Century Mining Corporation

Published : December 11th, 2014

Castle Mountain Mining Provides Corporate Update

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Castle Mountain Mining Provides Corporate Update

TORONTO, ONTARIO--(Marketwired - Dec 11, 2014) - Castle Mountain Mining Company Limited ("Castle Mountain" or the "Company" (TSX VENTURE:CMM)(CTMQF) provides the following corporate update. The ongoing volatility in the gold price and the resultant difficult market conditions have prompted Management and the Board of Castle Mountain Mining to take a comprehensive review of our business. Several important decisions have been made that will have the net result of preserving the Company's financial flexibility while pursuing further cost effective de-risking of the Castle Mountain Project, particularly in the area of metallurgy, strip ratio and water supply for the proposed resumption of mining and heap leach processing of the Company's gold resources.

  • Favourable metallurgical test results leads to plan to test coarser material up to run-of-mine
  • Feasibility Study suspended pending availability of these additional metallurgical results
  • On-going review and evaluation of historic and additional water sources by Schlumberger
  • Preservation of financial flexibility through G&A reductions including layoffs of non-essential personnel and significant salary reductions for management and staff

The Company has recently completed a core and reverse circulation drill program of 37 holes consisting of 1,196 metres of PQ-sized core and 2,140 metres of HQ-sized core and 6,922 metres of reverse circulation drilling at our Castle Mountain property in San Bernardino County, California. The large diameter PQ-sized core program was designed to access representative material for metallurgical testing purposes including cyanide solubility, bottle roll and column tests at a variety of size distributions. Although the column tests are still ongoing, initial results have been favourable and support the decision to undertake additional testing of even coarser material potentially up to run-of-mine. Processing of coarser material during mining could potentially reduce or even eliminate the need for certain crushing and grinding components that were previously included in our Preliminary Economic Assessment ("PEA") completed in the second quarter of 2014.

Until such time as this additional testing is completed the crusher and other design work for the Feasibility Study being prepared by M3 Engineering and Technology Corp. have been suspended. In conjunction with related reductions in site activity and G&A expenses the changes to the timing of the proposed Feasibility Study will provide the Company with enhanced financial flexibility while continuing to focus on those Project elements which can significantly impact the capital cost and overall economics of the Project as outlined in the PEA. The reduction in G&A is being accomplished by layoffs, termination of certain consulting arrangements, salary reductions and reduction of hours worked among other cost cutting measures.

Gordon McCreary, President and CEO of Castle Mountain stated, "We are encouraged by the positive initial metallurgical results but have to remain realistic about the high level of volatility in the gold market and the related challenging market conditions. To those Castle Mountain Mining staff and consultants that have been notified of layoff, salary reductions and reduction of hours worked, I thank you for your efforts on behalf of the Company and its shareholders. I would particularly like to thank Peter Olander, Vice President of Exploration, who will be stepping down as an officer of the Company, for his dedication and efforts on behalf of the Company."

About Castle Mountain Mining Company Limited

Subject to certain obligations, Castle Mountain has 100% of the right, title and beneficial interest in and to the Castle Mountain Venture, a California general partnership, which owns the Castle Mountain property in San Bernardino County, California. The Castle Mountain heap leach gold mine produced over one million ounces of gold from 1992 to 2001, when mining was suspended due to low gold prices.

The Castle Mountain Venture land holdings (7,458 acres total) include patented claims (1,298 acres), and unpatented claims (6,160 acres). On December 11, 2013, the Company filed the Technical Report for its maiden NI 43-101 mineral resource estimate and on June 5, 2014 filed the Technical Report for its Preliminary Economic Assessment. Both documents are available on SEDAR at www.sedar.com and on the Company's website at www.castlemountainmining.com. The Company has engaged M3 Engineering and Technology Corp. to complete a Feasibility Study but has suspended work in this regard pending additional metallurgical test results.

Kevin Kunkel, Project Manager and Geologist for the Company, is a Qualified Person as defined by National Instrument 43-101 has reviewed and approved the contents of this press release.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Forward-Looking Statements

Statements contained in this news release that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward-Looking Information") within the meaning of applicable Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. Forward Looking Information includes, but is not limited to, disclosure regarding possible events, conditions or financial performance that is based on assumptions about future economic conditions and courses of action; the timing and costs of future exploration and testing activities on the Company's properties; success of exploration activities; time lines for technical reports; planned exploration and development of properties and the results thereof; and planned expenditures and budgets and the execution thereof. In certain cases, Forward-Looking Information can be identified by the use of words and phrases such as "plans", "expects" or "does not expect", "is expected", budget", "scheduled", "suggest", "optimize", "estimates", "forecasts", "intends", "anticipates", "potential" or "does not anticipate", believes", "anomalous" or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". In making the forward-looking statements in this news release, the Company has applied several material assumptions, including, but not limited to, that the current testing and other objectives concerning the Castle Mountain Project can be achieved and that its other corporate activities will proceed as expected; that the current price and demand for gold will be sustained or will improve; that general business and economic conditions will not change in a materially adverse manner and that all necessary governmental approvals for the planned exploration on the Castle Mountain Project will be obtained in a timely manner and on acceptable terms; the continuity of the price of gold and other metals, economic and political conditions and operations.

Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the Forward-Looking Information. Such risks and other factors include, among others, operations and contractual obligations; changes in exploration programs based upon results of exploration; future prices of metals; availability of third party contractors; availability of equipment; failure of equipment to operate as anticipated; accidents, effects of weather and other natural phenomena and other risks associated with the mineral exploration industry; environmental risks, including environmental matters under U.S. federal and California rules and regulations; impact of environmental remediation requirements and the terms of existing and potential consent decrees on the Company's planned exploration on the Castle Mountain Project; certainty of mineral title; community relations; delays in obtaining governmental approvals or financing; fluctuations in mineral prices; the Company's dependence on one mineral project; the nature of mineral exploration and mining and the uncertain commercial viability of certain mineral deposits; the Company's lack of operating revenues; governmental regulations and the ability to obtain necessary licenses and permits; risks related to mineral properties being subject to prior unregistered agreements, transfers or claims and other defects in title; currency fluctuations; changes in environmental laws and regulations and changes in the application of standards pursuant to existing laws and regulations which may increase costs of doing business and restrict operations; risks related to dependence on key personnel; and estimates used in financial statements proving to be incorrect; as well as those factors discussed in the Company's public disclosure record. Although the Company has attempted to identify important factors that could affect the Company and may cause actual actions, events or results to differ materially from those described in Forward-Looking Information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as required by law, the Company does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this news release to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events.

Read the rest of the article at finance.yahoo.com

Century Mining Corporation

PRODUCER
CODE : CMM.V
CUSIP : 15662P
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Century Mining is a gold producing company based in United states of america.

Century Mining holds various exploration projects in Canada.

Its main assets in production are LAMAQUE and SIGMA-LAMAQUE in Canada and SAN JUAN in Peru and its main exploration properties are BOURLAMAQUE, JUNEAU, NORTH BELT LEASES, YAKIMA, EAGLE RIVER and LOUVICOURT in Canada and COLINA DORADA, SWEETHEART, PATTON, PETERSON, DREAM, BESSIE and TREADWELL in Peru.

Century Mining is listed in Canada and in United States of America. Its market capitalisation is CA$ 26.2 millions as of today (US$ 20.8 millions, € 16.9 millions).

Its stock quote reached its highest recent level on December 29, 2006 at CA$ 1.89, and its lowest recent point on November 28, 2008 at CA$ 0.01.

Century Mining has 37 960 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Century Mining Corporation
2007 Annual report
Financings of Century Mining Corporation
9/6/2013Castle Mountain Announces Closing of Private Placement
8/16/2013Castle Mountain Announces Private Placement
6/13/2011Closes Flow-Through Financing and Receives Working Capital L...
12/1/2010Closes $2.5 Million Flow-Through Private Placement
9/18/2008ANNOUNCES UP TO $3.7 MILLION OF FINANCINGS
6/6/2008ANNOUNCES UP TO C$6 MILLION IN FINANCINGS
5/20/2008 CLOSES FLOW-THROUGH AND UNIT FINANCINGS
3/28/2008ANNOUNCES UP TO C$4.5 MILLION IN FLOW-THROUGH AND UNIT FINAN...
1/11/2008CLOSES FLOW-THROUGH SHARE FINANCINGS
Option Grants of Century Mining Corporation
5/16/2011Engages Terre Partners as Investor Relations Consultants
Nominations of Century Mining Corporation
6/2/2010Appoints VP Geology
1/12/2010Appoints New Members to Board of Directors January 12, 2010
2/20/2008APPOINTS NEW CHIEF FINANCIAL OFFICER
11/7/2007APPOINTS NEW GENERAL MANAGER AT LAMAQUE COMPLEX
Financials of Century Mining Corporation
6/25/2008REPORTS 2007 FULL YEAR FINANCIAL RESULTS
12/1/2007Third quarter results confirm decision to accelerate shift i...
5/31/2007Reports First Quarter Net Income of $2.0 Million and Operati...
4/16/2007Achieves Fourth Quarter Net Income of C$2.6 Million and Reco...
Project news of Century Mining Corporation
5/2/2011(Lamaque)Lamaque Mine Receives Certificate of Authorization to Expand...
3/8/2011(Lamaque)Provides Operational and Financial Update for Lamaque Mine
2/3/2011(San Juan)Reports on 2010 Gold Production and Guidance for 2011 Produc...
2/3/2011(Lamaque)Reports on 2010 Gold Production and Guidance for 2011 Produc...
7/6/2010(Lamaque)Provides Operational Progress Update
4/28/2010(Lamaque)Lamaque Mill Facility Fully Operational & Provides Further P...
4/13/2010(Lamaque)Employees Ratify Terms of Collective Agreement at Lamaque Go...
2/2/2010(San Juan)Workforce Takes Illegal Strike Action
7/3/2008(Sigma-lamaque)ANNOUNCES TEMPORARY CURTAILMENT OF LAMAQUE UNDERGROUND PRODU...
2/27/2008(Sigma-lamaque)FILES FULL LAMAQUE TECHNICAL REPORT
1/14/2008Announces Updated NI 43-101 Reserves and Technical Report
11/6/2007(Bourlamaque)Converts Sigma-Lamaque to Full Underground Operation
2/21/2006forecasts production of 90,000 ounces of gold at a cash cost...
Corporate news of Century Mining Corporation
6/29/2015Castle Mountain Announces Name Change to NewCastle Gold Ltd....
4/2/2015Castle Mountain Announces Director Resignation from the Boar...
3/11/2015Castle Mountain Announces Positive Initial Results from Meta...
12/11/2014Castle Mountain Mining Provides Corporate Update
11/4/2014OTC Markets Group Welcomes Castle Mountain Mining to OTCQX®
11/3/2014Castle Mountain Mining to Trade on OTCQX
9/8/2014Castle Mountain Mining Board Appoints Mark Wayne as Chairman
8/20/2014Castle Mountain Mining Reports 7.46 g/t Gold Over 102.1 Metr...
8/7/2014Castle Mountain Announces Grant of Stock Options
7/31/2014Castle Mountain Mining Selects M3 Engineering as Lead on Fea...
7/7/2014Castle Mountain Mining Provides Corporate Update
6/5/2014Castle Mountain Mining Files Preliminary Economic Assessment...
4/24/2014Castle Mountain Mining's Preliminary Economic Assessment Del...
7/30/2013CMM Granted Five Year Extension to Mining Permit at Castle M...
7/16/2013Castle Mountain Reports 74 m of 1.44 g/t Au From Final Resul...
6/20/2013Initial Results from the Phase 1 Drill Program at Castle Mou...
7/12/2011(San Juan)Estimates Second Quarter Production at Lamaque and San Juan
6/20/2011White Tiger Gold and Century Mining Announce Further Update ...
6/7/2011(Lamaque)Provides Gold Production Update on the Lamaque Mine
5/26/2011White Tiger Gold and Century Mining Announce Update to Propo...
4/26/2011White Tiger Gold Ltd. and Century Mining Corporation Announc...
4/18/2011Grants Stock Options
4/11/2011Reports Year-End 2010 Results
4/6/2011(San Juan)Estimates First Quarter Production and Discusses Peruvian Or...
3/22/2011Announces Receipt of Deutsche Bank Consent to the Proposed B...
3/14/2011White Tiger Gold Ltd. and Century Mining Corporation Announc...
7/13/2010Union Securities Initiates Analyst Coverage of Century Minin...
6/15/2010Annual Meeting Results
5/22/2010Trading To Be Reinstated On May 25, 2010
5/15/20102009 Year End Financial Statements
1/6/2009REPORTS SIGNIFICANT PRIVATE PURCHASE OF CENTURY SHARES BY IN...
3/21/2008 PROVIDES UPDATE ON REGULATORY ISSUES
2/21/2008Receives Updated Lamaque Underground Permit
2/4/2008ANNOUNCES CHANGES TO BOARD OF DIRECTORS
1/17/2008RESPONDS TO SULLIDEN PRESS RELEASE
11/28/2007ANNOUNCES TAKEOVER BID FOR SULLIDEN EXPLORATION
10/31/2007EXTENDS MATURITY OF ITS OUTSTANDING LONG TERM DEBT
10/22/2007POSTS COURT DOCUMENTS THAT SUPPORT ALGAMARCA’S LEGAL POSITIO...
10/4/2007ANNOUNCES TAKEOVER BID FOR SULLIDEN EXPLORATION INC.
8/15/2007PERUVIAN COURT RULES IN ALGAMARCA’S FAVOR KEY ADVANCE FOR CE...
8/7/2007)Agrees to buy advanced exploration property in Peru
8/2/2007WELCOMES NEW CHIEF FINANCIAL OFFICER
7/10/2007Continues to create unnecessary delays in the legal proceedi...
6/28/2007Completes Acquisition of Third Mine
6/6/2007Provides an update on the Poderosa litigation in Peru
5/31/2007Algamarca Refutes Sulliden Press Release And Accurately Stat...
5/16/2007Breaking News Alert from Century Mining
5/15/2007Breaking News Alert from Century Mining
4/20/2007Breaking News Alert from Century Mining
5/19/2006reports 1st quarter operating profit of $1,9 million at Sigm...
3/13/2006debenture holders convert oustanding debentures into common ...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (CMM.V)Other OTC (CMNZF)
0.690+0.00%0.260+18.18%
TSX-V
CA$ 0.690
02/20 09:30 -
0%
Prev close Open
0.690 0.690
Low High
0.690 0.690
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.690 -%
Volume 1 month var.
0 -%
Produces Gold
Develops
Explores for Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/20/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :