MEO Australia

Published : October 27th, 2013

Blackwood-2 Progress Report No. 1

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Australia | K Street | Oil | Water |

Blackwood-2 Progress Report No. 1


Key Points:

MEO Australia Limited

ABN 43 066 447 952

Level 23

Tel:

+61 3 8625 6000

500 Collins Street

Fax:

+61 3 9614 0660

Melbourne Victoria 3000

Email:

[email protected]

Australia

Website:

www.meoaustralia.com.au

ASX & Media Release

Blackwood-2 Progress Report No.1

Ensco 104 drilling rig handed over to the NT/P68 Joint Venture on 26th October

Rig on location at Blackwood-2 location and preparations underway to spud well

MELBOURNE, AUSTRALIA (28th October, 2013)

MEO Australia Limited (ASX: MEO; OTCQX: MEOAY) advises that the Ensco 104 jack up drilling rig was handed over to the NT/P68 Joint Venture on 26th October and arrived on location on 27th October. The drilling program is expected to take around 65 days.
Blackwood-2 is expected to spud within the next few days and is planned to be drilled to a depth of
3,360mRT. The appraisal well is approximately 8km from the Blackwood-1 discovery well and will provide a greater understanding of the distribution of reservoir properties, clarify the position of the
Gas-Water-Contact and provide an indication of productivity.
The drilling of Blackwood-2 is an obligation under the NT/P68 Farm-in Agreement (FIA) dated 17th May 2011 between Eni Australia Limited (Eni) and MEO. Under the FIA and subsequent amendment, MEO's 50% participating interest share of the costs of the well will be carried.
MEO intends to release weekly progress reports.

MEO's CEO and MD Jürgen Hendrich commented on the announcement:

"We have eagerly been awaiting the drilling of the Blackwood-2 appraisal well. The results will help us to gain a better understanding of the resource size and the potential for the resource to underpin or complement a commercial development."

Jürgen Hendrich

Managing Director & Chief Executive Officer

Location Map.

MEO Australia Limited 1 ASX & Media Release

Northern Bonaparte Basin

NT/P68 Exploration Permit (MEO 50%)

Business Overview

Discovered resources with upside potential

Carried work program

3D Seismic coverage of key areas of Permit

History

The NT/P68 Exploration Permit is located approximately 300 km northwest of Darwin in the Timor Sea. It was awarded to MEO subsidiaries Oz-Exoil Pty Ltd and TSP Arafura Petroleum Pty. Ltd. on 23rd February 2004.
In June 2007 MEO farmed out a 10% interest in the permit to Petrofac Resources Limited in return for Petrofac carrying 25% of two exploration wells. Heron-2 was drilled in December 2007 and flowed gas to surface at more than 6 MMscfd from the Elang formation in an open hole test prior to the hole collapsing. Petrofac declined to participate in the second well of the program and MEO drilled Blackwood-1 in February 2008 at 100% equity.
Blackwood-1 encountered a 48m gross gas column in the Plover formation above an uncertain gas/water contact. As Blackwood-1 was a wildcat exploration well, a production test was not planned or carried out.

Figure 1. Location map showing well locations and 3D seismic coverage.

In October 2009, Petrofac withdrew from the permit and returned its partially earned equity to MEO. Petrofac was relieved of its obligations under its farmin arrangements.
In April 2010, MEO renewed the permit, relinquishing the less prospective southern portion of the permit while retaining the Heron and Blackwood areas.

Eni Farmin

On 17 May 2011, MEO executed a farmout agreement with Eni Australia Limited ("Eni") for 50% of the entire permit in return for funding a work program including a 3D seismic survey and a well in the Blackwood area and 2 wells in the Heron Area.

3D Seismic Coverage


The permit has modern 3D seismic coverage over most of the Heron and Blackwood mapped fields. The Bathurst 3D survey was acquired by Eni in December 2011 as part of the farmin arrangements referred to above.
MEO Australia Limited www.meoaustralia.com.au

Timor Sea Exploration Business Overview

Significant gas resource at Heron

Blackwood-2 appraisal drilling planned

Heron

The Heron-2 well, drilled in 2008, encountered more than 200m of gross gas column in the Plover sands in the Heron north structure.
Heron South-1 was drilled by Eni in 2H-2012 and was interpreted to have intersected two gross sandstone intervals of approximately 120m and 115m thickness separated by approximately 130m of shale and silt. Production tests on the two intervals proved movable gas but did not flow gas at commercial rates.
The low flow rates observed during production testing indicates low primary reservoir permeability and the absence of secondary permeability (due to natural fractures) at the well location. MEO's technical assessment predicts the possibility of natural fracturing in the Greater Heron structure which may provide areas of improved reservoir productivity.
Additional studies are underway to better understand the causes of and distribution of reservoir productivity and determine whether sweet spots can be predicted at Heron.

Blackwood

The gas water contact depth at Blackwood-1 could not be unambiguously determined from the 2008 well results but is indicated from MDT pressure data at 3,190mSS. MEO has assessed contingent (i.e. discovered but not proven economic) resources above 3,190mSS and prospective (i.e. unproven) resources below 3,190mSS down to
3,225mSS.

Blackwood-2 is expected to commence drilling in early November 2013 and is targeted to confirm the depth of the gas water contact, the gas quality and the productivity of the reservoir at this location.

Blackwood-1

W (2008)

Blackwood-2

E

Contingent (Discovery)

3,225m SS

Prospective Deep

Prospective East

3,190m SS

Blackwood East

Prospect

3,220m SS

Figure 2. Diagrammatic cross section showing indicative well locations.

Resource Assessment

MEO's assessment of the Blackwood and Heron resources is summarised in the tables below:

Gross Contingent Resources (100% share)

Discovered and prospective resources

Gross Prospective Resources (100% share)

Prospect Name Low Best Mean High

Blackwood - Deep

Gas Bsc 616 897 918 1,250

Blackwood - Deep

Total Liquids MMstb 2 3 3 5

Blackwood East

Gas Bscf 149 217 222 302

Blackwood East

Total Liquids MMstb - 1 1 1

Resources defined as contingent on the basis that evaluation of the accumulations are currently insufficient to clearly assess commerciality

MEO share can be derived by pro-rating the resource ranges described above by its 50% equity.

Total Liquids = oil + condensate

MEO Australia Limited 2 www.meoaustralia.com.au

Read the rest of the article at www.noodls.com
Data and Statistics for these countries : Australia | All
Gold and Silver Prices for these countries : Australia | All

MEO Australia

CODE : MEO.AX
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

MEO Australia is a and oil exploration company based in Australia.

MEO Australia is listed in Australia and in United States of America. Its market capitalisation is AU$ 25.7 millions as of today (US$ 19.8 millions, € 17.9 millions).

Its stock quote reached its highest recent level on November 19, 2010 at AU$ 0.62, and its lowest recent point on January 29, 2016 at AU$ 0.01.

MEO Australia has 953 240 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of MEO Australia
7/9/2008Investor Presentation
1/24/2008 General Meeting Presentation - January 24, 2008
1/16/2008Investor Update – January 2008
Annual reports of MEO Australia
Financial Report 2008
Annual Report 2007
Nominations of MEO Australia
5/20/2008APPOINTS NEW CEO
Project news of MEO Australia
1/29/2015Proposed acquisition of MEO Australia Limited Release of Bid...
Corporate news of MEO Australia
7/11/201625/11/2015 - MEO Annual General Meeting Presentation 2015
7/8/201609/07/2012 - MEO Investor Update - US Roadshow July 2012
4/14/201625/11/2015 - MEO Annual General Meeting Presentation 2015
12/4/201520/10/2015 - MEO Investor Presentation October 2015
3/17/2015Letter to MEO Shareholders
3/4/2015Letter to MEO Shareholders
3/3/201505/11/2014 - MEO NEON Merger Investor Presentation
1/19/2015Update on takeover bid for MEO Australia Limited
12/23/2014MEO: MEO receives $400,000 Reimbursement Fee from Neon
12/21/2014MEO: Neon Terminating Merger Implementation Agreement
12/19/2014MEO: Merger Transaction Update
12/14/2014MEO: MEO Directors respond to Mosman Proposal
12/2/2014MEO: Lodgement of Scheme Booklet
11/18/2014MEO NEON Merger Investor Presentation
11/18/2014MEO NEON Merger Announcement
11/18/2014New Address for MEO Australia Limited
11/4/2014MEO Securities Update as at 5 Nov 2014
11/3/2014Acting MEO Chairman
10/28/2014Quarterly Activities Summary for Period Ended 30th Sept 2014
7/25/2014ASX Release Quarterly Activities Summary to 30th June 2014
7/25/2014Quarterly Cash Flow Summary For Period Ending 30th June 2014
7/9/2014ASX Release MEO Securities
7/9/2014ASX Release - Appendix 3Y
4/22/2014Vulcan Sub-Basin AC/P50 and AC/P51 Work Program Variation
1/16/2014Quarterly Cash Flow Summary for Period Ended 31st Dec 2013
12/22/2013Blackwood-2 Progress Report No.8
12/16/2013Second Heron Well Notice Date extended
11/28/2013Blackwood-2 Progress Report No.5
11/28/2013MEO Securities Update as at 28 Nov 2013
11/22/2013Blackwood-2 Progress Report No.4
11/15/2013Blackwood-2 Progress Report No.3
10/31/2013Appendix 3Z
10/31/2013Results of Annual General Meeting
10/31/2013MEO 2013 AGM Tassie Shoal Overview
10/27/2013Blackwood-2 Progress Report No. 1
3/10/2009Commences acquisition of 250 km2 Artemis 3D Marine Seismic S...
2/26/2009Half Year Financial Report
2/17/2009Coal-to-Liquids & Gas-to-Liquids Conference
2/3/2009Zeus-1 update
1/27/2009Zeus-1 update
1/16/2009Zeus-1 update
1/15/2009Presentation Disclaimer
1/1/2009RDI options in relation to MEO’s Timor Sea Projects lapse
12/22/2008Secures 12 month extension to farm-in to WA-359-P and WA-360...
12/16/2008Update on Zeus-1 timing
12/11/2008Update on Zeus-1 timing
12/1/2008Update on Zeus-1 timing
11/5/2008ASX Media Release
9/22/2008Increases interest in WA-361-P & Zeus-1 to 35%
9/17/2008Update – Zeus-1 timing
8/22/2008OUTCOME OF RESOLUTIONS PUT AT GENERAL MEETING
8/21/200821 August 2008 General Meeting Presentation to Shareholders
7/17/2008 RETIREMENT OF MANAGING DIRECTOR
7/16/2008SONGA VENUS RIG CONTRACTS EXECUTED FOR ZEUS-1
7/14/2008RESIGNATION OF NON-EXECUTIVE DIRECTOR
7/4/2008ANNOUNCES MAJOR STRATEGIC ALLIANCE
5/30/2008Re: Price query
5/19/2008BLACKWOOD 3D SEISMIC ACQUISITION COMPLETED ON SCHEDULE
5/12/2008NEW DIRECTOR APPOINTED TO MEO BOARD
5/9/2008PROGRESS REPORT: BLACKWOOD 3D SEISMIC ACQUISITION
3/25/2008PGS AUSTRALIA AWARDED 3D SEISMIC ACQUISITION CONTRACT
3/11/2008BLACKWOOD-1 WELL WEEKLY DRILLING REPORT – No 6
3/3/2008BLACKWOOD-1 WELL WEEKLY DRILLING REPORT – No 5
2/25/2008BLACKWOOD-1 WELL WEEKLY DRILLING REPORT – No 4
2/18/2008BLACKWOOD-1 WELL WEEKLY DRILLING REPORT – No 3
2/7/2008BLACKWOOD-1 WELL WEEKLY DRILLING REPORT – No 2
2/1/2008BLACKWOOD-1 WELL WEEKLY DRILLING REPORT – No 1
1/31/2008REPORT ON ACTIVITIES FOR THE QUARTER ENDED 31 DECEMBER 2007
1/31/2008HERON-2 WELL WEEKLY DRILLING REPORT – No 14
1/24/2008OUTCOME OF RESOLUTION PUT AT GENERAL MEETING – 24 JANUARY 20...
1/21/2008HERON-2 WELL UPDATE
1/18/2008HERON-2 WELL WEEKLY DRILLING REPORT – No 13
1/15/2008HERON-2 WELL UPDATE
1/11/2008HERON-2 WELL WEEKLY DRILLING REPORT – No 12
1/8/2008HERON-2 WELL UPDATE
12/31/2007NORTHWEST SHELF 3D SEISMIC ACQUISITION UPDATE
12/28/2007DECISION TO PRODUCTION TEST HERON NORTH PLOVER RESERVOIR
12/27/2007HERON-2 WELL WEEKLY DRILLING REPORT – No 11
12/20/2007HERON-2 WELL WEEKLY DRILLING REPORT – No 10
12/12/2007PLACEMENT OF 50M SHARES
12/10/2007GAS BEARING HERON NORTH ELANG/PLOVER FM ENCOUNTERED
12/7/2007THE AUSTRALIAN FINANCIAL REVIEW
12/7/2007HERON-2 WELL WEEKLY DRILLING REPORT – No 8
12/6/2007 JOINT VENTURE DECISION TO PRODUCTION TEST EPENARRA DARWIN R...
11/30/2007HERON-2 WELL WEEKLY DRILLING REPORT – No 7
11/27/2007HERON-2 WELL UPDATE
11/23/2007HERON-2 WELL WEEKLY DRILLING REPORT – No 6
11/20/2007HERON-2 WELL
11/15/2007HERON-2 WELL WEEKLY DRILLING REPORT – No 5
11/9/2007HERON-2 WELL WEEKLY DRILLING REPORT – No 4
11/8/2007RECENT TRADING IN MEO SHARES
11/2/2007NORTHWEST SHELF SEISMIC ACQUISITION & REPROCESSING
11/2/2007HERON-2 WELL WEEKLY DRILLING REPORT – No 3
10/31/2007REPORT ON ACTIVITIES FOR THE QUARTER ENDED 30 SEPTEMBER 2007
10/29/2007Adds North West Shelf interests while NT/P68 drilling is wel...
10/25/2007FARMIN TO NORTHWEST SHELF PERMITS
10/25/2007HERON-2 WELL WEEKLY DRILLING REPORT
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (MEO.AX)OTHER OTC (CMNO)
0.027+3.85%0.005+0.00%
AUSTRALIA
AU$ 0.027
11/07 06:50 -
3.85%
Prev close Open
0.026 0.027
Low High
0.027 0.027
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.027 -%
Volume 1 month var.
50,000 -%
24hGold TrendPower© : -18
Produces
Develops
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :