Brilliant Mining Corp.

Published : September 19th, 2008

Contained Nickel Reserves Increase to 146 million pounds and Deacon Drilling Commences; Lanfranchi N

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Australia | Canada | Growth | Nickel | Recovery |
Brilliant Mining Corp. Suite 1440, 625 Howe St.
Vancouver BC, V6C 2T6

Toll Free: 1-888-331-2269

BMC: TSX-V

Contained Nickel Reserves Increase to 146 million pounds and Deacon Drilling Commences; Lanfranchi Nickel Mine, Kambalda District of Western Australia

Vancouver, B.C. - Brilliant Mining Corp. (BMC: TSXV) (�Brilliant� or the �Company�) today reported an 8% increase in Mineral Reserves to 2.7 million tonnes of ore grading 2.42% Ni for 146.1 million lbs of contained nickel.  In addition, a delineation drill program has commenced down-plunge of the Deacon orebody with the potential to add significant mineral resources and reserves at the Company�s 25% owned Lanfranchi Nickel Mine, located in the world class Kambalda Nickel District of Western Australia.

Key Point Summary:

  • 2.7 million tonnes of ore grading 2.42% Ni for 146.1 million lbs of Ni metal in Reserves
  • 8% or 10.9 Million Lbs contained Ni Metal increase in Ore Reserves at June 30, 2008 Year-on-Year, taking into account the July07�June08 (�2007/08�) 12 months of depletion from production
  • Significant Ore Reserves growth achieved from both Deacon and Lanfranchi orebodies
  • Deacon down-plunge extension drilling commences with the potential to substantially add to mine life in the Mineral Reserves and Resources categories

Lanfranchi Mine � Reserve Update

Updated Ore Reserves for the Lanfranchi Mine are reported in the following table (Table 1).

Table 1: Lanfranchi Mine Mineral Reserves at 30 June 2008

Ore

Reserves

30-Jun-08 30-Jun-07 Difference YoY
Body

Category

Tonnes
(,000)
Ni
(%)
Ni (t) Ni
(Mlbs)
Tonnes
(,000)
Ni
(%)
Ni (t) Ni
(Mlbs)
Ni
(Mlbs)
%
Deacon

Probable

2,085 2.35 48,954 107.9 1,695 2.54 43,009 94.8    
 

Total

2,085 2.35 48,954 107.9 1,695 2.54 43,009 94.8 13.1 13.8%
Helmut

Proven

268 2.29 6,129 13.5 410 2.17 8,909 19.6    
South

Probable

- - - - - - - -    
 

Total

268 2.29 6,129 13.5 410 2.17 8,909 19.6 -6.1 -31.2%
Winner

Probable

99 3.92 3,878 8.5 144 4.26 6,139 13.5    
 

Total

99 3.92 3,878 8.5 144 4.26 6,139 13.5 -5.0 -36.8%
Lanfranchi

Probable

126 2.86 3,594 7.9 25 1.92 486 1.1    
 

Total

126 2.86 3,594 7.9 25 1.92 486 1.1 6.9 639.5%
Schmitz

Probable

87 2.66 2,318 5.1 94 2.93 2,750 6.1    
 

Total

87 2.66 2,318 5.1 94 2.93 2,750 6.1 -1.0 -15.7%
Martin

Probable

75 1.86 1,385 3.1 - - - -    
 

Total

75 1.86 1,385 3.1 - - - - 3.1 N/A
Total

Proven

268 2.29 6,129 13.5 410 2.17 8,909 19.6    
 

Probable

2,471 2.43 60,129 132.6 1,958 2.68 52,396 115.5    
 

Total

2,739 2.42 66,258 146.1 2,368 2.59 61,305 135.2 10.9 8.1%
Notes:  1. 25% of the listed Reserves are attributable to Brilliant Mining Corp.
  2. Reserves estimated at 1.0% Ni cut-off except for Deacon stopes which are estimated at 0.8% Ni cut-off
  3. Additional notes detailing the Ore Reserves Estimation Parameters are listed at the bottom of this release
  4. Abbreviations: t=tonnes, Mlbs=million pounds, YoY=year on year

After production of 7,303 tonnes (16.1 Mlbs) of contained Ni metal from the Lanfranchi mine in 2007/08 the Mineral Reserves for the project increased by approximately 12,300 tonnes (27.1 Mlbs) of Ni metal.  The reported overall gain compared to the Mineral Reserves as at 30 June 2007 was due to significant Ore Reserve growth achieved from both Deacon and Lanfranchi orebodies.

Under the current mine plan and existing processing contracts, production of the delineated Ore Reserves at the Lanfranchi Mine is estimated to provide the Company with approximately 9,600 tonnes (21.1 Mlbs) of Payable Nickel.  Payable Nickel Metal is Brilliant Mining�s attributable nickel metal post recovery loss, smelter fee and ancillary charges.

Continued Resource Delineation

In 2008/09 underground exploration activities will be focused on replenishing and adding to the project�s mineral resource and reserve base by drilling the down plunge extensions at Deacon, Helmut South, Schmitz, and Lanfranchi

It is anticipated that subject to the mineralisation continuing down-plunge that each of the three producing channels (Lanfranchi, Winner/Schmitz and Helmut/Deacon) have the potential to add significant nickel tonnes.  Historically, the Lanfranchi, Schmitz and Helmut channels have contained approximately 6,000, 9,000 and 15,000 tonnes (13.2, 19.8 and 33.1 million lbs) of Ni metal respectively for each 100 metres of vertical extension.

1
Figure 1: Lanfranchi Mine Nickel Channels Showing Underground Workings
 

Deacon Down Plunge Delineation Drill Program

The Deacon down-plunge extensional drill program has commenced with the first phase of drilling targeting the existing 12,200 tonnes (26.9 million lbs) of Ni metal currently classified as an Inferred Mineral Resource at the base of the Deacon Ni channel.  The intent of the drill program is to upgrade the Inferred Resource to an Indicated Resource and hence allow subsequent conversion to Ore Reserves.  This drill campaign has the potential to significantly add to the mine life in the Reserve category.

The second phase of drilling will be to target a further 200m down plunge of the Inferred Resource limits with the intent to add new material into the resource base at the mine.  A high level of confidence exists for the down plunge continuation of the Deacon mineralisation as evidenced by the strong geophysical conductor identified by parallel EM drilling performed during the last quarter of 2007 (see Company press release dated November 1, 2007).

Figure 2: Deacon Resource 3-D Model in Cross Section
1

Lanfranchi and Schmitz Down-Plunge Extension

The drilling of the extensions to the Schmitz and Lanfranchi Channels requires the completion of drilling platforms in the hangingwall to each orebody.  This work has not yet commenced, is currently being planned and awaits mine development in order to attain a suitable position to mount a drill campaign.

All tonnage quantities in this press release unless otherwise stated are on a 100% gross tonnage basis, for the Lanfranchi Mine of which 25% is attributable to Brilliant; and reported on a June 30 year end to be in alignment with the Operation�s budgetary year.
The project is supervised by John Williamson, P.Geol., of Edmonton, Alberta. Mr. Williamson is CEO and a Director of Brilliant, and is the qualified person as defined by National Instrument 43-101.

**Table 1 Notes:

The Ore Reserves outlined in Table 1 reflect planned development that is a continuation of current mine operations and not a new operation.

The Ore Reserves estimation was completed by or reviewed by Jonathon Bayley and Robert Thorburn who are Members of The Australasian Institute of Mining and Metallurgy (MAusIMM).  The aforementioned are full-time employees of Panoramic Resources Limited, the 75% partner in the Lanfranchi Joint Venture.  The aforementioned have sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.  The aforementioned consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.  The Ore Reserves have been reconciled to the mineral reserve categories as set out by and adopted by the CIM Council.

The mining method selected for the Deacon Ore Body is a series of longhole open stopes which will mine approximately 65% of the reserve with underhand cut and fill mining of the remainder.  All stoping voids will be completely filled with paste as part of the mining process.

All shapes created for the reserve was broken into 2.5m sections along the line of advance. Each section was then analysed for diluted grade and the cutoff applied was 0.8%.  The measured and indicated resource was broken into 5 x 55m blocks (north-south) separated by 10m wide pillars. Each block was then divided into 3 x 7m primary stopes separated by 2 x 12m secondary stopes. All stopes have vertical walls, have top and bottom drives, and are 25m tall from the floor of the lower drive to the backs of the upper drive. Each drive was then positioned vertically to capture the highest amount of nickel tonnes. Once positioned, each stope then had the lower drive raised and the upper drive lowered to see if the material removed was economic. Each stope was then further manually optimised to add further ore or remove waste on a 2.5m section basis.

All ore remaining after the above three stages was then sliced into 5m vertical sections corresponding with the drives in Helmut South.  All sections were then divided into a series of 5 x 5m drives to mine the remaining ore where the diluted grade was above 0.8%.  This included areas where smaller amounts of ore which was mined with paste if the resultant grade was still above 0.8%.

Excepting of the longhole Deacon stopes, all drives are created (5x5 for twin boom jumbos, and 3x4 for single boom jumbos) then analysed on a 2.5m advance basis. Blocks grading less than 1.0% are classed as waste. 

Details of the parameters utilized for the underlying Mineral Resource Estimates are listed in the Company�s press release dated July 31, 2008.

The following are additional key assumptions and inputs utilized in the calculation of the Ore Reserves:

  • Nickel price used is $A23,000 per tonne.
     
  • AUD:USD exchange rate is assumed to be 0.90
     
  • The reserve numbers have allowed for planned dilution (mining shapes which include design waste assigned at a 0% Ni grade), 4% unplanned dilution and 1% ore loss
     
  • Recovery rates between 88% and 92% are used in the models
     
  • There is not expected to be any metallurgical issues leading to penalties
     
  • The current year-to-date operating costs for the Lanfranchi Nickel Mine is A$225 per tonne mined

About Brilliant Mining Corp.

Brilliant Mining Corp. is focused on the production, development and exploration of nickel opportunities world wide. The Company currently has a 25% interest in the producing Lanfranchi Nickel Mine in Western Australia and has active nickel projects in Canada, including the Michikamau property in central Labrador.

On behalf of the Board of Directors

�Mike Sieb�                     
Mike Sieb, B.Sc., MBA
President
Brilliant Mining Corp.

For further information about Brilliant Mining Corp., or this news release, please visit our website at www.brilliantmining.com, or contact:

Mike Sieb 
President 
604-646-4525
mikes@brilliantmining.com 
Derek Iwanaka
Investor Relations
 604-646-4524
info@brilliantmining.com    

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.
Certain disclosures in this release, including management's assessment of Brilliant�s plans and projects, constitute forward-looking statements that are subject to numerous risks, uncertainties and other factors relating to Brilliant's operation as a mineral exploration company that may cause future results to differ materially from those expressed or implied in such forward-looking statements. Readers are cautioned not to place undue reliance on forward-looking statements. Brilliant expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise.

- -
Data and Statistics for these countries : Australia | Canada | All
Gold and Silver Prices for these countries : Australia | Canada | All

Brilliant Mining Corp.

EXPLORATION STAGE
CODE : BLT.V
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Brilliant Mining is a nickel exploration company based in Canada.

Brilliant Mining holds various exploration projects in Canada.

Its main exploration property is MISCHIKAMAU in Canada.

Brilliant Mining is listed in Canada. Its market capitalisation is CA$ 38.1 millions as of today (US$ 30.9 millions, € 27.7 millions).

Its stock quote reached its highest recent level on January 16, 2009 at CA$ 0.56, and its lowest recent point on April 19, 2013 at CA$ 0.03.

Brilliant Mining has 149 450 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Brilliant Mining Corp.
2008 Annual Report
2007 Annual report
Financings of Brilliant Mining Corp.
4/18/2006Revises private placement terms
Project news of Brilliant Mining Corp.
10/8/2014Montana Exploration Corp. announces agreement to acquire Bri...
1/29/2009(Lanfranchi)Record Nickel Metal Production for December 2008 Quarter Lan...
1/14/2009(Lanfranchi)39% Increase of Deacon Indicated Mineral Resource to 157.4 M...
9/19/2008(Lanfranchi)Contained Nickel Reserves Increase to 146 million pounds and...
9/4/2008(Lanfranchi)450,000 Tonnes of Ore Approved for Delivery Lanfranchi Nicke...
8/1/2008(Kambalda)June Quarterly Production Update Lanfranchi Nickel Mine, Kam...
8/1/2008(Kambalda)Resource and Exploration Update Lanfranchi Nickel Mine, Kamb...
7/17/2008(Kambalda)Strong Production Growth Forecast - Lanfranchi Nickel Mine K...
4/23/2008(Lanfranchi)Record Quarterly Production – 49% Increase over December 200...
4/23/2008(Lanfranchi)7.0% Ni over 1.22m from First Hole on Northern Tramways Dome...
3/31/2008(Lanfranchi)Production Commences 18 Months After Discovery at High-Grade...
3/13/2008(Lanfranchi) Drill Program to Commence Lanfranchi Nickel Mine, Kambalda ...
1/31/2008(Lanfranchi)Record Quarterly Production?47% Increase over September Quar...
1/30/2008(Lanfranchi)Significant Conductor Identified on Northern Overturned Tram...
11/29/2007(Kambalda)5.4% Ni Delivered from Winner during First Month Production ...
10/30/2007(Kambalda)Winner Production Commenced Oct. 14?First Month Ore Deliveri...
10/29/2007(Lanfranchi)High Grade Massive Ni Sulphide Intersected on Overturned Nor...
10/4/2007Intersects Nickel Sulphide Mineralization at Michikamau Proj...
9/13/2007(Lanfranchi)High Grade Massive Ni Sulphide Zone Delineated, Lanfranchi O...
8/10/2007(Lanfranchi)Deacon Ore Reserve Economic Input Summary; Lanfranchi Nickel...
7/31/2007(Lanfranchi)June 2007 Quarterly Update
7/10/2007(Kambalda)Drilling Validates Tramways Dome Theory; 3.4% Ni over 1 Metr...
7/3/2007(Kambalda)Resource Delineation Drill Program Underway on Lanfranchi Ex...
6/25/2007(Mischikamau)Commences Exploration Program at Michikamau Ni-Cu-Co-PGE Pro...
5/29/2007(Kambalda)21,000 Tonnes (46.8 Million Lbs) Ni Metal Production Target ...
Corporate news of Brilliant Mining Corp.
4/20/2015Brilliant Announces Proposed Investment in Ram Power
4/15/2015Brilliant Announces Appointment of CFO and New Head Office
4/10/2015IIROC Trading Resumption - BLT
4/10/2015Announces Plans for A Return of Capital; Change of Business ...
4/10/2015Brilliant Announces Plans for A Return of Capital; Change of...
4/10/2015IIROC Trading Halt - BLT
4/9/2015Brilliant Receives Final Payment from Government of Equatori...
3/24/2015Brilliant Receives Third Payment from Government of Equatori...
2/26/2015IIROC Trading Resumption - BLT
2/26/2015IIROC Trading Halt - BLT
2/26/2015Brilliant Receives Second Payment from Government of Equator...
2/11/2015Brilliant Announces Cancellation of Shares
2/11/2015IIROC Trading Resumption - BLT
2/11/2015IIROC Trading Halt - BLT
2/11/2015Brilliant Provides Update on Payment From Government of Equa...
1/30/2015Brilliant Provides Update on Agreement With Government of Eq...
1/22/2015IIROC Trading Resumption - MPL; BLT
1/22/2015Brilliant Announces Agreement with the Government of Equator...
1/22/2015IIROC Trading Halt - BLT
11/25/2014Brilliant Resources and Montana Exploration Announce Termina...
10/8/2014Brilliant Announces Letter Agreement Setting Out Terms of Ac...
6/12/2014Brilliant Proceeds to Arbitration Against the Government of ...
11/19/2008Will Be Exhibiting at the San Francisco Hard Assets Conferen...
9/26/2008Will Be Exhibiting at the Toronto Resource Investment Confer...
6/23/2008TSX Venture 50 Ranks Brilliant Mining In Top 10 Mining Compa...
6/16/2008Ore Deliveries Unaffected - Lanfranchi Nickel Mine, Kambalda...
5/29/2008Retires $5 Million Convertible Debenture with Cash Payment
5/15/2008Cash Position Increases Receives $3.4 Million from Warrant E...
4/16/2008Visits Kamloops, White Rock and Victoria
1/29/2008Presents at 2008 World Outlook Financial Conference
1/15/2008Chairman s Message - Brilliant Mining 2007 Year in Review
11/1/2007Strong Conductor Down-Plunge of Deacon?Surface Drill Program...
9/24/2007Reports Significant Increase to Nickel Reserves and Resource...
8/7/2007Deacon Ore Reserve Exceeds 43,000 Tonnes of Nickel Metal; Tr...
8/1/2007Brilliant Nickel Production Un-hedged, Lanfranchi Nickel Min...
7/17/2007Quarterly Nickel Ore Deliveries Lanfranchi Nickel Mine, Kamb...
7/16/2007Commences Drilling at Michikamau Ni-Cu-Co-PGE Project: Labra...
6/20/2007Recognized as Top 10 Mining Company For 2007 TSX Venture 50 ...
3/5/2007Initial Deacon Resource Exceeds Expectations; 1,325,000 Tonn...
5/26/2006closes acquisition of Donegal Resources Pty Ltd.;…
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (BLT.V)
0.255+0.00%
TSX-V
CA$ 0.255
06/26 15:59 -
0%
Prev close Open
0.255 0.255
Low High
0.250 0.255
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.255 -1.92%
Volume 1 month var.
114,001 -1.92%
24hGold TrendPower© : -6
Produces
Develops
Explores for Cobalt - Copper - Nickel
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.66-0.71%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+0.01%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53+0.38%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.71+2.65%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.99-1.48%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22+2.38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.06%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.97+0.49%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :