European Goldfields

Published : February 06th, 2008

Certej Environmental Impact Study Completed ? Permitting Process Underw

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Certej Environmental Impact Study Completed - Permitting Process Underway

6 February 2008 - European Goldfields Limited (TSX / AIM: EGU) is pleased to announce that the final Environmental Impact Study (EIS) to develop its Certej gold/silver project in Romania has now been completed.

European Goldfields already holds a mining permit for Certej, which is currently being exploited on a small scale by way of an existing open pit. The EIS addresses a proposed increase in mine production at Certej and the processing of ore on site.

The EIS has been carried out over a 12-month period in order to accumulate all the required base line data during the different seasons.  The EIS is a detailed multi-discipline study comprising over 1,000 pages subdivided into a number of volumes assessing the environmental, social and health impacts of the project on the mine area.

In December 2007, European Goldfields also applied for a Zone Urban Plan (PUZ), which indicates that the project is now in the advanced stages of the public permitting process. This follows the submission of a Technical Feasibility Study to the Romanian authorities in March 2007 and the grant by the local county council of a General Urbanisation Certificate in September 2006. This certificate confirms the designation of Certej as an industrial mining area and attests to the local community's support for the project.

The PUZ is a detailed urbanisation plan for the project and its approval involves an initial review of the EIS.  The PUZ must be approved through a full public consultation process by local authorities, county councils and public utilities before the EIS can be approved by the regional Romanian environmental authorities in Timisoara.

The PUZ is expected to be approved by the end of Q1 2008, following which the EIS will be formally submitted to the environmental authorities.

The environmental permit and an updated mining permit are expected in Q3 2008 following a standard public consultation process with local communities, which is expected to start 45 days after submission of the EIS.  Customary construction and public utility permits are expected to follow by end-2008 when the detailed engineering design has been completed for the site plant.

The EIS has been prepared with the contribution of several Romanian institutes of international reputation, namely the National Institute of Research and Development for Industrial Ecology (ECOIND), the National Institute of Research and Development for Environment Protection (ICIM), the Technical University of Construction Bucharest and the Babes-Bolyai University of Cluj. The EIS was prepared to the regulatory framework established by Romanian and EU legislation.

Full feasibility study to be completed in Q2 2008 - European Goldfields is in the final stage of completing a full feasibility study for the Certej project, which will be used for internal approval and presentation to banks and other sources of potential financing of the project. The only major pending study is the engineering study for the process plant and associated infrastructure by Aker Kvaerner Engineering Services, scheduled for completion in Q2 2008.

Mining and processing - The deposit will be mined by open pit methods with a strip ratio of 3.1:1. The project will involve the mining and processing of 3.0 million tonnes of ore per annum over at least eleven years. This is expected to yield approximately 160,000 oz of gold and 820,000 oz of silver per year in dor�, reflecting an average total process recovery of 81% for gold and approximately 75% for silver.

The metallurgical process involves the production of a gold-bearing concentrate followed by the production of gold and silver as dor� on site by means of the Albion Process.

The Albion Process is a combination of ultra-fine grinding of concentrates and oxidative leaching at atmospheric pressure. The liberated gold and silver is then recovered as dor� by the conventional Carbon in Leach ("CIL") process.

The residues from the flotation and gold plants will be disposed of in two separate but adjoining tailings management facilities (TMFs), which are ideally located and designed for this project. The EIS confirms that the Certej project and its TMFs will have a negligible impact on the local water streams, flora and fauna.

About European Goldfields

European Goldfields Limited is a resource company involved in the acquisition, exploration and development of mineral properties in Greece, Romania and South-East Europe.

Greece - In addition to owning 80% of the Certej project in Romania, European Goldfields holds a 95% interest in Hellas Gold S.A. Hellas Gold owns three major gold and base metal deposits in Northern Greece. The deposits are the polymetallic operation at Stratoni, the Olympias project which contains gold, zinc, lead and silver, and the Skouries copper/gold porphyry project. Hellas Gold commenced production at Stratoni in September 2005 and commenced selling an existing stockpile of Olympias gold concentrates in July 2006. Hellas Gold is applying for permits to develop the Skouries and Olympias projects.

For further information please contact:

European Goldfields:
David Reading , Chief Executive Officer 
e-mail: info@egoldfields.com
Tel: +44 (0)20 7408 9534

Buchanan Communications:
Bobby Morse / Ben Willey 
e-mail: bobbym@buchanan.uk.com
Tel: +44 (0)20 7466 5000

Renmark Financial Communications:
Tina Cameron : tcameron@renmarkfinancial.com
Barbara Komorowski : bkomorowski@renmarkfinancial.com
Media - Fran�ois Tr�panier : ftrepanier@renmarkfinancial.com
Tel: +1 514 939 3989
Fax: +1 514 939 3717
www.renmarkfinancial.com

RBC Capital Markets:
Andrew K Smith / Sarah Wharry 
e-mail: andrew.smith@rbccm.com
Tel: +44 (0)20 7029 7882

Forward-looking statements
Certain statements and information contained in this document, including any information as to the Company's future financial or operating performance and other statements that express manag ement's expectations or estimates of future performance, constitute forward-looking information under provisions of Canadian provincial securities laws. When used in this document, the words "anticipate", "expect", "will", "intend", "estimate", "forecast", "planned" and similar expressions are intended to identify forward-looking statements or information. Forward-looking statements include, but are not limited to, the estimation of mineral reserves and resources, the timing and amount of estimated future production, costs and timing of development of new deposits, permitting time lines and expectations regarding metal recovery rates. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The Company cautions the reader that such forward-looking statements involve known and unknown risk s, uncertainties and other factors that may cause the actual financial results, performance or achievements of the Company to be materially different from its estimated future results, performance or achievements expressed or implied by those forward-looking statements and the forward-looking statements are not guarantees of future performance. These risks, uncertainties and other factors include, but are not limited to: changes in the price of gold, base metals or certain other commodities (such as fuel and electricity) and currencies; uncertainty of mineral reserves, resources, grades and recovery estimates; uncertainty of future production, capital expenditures and other costs; currency fluctuations; financing and additional capital requirements; the successful and timely permitting of the Company's Skouries, Olympias and Certej projects; legislative, political, social or economic developments in the jurisdictions in which the Company carries on business; operating or tec HNICAL DIFFICULTIES IN CONNECTION WITH MINING OR DEVELOPMENT ACTIVITIES; THE SPECULATIVE NATURE OF GOLD AND BASE METALS EXPLORATION AND DEVELOPMENT, INCLUDING THE RISKS OF DIMINISHING QUANTITIES OR GRADES OF RESERVES; THE RISKS NORMALLY INVOLVED IN THE EXPLORATION, DEVELOPMENT AND MINING BUSINESS; AND RISKS ASSOCIATED WITH INTERNAL CONTROL OVER FINANCIAL REPORTING. FOR A MORE DETAILED DISCUSSION OF SUCH RISKS AND MATERIAL FACTORS OR ASSUMPTIONS UNDERLYING THESE FORWARD-LOOKING STATEMENTS, SEE THE COMPANY'S ANNUAL INFORMATION FORM FOR THE YEAR ENDED 31 DECEMBER 2006, FILED ON SEDAR AT
WWW.SEDAR.COM. THE COMPANY DOES NOT INTEND, AND DOES NOT ASSUME ANY OBLIGATION, TO UPDATE OR REVISE ANY FORWARD-LOOKING STATEMENTS WHETHER AS A RESULT OF NEW INFORMATION, FUTURE EVENTS OR OTHERWISE, EXCEPT AS REQUIRED BY LAW.

Data and Statistics for these countries : Greece | Romania | All
Gold and Silver Prices for these countries : Greece | Romania | All

European Goldfields

PRODUCER
CODE : EGU.L
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

European Goldfields is a gold producing company based in United kingdom.

European Goldfields produces gold, lead, silver and zinc in Greece, develops copper, gold and silver in Greece and in Romania, and holds various exploration projects in Romania.

Its main asset in production is STRATONI in Greece and its main assets in development are SKOURIES and OLYMPIAS in Greece and CERTEJ in Romania.

European Goldfields is listed in Canada, in Germany, in United Kingdom and in United States of America. Its market capitalisation is GBX 147.8 billions as of today (US$ 232.7 billions, € 174.0 billions).

Its stock quote reached its lowest recent point on December 05, 2008 at GBX 100.00, and its highest recent level on January 28, 2011 at GBX 990.40.

European Goldfields has 183 932 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of European Goldfields
12/7/2009Mines and Money Presentation
Annual reports of European Goldfields
2009 Annual Report
Annual report 2007
Nominations of European Goldfields
6/10/2010 Appointment of nominated advisor and joint brokers
3/31/2010Mandate for certej project finance signed project manager ap...
7/9/2008New Executive Appointment
Project news of European Goldfields
8/3/2010(Certej)Certej EIS submitted
5/26/2010Update on Certej permitting - appointment of non executive d...
3/16/2010(Certej) Key permit secured for Certej project
11/11/2008(Certej)Results for Q3 2008 - Certej Project Continues to Advance - ...
8/14/2008(Stratoni)Results for Q2 2008 - Stratoni Production Up 38% - Certej De...
7/23/2008Definitive Feasibility Study Demonstrates Certej Project Via...
2/6/2008Certej Environmental Impact Study Completed ? Permitting Pro...
5/16/2007(Certej)Limited - High Grades in Certej Infill Drilling
Corporate news of European Goldfields
6/15/2010Final credit approval for Certej financing
6/10/2010 Drill permit approved for Greek Projects...
3/19/2010Results for 2009
3/8/20102009 results conference call and webcast
12/8/2008Martyn Konig Appointed as Non-Executive Director
11/13/2008Directors Dealings - Chairman Increases Personal Shareholdin...
9/3/2008Updated Mining Permit for Certej Project
8/6/2008Executive Vice-President Interview
7/16/2008Announcement
5/20/2008Cameron Mingay Appointed as Non-executive Director
5/14/2008Results for Q1 2008 - Certej EIS Submitted - Joint Venture i...
4/23/2008Joint Venture finalised with Ariana Resources
3/19/2008Results for 2007 - Strong Financial Performance - $43.6M Ope...
3/17/2008Added to S&P/TSX Composite Index
2/28/2008Joint Venture in Turkey with Ariana Resources
1/24/2008Over 60% Increase in Revenue in 2007 vs. 2006
11/21/2007 Change of Nominated Advisor
10/9/2007Certej Reserves Increased by 20% Life-of-Mine Extended by Tw...
10/1/2007Sale of Extra 71,000 Tonnes of Olympias Gold Concentrates
9/20/2007Added to S&P/TSX Global Gold Index
8/8/2007Results for Q2 2007 - Best Quarterly Results to Date - Subst...
7/19/2007Ministry of Development Completes Review of Business Plan fo...
7/3/2007Closing of Acquisition of an Additional 30% Interest in Hell...
5/15/2007Results for Q1 - Stratoni Increases Production - Stratoni Si...
4/24/2007Stratoni Silver Reserve Sold to Silver Wheaton
4/17/2007Hecla's President to Speak at the European Gold Forum in Zur...
4/3/2007MRI Trading Confirms Third Order of Olympias Gold Concentrat...
3/29/2007Mark Rachovides Appointed as Non-executive Director
3/22/2007Results for 2006 - Delivering on Promises
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
LSE (EGU.L)TORONTO (EGU.TO)
803.35+3.32%13.08+0.23%
LSE
GBX 803.35
02/23 16:07 25.85
3.32%
Prev close Open
777.50 790.00
Low High
785.00 804.59
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  803.35 7.11%
Volume 1 month var.
415,519 7.11%
24hGold TrendPower© : 15
Produces Zinc
Develops Copper - Gold - Silver
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/30/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.54-2.14%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.46-6.22%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54+2.68%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65+0.38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.72-4.61%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.26+4.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22-4.35%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.74-8.42%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.18-3.58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :