SilverCrest Continues to Expand Santa Elena Deposit More High Grade Intercepts; 21.6m @ 1.46 gpt Au and 169.1 gpt Ag Including 0.60m @ 5.2 gpt Au and 1,840 gpt Ag
Published : April 08, 2013
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

VANCOUVER, BRITISH COLUMBIA--(Marketwired - April 8, 2013) - SilverCrest Mines Inc. (News - Market indicators)(NYSE MKT:SVLC) (the "Company") is pleased to announce results of further delineation drilling at the Santa Elena Mine in Sonora, Mexico. Since mid 2012, 132 drill holes have been completed to further expand underground resources and reserves (see attached Figure - http://media3.marketwire.com/docs/svl408-LS.pdf). This drill program continues to be extremely successful with the most recent holes identifying additional bonanza grades (as defined below) and providing further intercepts in the El Cholugo Zone. To date, resources at Santa Elena have been delineated along a strike length of over 1,200 metres and to a depth of 600 metres. The results of all holes included in this news release will be part of the ongoing resource expansion and reclassification to be included in the Pre-Feasibility Study for the Santa Elena Expansion Project which is nearing completion.

J. Scott Drever, President stated; "This delineation drill program has been immensely successful. We have drilled the known portion of the deposit at 35 to 40 metre centres, the Main Mineralized Zone has been extended by approximately 300 metres beyond our current resource boundary and we have identified two new sub-parallel zones, El Cholugo and El Cholugo Dos. The results of the revised underground resource and reserve estimations is expected to demonstrate an extended mine life with a conventional mill facility well beyond the original 5.5 years estimated for the open pit heap leach operation."

In this reported series, core hole SE-13-126 intercepted further Bonanza grades (greater than 34 gpt Au or greater than 1,000 gpt Ag) with 0.60 metres grading 5.2 gpt Au and 1,840 gpt Ag. These high grades are included in a broader interval of 21.6 metres grading 1.46 gpt Au and 169.1 gpt Ag (see tables below). 

Assay values in this series of holes range from 0.1 gpt to 22.0 gpt gold and 34.8 gpt to 1,840.0 gpt silver. Mineralized intervals range from 0.6 metres to 22.7 metres. All mineralized drill intercepts are near true thicknesses. The most significant assay results in this series of holes are shown in the following tables.

Santa Elena Main Mineralized Zone

Hole ID From
(m)
To
(m)
Interval
(m)
Interval
(ft)
Au
gpt
Au
opt
Ag
gpt
Ag
opt
SE-13-121 449.3 458.9 9.7 31.8 2.81 0.082 127.2 3.7
  incl. 452.9 456.2 3.3 10.9 5.71 0.167 261.4 7.6
SE-13-122 249.5 262.5 13.0 42.6 1.06 0.031 144.8 4.2
  incl. 253.2 258.3 5.1 16.8 1.52 0.044 267.2 7.8
SE-13-123 433.5 438.3 4.8 15.7 3.87 0.113 89.2 2.6
  incl. 433.5 435.4 1.9 6.2 7.37 0.215 159.3 4.6
SE-13-124 271.6 276.2 4.6 15.1 0.62 0.018 75.7 2.2
  283.8 287.1 3.2 10.6 0.73 0.021 69.4 2.0
SE-13-125 474.8 487.1 12.3 40.2 0.96 0.028 117.0 3.4
  incl. 481.3 485.4 4.1 13.5 1.52 0.044 183.9 5.4
SE-13-126 446.3 467.9 21.6 70.7 1.46 0.043 169.1 4.9
  incl. 463.2 463.7 0.6 1.8 5.20 0.152 1,840.0 53.7
  incl. 463.2 467.0 3.8 12.5 2.72 0.079 632.1 18.4
SE-13-127 169.8 192.6 22.7 74.6 1.76 0.051 93.6 2.7
  incl. 177.1 179.9 2.8 9.3 8.65 0.252 200.1 5.8
SE-13-128 469.7 478.0 8.3 27.2 0.10 0.002 138.9 4.1
  516.2 529.3 13.1 43.0 1.38 0.040 165.8 4.8
  incl. 519.8 528.5 8.7 28.6 1.89 0.055 221.3 6.5
SE-13-129 215.3 223.7 8.4 27.7 0.62 0.018 53.8 1.6
SE-13-130 403.1 409.1 6.0 19.7 7.21 0.210 143.7 4.2
  incl. 403.1 406.0 3.0 9.7 12.92 0.377 240.8 7.0
SE-13-131 162.7 180.0 17.3 56.8 0.58 0.017 61.2 1.8
SE-13-132 224.2 229.2 5.0 16.5 0.84 0.025 71.9 2.1
SE-13-133 437.2 445.9 8.7 28.4 10.36 0.302 160.4 4.7
  incl. 441.3 444.3 3.0 9.8 22.00 0.642 303.0 8.8
SE-13-134 481.1 485.9 4.8 15.6 0.55 0.016 57.6 1.7
  490.6 494.8 4.2 13.7 1.03 0.030 141.3 4.1
SE-13-135 265.1 266.7 1.6 5.2 0.34 0.010 53.6 1.6
SE-13-136 458.5 478.1 19.6 64.2 1.08 0.032 84.4 2.5
SE-13-137 235.6 240.1 4.5 14.7 0.55 0.016 90.1 2.6
SE-13-138 464.4 473.2 8.8 28.8 0.49 0.014 76.0 2.2
SE-13-139 253.1 263.9 10.8 35.3 0.69 0.020 34.8 1.0
SE-13-140 215.3 234.1 18.8 61.7 0.77 0.022 125.5 3.7
  incl. 230.6 234.1 3.5 11.6 1.27 0.037 342.2 10.0
SE-13-141 448.4 457.4 9.1 29.8 4.16 0.121 189.1 5.5
Note: All numbers are weighted averages, uncut and rounded.

El Cholugo Zone

Hole ID From
(m)
To
(m)
Interval
(m)
Interval
(ft)
Au
gpt
Au
opt
Ag
gpt
Ag
opt
SE-13-122 270.7 276.4 5.7 18.8 1.06 0.031 63.6 1.9
SE-13-123 293.4 295.1 1.7 5.4 0.97 0.028 68.3 2.0
SE-13-129 236.0 239.5 3.5 11.4 0.96 0.028 78.2 2.3
SE-13-131 269.7 274.9 5.1 16.9 4.29 0.125 157.4 4.6
SE-13-139 287.3 292.9 5.7 18.6 0.83 0.024 44.1 1.3
SE-13-140 286.5 288.9 2.4 7.9 1.90 0.055 117.0 3.4
Note: All numbers are weighted averages, uncut and rounded.

All sample analyses were completed by ALS Chemex in Hermosillo, Mexico and North Vancouver, BC.

The El Cholugo Zone continues to expand to the west and to depth with 6 new drill hole intercepts (above table). The dimensions of this newly discovered zone is now approximately 400 metres long by 150 metres high with widths ranging from 1.7 to 17.1 metres.

Several Holes reported above (Holes SE-13-121, 123, 128, and 141) extend the strong silver and gold mineralization along the Main Mineralized Zone to the east and to depth. These intercepts are up to 300 metres beyond the boundary of current resource estimates. Core holes SE-13-132, 135, 137, 139, 140 reported above further expand mineralization 300 metres to the west under the current operating pit. Further drilling is underway to help delineate theses area of continued expansion.

Approximately 48,000 metres of drilling have been completed to date in the 2012-2103 program to convert underground resources to reserves and expand total resources. Three drills are currently on site completing the extended program. Summary results for revised Santa Elena Resources and Reserves are expected in late April or early May, 2013 with a NI 43-101 Technical Report for the Pre-Feasibility Study of the Expansion Plan to be filed within 45 days following announcement. 

The Qualified Person under NI 43-101 for this News Release is N. Eric Fier, CPG, P.Eng, and Chief Operating Officer for SilverCrest Mines Inc., who has reviewed and approved its contents.

SilverCrest Mines Inc. (TSX VENTURE:SVL)(NYSE MKT:SVLC) is a Canadian precious metals producer headquartered in Vancouver, BC. SilverCrest's flagship property is the 100%-owned Santa Elena Mine, located 150 km northeast of Hermosillo, near Banamichi in the State of Sonora, México. The mine is a high-grade, epithermal gold and silver producer, with an estimated life of mine cash cost of US$8 per ounce of silver equivalent (55:1 Ag: Au). SilverCrest anticipates that the 2,500 tonnes per day open pit heap leach facility at the Santa Elena mine should recover approximately 625,000 ounces of silver and 33,000 ounces of gold in 2013. An expansion plan is well underway to double the annual metals production at the Santa Elena Mine (open pit and underground). Exploration programs have rapidly advanced the definition of a large polymetallic deposit at the La Joya property in Durango State with stated resources nearing 200 million ounces of Ag equivalent.

FORWARD-LOOKING STATEMENTS

This news release contains "forward-looking statements" within the meaning of Canadian securities legislation and the United States Securities Litigation Reform Act of 1995. Such forward-looking statements concern the Company's anticipated results and developments in the Company's operations in future periods, planned exploration and development of its properties, plans related to its business and other matters that may occur in the future. These statements relate to analyses and other information that are based on expectations of future performance, including silver and gold production and planned work programs. Statements concerning reserves and mineral resource estimates may also constitute forward-looking statements to the extent that they involve estimates of the mineralization that will be encountered if the property is developed and, in the case of mineral reserves, such statements reflect the conclusion based on certain assumptions that the mineral deposit can be economically exploited.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements, including, without limitation: risks related to precious and base metal price fluctuations; risks related to fluctuations in the currency markets (particularly the Mexican peso, Canadian dollar and United States dollar); risks related to the inherently dangerous activity of mining, including conditions or events beyond our control, and operating or technical difficulties in mineral exploration, development and mining activities; uncertainty in the Company's ability to raise financing and fund the exploration and development of its mineral properties; uncertainty as to actual capital costs, operating costs, production and economic returns, and uncertainty that development activities will result in profitable mining operations; risks related to reserves and mineral resource figures being estimates based on interpretations and assumptions which may result in less mineral production under actual conditions than is currently estimated and to diminishing quantities or grades of mineral reserves as properties are mined; risks related to governmental regulations and obtaining necessary licenses and permits; risks related to the business being subject to environmental laws and regulations which may increase costs of doing business and restrict our operations; risks related to mineral properties being subject to prior unregistered agreements, transfers, or claims and other defects in title; risks relating to inadequate insurance or inability to obtain insurance; risks related to potential litigation; risks related to the global economy; risks related to the Company's status as a foreign private issuer in the United States; risks related to all of the Company's properties being located in Mexico and El Salvador, including political, economic, social and regulatory instability; and risks related to officers and directors becoming associated with other natural resource companies which may give rise to conflicts of interests. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the forward-looking statements. The Company's forward-looking statements are based on beliefs, expectations and opinions of management on the date the statements are made. For the reasons set forth above, investors should not place undue reliance on forward-looking statements.

The information provided in this news release is not intended to be a comprehensive review of all matters and developments concerning the Company. It should be read in conjunction with all other disclosure documents of the Company. The information contained herein is not a substitute for detailed investigation or analysis. No securities commission or regulatory authority has reviewed the accuracy or adequacy of the information presented.

J. Scott Drever, President     

SILVERCREST MINES INC.

Neither TSX Venture Exchange nor its Regulation Services Provider (as defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SilverCrest Mines Inc.
Fred Cooper
(604) 694-1730 ext. 108 or Toll Free: 1-866-691-1730
(604) 694-1761 (FAX)
info@silvercrestmines.com
www.silvercrestmines.com
Data and Statistics for these countries : Canada | El Salvador | Mexico | All
Gold and Silver Prices for these countries : Canada | El Salvador | Mexico | All

SilverCrest Mines

PRODUCER
CODE : SVL.V
ISIN : CA8283651062
CUSIP : 828365
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

SilverCrest Mines is a silver and gold producing company based in Canada.

SilverCrest Mines develops silver, gold and zinc in El Salvador, and holds various exploration projects in Mexico.

Its main asset in production is SANTA ELENA in Mexico, its main asset in development is EL ZAPOTE in El Salvador and its main exploration properties are SILVER ANGEL, CRUZ DE MAYO and LA JOYA DURANGO in Mexico.

SilverCrest Mines is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 287.2 millions as of today (US$ 259.0 millions, € 188.5 millions).

Its stock quote reached its lowest recent point on December 17, 2002 at CA$ 0.08, and its highest recent level on March 02, 2012 at CA$ 3.17.

SilverCrest Mines has 107 952 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of SilverCrest Mines
6/1/2010Greg McCoach - Mining Speculator June 2010
6/1/2010Corporate Presentation - June 2010
3/31/2010 Funding In Place, Construction on Schedule for 2010 Product...
1/1/2010Why invest in SilverCrest Mines?
6/10/2009Corporate report June 2009
3/31/2008New Recommendation
11/22/2006Corporate Presentation
In the News and Medias of SilverCrest Mines
3/14/2012Scott Drever=2C President of SilverCrest Interview on BNN
9/22/2008Objective Capital research
10/25/2007Analysis by David and Eric Coffin
11/17/2006Follow up N° 4
Annual reports of SilverCrest Mines
2009 Annual Report
2008 annual report
Annual Report 2006
Financings of SilverCrest Mines
5/20/2011Closes $30 Million Bought Deal Financing
4/28/2011Announces CAD$30.0 Million Bought Deal Common Share Financin...
3/20/2008Completes Private Placement; Amends $3.0 Million Macquarie F...
3/13/2008Announces First Closing Of Private Placement
Option Grants of SilverCrest Mines
3/29/2008 Engages Marketing Consultant and Grants Stock Options
Nominations of SilverCrest Mines
6/13/2013Reports Results of AGM Announces Officer and Director Appoin...
1/31/2013Appoints Vice President, Corporate Development
2/15/2011SilverCrest Appoints of Mr. Brent McFarlane Vice President, ...
Financials of SilverCrest Mines
8/13/2015Announces Q2, 2015 Financial Results; Operating Cash Flow of...
11/14/2013Reports Q3, 2013 Financial Results Cash Flow from Operations...
8/15/2013Reports Q2, 2013 Financial Results Cash Flow from Operations...
8/15/2013Reports Q2, 2013 Financial Results
5/15/2013Reports Q1, 2013 Financial Results Cash Flow from Operations...
3/14/2013Announces 2012 Financial Results Cash Flow from Operations o...
11/14/2012Reports Q3, 2012 Financial Results Cash Flow From Operations...
8/15/2012Reports Q2=2C 2012 Financial Results
5/15/2012Reports Q1 2012 Financial Results Cash Flow from Operations ...
4/10/2012Announces 2011 Financial Results Cash Flow from Operations o...
11/29/2011Reports $5.1 Million Third Quarter Cash Flow from Operation...
8/30/2011Announces Second Quarter Earnings of $790,000 and Cash Flow ...
8/2/2011Form 40-F Registration Statement Effective
Project news of SilverCrest Mines
2/25/2014(Santa Elena)Receives US$10 Million Commitment from Sandstorm Gold for Un...
1/14/2014Evrim Options Ermita=F1o Property to SilverCrest Mines
12/24/2013Files La Joya Preliminary Economic Assessment Report
10/21/2013Announces Positive La Joya Preliminary Economic Assessment ...
10/15/2013Announces Q3 Record Silver Production 202,736 Ounces Silver-...
9/5/2013(Santa Elena)Reports Additional Drill Results at Santa Elena Mine; Anothe...
7/25/2013(Santa Elena)Announces Santa Elena Expansion Pre-Feasibility Study; Base...
7/17/2013Announces Q2 Record Silver Production 194,022 Ounces Silver ...
5/29/2013(Santa Elena)Announces Updated Santa Elena Reserves and Resources; Silver...
4/24/2013Announces Q1 Production 153,481 Ounces Silver & 7,225 Ounces...
3/28/2013Files La Joya Technical Report Updated Resources & Positive ...
1/29/2013Announces Updated La Joya Resources
1/16/2013Exceeds 2012 Production Market Guidance Announces Q4 Results...
1/14/2013(Santa Elena)Expands Santa Elena Deposit; More High Grade Intercepts 13m ...
1/7/2013(Santa Elena)Discovers Bonanza Grades and New Zone at Santa Elena 15.6m ...
11/13/2012(Santa Elena)Drilling Update for Santa Elena Mine
11/7/2012Pays Out Gold Hedge Facility Gold and Silver Production Now ...
10/16/2012Announces Q3 Production 151,368 Ounces Silver & 7,184 Ounces...
7/23/2012Announces Q2 Production 139=2C850 Ounces Silver & 8=2C584 Ou...
7/6/2012(Santa Elena)=E2??s Santa Elena Mine Expansion Continues on Schedule
4/19/2012Announces Q1 Silver and Gold Production 134=2C528 Silver Ou...
3/20/2012(La Joya Durango)Reports 58m @ 164.7 gpt Ag Eq* at La Joya
2/16/2012(La Joya Durango)Reports Coloradito Target Results at La Joya Property=3B Pot...
1/23/2012(La Joya Durango)s Corporate Resources Silver Equivalent Inferred Resources ...
1/23/2012(Cruz De Mayo)s Corporate Resources Silver Equivalent Inferred Resources ...
1/23/2012(Cruz De Mayo)s Corporate Resources Silver Equivalent Inferred Resources ...
1/23/2012(Santa Elena)s Corporate Resources Silver Equivalent Inferred Resources ...
1/12/2012(Santa Elena)Reports Record Production in Q4 at Santa Elena=3B =E2?=A2 Si...
1/5/2012(La Joya Durango)Announces Initial Resources at La Joya Property=3B +100 mill...
11/30/2011(La Joya Durango)Commences Phase II Drilling at La Joya=3B Phase II Surface S...
10/14/2011(Santa Elena)Reports Increased Santa Elena Production in Q3 Silver Produc...
9/22/2011(Santa Elena)Begins Drilling at Cruz de Mayo, Reports on Santa Elena Nort...
9/22/2011(Cruz De Mayo)Begins Drilling at Cruz de Mayo, Reports on Santa Elena Nort...
8/10/2011(La Joya Durango)Video Tour of La Joya Mine Project, Durango Mexico
7/13/2011(Santa Elena)Declares Commercial Production at Santa Elena Mine; Pours 74...
6/7/2011(La Joya Durango)Reports Additional La Joya Drill Results, More High Grade Si...
4/26/2011(Santa Elena)Files NI 43-101 Technical Report for Santa Elena Reserve Up...
4/13/2011(Santa Elena)Santa Elena Mine Commissioning Phase Update, Silver And Gold...
4/12/2011(Santa Elena)Announces Santa Elena Expansion Plan Net Present Value of US...
3/13/2011(La Joya Durango)Reports La Joya Initial Drill Results; Up to 19.2 Metres of ...
1/6/2011(Santa Elena)Santa Elena Mine Start-Up Phase Update
12/1/2010(La Joya Durango)Acquires New Major Mexico Property
8/14/2009(Santa Elena)to Acquire 100% of the Santa Elena Project
6/9/2009(Santa Elena)Announces Agreement With MacQuarie Bank Limited For US12.5 M...
8/15/2008Receives Environmental Impact Assessment Approval; NI43-10...
6/30/2008(Santa Elena)Santa Elena prefeasibility study completed
6/26/2008(Santa Elena)Pre-Feasibility Results at Santa Elena, Mexico
6/5/2008(Santa Elena)Main Zone Expansion Drilling 11.2 metres (36.73 feet) gradin...
5/21/2008(Santa Elena) Submits Environmental Impact Assessment; Receives Land Use ...
4/8/2008(Santa Elena)Continues to Expand Main Zone at Santa Elena, Mexico
2/21/2008(Santa Elena)Updates Progress at the Santa Elena Project, Mexico
1/9/2008(Santa Elena)Continues to Intercept High Grade Gold and Silver at the San...
1/4/2008(Santa Elena)Resource Expansion at Santa Elena and Cruz de Mayo
12/20/2007(Santa Elena)Secures Surface Rights for Santa Elena Project, Mexico
11/29/2007(Santa Elena)Intercepts 32.9 Metres of 367 gpt (10.7 Ounces) Silver & Sil...
11/15/2007(Cruz De Mayo)SilverCrest Announces Resource Increase Indicated Resources ...
10/18/2007(Santa Elena)SilverCrest Intercepts 51.4 Metres of 1.53 gpt Gold and 126 ...
9/26/2007(Santa Elena) Continues to Expand Santa Elena Deposit, Northern Mexico
9/11/2007(Santa Elena)Mobilizes Second Drill Rig to Santa Elena Project, Mexico
9/6/2007(Santa Elena)Significantly Expands Mineralization at Santa Elena Project,...
7/26/2007(Cruz De Mayo)Reports Final RC Drill Results and Preliminary Metallurgy at...
7/5/2007(Cruz De Mayo)Reports More Silver at Cruz de Mayo, Mexico
5/24/2007(Cruz De Mayo)Reports New Silver Discovery at Cruz de Mayo, Mexico
5/10/2007(Cruz De Mayo)Updates Progress at the Santa Elena Project, Mexico
Corporate news of SilverCrest Mines
2/24/2014Graduates to Toronto Stock Exchange Trading Commences Februa...
2/20/2014Announces $20 Million Bought Deal
2/17/2014(Santa Elena)Confirms U/G High Grades at Santa Elena 11.6m @ 5.83 gpt Au ...
12/14/2013Announces Grant of Stock Options
11/19/2013SilverSeek LIVE! Wed. Nov, 20th @ 2PM EST -- David Morgan (S...
10/21/2013Announces Positive La Joya Preliminary Economic Assessment B...
7/12/2013Arranges $40 Million Credit Facility with Scotiabank
5/27/2013Completes Exercise of La Joya West Option
5/27/2013Completes Exercise of La Joya West Option
4/25/2013Announces 2013 Annual Meeting and Adoption of Corporate Gove...
4/8/2013(Santa Elena)Continues to Expand Santa Elena Deposit More High Grade Inte...
10/30/2012Closes $34.5 Million Prospectus Offering, Over-Allotment Opt...
10/5/2012Announces Increase in Bought Deal to $30 Million
10/5/2012Announces $26.1 Million Bought Deal
9/27/2012Reports High Grade Surface Sampling and Additional Drill Res...
8/22/2012ANNOUNCES TRADING ON NYSE MKT TO COMMENCE AUGUST 27=2C 2012
7/17/2012Reports 50m @ 151.8 gpt Ag Eq* at La Joya Main Mineralized...
6/29/2012Reports Annual General Meeting Results
5/7/2012Reports 127.4m @ 65.6 gpt Ag Eq* at La Joya Expands Main M...
2/21/2012Files NI43=2D101 Resource Report for La Joya Property
1/30/2012Presenting At the Silverseek Online Forum
1/9/2012Retires Bank Debt Ahead of Schedule
10/7/2011Commences Trading on OTCQX
6/17/2011Announces Appointment of New Director, Reconfirmation of Sha...
5/31/2011Files Form 40-F Registration Statement with SEC
7/29/2010Initial Gold & Silver Production Imminent
5/6/2010& Goldsource Appoint Director of Communications
9/22/2009Analyst Coverage by Jennings Capital
7/13/2009New office
6/24/2009Eric Fier on Newsmakers
11/17/2008At Hard Assets Conference, San Francisco
9/24/2008New Video Tour: Underground Silver Deposits at Santa Elena
7/13/2008Report
7/10/2008Signs Agreement For $3.0 Million Feasibility Finance Facilit...
4/21/2008Initiation Report
3/1/2008Announces US$3.0 Million Feasibility Finance Facility & Prop...
9/19/2007Intercepts 10.1 Metres of 6.53 gpt Gold and 218.7 gpt Silve...
3/8/2007Completes Second Phase Drill Program at Cruz de Mayo, Mexico
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (SVL.V)Other OTC (STVZF)
2.66-0.37%1.89-4.55%
TSX-V
CA$ 2.66
02/21 17:00 -0.010
-0.37%
Prev close Open
2.67 2.69
Low High
2.63 2.71
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  2.66 -%
Volume 1 month var.
493,509 -%
24hGold TrendPower© : 27
Produces Gold - Silver
Develops Gold - Silver - Zinc
Explores for Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 10/18/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.82+1.69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04+1.38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.52+6.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.05+2.62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19-7.32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.90+1.60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 51.43-0.46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :