Chart usGOLD   Chart usSILVER  
 
Food for thought
There can be nothing more unreal in its pretensions than debt currency itself
Charles Holt Carroll  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1365.863.06
Silver 22.310.10
Platinum 1467.507.00
Palladium 743.501.25
WORLD MARKETS
DOWJONES 15307-80
NASDAQ 3463-39
NIKKEI 15627246
ASX 5142-14
CAC 40 405115
DAX 853159
HUI 2573
XAU 97-3
CURRENCIES (€)
AUS $ 1.3281
CAN $ 1.3324
US $ 1.2834
GBP (£) 0.8539
Sw Fr 1.2593
YEN 132.7760
CURRENCIES ($)
AUS $ 1.0350
CAN $ 1.0382
Euro 0.7793
GBP (£) 0.6657
Sw Fr 0.9814
YEN 103.4480
RATIOS & INDEXES
Gold / Silver61.22
Gold / Oil14.22
Dowjones / Gold11.21
COMMODITIES
Copper 3.37-0.01
WTI Oil 96.05-0.11
Nat. Gas 4.200.01
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
( 0 vote, 0/5 ) Print article
     
Tweet

 

 

 

 

Donner Metals Ltd.: Bracemac-McLeod Ramp Moves Past 660 Metres

VANCOUVER, BRITISH COLUMBIA--(Marketwire - March 6, 2011) - Mr. Harvey Keats, Chief Executive Officer of Donner Metals Ltd. (TSX VENTURE:DON)(FRANKFURT:D4M), reports that the Bracemac-McLeod ramp is currently at 660 metres enroute to the Bracemac-McLeod deposit where initial production from the mine is scheduled to start in January, 2013. In addition to ramp advancement, the installation of mine ventilation facilities and the construction of support infrastructure at the ramp portal are in progress. The existing 4.3 kilometres of haulage road from the portal to the Matagami Mill is also currently being refurbished to accommodate haulage of ore from Bracemac-McLeod. The development of the Bracemac-McLeod deposit is operated by Xstrata Canada Corporation - Xstrata Zinc Canada Division ("Xstrata Zinc") with 12 contractor companies on site currently employing approximately 30 people in addition to Xstrata Zinc personnel.

In addition, exploration drilling has been conducted in the Radiore area, located 11.8 kilometres north of the Bracemac-McLeod deposit, and in the New Hosco area located 18.4 kilometres northwest of the Bracemac-McLeod deposit. Three diamond drillholes were completed on the near-surface, southeastern extension of the historical Radiore Mine (historical production of 0.14 million tons 1.34% zinc, 1.57% copper). Drillhole DR-11-04 targeted a geophysical response 450 metres east of the deposit. It intersected 51.6m of stringer and disseminated pyrite and pyrrhotite. A stepout drillhole from the same set-up (drillhole DR-11-05) intersected 1.8 metres of massive pyrrhotite with traces of chalcopyrite. Drillhole DR-11-06 was drilled 65 metres to the west of this mineralization and it intersected 49.3 metres of stringer and disseminated pyrite and pyrrhotite. All holes intersected stratigraphy consistent with the Radiore deposit. Two stratigraphic drillholes were completed 1.3 kilometres southwest of the historical New Hosco Mine (historical production of 1.83 million tonnes grading 1.73% zinc and 1.73% copper). Both drillholes stayed in rocks considered to be the hanging wall to the deposit and they did not intersect mineralization.

On the PD1 deposit, Xstrata Zinc is seeking bids from independent engineering firms for the feasibility study described in the news release dated February 10, 2011. The technical report on the resource calculation has been posted on SEDAR.

Additional information is available at
www.donnermetals.com.

PROJECT OVERVIEW

The Matagami Option and Joint Venture Agreement has an area of mutual interest of 4,753 square kilometres and presently includes 2,986 mineral claims covering 644 square kilometres. Donner has the option to earn an initial 50% participating joint venture interest from Xstrata Canada Corporation in the Matagami Project by incurring a total of $25 million of expenditures on exploration and related work on or before May 31, 2011. To date, Donner has provided $24.9 million towards exploration and has the balance of the funds at hand required to exercise the option. Donner will complete its 50% earn-in option in five separate joint venture areas within the Matagami Project, including Bracemac-McLeod and PD1 deposits, on or before May 31, 2011. Following earn-in, five separate joint venture ("JV") areas will be formed with initial interests of 50% Xstrata Zinc and 50% Donner. The JV areas are: South Flank JV area (includes Bracemac-McLeod, McLeod Deep, Orchan West), North Flank JV area (includes Radiore and New Hosco), Central Camp JV area; West Camp JV area (includes the PD1 deposit - Phelps Dodge Corporation of Canada holds a 15% net carried interest and cash payments in the 9 claims covering the PD1 deposit under a 1976 agreement) and the East JV area - see web site for map locations. Following earn-in, Xstrata Zinc has a "bump-up" right in each of the five JV areas to earn back a 15% interest by completing a bankable feasibility study or incurring a maximum of CDN $20 million towards a bankable feasibility study. Pursuant to this bump-up right, the South Flank joint venture area, which includes the Bracemac-McLeod mine, will become a 65% Xstrata Zinc and 35% Donner joint venture. The remaining 4 joint venture areas that comprise the rest of the Matagami project will remain at 50% Xstrata and 50% Donner, subject to remaining bump-up rights. The area of mutual interest remains in effect for two years following earn-in.

The Matagami Project covers the Matagami Mining Camp, a world-class mining district, with 18 known Volcanogenic Massive Sulphides (VMS) deposits including 10 past producers of varying sizes, including the giant Matagami Lake Deposit (25.64 million tonnes of 8.2% zinc, 0.56% copper, 20.91g/t silver and 0.41g/t gold) discovered in 1957 and mined from 1963 to 1988. The area is host to historical production of 8,600 million pounds of zinc and 853 million pounds of copper. The Matagami area is well serviced by established infrastructure including the town of Matagami, power, a permitted tailings facility, railway, airport and well-developed road and highway networks. Xstrata Zinc is currently producing from its low-cost and wholly-owned Perseverance Deposit which feeds its refurbished 2,600 tonnes per day Matagami mill complex. Any future development under the Donner-Xstrata agreement will support the established infrastructure and facilities. Zinc concentrates produced at Matagami are refined at the Noranda Income Fund zinc refinery in Valleyfield, Quebec. Copper concentrates are smelted at Xstrata's Horne smelter in Rouyn-Noranda and refined at Xstrata's Canadian Copper Refinery in Montreal, Quebec.

The Company's strategy is to explore for and discover zinc-copper deposits in the Matagami Camp and to leverage the general infrastructure and existing processing facilities within a known and well-established cost structure for developing VMS deposits. Donner's exploration objective is to investigate multiple stratigraphic horizons with potential for VMS mineralization including the prolific Key Tuffite horizon throughout the Matagami Camp. To date, Donner has discovered new mineralization at Bracemac-McLeod, Daniel1, Bell Channel, McLeod Deep and down-dip from Radiore. Within the extensive project area there are numerous exploration targets with excellent potential for additional discoveries.

SUPPLEMENTARY INFORMATION

Xstrata Zinc is the project operator for the Matagami Project and the future joint ventures. As operator, Xstrata Zinc is responsible for the execution of all development, production and exploration programs on the property. This includes resource evaluation, sampling, submittal of samples for assay, assay verification, metallurgical evaluation and QA/QC. Sample preparation and assaying are conducted by ALS Chemex-Chimitec, of Val D'Or, Quebec (zinc, copper and silver by atomic absorption, and gold by standard fire assay procedures).

Robin Adair (VP of Exploration) is the Qualified Person for Donner Metals Ltd. and is responsible for the technical information reported in this news release.

Click here to view Table 1: Regional Exploration Drilling:
http://media3.marketwire.com/docs/don36.pdf

ON BEHALF OF THE BOARD OF DONNER METALS LTD.

Harvey Keats, Chief Executive Officer

Cautionary Statement:

Certain phrases in this news release are "forward-looking statements". Forward-looking statements are identified by wording such as "will", "is scheduled", and "expected". Such statements are applicable specifically to the possible future completion of the Matagami Option and both the development of and production from the Bracemac-McLeod Deposit as well as expected assays from exploration drilling. With respect to Donner earning an interest in the Matagami Project, Donner's ability to meet the requirements of the Option and Joint Venture Agreement can be negatively affected by financial markets and Donner's ability to raise financing, among others. With respect to future production, and the commencement thereof, from the Bracemac-McLeod deposit, the forward looking statement using the wording "is scheduled" is in the context of the feasibility study completed by Xstrata Canada Corporation - Xstrata Zinc Canada Division and Genivar Limited Partnership in 2010. "Forward-looking statements" involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. This press release refers to information about Xstrata's Perseverance mine and mine property on which the Company has no right to explore or mine. This press release also refers to information about historical production from land covered by the Matagami Project. Investors are cautioned that mineral deposits on other properties and/or historical production on lands under option are not necessarily indicative of characteristics of new mineral deposits discovered on the Matagami Project or future discovery potential. Further discussion of "forward looking statements" and "future oriented financial information" and the risks inherent to mineral exploration and development, in relation to Donner's activities, can be found on the Company's website at
www.donnermetals.com. The reader is cautioned not to place any undue reliance on any forward-looking statement, reference to other properties or historical production from the Matagami Project area.


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

 

CONTACT INFORMATION:

Donner Metals Ltd.
David Patterson
(604) 683-0564 or Toll Free: 1-800-909-8311
Fax: (604) 602-9311
donner@bed-rock.com
www.donnermetals.com



Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All
Tweet

Donner Metals Ltd.

EXPLORATION STAGE
CODE : DON.V
ISIN : CA2578751042
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Donner Metals Ltd.
9/26/2009Donner Metals already looking to next big Matagami discovery
Annual reports of Donner Metals Ltd.
2008 Annual report
Annual Report 2007
Financings of Donner Metals Ltd.
11/14/2012Announces Closing of C$1,439,000 Final Tranche Private Place...
2/28/2012Increases Private Placement Financing
2/27/2012Announces C$10,000,000 Private Placement Financing
11/16/2011$440,000 Non-Brokered Private Placement Closes
11/10/2011$2,000,000 Brokered Private Placement Closes
10/27/2011Announces C$2,440,000 of Private Placement Financings
7/27/2011$3 Million Private Placement
7/25/2011Funds Received, Private Placement Closed
7/13/2011Financing News
12/21/2010$1,500,000 Private Placement Closes
2/15/2010Additional Private Placement Closings
11/16/2009Private Placements close
7/10/2009Private Placements Close
5/14/2009Non-Brokered Financing
5/8/2009Brokered private placement totaling $954,353 closes
4/8/2009Brokered Private Placement
4/8/2009Private Placement Totalling $901,595 Closes
3/17/2009Non-Brokered Financing
1/7/2008 $3.2 Million Private Placement Closed
12/17/2007 Private Placement Increased to $3.2 Million
Nominations of Donner Metals Ltd.
12/8/2010Appoints Vice President of Engineering
Project news of Donner Metals Ltd.
4/26/2011(Matagami)Completes Earn-In on the Matagami Project
3/6/2011(Matagami)Bracemac-McLeod Ramp Moves Past 660 Metres
2/10/2011(Pd1) Matagami Project Advances as the PD1 Deposit Moves to Feasi...
1/14/2011(Pd1)(angl) 1.74 MILLION TONNES GRADING 4.55% ZINC
11/15/2010(Matagami)2.35% Copper Over 8.9 Metres Intersected in the North Flank ...
10/4/2010(Matagami)Xstrata Zinc To Conduct Definition Drilling at PD1 Deposit
9/2/2010(Matagami)Receives a Positive Feasibility Study for the Bracemac-McLeo...
9/1/2010(Matagami)Inferred Resources at Bracemac-McLeod Expand by 2.07 Million...
7/12/2010(Matagami)Drilling Extends McLeod Deep Discovery
3/7/2010(Matagami)Bracemac-McLeod Update
2/16/2010(Matagami)McLeod Deep Discovery Expanded-7.50 Metres Grading 10.27% Zi...
11/23/2009(Matagami)Expanded Winter Drill Progam Initiated at Matagami
10/1/2009(Matagami)Bracemac-McLeod Feasibility Advances as Exploration Continue...
7/15/2009(Matagami) BRACEMAC-MCLEOD advances to feasibility
6/5/2009(Matagami)on BNN and Matagami Project Details
5/25/2009(Matagami)Drilling to Resume at Matagami; Scoping Study Nears Completi...
3/12/2009(Matagami)NEW DISCOVERY AT MATAGAMI²
2/26/2009(Matagami)BRACEMAC-MCLEOD NI 43-101 INDICATED RESOURCE: 3,623,000 TONN...
2/26/2009(Matagami)UPDATED BRACEMAC-MCLEOD NI 43-101
2/11/2009(Matagami)featured on Minesite.com
1/26/2009(Matagami)NI43-101 Resource
1/23/2009(Matagami)INITIAL BRACEMAC-MCLEOD NI43-101 INDICATED RESOURCE
11/12/2008(Matagami)Assays Return High-Grade Zincand Copper from the McLeod Disc...
10/27/2008(Matagami)Scoping Study Initiated as Latest Step-Out ...
9/5/2008Provides Initial Results From a Single Drill Hole Program on...
5/27/2008(Matagami)Four New High GradeIntersections at Bracemac/McLeod Includin...
5/9/2008(Matagami)13.47% Zinc, 2.33% Copper Over 6.95 Metres Intersected at Br...
4/11/2008High Grade Discovered Between Bracemac and McLeod
3/3/2008New High Grade Intersections Expand Zones at Bracemac and Mc...
1/9/2008 Drilling Intersects 9.48% Zinc and 2.81% Copper Over 6.00
11/26/2007DRILLING INTERSECTS MORE HIGH GRADE SULPHIDES AT BRACEMAC AN...
9/13/2007(South Voisey's Bay)Exploration Program Planned for South Voisey Bay Nickel-Copp...
Corporate news of Donner Metals Ltd.
10/22/2012Announces Results from Annual General Meeting, Head Office M...
10/22/2012Announces Results from Annual General Meeting, Head Office M...
7/13/2011Sandstorm Provides US$25 Million Senior Financing
11/29/2010Development of the Year!
10/23/2010Amendment to Warrant Terms
4/14/2010Definition Drill Program Completed at Bracemac-McLeod
2/3/2010$2,409,930 Financing Closed
1/30/2010Financing Increased
9/8/2009engineering contract and fast-tracked feasibility
8/24/2009Two Near Term Production Stories
6/22/2009Industrial Alliance Features Report on Donner Metals
5/19/2009A "Green Shoot" Rising
5/14/2009Is At The Starting Gate
4/14/2009Chinese zinc imports rise as domestic prices outperform LME ...
3/13/2009Xstrata and Donner Team Up to Exploit Matagami
2/26/2009Hotsheet
2/18/2009positioned for success
2/9/2009featured in Mining Journal
12/12/2008$1,048,000 Financing Closes
12/4/2008 AND XSTRATA ZINC CANADA WIN INTERNATIONAL EXPLORATION AWARD
11/25/2008$1.0 Million Financing
11/18/2008Donner Metals has fast-track potential says Reinhard
7/31/2008 Drilling Continues toDelineate and Expand Mineralization at...
8/1/2008Hotsheet for 7/31/2008
6/6/2008Hotsheet for 6/6/2008
6/6/2008$3.2 Million of Debentures Issued
5/28/2008$3 Million Debenture Offering
5/27/2008Hotsheet for 5/27/2008
4/11/2008Hotsheet for 4/11/2008
3/20/2008March Chairman's Letter
3/5/2008Hotsheet for 3/5/2008
2/1/2008Engages Mau Capital to Provide Investor Relations
1/8/2008Hotsheet for 1/8/2008
11/28/2007Expands Interest in Matagami Camp
11/8/2007Join us at the San Francisco Hard Assets Investment Conferen...
10/22/2007 Hotsheet for 10/21/2007
10/10/2007Corporate Update
8/2/20076 New Massive Sulphide =?ISO-8859-1?Q?=20Intersections,=20In...
6/14/2007New Zinc-Copper Discover 9.24% Zinc, 0.99% Copper Over 27.95...
6/7/2007Bracemac Yields Additional Results With New Mineralization I...
4/11/2007Copper-Rich Massive Sulphides Intersected in BRC-07-32 in th...
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (DON.V)FRANKFURT (D4M.F)
0.120+9.09%0.101+8.60%
TSX-V
CA$ 0.120
05/22 15:59 0.010
9.09%
Prev close Open
0.110 0.120
Low High
0.120 0.120
Year l/h YTD var.
0.110 -  0.180 -33.33%
52 week l/h 52 week var.
0.110 -  0.200 -36.84%
Volume 1 month var.
900,450 -%
24hGold TrendPower© : -37
Produces
Develops
Explores for Copper - Gold - Nickel - Palladium - Platinum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-40.00%
20120.00%0.270.16
2011-25.93%0.370.17
201012.50%0.370.18
2009200.00%0.280.08
 
5 years chart
 
3 months chart
 
3 months volume chart