Orsu Completes Infill Drilling Programme in Connection With Ongoing Definitive Feasibility Study at Its Karchiga Project
Published : September 01, 2011
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Commodities | Copper | Kazakhstan | London | Market | Oil |

LONDON, UNITED KINGDOM--(Marketwire - Sept. 1, 2011) - Orsu Metals Corporation ("Orsu" or the "Company") (News - Market indicators)(AIM:OSU), the London-based precious and base metals exploration and development company, is pleased to announce the on-schedule completion of 1,786m (46 holes) infill drilling of the central oxide ("Karchiga Central Oxide") and an additional 2,278m (26 holes) infill drilling of the North East sulphide ("Karchiga North East Sulphide") as part of the ongoing definitive feasibility study ("DFS") at its Karchiga volcanogenic massive sulphide copper deposit in Eastern Kazakhstan (the "Karchiga Project").

The Company expects that final assays will be received in September 2011 and new resource modelling and reserve optimisation will be performed thereafter. The Company expects to include the oxide mineralisation in the DFS, which is expected to be completed in November 2011.

Dr. Sergey V Kurzin, Executive Chairman of Orsu, commented: "We are pleased that the additional infill drilling programme at the Karchiga Project has been completed on time and we remain confident that its results will bring additional economic value to the Karchiga Project. The inclusion of Karchiga Central Oxide material into the DFS is expected to increase the Karchiga Project's net present value if a substantial amount of Central Oxide copper is included in the economics of the deposit. The additional infill drilling of the Karchiga North East Sulphide is expected to convert between 0.5Mt and 1Mt of sulphide mineralization from inferred to indicated mineral resource categories, which could extend the life of mine and optimise the pit designs. Both of these factors will have an important positive impact upon the financing of the construction stage of the Karchiga Project."

GLOSSARY of technical terms:

Indicated Mineral Resource - that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics, can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.

Inferred Mineral Resource – that part of a Mineral Resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.

Mineral Resource – a concentration or occurrence of natural, solid, inorganic or fossilized organic material in or on the Earth's crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge.

Oxide Mineral Resource – A Mineral Resource comprising mineralisation formed by the chemical interaction of an element or elements with oxygen, usually affected by surface waters

Notes to Editors:

  1. Alexander Yakubchuk, PhD, Director of Exploration and Chief Operating Officer for Orsu and a "qualified person" as such term is defined in National Instrument 43-101 and for the purposes of the AIM Guidance Note for Mining, Oil & Gas Companies, has prepared and reviewed and approved the contents of this press release and has verified the data disclosed in this press release (including sampling, analytical and test data underlying the information), other than with respect to the mineral resource estimates referred to herein.
  2. The technical report entitled "Preliminary Assessment of the Karchiga Copper Project, East Kazakhstan Region, Kazakhstan", dated May 25, 2010 (the "Micon 2010 Study") was prepared by L. S. Carroll, MIMMM CGeol FGS, G. Harris, MAusIMM and M. L. Owen, CGeol EurGeol FGS of Wardell Armstrong International Limited, and J, Steedman, MAusIMM, and D, Wells, MIMMM CEng, of Micon International Co. Limited and is available under the Company's profile on SEDAR (www.sedar.com). Each of the foregoing persons is a "qualified person" as such term is defined in National Instrument 43-101 and is independent of Orsu.

FORWARD-LOOKING INFORMATION

This press release contains forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information contained (or referred to) in this press release includes, but may not be limited to statements relating to: mineral resource estimates; mineral resource qualities; the potential for upgrading the Company's mineral resource estimates; plans to include certain mineral resource estimates in the DFS; receipt of assay results and the timing related thereto; resource modelling and reserve optimisation plans; the economics of the Karchiga Project; the Company's plans for the Karchiga Project; the expected completion of the DFS and the timing related thereto; and the potential for an increase in the life of mine and the optimisation of pit designs at the Karchiga Project.

Factors that could cause actual results to differ materially from those described in such forward-looking information include, but are not limited to, uncertainties in the interpretation of drill and test results, risks normally incidental to exploration and development of mineral properties, the possibility that future exploration, development and/or mining results will not be consistent with expectations, uncertainty of mineral resource estimates, the Company's inability to obtain, maintain, renew and/or extend required licences, permits, authorizations and/or approvals from the appropriate regulatory authorities and other risks relating to the regulatory framework in Kazakhstan, adverse changes in the political environment in Kazakhstan and the laws governing the Company, its subsidiaries and their respective business activities, uncertainties in the assumptions used, and the methodologies employed in, the Micon 2010 Study, adverse changes in commodities prices, as well as certain other risks set out in the Company's public documents, including its annual information form dated March 22, 2011, filed under the Company's profile on SEDAR at www.sedar.com.

The forward-looking information in this press release reflects the current expectations, assumptions and/or beliefs of the Company based on information currently available to the Company. In connection with the forward-looking information contained in this press release, the Company has made assumptions about: the Company's business; the economy and the mineral exploration industry in general; the parameters used in defining the pit optimization for the Karchiga Project; the Company's ability to raise any required additional financing, as needed; the regulatory framework in Kazakhstan with respect to, among other things, the Company's ability to obtain, maintain, renew and/or extend required permits, licences, authorizations and/or approvals from the appropriate regulatory authorities; the political environment in Kazakhstan; and the Company's ability to continue to obtain qualified staff and equipment in a timely and cost-efficient manner to meet the Company's demand. The Company has also assumed that no unusual geological or technical problems or unexpected developments occur, plant and equipment work as anticipated and no significant events occur outside of the Company's normal course of business. Although the Company believes that the assumptions inherent in the forward-looking information are reasonable, forward-looking information is not a guarantee of future performance and accordingly undue reliance should not be put on such information due to the inherent uncertainty therein.

The mineral resource figures contained and/or referred to in this press release are estimates only and no assurances can be given that the indicated levels of minerals will be produced. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. While the Company believes that the mineral resource estimates contained and/or referred to herein are well established, by their nature, mineral resource estimates are imprecise and depend, to a certain extent, upon statistical inferences which may ultimately prove unreliable. If such mineral resource estimates are inaccurate or are reduced in the future, this could have a material adverse impact on the Company. Due to the uncertainty that may be attached to inferred mineral resources, it cannot be assumed that all or any part of an inferred mineral resource will be upgraded to an indicated or measured mineral resource as a result of continued exploration. Inferred mineral resources are estimated on limited information not sufficient to verify geological and grade continuity or to allow technical and economic parameters to be applied. The Micon 2010 Study, and the information contained herein derived therefrom, is preliminary in nature and the Micon 2010 Study includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the conclusions of the Micon 2010 Study will be realized. Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that mineral resources can be upgraded to mineral reserves through continued exploration.

Any forward-looking information speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking information, whether as a result of new information, future events or results or otherwise.



Orsu Metals Corporation
Alexander Yakubchuk
COO
+44 (0) 20 7518 3999
www.orsumetals.com
or
Canaccord Genuity Limited
Ryan Gaffney / Andrew Chubb
+44 (0) 20 7050 6500
or
Vanguard Shareholder Solutions
+1 604 608 0824
Data and Statistics for these countries : Kazakhstan | All
Gold and Silver Prices for these countries : Kazakhstan | All

Orsu metals corporation

EXPLORATION STAGE
CODE : OSU.TO
ISIN : VGG3192Y1007
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Orsu is a gold and copper development stage company based in United kingdom.

Orsu holds various exploration projects in Kazakhstan.

Its main exploration properties are TOKHTAZAN, TADYBULAK and TALAS in Kyrgyzstan and KARCHIGA in Kazakhstan.

Orsu is listed in Canada, in Germany, in United Kingdom and in United States of America. Its market capitalisation is CA$ 6.4 millions as of today (US$ 4.9 millions, € 4.6 millions).

Its stock quote reached its highest recent level on October 19, 2007 at CA$ 1.83, and its lowest recent point on March 04, 2016 at CA$ 0.01.

Orsu has 182 696 049 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Orsu metals corporation
2/5/2009investor presentation
Annual reports of Orsu metals corporation
Annual report 2007
Nominations of Orsu metals corporation
4/22/2013Extension of East Balkhash 2 Agreement and Appointment of Te...
5/2/2012Announces the Appointment of Mr Kevin Denham as CFO
5/1/2012Announces Appointment of New Chief Financial Officer and Upd...
7/8/2008Announces Board and Committee Appointments
6/24/2008Results of the AGM and Director Appointments
6/23/2008Director Appointment
Financials of Orsu metals corporation
5/21/2013Re-filing of 2012 Annual Financial Statements
1/11/2013Filing of Revised Interim Financial Reports
8/14/2012Interim Results for the Period Ended June 30, 2012 (Unaudite...
5/14/2012Interim Results for the Period Ended March 31, 2012 (Unaudit...
8/11/2011Releases Interim Results for the Period Ended June 30, 2011
8/11/2011Interim Results for the Six Months Ended June 30, 2011 (Unau...
6/2/2011Interim Results for the Three Months Ended March 31, 2011 (U...
Project news of Orsu metals corporation
4/7/2015(Tokhtazan)New Exclusivity Agreement for Potential Sale of Akdjol-Tokht...
8/20/2012(Karchiga)Announces Approval from the Kazakh Authorities for the Devel...
7/17/2012(Talas)Gold Fields to Buy Remaining 40% Interest in Orsu's Talas Pr...
5/25/2012(Talas)Provides Update on the Talas Project in the Kyrgyz Republic
3/29/2012(Karchiga)Filed Definitive Feasibility Study on SEDAR for the Karchiga...
3/19/2012Develops Copper Mine on Chinese Border
3/14/2012A Step Closer to Production
2/29/2012(Karchiga)Announces Positive Definitive Feasibility Study for the Karc...
12/21/2011Expands Copper Resource On Chinese Border
9/29/2011(Karchiga)Karchiga Definitive Feasibility Study Update-Results of 2011...
5/11/2011(Karchiga)Announces Updated Mineral Resources for its Karchiga Project
4/28/2011(Karchiga)Karchiga Metallurgy Testwork Results
4/12/2011(Karchiga)Increases its Share in Karchiga Project to 94.75 per cent an...
3/3/2011(Tadybulak)Builds Kyrgyzstan Asset
2/24/2011(Karchiga)Drill Results Confirm High Grade Single Lode At Karchiga
2/10/2011(Karchiga)Assay Results for 2010 Infill Drilling Programme on the Karc...
5/26/2010(Karchiga)Completion of Preliminary Assessment Study
5/25/2010(Karchiga)N 43-101 technical report
4/6/2010(Tokhtazan)Provides Update on Extension of Tokhtazan Project Licences
3/23/2010(Karchiga)Resource Calculations on both Taldybulak Gold Asset & Karchi...
2/23/2010(Talas)Gets Approval of Class Action Claim Settlement/ Announces Co...
11/18/2009(Talas)Provides Update on Mineral Exploration Projects
6/15/2009(Varvarinskoye Mine)Sale of Varvarinskoye Project
1/30/2009(Varvarinskoye Mine)Mineral Reserves and Resources at Varvarinskoye Mine
12/11/2008completes 6,334m infill diamond drilling at the Taldybulak c...
5/9/2008(Varvarinskoye Mine)Reports Additional Resources at Varvarinskoye Project
Corporate news of Orsu metals corporation
8/3/2016Orsu Metals Corporation Reports Its Unaudited Results for th...
8/2/2016Orsu Metals Corporation Announces Sale of its Akdjol-Tokhtaz...
6/24/20162016 Annual Shareholders’ Meeting
5/31/2016Notice of Annual and Special Meeting of Shareholders and Pos...
5/12/2016Orsu Metals Corporation Reports its Unaudited Results for th...
5/10/2016Orsu Metals Corporation Reminder on Cancellation of Admissio...
5/5/2016Orsu Metals Corporation Update on Conditional Sale of Karchi...
4/11/2016Orsu Metals Corporation Announces Conditional Sale of Karchi...
3/30/2016Orsu Metals Corporation Reports its Audited Annual Results f...
1/26/2016Orsu Metals Corporation Update on Akdjol-Tokhtazan Project
1/25/2016Orsu Metals Corporation: Update on Akdjol-Tokhtazan Project
1/6/2016Update on Exclusivity Agreement for Potential Sale of Akdjol...
1/4/2016Orsu Metals Corporation: Update on Exclusivity Agreement for...
9/3/2015Orsu Metals Corporation Announces Grant of Options
9/2/2015Orsu Metals Corporation: Grant of Options
8/12/2015Orsu Metals Corporation Reports Its Unaudited Results for th...
8/12/2015Orsu Metals Corporation results for the period ended June 30...
7/14/2015Notification of Holding in Company
7/13/2015Orsu Metals Corporation: Notification of Holding in Company
6/23/20152015 Annual Shareholders’ Meeting
6/22/2015Orsu Metals Corporation: 2015 Annual Shareholders' Meeting
4/21/2015Orsu Metals Corporation: Expiry of Options
4/7/2015Orsu Metals Corporation Announces a New Conditional Exclusiv...
4/7/2015Orsu Metals Corporation: New Exclusivity Agreement for Poten...
3/27/2015Orsu Metals Corporation Reports its Audited Annual Results f...
3/27/2015Orsu Metals Corporation annual results for the year ended De...
3/24/2015Orsu Metals Corporation Announces Lapse of Mandate with UniC...
3/23/2015Lapse of Mandate With UniCredit and Barclays
3/23/2015Orsu Metals Corporation: Lapse of Mandate With UniCredit and...
1/29/2015Orsu Metals Corporation Announces Change in Senior Managemen...
1/29/2015Orsu Metals Corporation: Change in Senior Management
12/18/2014Orsu Metals Corporation Announces Assay Results for the Kogo...
12/18/2014Orsu Metals Corporation: Assay Results for Kogodai Licence A...
11/17/2014IIROC Trading Halt - OSU
11/17/2014Orsu Metals Corporation: New Exclusivity Agreement for Poten...
11/17/2014IIROC Trade Resumption - OSU
11/13/2014Orsu Metals Corporation Results for the Quarter Ended Septem...
10/14/2014Orsu Metals Corporation: Update on Exclusivity Agreement for...
10/6/2014Orsu Metals Corporation: Update on Exclusivity Agreement for...
9/24/2014Orsu Metals Corporation: Suspension of Joint Exploration of ...
9/19/2014Orsu Metals Corporation: New Exclusivity Agreement for Poten...
8/13/2014Orsu Metals Corporation: Results for the Quarter Ended June ...
8/4/2014Orsu Metals Corporation: Grant of License to Explore the Kog...
7/7/2014Orsu Metals Corporation: Update on the Potential Sale of Akd...
7/7/2014Orsu Metals Corporation: Update on the Potential Sale of Akd...
7/3/2014Orsu Metals Corporation: Extension of Exclusive Agreement to...
7/3/2014Orsu Metals Corporation: Extension of Exclusive Agreement to...
1/10/2014(Tokhtazan)=3A New Exclusivity Agreement for Potential Sale of Akdjol=2...
9/20/2013Exclusive Agreement to Continue Joint Exploration of the Eas...
9/12/2013(Tokhtazan)New Exclusivity Agreement for Potential Sale of Akdjol-Tokht...
8/13/2013Results for the Quarter Ended June 30, 2013 (Unaudited)
7/24/2013Completion of the Gold Fields Subscription
6/28/2013Annual Shareholders' Meeting Statement
6/28/2013Annual Shareholders' Meeting Statement
6/5/2013Notice of Annual Meeting and Posting of Circular
5/15/2013Results for the Quarter Ended March 31, 2013
5/15/2013Results for the Quarter Ended March 31, 2013 (Unaudited)
3/27/2013Annual Results for the Year Ended December 31, 2012
11/12/2012Grant of Exclusive Right to Explore the East Balkhash 2 Lice...
11/1/2012(Tokhtazan)on Sale of Akdjol-Tokhtazan
7/31/2012Appoints Barclays and UniCredit to Arrange a Senior Debt Fac...
7/24/2012(Talas)Completion of the Sale of Talas to Gold Fields
7/17/2012(Talas)sells Talas to Gold Fields for $10-million (U.S.)
6/19/2012Corrective Announcement of Extension of Endeavour Agreement
6/19/2012Extension of Endeavour Agreement
5/30/2012Notice of Annual General Meeting and Posting of Circular
3/30/2012Annual results for the year ended December 31, 2011
3/5/2012Hits The Sweet Spot In Kazakhstan
3/2/2012(Karchiga)Karchiga Feasibility Lifts Orsu Metals
12/8/2011(Karchiga)Announces An Increased Mineral Resource for its Karchiga Pro...
12/8/2011As Part the Ongoing Definitive Feasibility Study, Orsu Annou...
9/21/2011Receives US$6.83 Mil in Cash for Deferred Consideration and ...
9/21/2011Receives US$6.83 Million in Cash in Early and Final Settleme...
9/1/2011Completes Infill Drilling Programme in Connection With Ongoi...
7/27/2011in Growth Stocks Weekly
7/25/2011Receives US$5.5 Mil In Early and Final Settlement of Deferre...
7/25/2011to Receive US$5.5 Million Cash in Early and Final Settlement...
7/18/2011Commences Infill Drilling Programme in Connection With Ongoi...
3/23/2011Holding(s) in Company
8/6/2010Kyrgyzstan Project Updates: James Winston
7/22/2010Confirms Copper Deposit in Kazakhstan
7/21/2010Provides Update on Mineral Exploration Projects in Kyrgyzsta...
5/27/2010James Winston on Orsu Metals
5/20/2010Enters into Agreement to Increase Share in Karchiga to 94.75...
5/18/2010Interim Results for the Period Ended March 31, 2010
4/23/2010Holding(s) in Company - Sprott Holds 7.2 per cent
2/4/2010Completion of 1st Phase
11/27/2009Agreement to Settle Class Action Claim
11/24/2009Completes Share Consolidation
10/14/2009Provides Update on Sale of Varvarinskoye Project
10/2/2009The Speculative Investor Updates Orsu Metals
9/14/2009Sale of Varvarinskoye Project
7/13/20092009 Annual and Special Meeting Statement
6/24/2009Notice of 2009 Annual and Special Meeting of Shareholders
1/27/2009Winston updates Orsu Metals
1/14/2009Varvarinskoye Update
1/8/2009Announces Update on Extension of Principal Payment Deadline
12/3/2008announces completion of joint venture agreement with Gold Fi...
11/21/2008Crisis or Opportunity?
11/13/2008Corp: Interim Results for the Period Ended 30 September 2008...
11/3/2008poised to evolve into major gold producer, says Roulston
9/26/2008announces update on Varvarinskoye and exploration projects, ...
9/19/2008Winston Updates Orsu Metals Corp
9/9/2008' Denver Gold Forum presentation is available online
9/5/2008Director Share Purchase
8/19/2008Interim Results for the Period Ended 30 June 2008
7/30/2008The Speculative Investor Updates Orsu Metals
7/14/2008European Minerals name change to Orsu; symbol change
7/10/2008Completes First Sale of Copper-Gold Concentrate from the Var...
6/27/2008 Announces the Issue of Shares Pursuant to Acquisition
3/31/2008Varvarinskoye Quarterly Update, Litigation Update, and Finan...
12/27/2007Achieves First Gold Pour on 22 December
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (OSU.TO)LSE (OSU.L)
0.035-12.50%1.25-10.71%
TORONTO
CA$ 0.035
01/31 15:27 -0.010
-12.5%
Prev close Open
0.040 0.035
Low High
0.035 0.035
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.035 -12.50%
Volume 1 month var.
202,000 -12.50%
24hGold TrendPower© : 44
Produces
Develops
Explores for Copper - Gold - Molybdenum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/28/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.73-1.90%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.26-0.53%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.58-0.35%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.49-0.40%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.41-1.34%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-2.38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.72-0.86%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.68-1.39%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+3.03%Trend Power :