| Barsele drill hole at Risberget yields 32.0 meters grading 2.92 g/t gold, with a second drill hole yielding 1.0-meter grading 248.0 g/t gold. Recent Drilling has Expanded the Risberget Mineralized Zone to 250 meters. | |
| | |
|
Drilling at the Norra VMS Zone yields 9.5 meters grading 1.4 g/t Au, 10.54 g/t Ag, 1.61% Zn. VANCOUVER , Jan. 3, 2018 /CNW/ - Barsele Minerals Corp. – (TSX-V: BME) ("Barsele") is pleased to report an operational update for the ongoing exploration program within the Barsele Gold-VMS Project area in Västerbottens Län, northern Sweden . The exploration program is being operated by joint venture partner Agnico Eagle Mines Limited – (TSX, NYSE: AEM) ("Agnico Eagle"). Ownership in the project is 55% Agnico Eagle and 45% Barsele. Agnico Eagle can earn an additional 15% in the Barsele Project through the completion of a pre-feasibility study. There is no cash outlay by Barsele until Pre-Feasibility is completed. View original content with multimedia: http://www.newswire.ca/en/releases/archive/January2018/03/c6592.html |
|
Read the rest of the article at
https: