Capstone Mining Corp.

Published : February 02nd, 2012

Capstone Completes Another Successful Drill Season at Minto Mine

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Capstone Mining Corp. TSX:CS
Suite 900 - 999 West Hastings Street
Vancouver, B.C. V6C 2W2
Tel: (604) 684-8894
Fax: (604) 688-2180



Capstone Completes Another Successful Drill Season at Minto Mine


Additional 67 Million Pounds of Copper in M&I Mineral Resource and New High Grade Copper-Gold Discovery

VANCOUVER, Feb. 2, 2012 /CNW/ - Capstone Mining Corp. ("Capstone") (TSX: CS) today announced the result of an updated National Instrument 43-101 compliant mineral resource estimate for the Wildfire/Copper Keel area at its Minto Mine in Yukon, Canada.  Follow-up drilling in the Copper Keel region of Minto South Deposit ("MSD") in the second half of 2011 has added an additional 67 million pounds of copper resource in the measured and indicated categories.  At a 0.5% copper cut-off grade, total mineral resources at the Minto Mine exceeds 1.1 billion pounds of copper.

In addition, the 2011 drill program produced a new discovery called Fireweed. A total of 26 holes were drilled on Fireweed "A" and "B". The best intercept to date is 3.2% Cu & 1.0g/t Au over 16.6 metres including 6.8% Cu and 1.9g/t Au over 7.1 metres in hole 11SWC-871 at Fireweed A and  3.4% Cu and 1.4g/t Au over 14.4 metres including 4.2% Cu & 1.3g/t Au over 7.6 metres in hole 11SWC-882 at Fireweed B.  Fireweed "A" is located approximately 200 metres east of the Minto East deposit and Fireweed "B" lies a further 170 metres east of Fireweed "A".  Fireweed drilling highlights are summarized in a table below and the full results are attached.

"Exploration success at Minto continues to translate into mineral resource additions to support our objective of organic growth at our existing mining operations," said Brad Mercer, Vice President, Exploration for Capstone.  "Since 2006, the Minto Mine has achieved steady mineral resource increases through a program of discovery followed by feasibility studies in a series of phases.  This updated mineral resource will be included in the next Pre-Feasibility Study, which is currently underway."

"The latest new Fireweed discovery, not yet included in any mineral resource estimate, was made by testing a geological target that became compelling after we completed a new 3D geology model of MSD," continued Mr. Mercer.  "Future exploration at Minto will focus on depth, exploring beyond the limits of our existing geophysical surveys as our understanding of Minto's geology evolves," he added.

Drilling operations have begun again in 2012 on a $4.8 million exploration drill program (23,500 metres).  Drilling will initially in-fill the relatively shallow gap between the MSD and the Ridgetop deposits. After that, the Company will follow-up its latest exploration success by refocusing on Fireweed and on the potential for further high grade mineralization at depth in the Minto system. As in previous years, the 2012 program will be conducted in two phases, winter and summer, separated by a pause in the spring for thaw and freshet.  It is anticipated that the Company will provide an update of exploration results part way through 2012 when drilling is paused between phases.

Minto South Deposit (MSD) - Updated Mineral Resource Estimate effective as at December 31, 2011

The Wildfire/Copper Keel area is a southeastwardly extension of the Minto South Deposit.  On May 30, 2011 the Company announced a mineral resource gain of 219 million pounds of copper from drilling conducted in 2010 and early 2011 in the Wildfire/Copper Keel area of MSD. Geological modelling incorporating these drill holes indicated geological continuity between the Wildfire/Copper Keel region and the Area 2/118 region and supported a geological reinterpretation indicating these areas are part of one larger deposit (MSD) and not separate deposits as initially thought.  Subsequently, drilling in mid to late 2011 in the same area now brings the total holes in the current estimate to 423 and added a further 67 million pounds of copper in the M&I Class for MSD. Data from these latest drill holes add further confidence in geological continuity of mineralization modelled in the previous MSD estimate and also expands the limits of mineralization northward on the Copper Keel levels of MSD from the May 30, 2011 model.

Below are tables summarizing the new total mineral resource estimate for MSD and the gain in mineral resources at MSD since the last estimate.

Total Mineral Resources by Class for the Minto South Deposit**, *** at a 0.5% copper cut-off grade ("Cu COG")

Classification Tonnes
(000's)*
Copper
(%)
Gold
(g/t)
Silver
(g/t)
Contained Cu
(000's lbs)*
Contained Gold
(000's oz)*
Contained Silver
(000's oz)*
Measured (M) 10,387 1.21 0.45 4.07 278,028 151 1,360
Indicated (I) 28,556 0.98 0.32 3.44 616,152 290 3,162
Total (M+I) 38,943 1.04 0.35 3.61 894,180 441 4,522
Additional Inferred 8,134 0.81 0.24 2.93 145,718 63 767

*Rounded to nearest thousand; totals may not sum exactly due to rounding.
** Includes material mined but not processed during pre-stripping activities in the Area 2 region of MSD and currently held in stockpile.

Mineral Resources Addition by Class in the Wildfire/Copper Keel Region of MSD since May 30, 2011 at a 0.5% Cu COG

Classification Tonnes
(000's)*
Copper
(%)
Gold
(g/t)
Silver
(g/t)
Contained Cu
(000's lbs)*
Contained Gold
(000's oz)*
Contained Silver
(000's oz)*
Measured (M) 296 0.54 0.15 4.17 3,554 1 40
Indicated (I) 2,262 1.27 0.37 4.80 63,446 27 349
Total (M+I) 2,558 1.19 0.35 4.73 67,000 28 389
Additional Inferred 705 0.74 0.33 4.41 11,422 8 100

*Rounded to nearest thousand; totals may not sum exactly due to rounding.

Mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral resource estimates do not account for mineability, selectivity, mining loss and dilution. These mineral resource estimates include inferred mineral resources that are normally considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is also no certainty that these inferred mineral resources will be converted to measured and indicated categories through further drilling, or into mineral reserves, once economic considerations are applied.

Total Mineral Resources at the Minto Mine as of December 31, 2011

The table immediately below summarizes the total mineral resource on the Minto property at a COG of 0.5% Cu. It includes the undeveloped Minto North, Minto East and Ridgetop deposits and the Minto South deposit where development (pre-stripping) is underway plus a small amount of resource remaining on the east flank of the Minto Main open pit that is relatively low grade and not considered in any current mine plan.

Total Mineral Resources by Class for all Minto Mine Deposits**, *** at a 0.5% Cu COG

Classification Tonnes
(000's)*
Copper
(%)
Gold
(g/t)
Silver
(g/t)
Contained Cu
(000's lbs)*
Contained Gold
(000's oz)*
Contained Silver
(000's oz)*
Measured (M) 14,828 1.35 0.53 4.43 441,744 254 2,114
Indicated (I) 33,103 0.98 0.32 3.42 714,010 341 3,643
Total (M+I) 47,931 1.09 0.39 3.73 1,155,754 595 5,758
Additional Inferred 8,493 0.81 0.24 2.88 151,764 65 788

*Rounded to nearest thousand; totals may not sum exactly due to rounding.
** Includes material mined but not processed during pre-stripping activities in the Area 2 region of MSD and currently held in stockpile.
***Includes any resources remaining in the Minto Main Deposit not considered in current mine plans but excludes material existing in stockpiles that originated from the Minto Main Deposit.

Appended to this release are tables summarizing both the MSD and the total Minto Mine mineral resources at various copper COGs. Please note that estimated grade and tonnage stated at copper COGs below 0.5% copper are for illustrative purposes to show the sensitivity of the mineral resource to decreasing copper COGs.

Also note that mineral resources at higher cut-off grades are also for illustrative purposes and do not necessarily imply a higher potential for economic extraction. Only those mineral reserves determined by previous feasibility studies to be mineral reserves are currently considered economically viable. The property-wide mineral resource numbers reported herein are inclusive of all previously defined mineral reserves that are currently supported by previous pre-feasibility work. Please refer to the Technical Report titled Minto Phase V Preliminary Feasibility Study Technical Report dated December 15, 2010 filed on SEDAR for any further discussion about mineral reserves at Minto. A new pre-feasibility study (Phase VI) is currently underway to apply economic considerations to the newly estimated mineral resources in the Wildfire/Copper Keel extension of the MSD.

Mineral Resource Estimate Methodology

The mineral resource estimate for the Wildfire/Copper Keel addition to the Minto South Deposit reported herein was prepared by SRK Consulting of Vancouver.  The estimate was completed in Gemcom Software GEMS using a three dimensional block model (10 metres by 10 metres by 3 metres (vertical) block size).  The mineralization was interpreted into nine distinct domains, modelled as wireframes and used as hard boundaries to constrain estimation.  Geostatistical analysis was completed on the 1.5 metre composite assay data for each of the metals, and variograms were defined for each domain of mineralization.  The grades for copper and gold were interpolated into the block model using ordinary kriging method, whereas the silver grades were interpolated using the inverse distance squared method only.  Interpolated results are reported in measured, indicated and inferred categories and are based on continuity of the mineralization and sample density.

Fireweed Exploration Discovery

A summary of selected drill intercepts from the 2011 Fireweed discovery are below, and a complete summary for all Fireweed drill intercepts is attached.

Highlights of Recent Drilling at Fireweed

Hole ID Target Area From
(m)
To
(m)
Interval
(m) (*)
Interval
(ft) (*)
Copper
(%)
Gold
(g/t)
Silver
(g/t)
11SWC-871 Fireweed "A" 352.1 368.7 16.6 (16.2) 54.5 (53.1) 3.21 0.99 13.3
including   352.1 359.2 7.1 (6.9) 23.3 (22.6) 6.77 1.87 28.5
11SWC-866 Fireweed "B" 452.2 468.8 16.6 (15.6) 54.5 (51.2) 2.33 1.55 9.3
including   455.0 461.7 6.7 (6.3) 22.0 (20.7) 3.73 2.42 13.9
11SWC-882 Fireweed "B" 397.4 411.8 14.4 (14.2) 47.2 (46.6) 3.35 1.42 10.7
including   397.4 405.0 7.6 (7.5) 24.9 (24.6) 4.19 1.25 10.2
11SWC-884 Fireweed "B" 393.4 406.7 13.3 (13.1) 43.6 (43.0) 3.04 1.87 12.1
including   400.6 406.2 5.6 (5.5) 18.4 (18.0) 4.03 2.88 18.5

(*) Estimated true thickness in parentheses.

Drill Hole Location Maps

For current drillhole locations please view the accompanying map:
http://capstonemining.com/i/maps/2011-13CSCurrentDrillHoleLocations.jpg

For a current view of drill results in the Fireweed area please view the accompanying map:
http://capstonemining.com/i/maps/2011-13MintoDrillResultsUpdate.jpg

Quality Assurance

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ("NI 43-101") and supervised and reviewed by Brad Mercer, P. Geol., Vice President, Exploration for Capstone a "Qualified Person" as defined in National Instrument 43-101 and the person who oversees exploration activities on the Minto Mine property.  In addition, Gregg Bush, Senior Vice President and Chief Operating Officer for Capstone, reviewed and approved this news release

The mineral resource estimate reported herein for the Minto South Deposit (including Area 2, Area 118, and Wildfire/Copper Keel zones) was estimated by Wayne Barnett, Pr.Sci.Nat. and Marek Nowak, P. Eng. of SRK Consulting. Dr. Barnett is the Independent Qualified Person under NI 43-101 responsible for the MSD mineral resource estimate and has reviewed the information in this release in respect of the MSD mineral resource estimate. The database used to estimate the Wildfire/Copper Keel deposit was audited by SRK. SRK is of the opinion that the current drilling information is sufficiently reliable to extend with confidence the boundaries of the mineralized domains from Area 2 into Wildfire/Copper Keel, and that the assaying data is sufficiently reliable to support estimating mineral resources. The mineral resources presented herein have been estimated in conformity with generally accepted CIM "Estimation of Mineral Resource and Mineral Reserves Best Practices" guidelines and are reported in accordance with Canadian Securities Administrators' National Instrument 43-101. Mineral resources are not mineral reserves and do not have demonstrated economic viability. In the opinion of SRK, the block model resource estimate and resource classification reported herein are a reasonable representation of the mineral resources at Wildfire/Copper Keel deposit at the current level of sampling.

With respect to the MSD mineral resource estimate and the Fireweed discovery, the analytical method for the copper and silver analyses is aqua regia digestion of the samples followed by atomic absorption spectroscopy.  Gold is analysed by fire assay fusion with atomic absorption spectroscopy finish.  Analyses are carried out by ALS Chemex in North Vancouver. When visible gold is noted in drill core samples or regular fire assay values appear abnormally high, screen metallic assay method is used to determine the total gold content and gold content of different size fractions. This is considered industry best practice when dealing with coarse gold mineralization where a nugget effect is suspected. This determination is accepted as the most representative value and is used in the assay database for resource calculations. Blank and standard samples are used for quality assurance and quality control.  Where more than two check samples assay outside expected ranges, the entire batch is re-assayed. After the completion of planned drill programs, random check assays will be carried out by Inspectorate-IPL of Vancouver.

Cautionary Note Regarding Forward-Looking Information

This document may contain "forward-looking information" within the meaning of Canadian securities legislation and "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, "forward-looking statements"). These forward-looking statements are made as of the date of this document and Capstone Mining Corp. (the "Company") does not intend, and does not assume any obligation, to update these forward-looking statements, except as required under applicable securities legislation. 

Forward-looking statements relate to future events or future performance and reflect Company management's expectations or beliefs regarding future events and include, but are not limited to, statements with respect to the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, success of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims and limitations on insurance coverage. In certain cases, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative of these terms or comparable terminology. By their very nature forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, risks related to actual results of current exploration activities; changes in project parameters as plans continue to be refined; future prices of mineral resources; possible variations in ore reserves, grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities; as well as those factors detailed from time to time in the Company's interim and annual financial statements and management's discussion and analysis of those statements, all of which are filed and available for review on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements.

Accordingly, readers should not place undue reliance on forward-looking statements.

Minto South Deposit (MSD) ** -- Mineral Resources by Class at Select Copper Cut-offs

Classification Cut-Off
(Cu%)
Tonnes
(000's)*
Copper
(%)
Gold
(g/t)
Silver
(g/t)
Contained
Copper
(000's lbs)*
Contained
Gold
(000's oz)*
Contained
Silver
(000's oz)*
Measured (M) >2.0 1,363 2.55 1.13 9.3 76,639 50 408
  >1.5 2,836 2.12 0.89 7.53 132,668 81 687
  >1.0 5,198 1.72 0.68 5.93 196,891 114 991
  >0.5 10,387 1.21 0.45 4.07 278,028 151 1,360
  >0.4 12,517 1.08 0.4 3.6 299,024 159 1,450
  >0.3 15,562 0.94 0.33 3.1 322,329 167 1,550
  >0.2 19,860 0.79 0.28 2.58 345,700 176 1,649
                 
Indicated (I) >2.0 1,699 2.55 0.93 9.86 95,645 51 539
  >1.5 3,973 2.08 0.74 7.85 181,856 95 1,003
  >1.0 9,215 1.58 0.55 5.81 321,833 163 1,723
  >0.5 28,556 0.98 0.32 3.44 616,152 290 3,162
  >0.4 38,223 0.84 0.27 2.95 711,454 326 3,625
  >0.3 52,740 0.71 0.22 2.47 822,695 365 4,182
  >0.2 72,825 0.58 0.17 2.03 931,449 400 4,748
                 
Sub-total (M+I) >2.0 3,062 2.55 1.02 9.61 172,284 101 947
  >1.5 6,809 2.10 0.80 7.72 314,524 176 1,690
  >1.0 14,413 1.63 0.60 5.85 518,724 277 2,714
  >0.5 38,943 1.04 0.35 3.61 894,180 441 4,522
  >0.4 50,740 0.90 0.30 3.11 1,010,478 485 5,075
  >0.3 68,302 0.76 0.25 2.61 1,145,024 532 5,732
  >0.2 92,685 0.62 0.19 2.15 1,277,149 576 6,397
                 
Additional Inferred >2.0 193 2.35 0.83 10.68 9,986 5 66
  >1.5 368 2.04 0.75 8.9 16,519 9 105
  >1.0 1,415 1.46 0.55 6.31 45,581 25 287
  >0.5 8,134 0.81 0.24 2.93 145,718 63 767
  >0.4 12,577 0.68 0.19 2.4 189,501 76 970
  >0.3 18,715 0.57 0.15 1.97 236,244 89 1,186
  >0.2 27,810 0.47 0.12 1.61 285,449 103 1,443

*Rounded to nearest thousand; totals may not sum exactly due to rounding.
** Includes mineral resources mined during pre-stripping of waste rock at Area 2 that is currently unprocessed and located in stockpile.

Total Minto Resources**, *** -- Mineral Resources by Class at Select Copper Cut-offs

Classification Cut-Off
(Cu%)
Tonnes
(000's)*
Copper
(%)
Gold
(g/t)
Silver
(g/t)
Contained
Copper
(000's lbs)*
Contained
Gold
(000's oz)*
Contained
Silver
(000's oz)*
Measured (M) >2.0 2,500 3.01 1.49 10.60 166,001 119 852
  >1.5 4,451 2.45 1.13 8.44 240,160 162 1,209
  >1.0 7,799 1.93 0.82 6.45 331,018 206 1,618
  >0.5 14,828 1.35 0.53 4.43 441,744 254 2,114
  >0.4 17,444 1.21 0.47 3.97 467,567 263 2,228
  >0.3 20,996 1.07 0.40 3.48 494,796 273 2,349
  >0.2 25,711 0.92 0.35 2.97 520,470 282 2,460
                 
Indicated (I) >2.0 2,039 2.56 0.99 9.78 115,414 64 641
  >1.5 4,632 2.10 0.78 7.85 213,642 116 1,170
  >1.0 10,564 1.59 0.57 5.83 372,022 195 1,983
  >0.5 33,103 0.98 0.32 3.42 714,010 341 3,643
  >0.4 44,440 0.84 0.27 2.92 825,791 383 4,178
  >0.3 61,443 0.71 0.22 2.44 956,030 427 4,820
  >0.2 85,290 0.58 0.17 2.00 1,085,256 469 5,480
                 
Sub-total (M+I) >2.0 4,539 2.81 1.26 10.23 281,415 184 1,493
  >1.5 9,083 2.27 0.95 8.14 453,802 278 2,379
  >1.0 18,362 1.74 0.68 6.10 703,039 401 3,601
  >0.5 47,931 1.09 0.39 3.73 1,155,754 595 5,758
  >0.4 61,884 0.94 0.33 3.22 1,293,359 646 6,406
  >0.3 82,440 0.80 0.27 2.71 1,450,826 700 7,169
  >0.2 111,002 0.66 0.21 2.23 1,605,725 751 7,940
                 
Additional Inferred >2.0 194 2.35 0.83 10.69 10,022 5 66
  >1.5 379 2.03 0.75 8.82 16,919 9 107
  >1.0 1,475 1.45 0.53 6.13 47,286 25 291
  >0.5 8,493 0.81 0.24 2.88 151,764 65 788
  >0.4 13,103 0.68 0.19 2.37 197,205 78 998
  >0.3 19,478 0.57 0.15 1.95 245,766 92 1,221
  >0.2 28,963 0.47 0.12 1.59 297,090 106 1,489

* Rounded to nearest thousand; totals may not sum exactly due to rounding.
** Includes material mined during pre-stripping at Area 2 currently located in stockpiles.
***Includes any insitu resources remaining in the mined out Minto Main Deposit open pit mine that is not considered in any current mine plan but excludes material that still exists in stockpiles that originated from the Minto Main Deposit.

Details of Fireweed Prospect Drill Results

To accompany Capstone Mining News Release Dated February 1, 2012

Hole ID
& Interval
Target Collar
UTM X
Collar
UTM Y
Collar
UTM Z
Azimuth Dip From To Int.
(m) (*)
Int.
(feet) (*)
Cu
(%)
Au
(g/t)
Ag
(g/t)
(m) (m)
11SWC-859 Fireweed-A 385251 6945041 784 0 -90 112.0 151.6 39.6 129.9 0.50 0.14 1.2
and             216.7 224.9 8.2 26.9 1.16 0.28 2.0
including             218.4 221.7 3.3 10.8 1.46 0.34 1.9
and             318.0 327.2 9.2 30.2 1.50 1.03 7.4
including             323.1 327.2 4.1 13.5 2.93 2.16 15.3
and             333.6 349.0 15.4 50.5 0.60 0.24 2.2
                           
11SWC-860 Fireweed-A 385261 6945044 783 191 -81 102.1 139.8 37.7 (37.2) 123.7 (122.0) 0.62 0.18 1.8
including             131.5 139.8 8.3 (8.2) 27.2 (26.9) 1.37 0.30 3.6
and             201.1 207.0 5.9 (5.8) 19.4 (19.0) 0.84 0.19 2.4
                           
11SWC-861 Fireweed-A 385261 6945042 783 94 -85 89.9 143.5 53.6 (53.4) 175.9 (175.2) 0.63 0.22 2.1
including             122.6 140.5 17.9 (17.8) 58.7 (58.4) 0.85 0.36 2.9
and             217.5 221.4 3.9 (3.9) 12.8 (12.8) 1.21 0.29 2.8
and             315.0 318.4 3.4 (3.4) 11.2 (11.2) 1.98 1.37 12.2
and             326.1 343.1 17.0 (16.9) 55.8 (55.4) 0.63 0.23 2.1
                           
11SWC-862 Fireweed-A 385261 6945043 783 264 -79 126.7 150.1 23.4 (23.0) 76.8 (75.5) 0.50 0.11 1.2
and             205.1 216.4 11.3 (11.1) 37.1 (36.4) 0.90 0.23 2.2
including             213.9 216.4 2.5 (2.5) 8.2 (8.2) 1.79 0.56 6.2
                           
11SWC-863 Fireweed-A 385302 6945012 783 40 -80 78.0 114.8 36.8 (36.2) 120.7 (118.8) 0.69 0.18 1.9
including             87.0 105.0 18.0 (17.7) 59.1 (58.1) 0.93 0.25 2.5
and             136.1 142.9 6.8 (6.7) 22.3 (22.0) 1.11 0.23 3.2
                           
11SWC-865 Fireweed-A 385302 6945013 783 225 -84 91.5 126.2 34.7 (34.5) 113.8 (113.2) 0.51 0.15 1.2
and             321.7 326.6 4.9 (4.9) 16.1 (16.1) 0.81 0.19 2.3
                           
11SWC-867 Fireweed-A 385302 6945013 783 107 -81 91.5 135.5 44.0 (43.5) 144.4 (142.7) 0.57 0.15 1.7
including             101.0 112.0 11.0 (10.9) 36.1 (35.8) 0.99 0.29 3.0
and             356.2 363.3 7.1 (7.0) 23.3 (23.0) 0.61 0.23 1.5
and              388.9 392.3 3.4 (3.4) 11.2 (11.2) 0.77 0.27 3.0
                           
11SWC-868 Fireweed-A 385302 6945011 784 150 -78 93.0 124.2 31.2 (30.5) 102.4 (100.1) 0.61 0.15 1.4
including             110.2 114.2 4.0 (3.9) 13.1 (12.8) 1.41 0.23 2.9
and             379.1 383.0 3.9 (3.8) 12.8 (12.5) 0.52 0.26 2.8
                           
11SWC-870 Fireweed-A 385302 6945012 783 191 -78 95.6 120.8 25.2 (24.6) 82.7 (80.7) 0.50 0.12 1.3
including             100.5 106.8 6.3 (6.2) 20.7 (20.3) 0.97 0.20 2.4
and             181.5 186.6 5.1 (5.0) 16.7 (16.4) 1.14 0.17 2.5
and             349.0 355.9 6.9 (6.7) 22.6 (22.0) 0.66 0.22 3.5
                           
11SWC-871 Fireweed-A 385261 6945043 783 335 -78 83.0 149.5 66.5 (65.0) 218.2 (213.3) 0.47 0.13 1.4
including             128.0 139.5 11.5 (11.2) 37.7 (36.7) 0.82 0.24 2.7
and             191.2 197.2 6.0 (5.9) 19.7 (19.4) 0.46 0.04 1.0
and              352.1 368.7 16.6 (16.2) 54.5 (53.1) 3.21 0.99 13.3
including             352.1 359.2 7.1 (6.9) 23.3 (22.6) 6.77 1.87 28.5
                           
11SWC-872 Fireweed-A 385349 6944765 788 0 -90 Geochemically Anomalous - No Significant Assays
                           
11SWC-873 Fireweed-A 385260 6945044 783 28 -78 81.5 145.0 63.5 (62.1) 208.3 (203.7) 0.67 0.25 2.0
including             94.0 107.4 13.4 (13.1) 44.0 (43.0) 1.03 0.41 2.7
and             355.3 382.0 26.7 (26.1) 87.6 (85.6) 0.96 0.41 3.0
including             357.5 378.4 20.9 (20.4) 68.6 (66.9) 1.07 0.47 3.5
including             357.5 370.5 13.0 (12.7) 42.7 (41.7) 1.18 0.51 4.1
                           
11SWC-877 Fireweed-A 385124 6945228 809 0 -90 237.0 247.2 10.2 33.5 0.38 0.08 1.8
and             346.4 352.7 6.3 20.7 0.41 0.13 1.6
and             400.5 404.1 3.6 11.8 0.45 0.23 2.2
                           
11SWC-879 Fireweed-A 385261 6945043 783 334 -70 94.9 105.2 10.3 (9.7) 33.8 (31.8) 0.49 0.13 1.4
and             125.0 191.2 66.2 (62.2) 217.2 (204.1) 0.27 0.08 1.0
and             372.5 390.7 18.2 (17.1) 59.7 (56.1) 0.70 0.30 3.0
including             375.2 380.3 5.1 (4.8) 16.7 (15.7) 1.04 0.59 5.8
                           
11SWC-858 Fireweed-B 385577 6944831 783 0 -90 175.6 177.1 1.5 4.9 2.51 0.12 6.0
                           
11SWC-864 Fireweed-B 385482 6945239 769 40 -75 Geochemically Anomalous - No Significant Assays
                           
11SWC-866 Fireweed-B 385485 6945185 771 147 -70 452.2 468.8 16.6 (15.6) 54.5 (51.2) 2.33 1.55 9.3
including             455.0 461.7 6.7 (6.3) 22.0 (20.7) 3.73 2.42 13.9
                           
11SWC-869 Fireweed-B 385485 6945185 771 147 -77 451.2 455.4 4.2 (4.1) 13.8 (13.5) 0.40 0.49 3.7
                           
11SWC-874 Fireweed-B 385573 6944996 767 197 -85 139.7 147.0 7.3 (7.3) 24.0 (24.0) 0.55 0.19 2.9
and             202.5 204.5 2.0 (2.0) 6.6 (6.6) 1.02 0.26 8.7
and             386.0 395.4 9.4 (9.4) 30.8 (30.8) 1.52 0.94 6.3
                           
11SWC-881 Fireweed-B 385613 6944998 765 25 -87 103.8 107.0 3.2 (3.2) 10.5 (10.5) 3.14 2.00 35.5
and             397.0 406.8 9.8 (9.8) 32.2 (32.2) 1.98 1.11 9.8
including             400.4 404.8 4.4 (4.4) 14.4 (14.4) 2.66 1.43 12.8
                           
11SWC-882 Fireweed-B 385577 6944992 766 284 -81 397.4 411.8 14.4 (14.2) 47.2 (46.6) 3.35 1.42 10.7
including             397.4 405.0 7.6 (7.5) 24.9 (24.6) 4.19 1.25 10.2
                           
11SWC-883 Fireweed-B 385613 6944998 765 165 -85 Drillhole Abandoned
                           
11SWC-883A Fireweed-B 385613 6944998 765 165 -85 119.4 121.7 2.3 (2.3) 7.5 (7.5) 1.91 0.09 4.9
and             378.5 387.3 8.8 (8.8) 28.9 (28.9) 1.76 1.13 8.0
including             379.5 385.1 5.6 (5.6) 18.4 (18.4) 2.39 1.50 10.5
                           
11SWC-884 Fireweed-B 385577 6944992 766 240 -81 393.4 406.7 13.3 (13.1) 43.6 (43.0) 3.04 1.87 12.1
including             400.6 406.2 5.6 (5.5) 18.4 (18.0) 4.03 2.88 18.5
                           
11SWC-885 Fireweed-B 385584 6944993 766 184 -79 380.7 383.5 2.8 (2.7) 9.2 (8.9) 1.26 0.55 7.9
                           
11SWC-886 Fireweed-B 385684 6945020 761 0 -90 395.5 412.5 17.0 55.8 1.34 0.61 6.1
including             395.5 399.0 3.5 11.5 3.31 1.78 15.8

(*) Estimated true thickness in parentheses.

Drill Collars - Coordinates are in UTM NAD83 Zone 8. 

 

 

 

 

 

 

For further information:

Capstone Mining Corp.
Cindy Burnett, VP, Investor Relations
Telephone: 604-637-8157
Email: cburnett@capstonemining.com
Website: www.capstonemining.com

.
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Capstone Mining Corp.

PRODUCER
CODE : CS.TO
ISIN : CA14068G1046
CUSIP : 14067U104
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Capstone Mining is a copper producing company based in Canada.

Capstone Mining produces copper, gold, lead, silver and zinc in Canada and in Mexico, develops copper, gold, silver and zinc in Canada.

Its main assets in production are MINTO MINE in Canada and COZAMIN BACIS in Mexico and its main asset in development is KUTCHO in Canada.

Capstone Mining is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 3.5 billions as of today (US$ 2.6 billions, € 2.4 billions).

Its stock quote reached its lowest recent point on December 06, 2002 at CA$ 0.11, and its highest recent level on April 23, 2024 at CA$ 8.97.

Capstone Mining has 390 500 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Capstone Mining Corp.
12/31/2007Corporate Presentation
In the News and Medias of Capstone Mining Corp.
11/26/2018Capstone Mining mulls selling stake in Chile-based copper-ir...
Annual reports of Capstone Mining Corp.
2007 Annual Report
Nominations of Capstone Mining Corp.
5/14/2013Capstone Appoints D. James Slattery as Chief Financial Offic...
6/4/2012Capstone Mining Appoints Director
9/14/2011Capstone Appoints Santo Domingo General Manager and Awards E...
4/14/2011Reports Change to its Board
Financials of Capstone Mining Corp.
7/28/2015Second Quarter 2015 Financial Results
2/21/2014Capstone Mining Reports Financial Results
2/21/2014Reports Financial Results for Pivotal Year
1/13/2014Capstone Mining 2013 Fourth Quarter and Full
10/30/2013Capstone Mining 2013 Third Quarter Continues
10/10/2013Capstone Mining 2013 Third Quarter
7/11/2013Capstone Mining 2013 Second Quarter
5/8/2013Capstone Mining 2013 First Quarter Financial
4/11/2013Capstone Mining 2013 First Quarter
11/8/2012Capstone Reports 2012 Third Quarter Financial Results; Cash ...
8/15/2012Capstone Reports 2012 Second Quarter
5/10/2012Capstone Reports Solid 2012 First Quarter
8/15/2011Capstone Reports Second Quarter 2011
5/25/2011Capstone Reports First Quarter 2011 Financial Results
11/7/2008Reports Financial Results For The Third Quarter
7/23/2008To Release Second Quarter Results
7/9/2008Announces Production and Sales for the Second Quarter of 200...
4/30/2008 Reports Record Operating Profit Of $15.9 Million For The Fi...
4/23/2008To Release First Quarter Results On Tuesday April 29, 2008
4/16/2008 Announces Production And Sales For The First Quarter Of 200...
11/15/2007Year-End and Fourth Quarter Results
Project news of Capstone Mining Corp.
9/22/2014(Minto Mine)Receives Quartz Mining License Amendment for Minto Mine
12/3/2013Capstone Mining Provides Pinto Valley Production Update
10/11/2013Capstone Mining Completes Acquisition of
8/8/2013Capstone Mining Acquires Option on 350,000 Hectare Explorati...
6/11/2013Capstone Mining Provides Update on Pinto Valley Acquisition
10/25/2012Capstone adds 101 Million Pounds of Copper in Indicated Mine...
6/18/2012Capstone Completes Minto Mine Phase VI
2/8/2012Capstone Updates Mineral Resource Estimate for Footwall Zone...
2/2/2012Capstone Completes Another Successful Drill Season at Minto ...
6/20/2011Capstone Announces Initial Mineral Resource
6/17/2011Capstone Completes Acquisition of Far West Mining and Transa...
6/14/2011Capstone Mining and Far West Mining Approve Acquisition and ...
5/30/2011Capstone Adds 219 Million Pounds of Copper in M&I Mineral Re...
5/2/2011Capstone Reports Additional High Grade
4/14/2011Capstone Reports High Grade Intercepts at
3/14/2011Capstone Completes Prefeasibility Study on Phase V Expansion...
2/24/2011(Kutcho)Reports 2011 Prefeasibility Study for Kutcho Copper-Zinc Pro...
2/24/2011Capstone Reports 2011 Prefeasibility Study
2/17/2009(Minto)Reports 5th New High Grade Copper-Gold Discovery at Minto Mi...
2/9/2009Announces Robust Mineral Resource Update for High Grade Kutc...
2/4/2009(Cozamin Bacis)Reports Record Copper Production for 2008 and Increases Fore...
1/10/2008(Cozamin Bacis)Highlights Production and Sales for the Four Months Ended De...
10/16/2007(Cozamin Bacis)Capstone Increases Resources to 8.6 Million Tonnes at the Co...
10/11/2007(Cozamin Bacis) Declares Expanded Commercial Production at Cozamin and High...
Corporate news of Capstone Mining Corp.
7/26/2016Capstone reports 2Q loss
4/26/2016Capstone reports 1Q loss
1/19/2016Capstone Mining to Attend Upcoming Investor Conferences
1/18/2016Capstone Mining 2016 Operating and Capital Guidance
1/18/2016Capstone Extends Pinto Valley Mine Life to 2039
1/6/2016Edited Transcript of CS.TO earnings conference call or prese...
11/25/2015Capstone Mining to Attend Upcoming Investor Conferences
10/27/2015Capstone reports 3Q loss
10/13/2015Capstone Mining 2015 Third Quarter Production Results
9/9/2015Capstone Mining Announces Spending Cuts in Response to Marke...
9/8/2015Capstone Mining to Attend Upcoming Investor Conference
8/27/2015Edited Transcript of CS.TO earnings conference call or prese...
8/5/2015Capstone Mining Receives Water Use Licence for Minto Mine
8/3/2015Zacks Investment Ideas feature highlights: Avino Silver and ...
7/28/2015Capstone Mining Second Quarter 2015 Financial Results
7/13/2015Capstone Mining 2015 Second Quarter Production Results
7/8/2015Capstone Mining Receives Approval of Environmental Impact As...
4/13/2015Capstone Mining 2014 First Quarter Production Results
4/1/2015Capstone Mining Publishes Inaugural Sustainability Report
4/1/2015Publishes Inaugural Sustainability Report
2/19/2015to Attend Upcoming Investor Conferences
12/1/2014to Attend Upcoming Investor Conferences
10/29/2014Capstone Mining Reports Another Quarter of Record Cash Flow
10/14/2014Capstone Mining to Attend Upcoming Investor Conference
9/12/2014Discontinues Planned Offering of $300 million Senior Notes
9/5/2014Announces Launch of $300 million Senior Notes Offering
5/7/2014Reports Operating Cash Flow Increases 134% to $47.1 Million
4/10/2014Record 2014 First Quarter Production Results
3/26/2014Extends Pinto Valley Mine Life to 2026
1/20/2014Capstone Mining to Attend Upcoming Investor Conferences
1/20/2014to Attend Upcoming Investor Conferences
1/20/2014to Attend Upcoming Investor Conferences
1/13/20142013 Fourth Quarter and Full Year Production Results
12/11/2013Capstone Mining Files Updated Technical Report for Pinto Val...
12/11/2013Files Updated Technical Report for Pinto Valley
11/14/2013Capstone Mining to Attend Upcoming Investor Conferences
11/14/2013to Attend Upcoming Investor Conferences
10/7/2013Capstone Mining Provides Update on Pinto
10/7/2013Provides Update on Pinto Valley Acquisition
7/31/2013Capstone Mining Delivers Consistent 2013
7/11/20132013 Second Quarter Production Results
6/13/2013Capstone Mining Files Pinto Valley 43-101 Mineral Resource E...
6/11/2013Provides Update on Pinto Valley Acquisition
5/30/2013Capstone Mining to Attend Upcoming Investor Conferences
5/10/2013Capstone Mining Reports Annual General Meeting Voting Result...
4/29/2013Capstone Mining to Purchase Pinto Valley
4/28/2013to Purchase Pinto Valley Copper Mine
3/13/2013Capstone Mining Reports 2012 Year End
2/18/2013to Present at Upcoming Investor Conferences
1/10/2013Capstone 2012 Fourth Quarter and Full Year Production Result...
1/10/20132012 Fourth Quarter and Full Year Production Results Meet Gu...
10/31/2012Capstone Reports Senior Management Change
10/31/2012Reports Senior Management Change
10/23/2012Capstone Reports Board Change
10/23/2012Reports Board Change
10/11/2012Capstone 2012 Third Quarter Production Results on Track
7/12/2012Capstone 2012 Second Quarter Production Results On Target
5/14/2012Capstone Reports Board Change
4/13/2012Capstone Mining Announces New $200 Million
4/12/2012Capstone 2012 First Quarter Production
3/14/2012Capstone Reports Strong 2011 Results
2/10/2012Capstone Mining Reports Board Change
1/26/2012Capstone 2012 Operating and Capital Guidance
1/17/2012Capstone Fourth Quarter and Full Year 2011 Production Result...
1/16/2012Capstone Awards Contract for Santo Domingo
10/6/2011Capstone Third Quarter Production Results
8/15/2011Capstone Reports Pre-Feasibility Study
8/10/2011to Hold Second Quarter and Santo Domingo PFS Conference Call...
7/6/2011Capstone Second Quarter Production Results
6/20/2011Capstone Mining Board of Director Changes
6/14/2011and Far West Mining Approve Acquisition and KORES Agreement
6/2/2011Independent Proxy Firms Recommend Capstone Shareholders Vote...
5/23/2011Mails Information Circular with Respect to Acquisition of Fa...
5/20/2011Capstone Mining Mails Information Circular
5/10/2011to Hold First Quarter Conference Call May 25, 2011
4/26/2011Capstone Reports First Quarter Production
4/17/2011Capstone Mining to Acquire Far West Mining
4/14/2011Capstone Reports Change to its Board
3/15/2011Capstone Reports Record Revenue and Strong
1/26/2009Commences US$ 3 Million Resource Expansion Drill Program at ...
1/22/2009Reports Debt Repayments, Funding of Debenture Repurchase and...
12/10/2008Reports Final Drill Intercepts of Near Surface Copper-Gold a...
11/25/2008Reports Minto Mine Connected to Yukon Electrical Grid
11/24/2008Sherwood and Capstone Announce Closing of Business Combinati...
11/14/2008Shareholders Overwhelmingly Approve Business Combination wit...
9/8/2008Announce Combination to Create Intermediate Copper Producer
7/29/2008Reports Record Revenues of $35.3 Million and Record Operatin...
7/15/2008Announces Normal Course Issuer Bid
2/28/2008December 31, 2007 Four Month Stub Period Results
2/21/2008to Release 4 Months Ended December 31, 2007 Results on Thurs...
1/17/2008Provides 2008 Expansion And Exploration Plans And Increases ...
11/8/2007 To Release 2007 Year End Results On Wednesday November 14,...
7/19/2007Provides Cozamin Mine Expansion Update
6/28/2007Reports Q3 Results: Operating Profit of $7.8 Million, $0.09 ...
4/5/2007Closes Previously Announced Agreement to Sell Cozamin Silver...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (CS.TO)FRANKFURT (OUW.F)
8.97-2.61%5.45-2.68%
TORONTO
CA$ 8.97
04/23 17:00 -0.240
-2.61%
Prev close Open
9.21 9.12
Low High
8.95 9.27
Year l/h YTD var.
6.02 -  9.65 39.50%
52 week l/h 52 week var.
4.49 -  9.65 38.00%
Volume 1 month var.
2,771,523 13.83%
24hGold TrendPower© : 40
Produces Copper - Gold - Silver
Develops Copper - Gold - Silver - Zinc
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/5/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202447.53%
202323.08%7.254.90
2022-8.52%7.792.25
2021126.89%6.642.41
2020226.03%2.490.33
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.71-0.39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.11+2.21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.47+3.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.25-3.42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.79-3.76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.57+0.84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :