Barkerville Gold Mines Ltd.

Published : November 15th, 2016

Barkerville Intersects 10.34 g/t Au Over 11.50 Metres Island Mountain Phase I Drilling

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Barkerville Intersects 10.34 g/t Au Over 11.50 Metres Island Mountain Phase I Drilling

November 15th, 2016

VANCOUVER, BC- November 15, 2016 - Barkerville Gold Mines Ltd. (TSXV: BGM) (the 'Company' or 'Barkerville') is pleased to announce additional results from the ongoing Phase I Island Mountain exploration drilling program at the Company's flagship Cariboo Gold Project (CGP). Three drill rigs are currently operating on Island Mountain, with a fourth rig on Barkerville Mountain testing the 800 metre long KL Zone gold in soil anomaly. The results from the new drilling are presented below in Table 1. A drill hole location plan map and longitudinal section are presented at the end of this release.

Highlights of the new drilling include: 10.34 g/t Au over 11.50 metres (including 14.52 g/t Au over 7.60 metres) in DDH BGM-16-527, 74.31 g/t Au over 2.15 metres in DDH BGM-16-529, 23.73 g/t Au over 4.75 metres in DDH BGM-16-530, and 18.81 g/t Au over 3.60 metres in DDH BGM-16-533. Reported core lengths represent 50-75% true widths.

Island Mountain Phase I Drilling

The recently initiated 20,000 metre Phase I exploratory and stratigraphic drill program on Island Mountain represents the first major campaign of its kind since it was last explored in 2009. The program is intended to determine the extent of the vein systems that were historically undeveloped or unexplored, and is aimed at discovering new occurrences and extensions to the massive sulphide replacement bodies. Past exploration and mining was primarily focused on the replacement hosted gold as opposed to the veining due to the higher gold tenor and as such, the extents of the vein sets have never been investigated.

The area with no prior drilling or historical development (between the Aurum and Mosquito Creek mines) has again yielded previously unidentified vein-style mineralization confirmed by BGM-16-530 which intersected 23.73 g/t Au over 4.75 metres. This new instance mineralization is located 90 metres vertically below the 4000' level of the Mosquito Creek mine at a vertical depth of -200 metres below surface, and has not been tested at depth or along strike. This drill hole also intersected a new 30 metre wide corridor of vein and fault-fill hosted mineralization highlighted by 9.67 g/t Au over 0.70 metres and 5.25 g/t Au over 1.25 metres. Until now, this portion of the Island Mountain stratigraphy has never been drill tested and this new mineralization has generated a new exploration target outside the known mine geology.

Additional veining was also intersected by BGM-16-527 grading 10.34 g/t Au over 11.50 metres (including 14.52 g/t Au over 7.60 metres. The veining in this area remains untested by drilling in all directions.

Averaging 9.80 g/t Au over 2.65 metres, drill hole BGM-16-534 intersected a previously unidentified vein set 240 metres vertically below surface. This intercept is significant in that it has extended the width of the corridor that hosts the veins to 170 metres from the previously interpreted 100 metre wide stratigraphy, and is untested in all directions.

Chris Lodder, President and CEO of Barkerville Gold Mines remarked: 'The results of this first pass of widely spaced exploratory drilling have to date generated abundant targets with respect to the size and grade of this essentially untested gold system. We intend to drill 50,000 metres on the Phase II drilling program in 2017 to generate a maiden resource on Island Mountain.'

Qualified Persons

Exploration activities at the Cariboo Gold Project are jointly administered on site by the Company's Project Managers, Maggie Layman, P.Geo. and Wanda Carter, P.Geo. As per National Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Vice President Exploration, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting its exploration activities on the Cariboo Gold Project.

Quality Assurance - Quality Control

Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently stored on site at the Company's secure facility in Wells, BC. Numbered security tags are applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by
Paul Geddes, P.Geo, Vice President Exploration.

Drill core samples are submitted to ALS Geochemistry's analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 250 grams is pulverized. Analysis for gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 5ppb and upper limit of 10,000ppb. Samples with gold assays greater than 10,000ppb are re-analyzed using 50g fire assay with gravimetric finish, as well as 1,000g screen metallic fire assay. Samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS).

For further information on Barkerville Gold Mines Ltd. please contact:

Chris Lodder

President & Chief Executive Officer

Suite 400-365 Bay Street

Toronto, Ontario, Canada

[email protected]

About Barkerville Gold Mines Ltd.

The Company is focused on developing its extensive land package located in the historical Cariboo Mining District of central British Columbia. Barkerville's mineral tenures cover 1,164 square kilometres along a strike length of 60 kilometres which includes several past producing hard rock mines of the historic Barkerville Gold Mining Camp near the town of Wells, British Columbia. The QR Project, located approximately 110 kilometres by highway and all weather road from Wells was acquired by Barkerville in 2010 and boasts a fully permitted 900 tonne/day gold milling and tailings facility. Test mining of the Bonanza Ledge open pit was completed in March of 2015 with 91,489 tonnes of ore milled producing 25,464 ounces of gold. The Company has completed a number of drilling and exploration programs over the past 20 years and is currently compiling this data with all historical information in order develop geologic models which will assist new management and provide the framework to continue to explore the Cariboo Gold Project. An extensive drill program is currently underway with the goal of delineating additional high grade gold mineralization.

Cautionary Statement on Forward -Looking Information

Neither the TSX Venture Exchange ('TSXV') nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, statements regarding exploration results and exploration plans. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Table 1: Length weighted gold composites for drillholes BGM-16-523 through BGM-16-536:

HOLE-ID

FROM (M)

TO (M)

CORE LENGTH (M)

AU (G/T)

BGM-16-523

410.00

411.40

1.40

2.60

BGM-16-524

204.00

204.70

0.70

6.45

BGM-16-524

205.75

207.00

1.25

9.17

BGM-16-524

260.20

261.00

0.80

8.08

BGM-16-525

70.00

76.20

6.20

6.29

INCLUDING

71.30

73.00

1.70

14.19

INCLUDING

71.30

72.00

0.70

13.90

AND

72.00

73.00

1.00

14.40

BGM-16-525

191.00

191.90

0.90

8.10

BGM-16-525

266.00

267.00

1.00

8.32

BGM-16-526

304.00

305.30

1.30

1.11

BGM-16-527

351.50

353.00

1.50

6.46

BGM-16-527

431.65

432.80

1.15

9.91

BGM-16-527

436.25

437.75

1.50

6.15

INCLUDING

436.75

437.75

1.00

8.08

BGM-16-527

447.00

458.50

11.50

10.34

INCLUDING

450.90

458.50

7.60

14.52

INCLUDING

450.90

453.15

2.25

18.35

AND

456.00

458.50

2.50

27.55

INCLUDING

456.00

457.00

1.00

20.70

AND

457.55

458.50

0.95

50.70

BGM-16-528

32.95

33.45

0.50

20.80

BGM-16-528

98.00

98.70

0.70

5.04

BGM-16-528

156.65

157.70

1.05

12.30

BGM-16-528

354.30

357.70

3.40

11.01

INCLUDING

354.30

355.60

1.30

0.86

AND

356.50

357.70

1.20

24.80

BGM-16-528

364.35

365.10

0.75

6.66

BGM-16-528

367.80

368.45

0.65

4.57

BGM-16-528

370.00

371.15

1.15

12.00

BGM-16-529

93.20

94.20

1.00

6.44

BGM-16-529

102.00

102.50

0.50

20.50

BGM-16-529

179.60

181.75

2.15

74.31

INCLUDING

179.60

181.00

1.40

56.00

AND

181.00

181.75

0.75

108.50

BGM-16-529

185.70

187.00

1.30

100.00

BGM-16-529

223.15

234.60

11.45

6.90

INCLUDING

223.15

231.00

7.85

8.83

INCLUDING

223.15

224.00

0.85

14.10

AND

225.70

226.80

1.10

22.70

AND

228.70

229.35

0.65

28.50

BGM-16-529

257.40

258.20

0.80

17.90

BGM-16-529

261.90

262.40

0.50

6.30

BGM-16-529

318.50

319.50

1.00

7.44

BGM-16-529

351.10

354.20

3.10

11.20

INCLUDING

353.15

354.20

1.05

30.40

BGM-16-529

401.15

401.70

0.55

9.83

BGM-16-530

229.75

234.50

4.75

23.73

INCLUDING

229.75

230.50

0.75

14.80

AND

231.50

232.70

1.20

79.20

BGM-16-530

477.50

478.20

0.70

9.67

BGM-16-530

489.00

490.25

1.25

5.25

BGM-16-531

90.80

91.70

0.90

4.08

BGM-16-531

256.60

258.20

1.60

10.38

INCLUDING

257.10

258.20

1.10

13.05

BGM-16-532

ABANDONED

BGM-16-533

168.20

171.80

3.60

18.81

INCLUDING

168.20

169.50

1.30

31.20

AND

171.00

171.80

0.80

18.70

BGM-16-533

183.50

184.20

0.70

8.17

BGM-16-533

305.00

305.50

0.50

10.80

BGM-16-534

67.50

68.10

0.60

5.59

BGM-16-534

119.50

120.20

0.70

26.80

BGM-16-534

206.50

208.00

1.50

5.69

BGM-16-534

215.50

216.00

0.50

4.45

BGM-16-534

282.00

282.50

0.50

5.87

BGM-16-534

292.00

294.65

2.65

9.80

INCLUDING

292.00

293.00

1.00

13.70

AND

294.15

294.65

0.50

24.40

BGM-16-535

ABANDONED

BGM-16-536

231.20

231.70

0.50

5.08

BGM-16-536

234.30

234.80

0.50

26.50

*Core lengths represent 50-75% true widths. Rock not recovered by drilling was assigned zero grade and not included in the composites. Top cuts have not been applied to high grade assays. NSA - No Significant Assays.

Table 2: Drillhole Collar Orientations

HOLE-ID

AZIMUTH

DIP

BGM-16-523

137.3

-62.9

BGM-16-524

140.2

-45.4

BGM-16-525

139.2

-62.7

BGM-16-526

138.1

-45.5

BGM-16-527

139.9

-65.1

BGM-16-528

140.1

-45.4

BGM-16-529

141.5

-64.8

BGM-16-530

214.2

-44.7

BGM-16-531

137.1

-44.4

BGM-16-532

138.1

-65.0

BGM-16-533

139.3

-45.0

BGM-16-534

215.9

-45.6

BGM-16-535

115.7

-65.0

BGM-16-536

137.9

-44.8

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Canada | Georgia | All
Gold and Silver Prices for these countries : Canada | Georgia | All

Barkerville Gold Mines Ltd.

PRODUCER
CODE : BGM.V
ISIN : CA0676421088
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Barkerville Gold Mines is a gold producing company based in .

Barkerville Gold Mines holds various exploration projects in Canada.

Its main assets in production are QR and BONANZA LEDGE in Canada, its main asset in development is CARIBOO in Canada and its main exploration properties are BARKERVILLE MOUNTAIN, MUCHO ORO ZONE, PROMISE and MYRTLE-PROSERPINE in Canada.

Barkerville Gold Mines is listed in Canada. Its market capitalisation is CA$ 136.0 millions as of today (US$ 102.5 millions, € 93.0 millions).

Its stock quote reached its highest recent level on April 14, 2000 at CA$ 2.80, and its lowest recent point on January 02, 2009 at CA$ 0.01.

Barkerville Gold Mines has 335 780 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Barkerville Gold Mines Ltd.
2009 Annual Report
2008 Annual report
Financings of Barkerville Gold Mines Ltd.
7/19/2011Receives $8,529,375 From Warrant Exercise-All Warrants From ...
5/18/2006First tranche of private placement closes
Project news of Barkerville Gold Mines Ltd.
8/12/2015Phase 1 drilling results extends mineralization and identifi...
8/15/2013Barkerville Gold Mines Ltd. Project Update
6/19/2013Barkerville Gold Mines Ltd. Announces Updated Resource Estim...
5/11/2013(Cariboo)Provides Technical Update on Cariboo Gold Project
4/5/2013(Cariboo)Provides Technical Update on Cariboo Gold Project
6/21/2012Barkerville Gold Mines Receives Environmental Approval at QR...
3/21/2012Barkerville Gold Mines Reports Remaining 2011 Drill Results
2/29/2012Barkerville Gold Mines Summarizes 2012 Exploration Work and ...
2/15/2012Barkerville Gold Mines Intercepts 27.4 meters (90.0 feet) of...
2/15/2012Barkerville Gold Mines Intercepts 27.4 Meters (90.0 Feet) of...
12/6/2011Barkerville Gold Mines Receives Provincial Government Approv...
5/26/2011(Barkerville Mountain)Assays Gold in First 10 Diamond Drill Holes for 2011 on The ...
5/13/2011(Myrtle-proserpine)Acquisition of Myrtle-Proserpine and Promise Properties
4/7/2011(Bonanza Ledge)Provides Update on the Permitting of the Bonanza Ledge Mine
3/22/2011(Barkerville Mountain)First Diamond Drilling Assay at New Discovery on Barkerville...
2/14/2011(Barkerville Mountain)Extends New Discovery Zone on Barkerville Mountain to 125 Me...
5/3/2006(Bonanza Ledge)Preliminary assessment report & application for mine permit ...
4/19/2006(Bonanza Ledge)drilling continues at the Cariboo gold project
Corporate news of Barkerville Gold Mines Ltd.
7/6/2016Barkerville Gold Mines Provides Corporate Update
6/29/2016Barkerville Gold Mines Intersects 30.98 G/T (0.90 Oz/T) Au O...
6/21/2016Barkerville Gold Announces Change of Year-End
6/9/2016Barkerville Gold Mines Intersects 9.97 G/T (0.29 Oz/T) Gold ...
6/3/2016Barkerville Gold Mines Acquires Nugget Mountain Claims
5/2/2016Barkerville Gold and Williams Creek Gold Enter Into Arrangem...
4/26/2016Barkerville Gold Mines Closes $15.5 Million Bought Deal Priv...
4/21/2016Barkerville Gold Mines Provides Outlook and Corporate Update...
4/8/2016Barkerville Gold Mines to Defend Lawsuit
4/4/2016Barkerville Announces $13.5 Million Bought Deal Private Plac...
1/22/2016Barkerville Gold Mines Files Amended Financial Statements an...
1/7/2016Barkerville Gold Mines Intersects 43.48 G/T (1.27 OZ/T) AU O...
12/24/2015Barkerville Gold Mines Closes $6Million Flow-Through Share O...
12/16/2015Barkerville Gold Mines Identifies New High Grade Vein Trend ...
12/2/2015Barkerville Gold Mines Announces Flow-Through Unit Offering ...
11/30/2015Barkerville Gold Mines Enters into Letter Agreement with Osi...
10/30/2015Barkerville Gold Mines Files Amended Financial Statements an...
10/20/2015BGM Announces Discovery of Two Additional High Grade Gold Ho...
10/14/2015Barkerville Gold Mines Grants Stock Options
9/15/2015BGM Discovers New High Grade Gold Horizon on Barkerville Mou...
9/2/2015Barkerville Gold Mines Enters into Settlement Agreement
7/29/2015Barkerville Gold Mines Announces Strategic Relationship with...
7/28/2015BGM Announces First Drilling Results from Phase I Program on...
7/28/2015Barkerville Gold Mines Files Amended Financial Statements an...
7/15/2015Barkerville Gold Mines Closes $19Million Debt Settlement and...
7/8/2015Barkerville Gold Mines Announces Settlement of Debt and Crea...
4/9/2015Barkerville Gold Mines Announces Results of AGM
3/31/2015Barkerville Gold Mines Updates Cow Mountain Mineral Resource
3/23/2015Barkerville Announces Debt Settlement with Lender
3/17/2015Barkerville Gold Mines Provides Corporate Update
3/10/2015Barkerville Announces Executive Appointment
1/13/2015Executive Officer Appointments
12/16/2014Barkerville Announces Director Appointments
12/2/2014Barkerville Announces Further Extension to Credit Facility
11/4/2014Barkerville Gold Mines Reports Whole Hole Fire Assay Results...
10/28/2014Island Mountain Project Update
10/21/2014Barkerville Gold Mines Reports That a New Gold Mineralized Z...
3/13/2014Barkerville Closes Initial Tranche Of Private Placement
2/24/2014Barkerville Gold Mines Reports Whole Hole Metallic Screen Fi...
12/16/2013Barkerville Gold Mines Reports Metallic Screen Fire Assay Re...
11/4/2013Barkerville Gold Mines Reports Significant Intercepts of 201...
10/24/2013Barkerville Gold Mines Ltd. Pricing on Warrants and Grant of...
10/9/2013Closes $15 Million Gold Loan Facility and Common Shares Are ...
8/21/2013Barkerville Gold Mines Ltd. Clarifies And Updates Its Most R...
8/12/2013Barkerville Gold Mines Ltd. Arranges Short Term Loan
4/18/2013Announces Results of AGM
2/19/2013Approves Advanced Notice Policy
1/30/2013Resolves Shareholder Petition Respecting AGM and Pours Gold ...
1/15/2013Provides Project and Technical Update
12/10/2012Extension to Hold AGM and Petition by Rex Harbour to Call AG...
11/5/2012Provides Additional Update on its Technical Review and Proje...
10/20/2012Provides Update on its Technical Review
8/7/2012Be Advised - Barkerville Gold Mines - the next Goldcorp?????...
12/13/2011Barkerville Gold Mines Intercepts 62.3 meters (204.5 feet) o...
6/27/2011Intersects 19.9 Meters (65.4 Feet) of 83 g/t (2.429 oz/t) Go...
6/15/2011(Bonanza Ledge)Appoints Ross Hollinger as Mine Manager For Bonanza Ledge an...
6/2/2011(Myrtle-proserpine)Closes Acquisition of Myrtle-Proserpine and Promise Properti...
5/27/2011Barkerville Gold Mines
2/1/2011Releases Q3 Financials
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (BGM.V)
0.405-3.57%
TSX-V
CA$ 0.405
11/22 09:30 -0.020
-3.57%
Prev close Open
0.420 0.405
Low High
0.405 0.405
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.405 -%
Volume 1 month var.
7,500 -%
24hGold TrendPower© : -18
Produces Gold
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 7/13/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.84+1.75%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.28-0.39%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.71+4.41%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.62-1.13%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.06+0.75%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22+7.50%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.89-5.03%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.12-1.44%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04-5.26%Trend Power :