to the geological complexity of the area. This issue may be resolved during future 3D geological modeling.


Drill core processing included descriptive logging and sampling for geochemical analyses. The NQ & NQ2-size drill core was cut/split in two halves using saws or a splitter at the Company's Lowhee Creek Compound in Wells-Barkerville, central B.C. One-half of the core is put in a plastic sample bag and the remaining half is returned to the core box. A number of these plastic sample bags are placed in the rice bags at the mine site until the rice bags weighs approximately 10 kilograms. The rice bags are transported by BGM's personnel to a shipping company in Quesnel for trans-shipment to ALS Minerals in North Vancouver or Inspectorate Exploration & Services Ltd. in Richmond, B.C. for analysis. Sample preparation and geochemical assaying is done at each lab, following their own internal standards for quality control and verification. The gold assaying method uses a standard fire assay with AA finish and a metallic gold assay for those samples with visible gold. Both ALS and Inspectorate are certified under the Assayers Certification Program of B.C.

The technical information in this News Release has been reviewed and approved by Chief Geologist Jim Yin, PhD, P.Geo, a qualified person as defined in National Instrument 43-101.


About Barkerville Gold Mines Ltd.

Since the mid 1990s the Company has focused on exploration and development of gold projects in the Cariboo Mining District in central B.C. The Company's mineral tenures now cover over 117,691.14 hectares, encompassing seven past producing hard rock mines and three NI 43-101 gold deposits, including the QR Mine & Mill. The QR Property was acquired in February 2010 and includes a 900 tonne/day gold milling facility and a permitted gold mine located approximately 110 kilometers by highway and all-weather road from the Barkerville Gold Camp. In November 2010, the Company acquired a second permitted mill currently on care and maintenance in Revelstoke, B.C. In November 2010 the Company and the Lhtako Dene First Nation also signed a Project Agreement in relation to its Bonanza Ledge and Cariboo Gold Projects. On December 5, 2011 the Company received under the British Columbia Mines Act, their Mine Permit approving the Mine Plan and Reclamation Program for Bonanza Ledge. The Company has completed significant drilling and exploration programs and together with the historical data is compiling all information to determine geologic models and update mineral resource estimates to continue with exploration and development of the Cariboo Gold Projects.


Table 1. COW MOUNTAIN - SIGNIFICANT INTERCEPTS (values >= 1 g/T)

PAD # DIP DDH# FROM TO WIDTH Au Ag
FEET METRE g/T oz/t g/T
S -44.5 CM11-41 HOLE ABANDONED BEFORE TARGET DUE TO POOR GROUND
-59.6 CM11-42 HOLE ABANDONED BEFORE TARGET DUE TO POOR GROUND
-54.9 CM11-65 126.3 128.9 2.6 0.8 1.203 0.035 N/S
HOLE GOT STUCK AND ABANDONED
-54.4 CM11-65A 147 148.3 1.3 0.4 3.394 0.099 N/S
252.6 256.5 3.9 1.2 23.05 0.672 5.0
267.3 271.8 4.5 1.4 10.2 0.297 1.3
HOLE ABANDONED BEFORE TARGET DUE TO POOR GROUND
T -68.1 CM11-64 130.1 133.5 3.4 1.0 8.206 0.239 N/S
408.6 419.4 10.8 3.3 3.421* 0.100* N/S
including
408.6 413.4 4.8 1.5 7.069* 0.206* N/S
including
408.6 409.6 1.0 0.3 23.54 0.687 1.0
497.3 498.3 1.0 0.3 4.578 0.134 N/S
503.2 507.4 4.2 1.3 1.138 0.033 N/S
516.3 520.6 4.3 1.3 1.225 0.036 N/S
541.3 544.3 3.0 0.9 4.128 0.12 N/S
964.6 970.7 6.1 1.9 20.3 0.592 1.1
Z10 -54.6 CM11-66 311.7 315.8 4.1 1.2 1.219 0.036 N/S
390.8 405.4 14.6 4.5 1.435* 0.042* N/S
926.2 934.8 8.6 2.6 1.079* 0.031* N/S
1170.7 1176.8 6.1 1.9 1.129 0.033 N/S
1227.6 1234.4 6.8 2.1 3.125 0.091 N/S
-65.5 CM11-67 162.3 180.8 18.5 5.6 3.725* 0.109* N/S
537.4 538.4 1.0 0.3 4.872 0.142 N/S
802.1 809.6 7.5 2.3 2.529 0.074 N/S
-52.8 CM11-68 23.4 40.2 16.8 5.1 5.812* 0.170* N/S
HOLE ABANDONED DUE TO CUTTING INTO A SHAFT
-70 CM11-69 32.8 38.9 6.1 1.9 11.62 0.339 N/S
514.8 517.5 2.7 0.8 3.193 0.093 3.2
Z6 -48.6 CM11-70 78.7 108.3 29.6 9.0 3.594* 0.105* N/S
128 137.8 9.8 3.0 1.61 0.047  
HOLE ABANDONED DUE TO POOR GROUND
-50.1 CM11-70A 107.3 137.8 30.5 9.3 1.276* 0.037* N/S
180.8 196.8 16 4.9 7.635* 0.223* N/S
399.6 423.2 23.6 7.2 3.972* 0.116* N/S
610.2 629.9 19.7 6.0 13.51* 0.394* N/S
846.4 851.6 5.2 1.6 1.039 0.03 N/S
-58.9 CM11-137 68.9 91.5 22.6 6.9 1.216 0.035 N/S
99.7 108.3 8.6 2.6 34.92 1.018 8.5
121.3 127 5.7 1.7 26.37 0.769 3.0
153.3 158.8 5.5 1.7 3.678 0.107 N/S
HOLE ABANDONED DUE TO CUTTING INTO A SHAFT
Y4 -44.3 CM11-107 455.5 459.5 4.0 1.2 2.009 0.059 N/S
732.5 748.7 16.2 4.9 3.567* 0.104* N/S
963 983.7 20.7 6.3 3.007* 0.088* N/S
X8 -59 CM11-110 149.1 150.5 1.4 0.4 3.184 0.093 N/A
301.6 303.7 2.1 0.6 1.561 0.046 N/A
330.3 335.3 5.0 1.5 1.515 0.044 N/A
920.7 922.9 2.2 0.7 1.741 0.051 1.8
Z8 -44.3 CM11-111 HOLE ABANDONED DUE TO CUTTING INTO A SHAFT
-70.6 CM11-111A 54.7 61.6 6.9 2.1 2.914 0.085 N/A
HOLE ABANDONED DUE TO CUTTING INTO A SHAFT
X9 -45.6 CM11-112 224.6 238.7 14.1 4.3 2.435* 0.071* N/A
550.6 557.9 7.3 2.2 8.289 0.242 N/A
-60.8 CM11-113 99 100.4 1.4 0.4 2.048 0.06 N/A
145 151.1 6.1 1.9 1.508* 0.044* N/A
414 417.2 3.2 1.0 1.601 0.047 N/A
451.2 453.2 2.0 0.6 5.384 0.157 N/A
629 630.1 1.1 0.3 10.41 0.304 2.6
658.9 662.3 3.4 1.0 1.675 0.049 N/A
767.7 773.4 5.7 1.7 2.042 0.06 N/A
786.3 793.6 7.3 2.2 1.545 0.045 N/A
859 864.3 5.3 1.6 4.128 0.12 N/A
-42.4 CM11-114 262.5 266.2 3.7 1.1 1.112 0.032 N/A
376 377 1.0 0.3 1.381 0.04 N/A
388 395 7.0 2.1 2.761 0.081 N/A
HOLE ABANDONED DUE TO CUTTING INTO A STOPE
-58.9 CM11-115 35 48.7 13.7 4.2 2.184* 0.064* N/A
Y -56.1 CM11-116 237.9 239.5 1.6 0.5 4.623 0.135 N/A
865.9 872.2 6.3 1.9 1.012 0.03 N/A
891.5 897.2 5.7 1.7 1.017* 0.030* N/A
903 911.3 8.3 2.5 1.062* 0.031* N/A
938.3 939.6 1.3 0.4 7.402 0.216 1.0
-70.7 CM11-117 178.2 187 8.8 2.7 1.697* 0.049* 3.7*
318.9 320.2 1.3 0.4 23.9 0.697 1.1
361.8 368 6.2 1.9 9.790* 0.286* N/A
404.6 406.8 2.2 0.7 1.408 0.041 N/A
HOLE ABANDONED DUE TO CUTTING INTO A STOPE
Y3 -46.2 CM11-118 90.5 93 2.5 0.8 34.92 1.019 1.9
145 153.6 8.6 2.6 5.563* 0.162* N/A
including
150.6 153.6 3.0 0.9 13.32 0.389 2.1
166.3 168.6 2.3 0.7 21.09 0.615 1.0
239.4 245.7 6.3 1.9 1.131 0.033 N/A
256.5 258.9 2.4 0.7 2.666 0.078 2.4
531.5 535.6 4.1 1.2 3.601 0.105 N/A
572.1 573.9 1.8 0.5 2.618 0.076 N/A
673.4 680.9 7.5 2.3 1.618 0.047 N/A
891.6 893.1 1.5 0.5 2.498 0.073 N/A
997.9 999.4 1.5 0.5 3.364 0.098 3.7
1035.8 1038.2 2.4 0.7 5.337 0.156 N/A
-59.7 CM11-119 140.2 141.7 1.5 0.5 12.58 0.367 N/A
176.8 180.5 3.7 1.1 2.973 0.087 N/A
322.2 331.1 8.9 2.7 4.154 0.121 N/A
352.3 355 2.7 0.8 2.126 0.062 N/A
Z -59.3 CM11-127 209.3 217 7.7 2.3 5.799 0.169 N/A
338 347.7 9.7 3.0 1.134* 0.033* N/A
380.5 389.3 8.8 2.7 1.649 0.048 N/A
591.9 593.1 1.2 0.4 6.101 0.178 N/A
637.7 657.5 19.8 6.0 1.641* 0.048* N/A
688.8 692.8 4.0 1.2 16.4 0.478 1.1
Z1 -46.4 CM11-128 456.2 458.6 2.4 0.7 6.211 0.181 N/A
914.6 917 2.4 0.7 1.123 0.033 N/A
924.5 933.7 9.2 2.8 2.751* 0.082* N/A
945.3 952.5 7.2 2.2 10.16* 0.296* N/A
-58.6 CM11-129 452.2 460.8 8.6 2.6 4.599* 0.134* N/A
482 487 5.0 1.5 2.451 0.071 N/A
614 617 3.0 0.9 7.157 0.209 1.9
629.3 630.5 1.2 0.4 1.993 0.058 1.0
763 777 14 4.3 1.069* 0.031* N/A
943.2 944.4 1.2 0.4 1.179 1.993 N/A
-46.8 CM11-154 NO SIGNIFICANT ASSAY
HOLE ABANDONED BEFORE TARGET DUE TO CUTTING INTO A STOPE
-53.9 CM11-155 NO SIGNIFICANT ASSAY
HOLE ABANDONED BEFORE TARGET DUE TO CUTTING INTO A STOPE
Z4 -55.4 CM11-131 467.4 472 4.6 1.4 2.985 0.087 N/S
481 494.8 13.8 4.2 15.16* 0.442* N/S
520.7 537.8 17.1 5.2 10.14* 0.296* 1.1
including
481 485.4 4.4 1.3 33.51 0.977 5.8
520.7 537.8 17.1 5.2 10.14* 0.296* 1.1
920 924.5 4.5 1.4 4.112 0.12 5.5
1192.5 1193.6 1.1 0.3 3.734 0.109 N/S
1510.7 1513.4 2.7 0.8 32.14 0.937 N/S
-70 CM11-132 448.2 462.6 14.4 4.4 8.414* 0.245* N/S
including
458 462.6 4.6 1.4 22.96 0.67 3.3
601.2 614.4 13.2 4.0 6.763* 0.197* 1.5*
including
610.2 614.4 4.2 1.3 17.62 0.514 2.1
Z5 -46.3 CM11-133 128.3 137.4 9.1 2.8 6.129 0.179 N/A
311.5 312.5 1.0 0.3 1.304 0.038 N/S
720.3 721.7 1.4 0.4 7.176 0.209 N/S
731.2 733.4 2.2 0.7 1.516 0.044 N/S
851.4 861.6 10.2 3.1 4.579* 0.134* N/S
936.7 950.9 14.2 4.3 6.225* 0.182* N/A
-60.8 CM11-134 401.1 402 0.9 0.3 43.87 1.279 N/A
610.2 615.5 5.3 1.6 2.378 0.069 N/S
HOLE ABANDONED BEFORE TARGET DUE TO CUTTING INTO A STOPE
-46.5 CM11-135 HOLE ABANDONED BEFORE TARGET DUE TO CUTTING INTO A STOPE
-60.2 CM11-136 HOLE ABANDONED BEFORE TARGET DUE TO CUTTING INTO A STOPE
Z16 -54.8 CM11-141 536.4 537.6 1.2 0.4 26.38 0.77 1.5
547 549.2 2.2 0.7 7.884 0.23 1.1
566.2 567.9 1.7 0.5 20.01 0.584 3.5
HOLE ABANDONED BEFORE TARGET DUE TO CUTTING INTO A STOPE
-64.9 CM11-141A 80.4 85.2 4.8 1.5 2.693 0.079 N/A
265.6 271.3 5.7 1.7 8.333* 0.243* N/A
410.5 413.5 3.0 0.9 2.964 0.086 N/A
570.9 571.5 0.6 0.2 3.167 0.092 N/A
611.1 614.7 3.6 1.1 45.61 1.33 2.2
663.4 666.8 3.4 1.0 20.26 0.591 N/A
716.4 718.6 2.2 0.7 2.725 0.079 1.3
1132 1138.6 6.6 2.0 10.54* 0.307* N/A
including
1137.6 1138.6 1.0 0.3 28.38 0.828 2.7
1293.1 1298.3 5.2 1.6 2.775 0.081 N/A
Y6 -47.9 CM11-142 737 744.8 7.8 2.4 6.999* 0.204* 1.6*
including
743.2 744.8 1.6 0.5 15.85 0.462 6.2
-62.9 CM11-143 543.5 551 7.5 2.3 1.588 0.046 1.9
HOLE ABANDONED BEFORE TARGET DUE TO CUTTING INTO A STOPE
-46.4 CM11-144 375.4 377.8 2.4 0.7 25.54 0.745 4.4
555 559.7 4.7 1.4 1.126 0.033 N/A
585.2 587 1.8 0.5 6.085 0.177 N/A
-60.5 CM11-151 470.3 476.3 6.0 1.8 8.515 0.248 N/A
727 734.8 7.8 2.4 1.61 0.047 N/A
-47.6 CM11-152 345.5 352.6 7.1 2.2 4.882 0.142 N/A
HOLE ABANDONED BEFORE TARGET DUE TO CUTTING INTO A STOPE
-66.3 CM11-153 449.5 456.2 6.7 2.0 14.84 0.433 1.0
722 727 5.0 1.5 2.09 0.061 N/A
Y5 -44.4 CM11-146 409.2 411.5 2.3 0.7 12.07 0.352 1.0
457 464.5 7.5 2.3 1.291 0.038 N/A
468.3 469.6 1.3 0.4 6.297 0.184 1.1
478.4 482 3.6 1.1 14.96 0.436 N/A
483.4 491 7.6 2.3 7.458* 0.218* N/A
-60 CM11-147 647.8 650.9 3.1 0.9 4.612 0.135 N/A
703.6 715.5 11.9 3.6 2.011* 0.059* N/A
811.2 813.1 1.9 0.6 2.707 0.079 N/A
902.9 911.3 8.4 2.6 10.23* 0.298* 3.6*
960.9 963.6 2.7 0.8 15.11 0.441 1.4
1141.3 1143.7 2.4 0.7 7.765 0.226 N/A
1234.1 1238.2 4.1 1.2 1.563 0.046 N/A
-46 CM11-148 151.4 187 35.6 10.9 8.544* 0.249* N/A
including
161.4 187 25.6 7.8 11.32* 0.330* 1.0*
including
161.4 177.2 15.8 4.8 17.65* 0.515* 1.6*
325.5 353.4 27.9 8.5 3.285* 0.096* N/A
including
325.5 337 11.5 3.5 6.411* 0.187* N/A
444 455.9 11.9 3.6 4.315* 0.126* N/A
1099 1100 1.0 0.3 7.879 0.23 2.4
-60 CM11-149 95 101.8 6.8 2.1 1.233 0.036 N/A
200 201 1.0 0.3 47.46 1.384 58.1
210 216.7 6.7 2.0 1.188 0.035 N/A
700.3 707 6.7 2.0 1.703* 0.050* N/A
747.7 751.6 3.9 1.2 8.264 0.241 1.6
933.8 935 1.2 0.4 1.182 0.034 1.3
947.7 949.2 1.5 0.5 1.582 0.046 1.0
Z9 -48.5 CM11-150 57 68.1 11.1 3.4 1.919* 0.056* N/A
79.6 87 7.4 2.3 1.092* 0.032* N/A
149.2 150.2 1 0.3 4.445 0.13 N/A
165.4 172 6.6 2.0 6.958 0.203 N/A
846.2 847.6 1.4 0.4 1.178 0.034 6.7
-60 CM11-145 54.3 66.4 12.1 3.7 1.234* 0.036* N/A
83.7 84.4 0.7 0.2 1.02 0.03 N/A
96.2 122.3 26.1 8.0 5.875* 0.171* N/A
including
96.2 103.2 7.0 2.1 14.72 0.429 1.9
156.3 157.3 1.0 0.3 2.764 0.081 N/A
Y7 -50.3 CM11-156 256.1 266.4 10.3 3.1 3.316 0.097 1.3
317 320.4 3.4 1.0 6.67 0.195 1.6
-63.1 CM11-157 387 397 10 3.0 4.009 0.117 N/A
730.3 737 6.7 2.0 3.262 0.095 1.6
789.7 795.8 6.1 1.9 1.675 0.049 N/A
Note: N/S - no significant assay; * weighted arithmetic average
All the intercepts described above may not be true width due to the complexity of the area. This issue may be resolved during future 3D geological modeling of the structures.


Assay results of 167 drill holes (141,151.2 feet) were reviewed for this table. A total of 51 holes had significant intercepts. These are the last holes to be assayed from the 2011 drill campaign.

Table 2. BARKERVILLE MOUNTAIN - SIGNIFICANT INTERCEPTS (values >= 1 g/T)

DDH# FROM TO WIDTH Au Ag True
FEET METRE g/T oz/t g/T Width (ft)
BCV11-24 207.0 221.2 14.2 4.3 1.303* 0.038* N/S 11.2
405.0 413.3 8.3 2.5 2.252* 0.066* 1.5 6.5
510.4 512.6 2.2 0.7 1.702 0.050 N/S 1.7
BCV11-25 294.4 297.7 3.3 1.0 1.866 0.054 N/S 3.1
328.8 332.4 3.6 1.1 26.12 0.762 5.9 3.4
377.0 380.4 3.4 1.0 1.138 0.033 N/S 3.2
440.5 447.0 6.5 2.0 1.938 0.057 N/S 6.1
BCV11-26 385.8 404.6 18.8 5.7 13.04* 0.380* 6.3* 15.0
Including  
385.8 388.1 2.3 0.7 85.47 2.493 38.7 1.8
617.0 622.4 5.4 1.6 1.8 0.052 N/S 4.2
BCV11-27 577.0 587.0 10.0 3.0 1.060 0.031 N/S 6.0
BCV11-28 96.0 103.0 7.0 2.1 2.579 0.075 N/S 6.4
300.6 306.2 5.6 1.7 2.568* 0.075* N/S 5.1
399.8 404.5 4.7 1.4 1.470 0.043 1.1 4.3
536.6 540.0 3.4 1.0 7.388 0.215 1.6 3.1
562.1 570.6 8.5 2.6 1.723* 0.050* N/S 7.8
BCV11-29 262.2 270.1 7.9 2.4 8.754 0.255 N/S 6.2
301.7 315.4 13.7 4.2 1.380* 0.040* N/S 10.8
393.6 423.0 29.4 9.0 14.95* 0.436* 1.5 24.0
Including  
393.6 402.6 9.0 2.7 23.79* 0.694* 1.7* 7.1
Note: N/S - no significant assay; * weighted arithmetic average

Assay results of 29 drill holes (30,460.8 feet) reviewed for this table. A total of six holes had significant intercepts. These are the last holes to be assayed from the 2011 drill campaign.

Table 3. WATER MONITORING HOLES - SIGNIFICANT INTERCEPTS (values >= 1 g/T)

PAD # DIP DDH# FROM TO WIDTH Au Ag
FEET METRE g/T oz/t g/T
A -89.4 CMW11-01 125.4 129.0 3.6 1.1 12.5 0.365 N/A
-90.0 CMW11-01A 68.4 69.7 1.3 0.4 14.0 0.408 N/A
74.7 76.0 1.3 0.0 5.30 0.155 N/A
B -86.8 CMW11-02 No Significant (> & = 1.0 g/T Au) Assay
C -88.8 CMW11-03 186.0 190.6 4.6 1.4 4.75 0.139 N/A
235.2 246.0 10.8 3.3 3.81* 0.111* N/A
Including
235.2 237.3 2.1 0.6 10 0.292 N/A
730.6 734.1 3.5 1.1 18.2 0.531 N/A
-88.6 CMW11-03A 105.5 125.3 19.8 6.0 5.31* 0.155* 17.5*
-87.3 CMW11-03B No Significant (> & = 1.0 g/T Au) Assay
-86.1 CMW11-03C 188.6 190.2 1.6 0.5 4.42 0.129 N/A
D -86.9 CMW11-04 232.6 236.6 4.0 1.2 27.5 0.802 1.6
316.0 318.5 2.5 0.8 4.95 0.144 N/A
446.0 456.5 10.5 3.2 2.45 0.071 1.0
-89.1 CMW11-04A No Significant (> & = 1.0 g/T Au) Assay
E N/A CMW11-11 N/A (hole abandoned)
F -90 CMW11-12 No Significant (> & = 1.0 g/T Au) Assay
G -89.0 CMW11-13 No Significant (> & = 1.0 g/T Au) Assay
H -87.4 BMW11-06 No Significant (> & = 1.0 g/T Au) Assay
-88.0 BMW11-06A ASSAY PENDING
I -88.4 BMW11-07 447.2 448.8 1.6 0.5 3.720 0.108 1.2
460.9 462.5 1.6 0.5 16.95 0.494 2.1
490.8 496.0 5.2 1.6 1.845 0.054 2.5
-89.3 BMW11-07A 849.7 852.1 2.4 0.7 1.585 0.046 N/A
884.6 885.6 1.0 0.3 1.285 0.037 N/A
J -87.6 BMW11-08 587.6 588.6 1.0 0.3 3.750 0.109 N/A
600.9 605.3 4.4 1.3 4.330 0.126 N/A
-88.5 BMW11-08A No Significant (> & = 1.0 g/T Au) Assay
K -87.5 BMW11-09 No Significant (> & = 1.0 g/T Au) Assay
-90 BMW11-09A No Significant (> & = 1.0 g/T Au) Assay
L -90 BMW11-10 No Significant (> & = 1.0 g/T Au) Assay
M -90 BMW11-10A No Significant (> & = 1.0 g/T Au) Assay
Note: N/S - no significant assay; * weighted arithmetic average
All the intercepts described above may not be true width due to limited information. This issue may be resolved during future 3D geological modeling of the structures.


Assay results of 22 drill holes (11,594.0 feet) were reviewed for this table. These are the last holes to be assayed from the 2011 drill campaign.


On behalf of the Board of Directors

"Jack Miller"

Jack Miller
Acting CEO

Tel: (604) 669 -- 6463



This News Release contains forward-looking statements. Forward-looking statements are statements which relate to future events and conditions and therefore involve inherent risks and uncertainties. These statements are only predictions and involve known and unknown risks, uncertainties and other factors that may cause our or our industry's actual results, levels of activity, performance or achievements to be materially different from any future results, levels of activity, performance or achievements expressed or implied by these forward-looking statements. While these forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our industry, actual results will almost always vary, sometimes materially, from any estimates, predictions, projections, assumptions or other future performance suggested herein. Except as required by applicable law, the Company does not intend to update any of the forward looking statements to conform these statements to actual results. All phases of the Company's operations are subject to environmental regulation and governmental approval and permits and there can be no assurance that the Company will obtain all the requisite permits for future development. Mining is an inherently risky business with large capital expenditures and cyclical metals markets.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Associated File: http://www.barkervillegold.com/i/pdf/BGM-NR12-09.pdf
256 KB in size, approx. 49 seconds to download at 56.6Kbps
Home   About   Operations   Investors   News   Media   Contact   Subscribe   

This email was sent to .com

Barkerville Gold Mines Ltd.

PRODUCER
CODE : BGM.V
ISIN : CA0676421088
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Barkerville Gold Mines is a gold producing company based in .

Barkerville Gold Mines holds various exploration projects in Canada.

Its main assets in production are QR and BONANZA LEDGE in Canada, its main asset in development is CARIBOO in Canada and its main exploration properties are BARKERVILLE MOUNTAIN, MUCHO ORO ZONE, PROMISE and MYRTLE-PROSERPINE in Canada.

Barkerville Gold Mines is listed in Canada. Its market capitalisation is CA$ 136.0 millions as of today (US$ 102.5 millions, € 93.0 millions).

Its stock quote reached its highest recent level on April 14, 2000 at CA$ 2.80, and its lowest recent point on January 02, 2009 at CA$ 0.01.

Barkerville Gold Mines has 335 780 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Barkerville Gold Mines Ltd.
2009 Annual Report
2008 Annual report
Financings of Barkerville Gold Mines Ltd.
7/19/2011Receives $8,529,375 From Warrant Exercise-All Warrants From ...
5/18/2006First tranche of private placement closes
Project news of Barkerville Gold Mines Ltd.
8/12/2015Phase 1 drilling results extends mineralization and identifi...
8/15/2013Barkerville Gold Mines Ltd. Project Update
6/19/2013Barkerville Gold Mines Ltd. Announces Updated Resource Estim...
5/11/2013(Cariboo)Provides Technical Update on Cariboo Gold Project
4/5/2013(Cariboo)Provides Technical Update on Cariboo Gold Project
6/21/2012Barkerville Gold Mines Receives Environmental Approval at QR...
3/21/2012Barkerville Gold Mines Reports Remaining 2011 Drill Results
2/29/2012Barkerville Gold Mines Summarizes 2012 Exploration Work and ...
2/15/2012Barkerville Gold Mines Intercepts 27.4 meters (90.0 feet) of...
2/15/2012Barkerville Gold Mines Intercepts 27.4 Meters (90.0 Feet) of...
12/6/2011Barkerville Gold Mines Receives Provincial Government Approv...
5/26/2011(Barkerville Mountain)Assays Gold in First 10 Diamond Drill Holes for 2011 on The ...
5/13/2011(Myrtle-proserpine)Acquisition of Myrtle-Proserpine and Promise Properties
4/7/2011(Bonanza Ledge)Provides Update on the Permitting of the Bonanza Ledge Mine
3/22/2011(Barkerville Mountain)First Diamond Drilling Assay at New Discovery on Barkerville...
2/14/2011(Barkerville Mountain)Extends New Discovery Zone on Barkerville Mountain to 125 Me...
5/3/2006(Bonanza Ledge)Preliminary assessment report & application for mine permit ...
4/19/2006(Bonanza Ledge)drilling continues at the Cariboo gold project
Corporate news of Barkerville Gold Mines Ltd.
7/6/2016Barkerville Gold Mines Provides Corporate Update
6/29/2016Barkerville Gold Mines Intersects 30.98 G/T (0.90 Oz/T) Au O...
6/21/2016Barkerville Gold Announces Change of Year-End
6/9/2016Barkerville Gold Mines Intersects 9.97 G/T (0.29 Oz/T) Gold ...
6/3/2016Barkerville Gold Mines Acquires Nugget Mountain Claims
5/2/2016Barkerville Gold and Williams Creek Gold Enter Into Arrangem...
4/26/2016Barkerville Gold Mines Closes $15.5 Million Bought Deal Priv...
4/21/2016Barkerville Gold Mines Provides Outlook and Corporate Update...
4/8/2016Barkerville Gold Mines to Defend Lawsuit
4/4/2016Barkerville Announces $13.5 Million Bought Deal Private Plac...
1/22/2016Barkerville Gold Mines Files Amended Financial Statements an...
1/7/2016Barkerville Gold Mines Intersects 43.48 G/T (1.27 OZ/T) AU O...
12/24/2015Barkerville Gold Mines Closes $6Million Flow-Through Share O...
12/16/2015Barkerville Gold Mines Identifies New High Grade Vein Trend ...
12/2/2015Barkerville Gold Mines Announces Flow-Through Unit Offering ...
11/30/2015Barkerville Gold Mines Enters into Letter Agreement with Osi...
10/30/2015Barkerville Gold Mines Files Amended Financial Statements an...
10/20/2015BGM Announces Discovery of Two Additional High Grade Gold Ho...
10/14/2015Barkerville Gold Mines Grants Stock Options
9/15/2015BGM Discovers New High Grade Gold Horizon on Barkerville Mou...
9/2/2015Barkerville Gold Mines Enters into Settlement Agreement
7/29/2015Barkerville Gold Mines Announces Strategic Relationship with...
7/28/2015BGM Announces First Drilling Results from Phase I Program on...
7/28/2015Barkerville Gold Mines Files Amended Financial Statements an...
7/15/2015Barkerville Gold Mines Closes $19Million Debt Settlement and...
7/8/2015Barkerville Gold Mines Announces Settlement of Debt and Crea...
4/9/2015Barkerville Gold Mines Announces Results of AGM
3/31/2015Barkerville Gold Mines Updates Cow Mountain Mineral Resource
3/23/2015Barkerville Announces Debt Settlement with Lender
3/17/2015Barkerville Gold Mines Provides Corporate Update
3/10/2015Barkerville Announces Executive Appointment
1/13/2015Executive Officer Appointments
12/16/2014Barkerville Announces Director Appointments
12/2/2014Barkerville Announces Further Extension to Credit Facility
11/4/2014Barkerville Gold Mines Reports Whole Hole Fire Assay Results...
10/28/2014Island Mountain Project Update
10/21/2014Barkerville Gold Mines Reports That a New Gold Mineralized Z...
3/13/2014Barkerville Closes Initial Tranche Of Private Placement
2/24/2014Barkerville Gold Mines Reports Whole Hole Metallic Screen Fi...
12/16/2013Barkerville Gold Mines Reports Metallic Screen Fire Assay Re...
11/4/2013Barkerville Gold Mines Reports Significant Intercepts of 201...
10/24/2013Barkerville Gold Mines Ltd. Pricing on Warrants and Grant of...
10/9/2013Closes $15 Million Gold Loan Facility and Common Shares Are ...
8/21/2013Barkerville Gold Mines Ltd. Clarifies And Updates Its Most R...
8/12/2013Barkerville Gold Mines Ltd. Arranges Short Term Loan
4/18/2013Announces Results of AGM
2/19/2013Approves Advanced Notice Policy
1/30/2013Resolves Shareholder Petition Respecting AGM and Pours Gold ...
1/15/2013Provides Project and Technical Update
12/10/2012Extension to Hold AGM and Petition by Rex Harbour to Call AG...
11/5/2012Provides Additional Update on its Technical Review and Proje...
10/20/2012Provides Update on its Technical Review
8/7/2012Be Advised - Barkerville Gold Mines - the next Goldcorp?????...
12/13/2011Barkerville Gold Mines Intercepts 62.3 meters (204.5 feet) o...
6/27/2011Intersects 19.9 Meters (65.4 Feet) of 83 g/t (2.429 oz/t) Go...
6/15/2011(Bonanza Ledge)Appoints Ross Hollinger as Mine Manager For Bonanza Ledge an...
6/2/2011(Myrtle-proserpine)Closes Acquisition of Myrtle-Proserpine and Promise Properti...
5/27/2011Barkerville Gold Mines
2/1/2011Releases Q3 Financials
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (BGM.V)
0.405-3.57%
TSX-V
CA$ 0.405
11/22 09:30 -0.020
-3.57%
Prev close Open
0.420 0.405
Low High
0.405 0.405
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.405 -%
Volume 1 month var.
7,500 -%
24hGold TrendPower© : -18
Produces Gold
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 7/13/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.22+1.63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+2.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.48-1.59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.84-1.31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.85-2.63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.83+0.78%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :