U3O8 Corp. Confirms Positive Economics on Its Berlin Deposit in Colombia
Published : December 13, 2012

PEA shows Berlin could be a zero cash cost uranium producer with considerable growth potential

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

TORONTO, ONTARIO--(Marketwire - Dec. 13, 2012) - U3O8 Corp. (News - Market indicators)(OTCQX:UWEFF), a Canadian-based company focused on exploration and resource expansion of uranium and associated commodities in South America, reports a positive Preliminary Economic Assessment ("PEA") on its flagship Berlin Project in Colombia. The PEA was completed over a 6-month period by internationally recognized firm, Tenova Mining & Minerals (formerly Bateman Engineering N.V.), which has extensive experience with multi-commodity processing and plant design.

All figures are in US$, unless otherwise noted. The Berlin PEA is based on a uranium price of $60 per pound ("lb"), which is the average reported price for long-term contracts over the previous 12 months (sources: Ux Consulting, TradeTech). The current spot uranium price is $43.50/lb. Approximately 75% of uranium sales are in long-term contracts.

Highlights

  • Revenue of ~$430 per tonne ("t") of mineralized material against an operating cost of $240/t;
  • Uranium revenue is cash-flow positive - revenue from by-products, principally phosphate, vanadium and yttrium, more than pays for mining and extraction of the uranium;
  • Base case pre-tax net present value ("NPV") at a 10% discount is $181 million;
  • The internal rate of return ("IRR") is 17%;
  • Capital costs of $437 million that includes sustaining capital of $31 million and a $41 million contingency;
  • Cumulative cash flow of $892 million over the mine life; and
  • Average 1.2 million pounds ("Mlb") of uranium produced annually over a 15-year mine life from a 500,000t per year underground mine.

The PEA is based on an initial uranium resource of 1.5Mlb at 0.11% U3O8 Indicated and 19.9Mlb at 0.11% U3O8 Inferred, defined on three kilometres ("km") of the 10.5km mineralized trend at Berlin. Exploration drilling has shown similar grades extend over a further 3.3km of the trend and this area is ready for resource drilling. Trenching shows that the remaining 4.2km of the Berlin trend is mineralized and this portion has yet to be drilled (Figure 1).

"This robust PEA for the Berlin deposit marks a key milestone in providing an independent valuation of our flagship project - and a yardstick by which a value can be derived for U3O8 Corp.," said Dr. Richard Spencer, U3O8 Corp's President and CEO. "The Berlin PEA demonstrates that we believe U3O8 Corp's share price is trading at a deep discount based on a resource from just one third of the property. We expect the project economics to improve from this base case as the size of the deposit increases through further resource drilling and efficiencies are realized from ongoing metallurgical test work. Importantly, the PEA shows that the uranium can be mined and recovered from Berlin at a zero cash cost, thanks to the value of the associated commodities."

Dr. Spencer added, "While this milestone has been achieved within just two and a half years of our acquisition of the project, social and environmental work has been undertaken at a similar rapid pace. We are working with the local people to improve education, health and nutrition while developing sustainable projects for further development by the communities. And we are minimizing our exploration footprint and related environmental impact through the use of man-portable rigs and the transport of personnel and equipment by aerial cable systems, for example."

Table 1 - PEA Summary (Base Case at $60/lb uranium price):

Annual mill throughput   500,000 tonnes  
Total U3O8 produced   16.3 million pounds  
Average annual production of U3O8   1.2 million pounds  
Mine life   15 years  
Cumulative free cash flow (pre-tax)   $892 million  
NPV (pre-tax) at a 10% discount   $181 million  
IRR (pre-tax)   17 %
Pay-back period   4.5 years  
Cash cost per pound of U3O8, net of by-product credits   <$0 per pound  
Capital investment: Initial capital $365 million  
  Sustaining capital $31 million  
  10% Contingency $41 million  
  Total Capital $437 million  

The PEA is preliminary in nature as it includes inferred mineral resources that are considered too speculative geologically for economic consideration that would enable them to be classified as mineral reserves. Mineral resources are not mineral reserves and have not demonstrated economic viability. There is no certainty that the PEA will be realized.

Based on the PEA, the Berlin Project is expected to generate $3.0 billion in revenue with free cash flow of $892 million over the 15-year life of the mine.

Berlin's pre-tax NPV at a 10% discount is $181 million. The project's NPV and IRR are shown at various discount rates and uranium prices in Table 2. Berlin NPV's sensitivity to a plus or minus 10% change in capital and operating expenditures is shown in Table 3.

Uranium (33%), phosphate (29%), vanadium (9%) and yttrium (10%) represent the most significant commodities in the mineralized material at Berlin. Revenue from the by-products covers the cost of extracting the uranium, resulting in Berlin having a production cash cost of less than $0 per pound of uranium. Gypsum (6% of revenue) is an additional by-product generated from calcite when acetic acid is used in the beneficiation step of the process. Commodity prices of the other elements used in the PEA are shown in Table 4.

An increase in resources is likely to result in a higher IRR from the current 17% by providing flexibility to extend the mine life and/or increase the mining rate.

Table 2 - Sensitivity Analysis of Berlin NPV (in $ million) to Uranium Price

Uranium Price $40   $50   $60
(Base
Case)
  $70   $80  
Discount Rate 0% $ 606   $ 749   $ 892   $ 1,035   $ 1,177  
  5% $ 252   $ 342   $ 431   $ 521   $ 610  
  10% $ 63   $ 122   $ 181   $ 241   $ 300  
  15% $ (43 ) $ (2 ) $ 40   $ 81   $ 123  
   
IRR   13 %   15 %   17 %   19 %   21 %
   
Pay-back period (years)   5.8     5.1     4.5     4.1     3.7  

The PEA is based on the 12-month trailing average long-term uranium price of approximately $60/lb.

Table 3 - Berlin NPV (in $ million) Sensitivity to +/-10% Change in Capital and Operating Costs

Discount Rate Base Case NPV Effect on NPV
of
10% Change in
Operating Costs
Effect on NPV
of 10% Change in
Capital Costs
0% $892 $892 +/- $153 $892 +/- $44
5% $431 $431 +/- $96 $431 +/- $40
10% $181 $181 +/- $64 $181 +/- $37
15% $40 $40 +/- $44 $40 +/- $35

Capital expenditures are less sensitive to discount rate due to the front-end nature of the initial capital costs.

Table 4 - Commodity Prices of the By-Products in the Berlin PEA

Commodity Price
Phosphoric Acid $980/t
Vanadium $5.20/lb
Yttrium $100/kg
Neodymium $100/kg
Nickel $7.80/lb
Molybdenum $12/lb
Rhenium $2,800/kg
Zinc $0.90/lb
Gypsum $30/t

Commodity prices are based on current international market prices. The phosphoric acid price is based on a trailing 12-month average price.

Capital Costs

The PEA is based on an annual throughput of 500,000t with a capital investment of $437 million including $31 million in sustaining capital and $41 million contingency (Table 5).

Table 5 - Summary of Capital Costs

Items Capital costs
(million)
Mining $ 77
Process plant $ 181
Infrastructure and tailing management $ 69
Other (EPCM, indirect costs, etc.) $ 69
Contingency $ 41
TOTAL $ 437

Operating Costs

Operating costs for the Berlin Project are expected to average $240/t of mineralized material including royalties and a 10% contingency (Table 6).

Table 6 - Summary of Operating Costs

Items Cost per tonne
Revenue-based royalties $ 20
Mining $ 60
Processing $ 136
G&A $ 4
Contingency $ 20
TOTAL $ 240

Mineral Resources(1)

The Berlin PEA is based on resources prepared in accordance with National Instrument 43-101 ("NI 43- 101") at a cut-off grade of 0.04% U3O8 (Table 7).

Table 7 - Resource Estimate Summary for Uranium and Other Commodities

    Uranium Phosphate Vanadium Yttrium
NI 43-101 Resource Tonnes
(million)
Grade   (Mlb) Grade   (Mt) Grade   (Mlb) Grade (t)
Indicated 0.6 0.11 % 1.5 8.4 % 0.5 0.4 % 6.0 461ppm 294
Inferred 8.1 0.11 % 19.9 9.4 % 0.8 0.5 % 91.0 500ppm 4,066
 
    Neodymium Nickel Molybdenum Rhenium
NI 43-101 Resource Tonnes
(million)
Grade   (t) Grade   (Mlb) Grade   (Mlb) Grade (t)
Indicated 0.6 110ppm   70 0.2 % 3.1 570ppm   0.8 6ppm 4
Inferred 8.1 100ppm   813 0.2 % 42.1 620ppm   11.0 7ppm 55

(1) See the March 2, 2012 technical report: "Berlin Project, Colombia - National Instrument NI 43-101 Report" prepared by Coffey Mining Pty Ltd. and on U3O8 Corp's web site at www.u3o8corp.com and on SEDAR at www.sedar.com. Based on the initial resource and scout drilling results, management believes that there is a conceptual uranium target of 20-23Mt at 0.09% to 0.11% U3O8 (~45-50Mlb U3O8) on 6.3km of the Berlin trend. Potential quantity and grades are conceptual in nature. There has been insufficient exploration to define a mineral resource north of the current Berlin resource area, and it is uncertain if further exploration will result in additional mineral resources being delineated on the property.

Mining Plan

The PEA is based on an underground mine on the maiden resource and assumes that approximately 80% of the resource is mined with 20% left as pillars for mine support. After a first year mine production of 250,000t of mineralized material, the mine would ramp up to a production rate of 500,000t during a 15-year mine life. Planned daily output from the operation is 1,428t of mineralized material and 716t of waste.

Mineralization at Berlin lies in a specific layer that is "U"-shaped in cross section. The steeply inclined parts of the deposit require mining by cut and fill methods while the shallowly inclined parts use room and pillar mining techniques. Mine access is from a portal located at an elevation of 805 metres ("m") above mean sea level via a 760m ramp at a 15% inclination.

Crushing and semi-autogenous (SAG) milling will be done in an underground chamber so that dust can be controlled to the highest safety standards. All tailings from the plant site will be pumped back underground and used as backfill in the mined-out areas.

Metallurgy and Processing

A complete flow sheet was developed from extensive metallurgical test work on intercepts from 35% of all bore holes drilled in the initial resource area at Berlin. The process route has been designed to efficiently extract multiple commodities, to be versatile in terms of reagent consumption, to be compatible with standard recovery methods and to create an environmentally benign tailing. The three main components of this process are:

(1) beneficiation of the crushed mineralized material using acetic acid (vinegar) to remove calcite and concentrate the valuable commodities into 40-47% of the original mass, which makes the subsequent extraction and recovery processes more efficient, reduces capital and operating costs and decreases the volume of tailings by 50-60%;

(2) extraction of the metals and phosphate into a pregnant liquor solution ("PLS") by an acidic ferric iron leach method. The rates of extraction achieved for each metal and phosphate is shown in Table 8; and

(3) recovery of the individual elements from the PLS by conventional ion exchange, solvent extraction and direct precipitation.

Table 8 - Extraction Rates of the Metals and Phosphate from the Berlin Deposit

Commodity Extraction %
Uranium 96.1
Phosphate 98.9
Vanadium 66.3
Yttrium 86.1
Neodymium 59.6
Nickel 65.9
Molybdenum 51.4
Rhenium 32.8
Zinc 95.9

Infrastructure

The Berlin Project is in Caldas Province of central Colombia, and favourably located between the country's largest cities - 140km from Bogota and 100km from Medellin (Figure 1). The town of La Dorada is 60km east of the project and lies on the principal paved road between Bogota and Medellin. La Dorada provides port facilities on the Magdalena River, which is navigable by barge to the coastal port of Barranquilla. Barranquilla is the largest port in Colombia and provides access to the export destinations of the Caribbean, Central America, the southern U.S. and northern South America. A defunct railway line also runs from La Dorada to the port town of Santa Marta on the Caribbean coast. The Colombian government is reported to be planning to have the railway line operational in 2015, which would offer an alternative link between the project and the Caribbean coast.

Large volumes of quality water are available in the project area. The PEA indicates that about 75% of the required electricity can be produced from heat generated from a sulphuric acid plant that will produce acid from sulphur - and forms an integral part of the processing facility. In addition, the project is planned to be linked to the 395MW La Miel hydroelectric dam located about 12km from the Berlin Project. La Meil would serve as a back-up power source.

Next Steps

  • Tenova Mining & Minerals is modelling the effect on project economics of eliminating the acetic acid leach step. The results of this study will be incorporated in the PEA technical report.

  • Metallurgical test work is continuing to build on recent flotation results as a means of extracting a large quantity of acid-consuming calcite from the mineralized material, which could lead to significant capital and operating cost savings.

  • The northern 4.2km of the mineralized trend at Berlin remains to be explored and consideration will be given to wide-spaced drilling in that area to fully define the size potential of the Berlin deposit.

  • Consideration will be given to infill drilling parts of the 3.3km of the mineralized trend that have already undergone exploration drilling so that the resource estimate can be expanded.

The Berlin PEA technical report prepared in accordance with NI 43-101 will be filed on SEDAR within 45 days of this news release.

The PEA on the initial uranium-vanadium deposit on the Laguna Salada Project in Argentina is being finalized and is expected to be published in the first quarter of 2013.

Qualified Persons and Accreditation

The PEA was completed under the supervision of Mr. Pieter Niemann, P. Eng., at Tenova Mining & Minerals (formerly Bateman Engineering N.V.) ("TMM"). TMM is part of the Techint Group, a leading global engineering firm, that has been providing process design, development and construction services to the resource sector for over 90 years with extensive and specific process and engineering experience in the extraction of uranium, phosphate, rare earths, nickel and zinc as well as in sulphuric acid production. Clients and projects have included AREVA's Imouraren, Cameco's Key Lake, Harmony, Rossing, Kazatomprom and Arafura's Nolans Bore project (rare earths, phosphoric acid, gypsum production and uranium recovery). TMM has also constructed phosphate plants in Australia, South America, Africa and the US. For more information, see www.tenovagroup.com.

Mr. Pedro Pino Veliz, President of P&K Projetos e Consultoria LTDA ("P&K"), was responsible for the mine design in the PEA. Mr. Veliz is a Civil Mining Engineer (P.E.), Eng. Dr. (IT) SME with over 35 years of mining operations experience. P&K has extensive experience serving its Brazilian and international clientele with rock mechanics, rock characterization, underground stability and hydrological studies. This has included detailed design of tunnels and stations, methods of excavation and specifications for support methods in the expansion of the Rio de Janeiro subway system in preparation for the 2014 World Cup and 2016 Olympic Games. Mr. Veliz also planned and undertook initial underground development of Colossus Minerals Inc's Serra Pelada precious metal deposit in Brazil.

TMM was responsible for the PEA design of the communition, extraction and recovery parts of the plant, as well as for the operational expenditure and capital expenditure estimates thereof. Pricing of reagents was done by TMM and U3O8 Corp. Product price assumptions were made by U3O8 Corp. Sulphur was assumed to be sourced within Colombia at international prices. The value of parts of the heating systems was estimated conservatively and the power consumption values thereof are qualified at this stage of the plant design. Further detail in the design of the heating and energy balance could deliver additional savings to operating costs. The price for power was provided by U3O8 Corp. from a pro-forma quote from the national power distributor in Colombia. Credits for power from a plant driven by steam produced from the sulfuric acid plant are based on the price of the commercial source of electricity. The economic model was constructed by U3O8 Corp. using capital and operating cost estimates from TMM for the plant and from P&K for the mine plan. The economic model was reviewed by both TMM and P&K.

Dr. Paul Miller, Managing Director of Sulphide Resource Processing Pty Ltd., has overseen the metallurgical test work carried out by SGS Lakefield OreTest in Perth, Australia. Dr. Miller is a metallurgist specializing in hydrometallurgy with over 30 years' experience in the commercial application of processes for the treatment of sulphide-bearing ore. He has a doctorate in Chemical Engineering, is a member of the Institute of Mining and Metallurgy, London, and is a Chartered Engineer.

Each of the individuals named above are qualified persons as defined in NI 43-101 of the Canadian Securities Administrators ("QP"), are independent of U3O8 Corp. and has verified their related technical disclosure presented in this press release.

The PEA has relied on the NI 43-101 resource prepared by Mr. Neil Inwood, a Fellow of The Australian Institute of Mining and Metallurgy and a QP, who was employed by Coffey Mining Pty Ltd ("Coffey Mining") at the time of the writing of the report. Mr. Inwood is independent of U3O8 Corp. As Mr. Inwood is no longer with Coffey Mining, Coffey Mining has reviewed the information related to the mineral resources as derived from the original report and consent to its inclusion, form and context in this press release.

Dr. Richard Spencer, P. Geo., President & CEO of U3O8 Corp. and a QP, has supervised the preparation of, and verified the technical information contained in this press release relating to the Berlin Project.

About U3O8 Corp.

U3O8 Corp. is an advanced exploration company focused on exploration and resource expansion of uranium and associated commodities in South America - a promising new frontier for uranium exploration and development. In just one year, U3O8 Corp's uranium resources have grown 7-fold with deposits now in Colombia, Argentina and Guyana comprising of:

  • Berlin Project, Colombia - its flagship property contains a uranium deposit supported by a high-value suite of by-products including phosphate, vanadium, rare earths (yttrium and neodymium) and other metals;

  • Laguna Salada Project, Argentina - a near surface, free-digging uranium, vanadium deposit that is potentially amenable to low-cost mining and processing methods; and

  • Kurupung Project, Guyana - an initial uranium deposit in a large emerging uranium district.

Additional information on U3O8 Corp. and its mineral resources are available at www.u3o8corp.com.

Forward-Looking Statements

Certain information set forth in this news release may contain forward-looking statements that involve substantial known and unknown risks and uncertainties. These forward-looking statements are subject to numerous risks and uncertainties, certain of which are beyond the control of U3O8 Corp., including, but not limited to, the future results of metallurgical test work, whether results of metallurgical test work on a smaller scale to date can be duplicated on a larger scale, the impact of general economic conditions, industry conditions, the timing of laboratory results and preparation of technical reports and PEAs, the actual results of independent scoping studies and subsequent metallurgical testing, volatility of commodity prices, risks associated with the uncertainty of exploration results and estimates and that the resource potential and PEA will be achieved on the Berlin Project and other exploration projects, currency fluctuations, legislative change, dependence upon regulatory approvals, and the uncertainty of obtaining additional financing and exploration risk. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

To view Figure 1, please visit the following link: http://media3.marketwire.com/docs/uweff1213fig1.pdf.



U3O8 Corp.
Richard Spencer
President & CEO
(416) 868-1491
richard@u3o8corp.com
or
U3O8 Corp.
Nancy Chan-Palmateer
Vice President, Investor Relations
(416) 868-1491
nancy@u3o8corp.com
www.u3o8corp.com
Data and Statistics for these countries : Argentina | Australia | Brazil | Colombia | All
Gold and Silver Prices for these countries : Argentina | Australia | Brazil | Colombia | All

U3O8 Corp.

EXPLORATION STAGE
CODE : UWE.V
ISIN : CA9034151071
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

U3O8 is a uranium exploration company based in Canada.

Its main exploration properties are BERLIN in Colombia, LAGUNA SALADA in Argentina and ARICHENG NORTH, ARICHENG SOUTH and KURUPUNG BATHOLITH in Guyana.

U3O8 is listed in Canada and in United States of America. Its market capitalisation is CA$ 47.8 millions as of today (US$ 38.2 millions, € 36.4 millions).

Its stock quote reached its highest recent level on January 26, 2007 at CA$ 5.85, and its lowest recent point on September 28, 2022 at CA$ 0.12.

U3O8 has 281 134 770 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of U3O8 Corp.
4/15/2013closes first tranche of private placement
3/13/2013announces $1.0 million private placement
2/10/2012Closes Bought Deal Private Placement to Raise $11,523,000
1/19/2012Announces $10 Million Bought Private Placement
2/15/2011U3O8 Corp. completes C$20.5 million private placement
1/28/2011U3O8 Corp. announces approximately C$15 million private plac...
1/28/2011U3O8 Corp. announces approximately C$2.8 million increase in...
Nominations of U3O8 Corp.
6/4/2010U3O8 Corp. appoints John Ross as Chief Financial Officer
Project news of U3O8 Corp.
11/12/2013(Laguna Salada)makes a new uranium-vanadium discovery in the Laguna Salada ...
9/26/2013(Laguna Salada)Continuous surface mining scenario to be contemplated in eco...
8/27/2013(Laguna Salada)& Chubut Provincial Government in advanced negotiations to p...
5/14/2013completes acquisition of Calypso Uranium Corp.
3/11/2013consolidates position as South America's leading uranium exp...
2/19/2013Corp's value based on its Colombia deposit only & compared w...
2/14/2013(Berlin)files PEA showing that its Berlin Project in Colombia could ...
11/1/2012(Berlin)defines the full extraction process for its Berlin deposit i...
10/17/2012(Berlin)Further Optimizes Metallurgical Process on the Berlin Projec...
6/7/2012(Berlin)advancing drill program that aims to show the large size pot...
4/3/2012expands its strategic land position adjacent to Argentina's ...
3/26/2012and Minexco Minerals Corp. enter into agreements for gold ex...
12/6/2011signs letter of intent to joint venture its non-core Sierra ...
5/26/2011(Berlin)U3O8 Corp's drilling confirms consistent uranium, vanadium, ...
3/2/2011(Laguna Salada)U3O8 Corp. reports positive metallurgical test results from ...
2/24/2011(Berlin)Corp's Drilling Confirms Consistent Uranium, Vanadium, Phosp...
1/24/2011U3O8 Corp. outlines 2011 exploration program aimed at rapidl...
6/3/2010(Laguna Salada)advances towards NI 43-101 resource estimation on the Laguna...
5/20/2010(Aricheng North) intersects 2.9 metres at 0.228% (4.6 pounds per short ton) ...
1/22/2009(Aricheng North)announces initial uranium resource estimate for the Aricheng...
8/21/2008(Permit A)cuts 25 metres grading 0.099% U3O8 (2.0 lbs per short ton) a...
Corporate news of U3O8 Corp.
2/14/2014announces $1 million private placementCc:
1/9/2014(LAN:TSX-V) Lakeland, Declan sample up to 4.28% U3O8 at Gibb...
12/4/2013(Laguna Salada)discovers potentially large area of shallow uranium-vanadium...
6/27/2013shareholders approved all matters at annual & special meetin...
5/16/2013advancing strategy for near-term development to meet Argenti...
5/13/2013adopts advance notice by-law
5/8/2013Corp's Acquisition of Calypso Uranium Corp. Receives Shareho...
4/29/2013Why U3O8 Corp. is bullish on Argentina for nuclear
4/24/2013Anthem Intersects 2.3 metres grading 0.45% U3O8 on Hatchet L...
3/25/2013Alpha Minerals Reports 34m of 4.92% U3O8=2C Including 12.5m ...
1/11/2013Completes $3.16 Million Private Placement
11/13/2012Key market events suggest uranium prices should rise in the ...
10/22/2012New Kianna East Basement Zone at Shea Creek Yields Further R...
9/24/2012Uranium Outlook and U3O8 Corp. on King World News
9/20/2012(Berlin)Corp's Exploration Drilling Extends Mineralization a Minimum...
8/27/2012graduates to the TSX
7/12/2012files NI 43-101 report on the Kurupung uranium project, Guya...
6/27/2012Shareholders Approved All Matters at Annual & Special Meetin...
6/21/2012files patent application for metallurgical process that effi...
6/6/2012Zone 3 Grows Kvanefjeld Project Resource Inventory to 575 Ml...
5/23/2012increases NI 43-101 uranium resources by 125% in the Kurupun...
5/8/2012commences trading on the OTCQX International in the U.S.
3/5/2012(Berlin)files NI 43-101 technical report on the uranium, phosphate &...
3/1/2012Corp?s resource drilling returned 18m at 0.11% U
2/23/2012Corp?s resource drilling intersects 13m at 0.11%
1/18/2012(Berlin)confirms significant NI 43-101 compliant uranium, phosphate ...
1/12/2012reports excellent metallurgical recoveries of 97% for uraniu...
11/18/2009Cuts 8.7 metres at 0.106% (2.1 pounds per short ton) U3O8 at...
1/28/2010Extends the Aricheng West uranium zone another 150 metres
11/27/2009Granted extensions on its uranium exploration areas in Guyan...
1/12/2010Identifies key pathfinder elements in its uranium exploratio...
11/26/2009Cuts 2.3 metres at 0.551% (11 pounds per short ton) U3O8 at ...
10/23/2009To early adopt International Financial Reporting Standards i...
10/8/2009BHP Biliton's Olympic Dam Malfunction Could Affect U3O8 Pric...
8/5/2009plans a 6,000 metre drill program to test the potential size...
7/1/2009Shareholders Approved All Matters at Annual & Special Meetin...
5/20/2009U3O8 Corp. cuts 8 metres of 0.119% (2.4 pounds per short ton...
1/13/2009U3O8 Corp. cuts 9.4 metres at 0.132% (2.64 pounds per short ...
12/23/2008U3O8 Corp. cuts 5.9 metres grading 0.13% (2.5 pounds per sho...
12/11/2008granted access to previously drilled core in the Roraima Bas...
11/18/2008Search continues for missing crew and plane conducting geoph...
11/7/2008Drilling Encounters 3.0m Width With its Highest Intersection...
9/24/2008cuts 5.6 metres grading 1.01% (20.3 pounds per short ton) U3...
9/9/2008receives one-year extension on its Reconnaissance Permits fo...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (UWE.V)OTHER OTC (UTREF)
0.170+41.67%0.110+0.00%
TORONTO
CA$ 0.170
12/06 09:30 0.050
41.67%
Prev close Open
0.120 0.185
Low High
0.170 0.190
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.170 -%
Volume 1 month var.
840,401 -%
24hGold TrendPower© : -2
Produces
Develops
Explores for Uranium - Vanadium
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/12/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
20220.00%0.270.12
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.49%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :