Gold Bullion Dev. continues to expand mineralized zones at granada property

 

 

 

 

 

 

 

Gold Bullion Development Corp. (CDNX:GBB.V) (Other OTC:GBBFF.PK) (the "Company" or "Gold Bullion") has received assay results for 56 diamond drill holes on its 100% owned Granada Gold Property near Rouyn-Noranda, Quebec.  This includes the remaining assay results from the Phase 2, 25,000-metre drill program as well as initial holes of the 50,000 metre Phase-3 program.  To date, over 13,000 metres of the Phase 3 program have been drilled. The goal of the current drill campaign is to test the continuity between the currently outlined Preliminary Block Model area and the eastern section of the LONG Bars Zone. 

 

"We have now drilled an area 1,200 metres long and from 250 to 500 metres wide at the Granada property", commented Mr. Frank Basa, President and CEO of Gold Bullion Development Corp. "We are very pleased with the results to date and believe they will ultimately significantly expand the mineralized area in all directions outside the Preliminary Block Model."

 

Summary

 

  • Outside of the Preliminary Block Model area, drilling has identified significant gold mineralization, many with long intercepts, in new structures in the NE Extension, SE Extension and Eastern Extension sectors.
  •  
  • Consulting geologists at GENIVAR believe they may have intersected the extension of Vein #5 in the NE Waste Pile Sector
  •  
  • Drills intersected high grade gold intervals in the Trail sector which may be related to a series of NNE trending fault zones.  More work is required to validate this relationship.
  •  
  • In the Preliminary Block Model area, Vein #2 has been extended along strike and down dip into the Vein #2 sector and numerous smaller parallel mineralized structures were identified to the north, in the hanging wall of the Vein.
  •  
  • An aggressive drilling campaign continues to target the NE Extension, SE Extension and NE Waste Pile sectors.
  •  
  • In March a drill will be moved to the Eastern part of the property to test the promising Aukeko target.
  •  

For increased clarity and ease of locating drill hole stations, the names of sector areas are being used to help describe drill hole locations with reference to the drill plan map which can be found on our website at http://www.GoldBullionDevelopmentCorp.com.

 

Mineralization at Granada is typically associated with finely disseminated pyrite and/or arsenopyrite. It is hosted within altered sericitized and silicified syenite feldspar porphyry sills and quartz vein stockwork and breccias as well as quartz-carbonate veinlets in the sedimentary rocks. These structures strike in an East-West direction and dip steeply to the north. Numerous parallel mineralized structures have been identified throughout the property.

 

Newly Delineated Structures

 

Gold Bullion's geological consultants, GENIVAR, report that additional structures have been intersected in the following sectors of the property; the NE Extension, the SE Extension and the Eastern Extension. Some drill hole highlights from these sectors include:

 

  • Hole GR-10-113 in the NE Extension zone intersected a vein grading 162.75 g/t gold over 1.09 metres (starting 232.5-metres down hole).
  •  
  • In the SE Extension area, holes GR-10-131 and 134 intersected what GENIVAR believes to be the same new structure. Hole GR-10-134 intersected 9.3-metres averaging 1.09 g/t gold within a 57-metre interval averaging 0.56 g/t gold. Hole GR-10-131 intersected 5-metres averaging 2.14 g/t gold within a 129-metre interval averaging 0.15 g/t gold.
  •  
  • In the Eastern Extension zone, (where previously reported Hole GR-10-17 intersected 65.5 metres averaging 1.21 g/t gold), nine additional holes intersected long intervals of mineralization interspersed with narrow sections of higher grade. Hole GR-10-153 hit 135-metres averaging 0.62 g/t gold starting 3.9-metres down-hole.  This included a 1-metre interval averaging 54.97 g/t starting 3.9-metres down-hole.  Hole GR-10-145 cut a 45.9-metre interval averaging 0.82 g/t gold starting 31.3-metres down-hole that included a 1.5-metre interval that averaged 12.3 g/t gold.
  •  

NE Waste Pile Sector

 

In the NE Waste Pile Zone, GENIVAR believes it may have intersected the extension of Vein #5 in Holes GR-10-118 and GR-10-141. The Vein #5 outlined in the Preliminary Block Model Zone and based on this drill data may continue eastward. Hole GR-10-141 intersected 1.5-metres averaging 39.9 g/t gold, starting 40-metres down hole. This occurred in a larger mineralized envelope that averaged 0.52 g/t over 276 metres.

 

Trail Sector (Sector between Eastern Extension and Preliminary Block Model area)

 

A series of holes were drilled to test NNE trending faults identified in the Trail Sector.  It is hypothesized that these faults may have acted as conduits for mineralizing fluids.  Hole GR-10-117 cut a number of high grade intervals including:

 

  • 2.4 metres averaging 22.5 g/t gold starting 4.6 metres down hole
  •  
  • 1 metre averaging 14.95 g/t gold starting 76.5 metres down hole
  •  
  • 1 metre averaging  15.65 g/t gold starting 107.5 metres down hole
  •  
  • 18.5 metres averaging 2.3 g/t gold starting 150.5 metres down hole
  •  

These intervals, together with lower grade sections averaged 0.74 g/t gold over 198 metres.

 

Vein 2 Sector 

 

A total of 16 new holes were drilled into the Vein #2 sector. Results have extended the vein down dip between 100 and 200 metres.  In addition, numerous smaller parallel veins have been intersected in the hanging wall of Vein #2. All of these veins appear to be related to an altered feldspar porphyry.

 

Significant drill results include Hole GR-10-114 which intersected 177 metres averaging 0.51 g/t gold starting 3 metres down hole and Hole GR-10-54 which intersected 110 metres averaging 0.55 g/t gold starting 19 metres down hole.

 

Looking Ahead

 

Currently Gold Bullion has two drill rigs turning on the property as part of its Phase 3 drilling campaign. Five more holes will be collared in the NE Extension sector. An additional three holes will target the NE Waste Pile area and three holes will test the SE Extension sector (more if results warrant).

 

Later in March, Gold Bullion intends to drill test the Aukeko Shaft and the surrounding area. This target is situated on the eastern part of the property about 2 km east of the LONG Bars Zone. Historical data indicates that considerable visible gold was noted in the Aukeko vein at the bottom of the Aukeko shaft.  Previous geological mapping detected numerous easterly striking syenite porphyry "dykes" and quartz veins similar to what is seen at the LONG Bars zone.

 

The Company plans to initiate a NI-43-101 resource estimate this summer once the majority of the Phase 3 drill results are received.

 

Please refer to the detailed drill map available on the Gold Bullion web site, www.GoldBullionDevelopmentCorp.com.

Hole Number

From
(metres)

To
(metres)

Interval
(metres)

Weighted
Grade
g/t Au

Sector Location

GR-10-59

3.50

195.00

191.50

0.300

East Vein 2

Included

24.00

81.00

57.00

0.409

 

Included

74.50

81.00

6.50

1.921

 

GR-10-61

3.60

93.00

89.40

0.221

East Vein 2

Included

38.74

62.00

23.26

0.666

 

GR-10-104

3.00

231.00

228.00

0.509

East of Waste Pile

Included

20.00

21.00

1.00

45.800

 

Included

131.00

131.55

0.55

8.420

 

Included

209.50

210.50

1.00

8.620

 

GR-10-49

16.70

101.31

84.61

0.433

East of Waste Pile Vein 2

Included

97.05

99.31

2.26

7.128

 

GR-10-62

100.00

117.50

17.50

0.498

Eastern Extension

GR-10-84

6.40

168.00

161.60

0.301

Eastern Extension

Included

115.85

157.00

41.15

0.900

 

Included

117.00

118.00

1.00

18.900

 

GR-10-87

16.00

79.10

63.10

0.455

Eastern Extension

Included

18.00

18.75

0.75

23.485

 

Included

18.00

35.60

17.60

1.356

 

GR-10-93

3.90

275.00

271.10

0.093

Eastern Extension

GR-10-127

14.30

107.45

93.15

0.212

Eastern Extension

GR-10-129

33.50

85.30

51.80

0.181

Eastern Extension

Included

33.50

35.00

1.50

3.760

 

GR-10-131

6.00

135.00

129.00

0.152

SE Extension

Included

64.00

68.00

4.00

2.622

 

GR-10-139

3.30

237.00

233.70

0.216

Eastern Extension

Included

8.85

12.50

3.65

3.432

 

Included

102.34

106.14

3.80

1.488

 

GR-10-145

3.00

135.00

132.00

0.315

Eastern Extension

Included

31.35

77.21

45.86

0.816

 

Included

31.35

32.85

1.50

12.300

 

Included

68.25

69.71

1.46

7.570

 

Included

129.50

137.00

7.50

1.336

 

GR-10-153

3.90

139.00

135.10

0.624

Eastern Extension

Included

3.90

80.10

76.20

0.988

 

Included

3.90

4.90

1.00

54.977

 

GR-10-112

28.50

147.00

118.50

0.456

NE Waste Pile

Included

28.50

34.55

6.05

1.537

 

Included

73.00

74.50

1.50

15.139

 

Included

146.20

147.00

0.80

9.400

 

AND

217.00

226.00

9.00

1.916

 

Included

218.80

220.00

1.20

9.010

 

GR-10-141

3.00

279.00

276.00

0.515

NE Waste Pile

Included

40.00

41.50

1.50

39.900

 

Included

226.30

244.32

18.02

1.127

 

GR-10-142

88.5

173.5

85.0

0.439

NE Waste Pile

AND

235.00

275.80

40.80

0.506

 

GR-10-118

109.25

274.50

165.25

0.410

NE Waste Pile-trail sector

Included

168.75

170.45

1.70

2.203

 

Included

187.90

188.40

0.50

30.120

 

Included

246.30

246.80

0.50

16.820

 

GR-10-60

157.29

209.33

52.04

0.567

NE trail sector

Included

197.33

201.83

4.50

3.865

 

GR-10-63

62.37

65.82

3.45

0.821

NE Extension

GR-10-73

34.60

218.50

183.90

0.283

NE Extension

Included

34.60

47.49

12.89

1.876

 

GR-10-110

28.00

90.60

62.60

0.308

NE Extension

Included

28.00

56.90

28.90

0.484

 

GR-10-113

22.97

252.92

229.95

0.926

NE Extension

Included

91.50

252.92

161.42

1.295

 

Included

212.87

252.92

40.05

4.927

 

Included

232.50

233.59

1.09

162.750

 

GR-10-134

6.00

171.00

165.00

0.325

SE Extension

Included

72.70

82.00

9.30

1.096

 

Included

72.70

129.60

56.90

0.557

 

GR-10-58

6.90

58.2

51.3

0.241

Trail Sector

GR-10-79

1.50

225.00

223.50

0.668

Trail Sector

Included

22.50

185.00

162.50

0.877

 

Included

22.50

30.50

8.00

2.367

 

Included

22.50

87.00

64.50

1.361

 

GR-10-81

58.85

208.59

149.74

0.367

Trail Sector

Included

81.29

90.00

8.71

2.299

 

Included

162.91

163.91

1.00

7.160

 

Included

188.45

189.57

1.12

4.800

 

Included

207.09

208.59

1.50

2.370

 

GR-10-82

3.40

240.00

236.60

0.139

Trail Sector

Included

122.55

195.67

73.12

0.248

 

GR-10-117

3.00

201.00

198.00

0.743

Trail Sector

Included

4.60

77.50

72.90

1.019

 

Included

4.60

7.00

2.40

22.485

 

Included

76.50

77.50

1.00

14.952

 

Included

107.50

108.50

1.00

15.650

 

Included

150.50

152.30

1.80

15.070

 

Included

77.00

185.50

108.50

0.784

 

Included

107.50

185.50

78.00

0.879

 

Included

107.50

169.00

61.50

1.057

 

GR-10-120

3.10

186.00

182.90

0.161

Trail Sector

Included

33.00

37.50

4.50

1.542

 

Included

175.00

181.00

6.00

0.622

 

GR-10-169

9.00

117.00

108.00

0.635

Vein 1

Included

51.00

115.50

64.50

1.032

 

Included

81.00

82.50

1.50

27.075

 

Included

97.50

103.50

6.00

2.343

 

GR-10-170

70.00

115.00

45.00

0.318

Vein 1

Included

70.00

70.50

0.50

9.450

 

AND

168.10

169.00

0.90

6.520

 

GR-10-172

90.00

116.30

26.30

0.826

Vein 1

Included

105.50

107.00

1.50

8.540

 

GR-10-175

24.10

100.00

75.90

0.335

Vein 1

Included

24.10

27.80

3.70

3.512

 

Included

99.50

100.00

0.50

8.320

 

GR-10-176

3.50

75.00

71.50

0.341

Vein 1

Included

41.50

43.00

1.50

7.140

 

GR-10-167

3.00

123.00

120.00

0.321

South Vein 1

Included

23.40

59.00

35.60

0.923

 

Included

58.00

59.00

1.00

19.900

 

GR-10-38

57.03

119.87

62.84

0.226

Vein 2

Included

112.50

119.87

7.37

0.958

 

GR-10-39

27.72

120.43

92.71

0.325

Vein 2

Included

29.22

36.72

7.50

0.898

 

Included

91.54

94.54

3.00

2.572

 

GR-10-40

120.73

129.73

9.00

0.620

Vein 2

Included

120.73

171.42

50.69

0.178

 

GR-10-43

22.63

138.50

115.87

0.350

Vein 2

Included

65.00

137.00

72.00

0.416

 

Included

129.50

137.00

7.50

1.336

 

GR-10-45

126.50

175.50

49.00

0.442

Vein 2

Included

126.50

145.50

19.00

0.652

 

GR-10-52

3.20

159.00

155.80

0.228

Vein 2

Included

3.20

53.00

49.80

0.326

 

GR-10-54

3.20

192.00

188.80

0.324

Vein 2

Included

19.07

130.00

110.93

0.517

 

Included

78.61

99.50

20.89

1.122

 

GR-10-67

1.50

123.00

121.50

0.286

Vein 2

Included

69.70

123.00

53.30

0.428

 

Included

102.00

123.00

21.00

0.853

 

GR-10-70

3.40

87.00

83.60

0.514

Vein 2

Included

39.40

71.00

31.60

1.202

 

Included

39.40

46.90

7.50

3.608

 

GR-10-95

3.10

105.00

101.90

0.515

Vein 2

Included

46.43

53.62

7.19

2.092

 

Included

89.62

95.62

6.00

4.946

 

GR-10-96

3.10

99.00

95.90

0.278

Vein 2

Included

67.75

87.20

19.45

0.706

 

Included

78.90

87.20

8.30

1.416

 

GR-10-99

3.50

87.00

83.50

0.979

Vein 2

Included

8.80

13.50

4.70

3.606

 

Included

53.20

61.50

8.30

1.389

 

GR-10-100

6.00

65.65

59.65

0.327

Vein 2

Included

6.00

7.50

1.50

4.610

 

GR-10-101

3.00

177.00

174.00

0.339

Vein 2

Included

24.10

27.10

3.00

4.580

 

Included

147.21

148.14

0.93

7.820

 

GR-10-114

3.00

180.00

177.00

0.512

Vein 2

Included

76.46

169.00

92.54

0.871

 

Included

168.00

169.00

1.00

54.900

 

GR-10-116

4.60

156.00

151.40

0.578

Vein 2

Included

52.35

60.00

7.65

1.057

 

Included

128.50

131.00

2.50

20.471

 

GR-10-126

2.00

90.00

88.00

0.676

Vein 2

Included

29.10

85.05

55.95

1.010

 

Included

29.10

30.50

1.40

22.667

 

GR-10-130

2.00

96.00

94.00

1.030

Vein 2

Included

44.30

45.20

0.90

50.703

 

Included

77.90

78.60

0.70

41.270

 

Included

5.00

78.60

73.60

1.289

 

Included

41.00

45.20

4.20

11.384

 

GR-10-132

1.90

90.00

88.10

0.282

Vein 2

Included

30.00

48.00

18.00

0.615

 

GR-10-133

3.50

81.00

77.50

0.723

Vein 2

Included

18.50

19.00

0.50

54.913

 

Included

56.50

60.00

3.50

4.409

 

Widths reported in the preceding table are drill widths; true widths are unknown at this time. Assays are uncut, length-weighted average values.

 

QA/QC

 

Gold Bullion's NQ drill program and drill core sampling, including the quality assurance/quality control program, are supervised by GENIVAR, Gold Bullion's geological consultant. Core from the above holes was sent to ALS Chemex Labs in Val d'Or, Quebec, and Laboratoire Expert in Rouyn-Noranda, Quebec, for analysis. Gold was assayed by fire assay with additional metallics analysis done on samples where visible gold was identified. Analytical accuracy and precision are monitored by the analysis of reagent blanks and reference materials at both labs. Quality control is further assured by the insertion of blind certified standard reference material and blanks into the sample stream at regular intervals by Gold Bullion and GENIVAR personnel in order to independently assess analytical accuracy.

 

About Gold Bullion Development Corp.

 

Gold Bullion Development Corp. is a TSX Venture listed junior natural resource company focusing on the exploration and development of its Granada Gold Property near Rouyn-Noranda, Quebec, and its high grade Castle Silver Mine in Gowganda, Ontario.

 

For more information on Gold Bullion Development Corp. (TSX-V: GBB, OTC PK: GBBFF), visit our web site: http://www.GoldBullionDevelopmentCorp.com

 

Qualified Person

 

The scientific and technical information in this release was prepared under the supervision of Ms. Nicole Rioux, P. Geo., Genivar's senior geologist and a member of the Ordre des géologues du Québec and a "qualified" person in accordance with National Instrument 43-101.

 

"Frank J. Basa"

 

Frank J. Basa, P.Eng.
President and Chief Executive Officer

 

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gold Bullion Development Corp.

EXPLORATION STAGE
CODE : GBB.V
ISIN : CA3805391065
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Gold Bullion Dev. is a gold exploration company based in Canada.

Gold Bullion Dev. holds various exploration projects in Canada.

Its main exploration properties are CASTLE SILVER MINE and GRANADA in Canada.

Gold Bullion Dev. is listed in Canada and in Germany. Its market capitalisation is CA$ 29.1 millions as of today (US$ 22.1 millions, € 20.8 millions).

Its stock quote reached its highest recent level on December 24, 2010 at CA$ 0.93, and its lowest recent point on October 09, 2015 at CA$ 0.02.

Gold Bullion Dev. has 387 890 016 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Gold Bullion Development Corp.
4/23/2008Announces Non-Brokered Private Placement
Project news of Gold Bullion Development Corp.
11/9/2012Drills 29.23 m of 15.61 g/t Gold at Grenada
11/8/2012(Granada)releases results from 54 backlogged Granada drill holes with...
9/18/2012(Granada)releases results from 43 backlogged Phase III Granada drill ...
3/1/2011(Castle Silver Mine)INITIATES DRILL PROGRAM ON CASTLE SILVER MINE, GOWGANDA
2/15/2011(Granada)CONTINUES TO EXPAND MINERALIZED ZONES AT GRANADA PROPERTY
2/6/2008(Granada) Recovers 1304.33 Troy Ounces of Fine Gold in Bulk Sampling ...
Corporate news of Gold Bullion Development Corp.
7/7/2016GOLD BULLION CLOSES $230,181 FLOW-THROUGH AND NON FLOW-THROU...
7/4/2016GOLD BULLION ACQUIRES INTEREST IN HIGH-GRADE GOLD TARGET NEX...
6/29/2016GOLD BULLION CLOSES $200,000 FLOW-THROUGH UNIT PRIVATE PLACE...
6/29/2016GOLD BULLION ANNOUNCES $200,000 FLOW-THROUGH PRIVATE PLACEME...
6/9/2016GOLD BULLION PROVIDES UPDATE ON GRANADA GOLD MINE
5/27/2016GOLD BULLION DEVELOPMENT GRANTED ENVIRONMENTAL CERTIFICATE O...
5/26/2016GOLD BULLION APPOINTS RONALD GOGUEN SR. TO THE BOARD OF DIRE...
5/17/2016GOLD BULLION CLOSES $804,000 FLOW-THROUGH UNIT PRIVATE PLACE...
5/3/2016GOLD BULLION ANNOUNCES RESULTS OF 2016 ANNUAL GENERAL MEETIN...
5/3/2016GOLD BULLION RETRACTS UPDATED MINERAL RESOURCES ESTIMATES OF...
4/19/2016GOLD BULLION APPOINTS CORPORATE SECRETARY
4/8/2016GOLD BULLION DECLARES DIVIDEND - CORRECTION FROM SOURCE
4/8/2016GOLD BULLION DECLARES DIVIDEND
4/4/2016GOLD BULLION OVERSUBSCRIBES AND CLOSES $830,000 PRIVATE PLAC...
4/4/2016GOLD BULLION ANNOUNCES $915,137 PRIVATE PLACEMENT
11/6/2015GOLD BULLION PROVIDES OPERATIONS AND FINANCE UPDATE
10/16/2015GOLD BULLION DEVELOPMENT ENTERS ASSIGNMENT AGREEMENT TO SELL...
9/15/2015GOLD BULLION ANNOUNCES CLOSING OF CASTLE SILVER MINES INC. A...
9/9/2015GOLD BULLION CLARIFIES SHAREHOLDER LOAN TERMS
8/24/2015GOLD BULLION ANNOUNCES FILING OF 43-101 TECHNICAL REPORT ON ...
8/10/2015GOLD BULLION EARNS NSR ON CASTLE SILVER MINES INC.
8/7/2015GOLD BULLION ENTERS INTO SHAREHOLDER LOAN AGREEMENTS
4/22/2015SURFACE GRADES OF 6.05 G/T AU OVER 8 METRES IN CHANNEL SAMPL...
4/13/2015GOLD BULLION ANNOUNCES SIGNING OF DEFINITIVE AGREEMENT WITH ...
4/10/2015GOLD BULLION RECEIVES WOOD CUTTING PERMIT FOR SITE CLEARING ...
4/10/2015(Granada)Receives Wood Cutting Permit for Site Clearing in Preparatio...
4/2/2015GOLD BULLION IDENTIFIES NEW GOLD-BEARING STRUCTURES AT CASTL...
3/31/2015GOLD BULLION ANNOUNCES RESULTS OF 2015 ANNUAL GENERAL MEETIN...
3/12/2015GOLD BULLION ENTERS INTO LOI WITH TAKARA RESOURCES INC. TO S...
3/11/2015(Castle Silver Mine)enters into LOI with Takara Resources Inc. to spin out Castl...
3/11/2015Gold Bullion enters into LOI with Takara Resources Inc. to s...
2/21/2015GOLD BULLION COMMENCES 2015 EXPLORATION AT GRANADA IN ADVANC...
1/30/2015GOLD BULLION SIGNS MOU ON GRANADA PROJECT WITH TIMISKAMING F...
1/16/2015WESTWOOD MILL PERMITTED TO PROCESS GRANADA ORE
12/24/2014GOLD BULLION CLOSES FIRST TRANCHE OF PRIVATE PLACEMENT
12/8/2014GOLD BULLION DISCOVERS NEW GOLD AND COPPER OCCURRENCE ON ITS...
11/25/2014GOLD BULLION ANNOUNCES RECEIPT OF AUTHORIZATION FOR LOCATING...
11/10/2014GOLD BULLION ANNOUNCES DIRECTOR RESIGNATION
10/22/2014GOLD BULLION PROGRESS UPDATE ON GRANADA GOLD PROPERTY PERMIT...
8/21/2014clarifies disclosure following BCSC review
8/21/2014Gold Bullion clarifies disclosure following BCSC review
8/13/2014Gold Bullion moving forward on the Granada Mine Rolling Star...
7/14/2014Gold Bullion announces signing of custom milling agreement w...
6/19/2014Gold Bullion Announces Filing of Pre-Feasibility Study (PFS)...
5/15/2013Provides Update
2/14/2013- Summary of metallurgical tests performed on hand cobbed sa...
1/5/2013(Granada)43-101 Report for its Granada Gold Project
10/18/2012Drill hole GR-12-400 extends near surface mineralized zone a...
9/12/2012Awards SGS Canada Inc. Mandate for Preliminary Feasibility S...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (GBB.V)FRANKFURT (B6D.F)
0.075+7.14%0.021+0.00%
TSX-V
CA$ 0.075
01/13 15:59 -
7.14%
Prev close Open
0.070 0.075
Low High
0.070 0.075
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.075 -6.25%
Volume 1 month var.
204,530 -6.25%
24hGold TrendPower© : 1
Produces
Develops
Explores for Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 3/11/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65+11.34%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.62+1.93%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.58+0.93%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :