Chart usGOLD   Chart usSILVER  
 
Food for thought
On a surface level, life is a comedy. On a deep level, life is a tragedy
.  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1359.60-27.44
Silver 22.25-0.41
Platinum 1451.52-31.48
Palladium 735.25-1.25
WORLD MARKETS
DOWJONES 15354120
NASDAQ 349934
NIKKEI 15138101
ASX 516016
CAC 40 400122
DAX 839828
HUI 246-10
XAU 105-1
CURRENCIES (€)
AUS $ 1.3162
CAN $ 1.3193
US $ 1.2838
GBP (£) 0.8461
Sw Fr 1.2477
YEN 132.4600
CURRENCIES ($)
AUS $ 1.0268
CAN $ 1.0279
Euro 0.7789
GBP (£) 0.6593
Sw Fr 0.9725
YEN 103.1300
RATIOS & INDEXES
Gold / Silver61.11
Gold / Oil14.16
Dowjones / Gold11.29
COMMODITIES
Copper 3.310.02
WTI Oil 96.020.86
Nat. Gas 4.060.13
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
( 0 vote, 0/5 ) Print article
     
Tweet

 

Continued Drilling Success at Seabridge Gold's Sulphurets Deposit

 

Toronto, Canada - Results from the first seven core holes drilled this summer at the Sulphurets deposit, part of Seabridge Gold's 100% owned KSM Project, are likely to expand reserves and improve overall project economics.

 

Seabridge President Rudi Fronk commented that the 2011 KSM drill program is off to a good start. "A key objective of this year's program is to upgrade approximately three million ounces of higher grade inferred gold resources at the Sulphurets and Kerr deposits to proven and probable reserves. These resources are currently classified as waste in the 2011 Preliminary Feasibility Study. The first seven holes drilled this year at Sulphurets have exceeded expectations with wide intersections containing gold grades well above the KSM average. This material should increase reserves and could be exploited in the earlier years of production which would enhance its economic impact."

 

Geotechnical drilling is now underway in the Mitchell deposit to confirm requirements for a cost-effective underground panel caving operation which is currently under review. Panel caving deeper portions of the Mitchell deposit could improve production grades and substantially reduce both stripping ratios and waste rock storage requirements. Additional drilling at Sulphurets and Kerr will also be completed later this season.

Assay results of the initial seven holes drilled this year at Sulphurets are as follows:

 

Description : http://media3.marketwire.com/docs/seab0727table1.jpg

 

Descriptions of the initial seven holes drilled this year at Sulphurets are as follows (see attached map for locations):

 

S-11-34: Collared in the southwest area of Sulphurets to fill a data gap in projected shallow mineralization. After 5 meters of overburden, the hole entered Sulphurets gold breccia style mineralization of intensely silica and pyrite altered rocks with disseminated chalcopyrite down to 101.1 meters. From here to the end of the hole, silica-chlorite-pyrite altered sedimentary and volcanic rocks with minor intrusions typical of Raewyn copper style mineralization were intersected. Minor disseminated chalcopyrite occurs as deep as 166.5 meters. This hole is expected to re-classify waste blocks to reserves in the current pit design and allow deepening of the southeast side of the pit to capture additional ore beneath the current pit bottom.

 

S-11-35: Collared in central Sulphurets to fill a data gap in projected deep mineralization and re-classify inferred and unclassified blocks to indicated blocks. The hole was collared above the Sulphurets Thrust Fault (STF) and entered an intrusive-hydrothermal breccia zone at the contact of a monzonitic intrusion and andesite host rocks in the Main Copper zone. The breccia has an alteration mineral assemblage that includes quartz, chlorite, pyrite, feldspar, magnetite and chalcopyrite. From 4 meters to 153 meters, the hole intersected the longest continuous interval and highest grade gold and copper mineralization intersected to date in the Main Copper zone. As a result, considerable low grade ore and waste blocks in the Main Copper zone will receive higher gold and copper grades in the next resource model revision. The STF was intersected at 262.1 meters. The Raewyn Copper zone was cut from 374 to 592 meters and provided the longest and highest grade interval drilled to date in this zone. Disseminated and replacement clusters of chalcopyrite are associated with intense potassic alteration of sedimentary and volcanic rocks. The hole is expected to upgrade waste and inferred blocks to above average grade reserves, as well as increasing the grade of current reserve blocks. The increasing intensity of potassic alteration, higher chalcopyrite to pyrite ratio, and higher gold and copper grades, all vectoring positively down dip and apparently thickening, are encouraging indications that stronger mineralization continues down dip in this area of Sulphurets.

 

S-11-36: This hole is located approximately 90 meters southwest of S-11-34 and had the same objectives. It entered Sulphurets gold zone alteration and mineralization beneath 9 meters of overburden. At 129 meters, the alteration transitions from silica-pyrite dominated to Raewyn copper style silica-chlorite-pyrite with more disseminated chalcopyrite, to a depth of 169 meters. This hole will re-classify waste blocks to reserves in the current pit model, and allow deepening of the southeast side of the pit to capture additional ore blocks not in the current pit design.

 

S-11-37: Collared approximately 80 meters northeast of S-11-34 with the same objectives. This hole intersected intensely silica-pyrite altered rocks of the Sulphurets gold breccia zone with tourmaline to a depth of 153.8 meters. From here to the end of the hole at 270 meters, chlorite-pyrite altered sedimentary and volcanic rocks dominate. Mineralization is mostly confined to above 153.8 meters. From this area to the northeast, the Raewyn copper zone is increasingly superimposed by later Sulphurets gold alteration and mineralization. This hole will upgrade unclassified and inferred mineralized blocks to reserves.

 

S-11-38: Collared approximately 100 meters northeast of S-11-37 to complete infilling the data gap in the shallow projected mineralization from S-11-36 to the southwest side of the Sulphurets gold breccia zone. From 3.7 meters to a fault at 137.1, this hole intersected intensely silica-pyrite altered rocks with minor chalcopyrite. Below the fault, alteration is silica-chlorite-pyrite dominant with intermittent intervals of disseminated chalcopyrite, diminishing with depth. Gold grades are in line with what the current model predicts, but blocks currently classified as waste will be upgraded to reserves. Also, the results will allow deepening of the southeast wall of the current pit design.

 

S-11-39: Collared approximately 160 meters northeast of S-11-35 with similar objectives. This hole intersected the STF at 265.9 meters and the Raewyn Copper Zone from 361 to 504 meters. Grades are in line to slightly above current model predictions, but the zone is approximately 30 meters thicker than expected. Some inferred blocks will be upgraded to reserves and grades enhanced along the southwest pit wall.

 

S-11-40: Infill hole near the southwestern-most drilled section on Sulphurets (Canyon Zone). Variably silica-chlorite-pyrite altered volcanic rocks were cut top to bottom. Weak chalcopyrite extends to about 260 meters; however the gold to copper ratio in this area is higher than typical for Sulphurets. Mineralization begins shallower than predicted and will add reserves in current pit design. Mineralization is still open to southwest and down dip.

 

The above reported drill holes were designed to intersect the true width of the Sulphurets deposit.

 

Description : http://media3.marketwire.com/docs/seab727map.jpg

 

The 100% owned KSM project, located near Stewart, British Columbia, Canada, is one of the world's largest undeveloped gold/copper projects. Proven and probable reserves for the KSM project are as follows (see news release dated May 2, 2011 for details):

 

Description : http://media3.marketwire.com/docs/seab0727table2.jpg

 

National Instrument 43-101 Disclosure

Exploration activities at KSM are being conducted by Seabridge personnel under the supervision of William E. Threlkeld, Senior Vice President of Seabridge and a Qualified Person as defined by National Instrument 43-101. Mr. Threlkeld has reviewed and approved this news release. An ongoing and rigorous quality control/quality assurance protocol is being employed during the 2011 program including blank and reference standards in every batch of assays. Cross-check analyses are being conducted at a second external laboratory on 10% of the samples. Samples are being assayed at Eco Tech Laboratory Ltd., Kamloops, B.C., using fire assay atomic adsorption methods for gold and total digestion ICP methods for other elements.

 

Seabridge holds a 100% interest in several North American gold projects. The Company's principal assets are the KSM property located near Stewart, British Columbia, Canada and the Courageous Lake gold project located in Canada's Northwest Territories. For a breakdown of Seabridge's mineral reserves and resources by project and category please visit the Company's website at http://www.seabridgegold.net/resources.php.

 

All reserve and resource estimates reported by the Corporation were calculated in accordance with the Canadian National Instrument 43-101 and the Canadian Institute of Mining and Metallurgy Classification system. These standards differ significantly from the requirements of the U.S. Securities and Exchange Commission. Mineral resources which are not mineral reserves do not have demonstrated economic viability.

This document contains "forward-looking information" within the meaning of Canadian securities legislation and "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995. This information and these statements, referred to herein as "forward-looking statements" are made as of the date of this document. Forward-looking statements relate to future events or future performance and reflect current estimates, predictions, expectations or beliefs regarding future events and include, but are not limited to, statements with respect to: (i) the amount of mineral reserves and mineral resources; (ii) any potential for the increase of mineral reserves and mineral resources, whether in existing zones or new zones; (iii) the amount of future production; (iv) further optimization of the PFS including metallurgical performance; (v) completion of and submission of the Environmental Assessment Application; and (vi) potential for engineering improvements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "plans", "projects", "estimates", "envisages", "assumes", "intends", "strategy", "goals", "objectives" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements.

All forward-looking statements are based on Seabridge's or its consultants' current beliefs as well as various assumptions made by them and information currently available to them. These assumptions include: (i) the presence of and continuity of metals at the Project at modeled grades; (ii) the capacities of various machinery and equipment; (iii) the availability of personnel, machinery and equipment at estimated prices; (iv) exchange rates; (v) metals sales prices; (vi) appropriate discount rates; (vii) tax rates and royalty rates applicable to the proposed mining operation; (viii) financing structure and costs; (ix) anticipated mining losses and dilution; (x) metallurgical performance; (xi) reasonable contingency requirements; (xii) success in realizing further optimizations and potential in exploration programs and proposed operations; (xiii) receipt of regulatory approvals on acceptable terms, including the necessary right of way for the proposed tunnels; and (xiv) the negotiation of satisfactory terms with impacted First Nations groups. Although management considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect. Many forward-looking statements are made assuming the correctness of other forward looking statements, such as statements of net present value and internal rates of return, which are based on most of the other forward-looking statements and assumptions herein. The cost information is also prepared using current values, but the time for incurring the costs will be in the future and it is assumed costs will remain stable over the relevant period.

By their very nature, forward-looking statements involve inherent risks and uncertainties, both general and specific, and risks exist that estimates, forecasts, projections and other forward-looking statements will not be achieved or that assumptions do not reflect future experience. We caution readers not to place undue reliance on these forward-looking statements as a number of important factors could cause the actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates assumptions and intentions expressed in such forward-looking statements. These risk factors may be generally stated as the risk that the assumptions and estimates expressed above do not occur, but specifically include, without limitation: risks relating to variations in the mineral content within the material identified as mineral reserves or mineral resources from that predicted; variations in rates of recovery and extraction; developments in world metals markets; risks relating to fluctuations in the Canadian dollar relative to the US dollar; increases in the estimated capital and operating costs or unanticipated costs; difficulties attracting the necessary work force; increases in financing costs or adverse changes to the terms of available financing, if any; tax rates or royalties being greater than assumed; changes in development or mining plans due to changes in logistical, technical or other factors; changes in project parameters as plans continue to be refined; risks relating to receipt of regulatory approvals or settlement of an agreement with impacted First Nations groups; the effects of competition in the markets in which Seabridge operates; operational and infrastructure risks and the additional risks described in Seabridge's Annual Information Form filed with SEDAR in Canada (available at www.sedar.com) for the year ended December 31, 2010 and in the Corporation's Annual Report Form 40-F filed with the U.S. Securities and Exchange Commission on EDGAR (available at www.sec.gov/edgar.shtml). Seabridge cautions that the foregoing list of factors that may affect future results is not exhaustive.

When relying on our forward-looking statements to make decisions with respect to Seabridge, investors and others should carefully consider the foregoing factors and other uncertainties and potential events. Seabridge does not undertake to update any forward-looking statement, whether written or oral, that may be made from time to time by Seabridge or on our behalf, except as required by law.

 

 

ON BEHALF OF THE BOARD

 

"Rudi Fronk"

President & C.E.O.

 

For further information please contact:

Rudi P. Fronk, President and C.E.O.

Tel: (416) 367-9292 Fax: (416) 367-2711

Email: info@seabridgegold.net

 

(To unsubscribe from our private distribution list, please send an e-mail to gloria@seabridgegold.net)

 

________________________________________________________

106 Front Street East, Suite 400, Toronto, Ontario M5A 1E1, Canada

Telephone: (416) 367-9292 Facsimile: (416) 367-2711 www.seabridgegold.net

.

Tweet

Seabridge Gold Inc.

DEVELOPMENT STAGE
CODE : SA
ISIN : CA8119161054
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Seabridge Gold Inc.
7/31/2009Singular Research initiates coverage of Seabridge Gold
7/7/2009Seabridge Continues to Successfully Monetize its Non-Core As...
6/16/2009Two Long-Term Pit Scenarios Emerge for Seabridge’s KSM Proje...
3/12/2009Expands World-Class Mitchell Deposit at its KSM Project
2/3/2009Hunting the Big Game: Emerging Miners with Big Project Value...
4/29/2008Seabridge Gold to move KSM project towards feasibility
3/27/2008Seabridge Gold rating strong buy in update;
1/30/2008Seabridge Increases Resource Estimate at Noche Buena;
1/11/2008Seabridge Increases Resource Estimate at Kerr-Sulphurets
In the News and Medias of Seabridge Gold Inc.
12/13/2012Seabridge Gold upping exploration for higher grades at KSM
3/14/2012Seabridge Gold mammoth hunting at Courageous Lake
3/23/2011Seabridge Gold Options Grassy Mountain Project To Calico Res...
1/27/2011Seabridge's Courageous Lake may hold nearly 7m gold ounces
4/8/2010Seabridge: Taking It To The Shorts
1/25/2010Seabridge Gold CEO: Take Us Out
9/15/2009Seabridge Gold, Inc. in Singular Research Annual “Best of th...
3/12/2009Seabridge's Growth at Mitchell Deposit Provides Promising Op...
11/13/2008Follow up N° 6
Annual reports of Seabridge Gold Inc.
Annual Report Available for Seabridge Gold
2009 Annual Report
2008 Annual Report
2007 Annual Report
2006 Annual Report
2003 Annual Report
Financings of Seabridge Gold Inc.
6/30/2011Royal Gold and Seabridge Close Private Placement/Royalty Par...
6/22/2011Golden Predator and Seabridge Gold Agree to Contribute Selec...
6/17/2011Royal Gold and Seabridge Agree to PrivatePlacement/Royalty P...
Nominations of Seabridge Gold Inc.
1/5/2012Appoints Vice President, Corporate Affairs
4/5/2011Announces Transition in Chief Financial Officer Position
2/14/2011Seabridge Hires hired Jay S. Layman Executive Vice President...
12/6/2010Appointments of R. Brent Murphy as VP, Environmental Affairs...
4/29/2009Seabridge Gold Showcased at AGORACOM Bay Street Event for Fu...
Financials of Seabridge Gold Inc.
5/16/2012Publishes 2011 Annual Reportand Files First Quarter 2012 Fin...
8/16/2011Files Second Quarter 2011 Financial Statements and MD&A
4/1/2011Files Year End Audited Financial Statements and MD&A
11/12/2010Files Third Quarter 2010 Financial Statements and MD&A
8/9/2010Files Second Quarter 2010 Financial Statements and MD&A
5/15/2010 Files First Quarter 2010 Financial Statements and MD&A
11/12/2009Files Third Quarter 2009 Financial Statements and MD&A
8/13/2009Files Second Quarter 2009 Financial Statements and MD&A
4/6/2009Precious Metal Developers Outperform Gold-Silver in First Qu...
11/13/2008Files Third Quarter Financial Statements and MD&A
8/14/2008Files Second Quarter Financial Statements and MD&A
5/9/2008Files First Quarter Financial Statements and MD&A
Project news of Seabridge Gold Inc.
3/14/2012(Courageous Lake)Commences 2012 Exploration Program at Courageous Lake
2/8/2012(Kerr (ksm))2011 Drilling Upgrades and Grows Resources at Seabridge Gold...
1/4/2012(Kerr (ksm))Drilling at Seabridge Gold's Kerr DepositYields Significant ...
12/1/2011(Kerr (ksm))Revises KSM Permitting Schedule to Accommodate Improved Desi...
11/22/2011(Sulphurets)Drill Results to Upgrade Resources and Increase Reserves at ...
10/20/2011(Sulphurets)Sulphurets Deposit Continues to Grow
9/22/2011(Mitchell Zone)New Drilling Supports Partial Underground Scenario at Seabri...
9/12/2011(Courageous Lake)Drilling Confirms Likely Resource Enhancements at Seabridge ...
8/9/2011(Courageous Lake)Drilling Upgrades and Expands Gold Resources at Seabridge's ...
7/27/2011(Sulphurets)Continued Drilling Success at Seabridge Gold's Sulphurets De...
6/20/2011Files Preliminary Feasibility Study for KSM Project
6/9/2011(Kerr (ksm))2011 Drill Program Underway at Seabridge Gold's KSM Project
6/2/2011(Courageous Lake)New Preliminary Assessment Completed for Seabridge Gold's Co...
5/9/2011(Kerr (ksm))and Pretium Sign Agreements on Cooperation
5/2/2011(Kerr (ksm))Updated Preliminary Feasibility Study Completed for Seabridg...
4/18/2011(Grassy Mountain)Options Grassy Mountain Project to Calico Resources
3/30/2011(Courageous Lake)Moving Courageous Lake Towards Preliminary Feasibility
3/23/2011(Grassy Mountain)Options Grassy Mountain Project to Calico Resources
2/16/2011(Kerr (ksm))Resources Continue to Grow at Seabridge Gold's KSM Project
2/8/2011(Kerr (ksm))Reports Major New Gold/Copper Resource at KSM's Iron Cap Zon...
1/25/2011(Courageous Lake)Seabridge Improves Size, Grade and Quality of Courageous Lak...
12/9/2010(Kerr (ksm))Drilling Expands Iron Cap: Resource Estimate Expected Shortl...
11/23/2010(Courageous Lake)Drilling Success Continues at Seabridge Gold's Courageous La...
11/3/2010(Kerr (ksm))Iron Cap Emerges as 4th Major Deposit at Seabridge Gold's KS...
9/27/2010(Courageous Lake)Drills Upgrading Large Resource at Seabridge Gold's Courageo...
9/8/2010(Kerr (ksm))Drilling Expands and Upgrades KSM Project
6/16/2010(Courageous Lake)Drilling Underway at Seabridge's Courageous Lake Gold Projec...
6/9/2010(Kerr (ksm))Permitting Progresses at Seabridge Gold's KSM Project
5/27/2010(Kerr (ksm))Drilling Commences at Seabridge Gold's KSM Project
4/19/2010(Kerr (ksm))Announces 2010 Program for KSM
4/6/2010(Courageous Lake)Announces 2010 Program for Courageous Lake
3/31/2010(Kerr (ksm))Preliminary Feasibility Study Completed for Seabridge Gold's...
3/15/2010(Kerr (ksm))Independent Review Confirms Resource Estimates for Seabridge...
1/27/2010(Mitchell Zone)Files NI-43-101 Technical Report for KSM Project
12/21/2009Reports on Progress of KSM Preliminary Feasibility Study
11/23/2009(Kerr (ksm))Permitting Progresses at Seabridge Gold's KSM Project
11/3/2009(Kerr (ksm))Reports Positive Drill Results From Kerr Zone
10/27/2009(Mitchell Zone)Drill Results Move Seabridge Gold's Mitchell Resources Towar...
10/14/2009(Sulphurets)Drill Results at Seabridge Gold's Sulphurets Zone Exceed Exp...
9/10/2009(Kerr (ksm))2009 Drill Program Nearing Completion at Seabridge Gold's KS...
9/8/2009(Kerr (ksm))Completes Land Expansion at KSM Project
8/13/2009Expands Land Position at KSM Project
6/26/2009(Red Mountain)Agrees to Sell Red Mountain Project for C$12 Million
6/10/2009(Mitchell Zone)Reports Updated Open Pit Scenarios for KSM Project
3/25/2009(Kerr (ksm))Reports Updated Resources for Sulphurets and Kerr Zones
3/11/2009(Mitchell Zone)Reports Major Expansion of Mitchell Resource
1/7/2009(Sulphurets)Reports Final 2008 Drill Results From Sulphurets Zone
12/22/2008(Kerr (ksm))Reports Final 2008 Drill Results From Mitchell Zone
11/20/2008(Kerr (ksm))Higher Grade Mineralization Encountered at Mitchell
10/23/2008(Kerr (ksm))KSM Project Continues to Expand
6/4/2008(Kerr (ksm))15,000 Meter Drill Program Begins at Seabridge Gold's KSM Pr...
4/30/2008(Kerr (ksm))KSM Property Enviro/Mining Proposal Report--Stewart,B.C.
4/29/2008(Sulphurets)Project Description Report Filed for Seabridge Gold's KSM Pr...
3/25/2008(Kerr (ksm)) to Drill 15,000 Meters at KSM Project in 2008
3/10/2008(Courageous Lake)Economic Assessment Completed for Seabridge Gold's Courageou...
1/10/2008(Sulphurets) Resource Estimates for Seabridge's Kerr and Sulphurets Gold...
12/19/2007(Kerr (ksm))Mitchell Gold-Copper Deposit Continues to Expand
Corporate news of Seabridge Gold Inc.
4/4/2012to List on the New York Stock Exchange Under Symbol "SA"
3/30/2012Files Year End Audited Financial Statements and MD&A
9/30/2011Views on Gold from Seabridge
12/16/2010Sells Residual Noche Buena Project Interest for US$10=2E12 M...
10/28/2010to Sell Residual Noche Buena Project Interest for US$10=2E12...
8/19/2010Projected Economics Continue to Improve at Seabridge Gold's ...
7/26/2010Drilling Confirms Iron Cap as Major New Gold-Copper Deposit
3/27/2010Files Year End Audited Financial Statements and MD&A
3/3/2010Announces Closing of US$65.8 Million Offering
2/26/2010Announces Pricing of Offering
2/20/2010Announces Offering of Common Shares
1/11/2010Reports Updated Resource Estimate for KSM Project
12/3/2009Enters Into Letter of Intent to Sell Nevada Properties
6/5/2009(Video) BNN chats with Rudi Fronk, President and CEO of Seab...
3/27/2009Files Year End Audited Financial Statements and MD&A
12/17/2008to be Added to S&P/TSX Global Gold and Global Mining Indices
12/15/2008Completes Sale of Noche Buena to Fresnillo/Newmont JV
12/1/2008Preliminary Economic Assessment Completed forSeabridge Gold'...
11/7/2008Interview on TMX Money
10/9/2008Agrees to Sell Noche Buenato Fresnillo/Newmont Joint Venture
9/8/2008Positive Metal Recoveries Predicted for Seabridge Gold's KSM...
7/17/2008Independent Road Access Study Completed for Seabridge Gold's...
7/10/2008Announces Commencement of Trading on the TSX
6/18/2008Receives Conditional Approval for TSX Listing
3/31/2008Files Year End Audited Financial Statements and MD&A
3/31/2008Files Year End Audited Financial Statements and MD&A
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
AMEX (SA)TORONTO (SEA.TO)
9.30-7.83%9.58-6.63%
AMEX
US$ 9.30
05/17 16:02 -0.790
-7.83%
Prev close Open
10.09 9.92
Low High
9.25 10.01
Year l/h YTD var.
9.30 -  18.36 -49.35%
52 week l/h 52 week var.
9.30 -  19.98 -25.84%
Volume 1 month var.
579,228 -12.92%
24hGold TrendPower© : -40
Produces
Develops Copper - Gold - Molybdenum - Silver
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-53.05%
201214.38%25.6512.20
2011-41.21%36.2216.87
201028.31%37.9520.84
200975.54%33.2511.36
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Get Investor Information
High Desert Gold
Select
& click