Copper Mountain Mining Corp.

Published : May 02nd, 2014

Copper Mountain announces 2014 first quarter results

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Copper | Debt | Derivative | Gold | Growth | Japan | Recovery | Silver | Swaps |

Copper Mountain announces 2014 first quarter results

This release should be read with the unaudited financial statements and management's discussion and analysis available at www.cumtn.com and filed on www.sedar.com. Our financial results are prepared in accordance with IFRS and expressed in Canadian dollars, unless otherwise noted. Sales and production volumes for the Company's 75%-owned Copper Mountain mine are presented on a 100% basis unless otherwise indicated.

Web Site: www.CuMtn.com
TSX: CUM

VANCOUVER, May 2, 2014 /PRNewswire/ - Copper Mountain Mining Corporation (CUM.TO) (the "Company" or "Copper Mountain") announces sales of 19.8 million pounds of copper, 6,500 ounces of gold and 98,600 ounces of silver tp produce revenues of $61.2 million after pricing adjustments and treatment charges, which is net of a $9.8 million negative pricing adjustment for the three months ended March 31st, 2014.

First Quarter 2014 Highlights (100% Basis)
  • Total production for the 2014 first quarter at Copper Mountain Mine was 19.1 million pounds of copper, 5,400 ounces of gold and 105,300 ounces of silver. This represents a 34% increase in copper production from the same period last year.
  • Copper concentrate shipments of 39,100 wmt contained the sale of 19.8 million pounds of copper, 6,500 ounces of gold, and 98,600 ounces of silver.
  • Mill throughput averaged 29,300 tpd which was a 17% improvement from the same period last year.
  • Adjusted EBITDA1 was $17.1 million for the three months ended March 31st 2014.
  • Adjusted earnings were $6.7 million or $0.07 per share
  • Cash flows from operations was $12.4 million for the first quarter of 2014 compared to negative $5.1 million for 2013.
  • Site cash costs for the 2014 first quarter were US$1.62 per pound of copper produced net of precious metal credits.
  • Total cash costs for the period US$2.08 per pound of copper sold net of precious metal credits and after all off-site charges.
  • Realized prices on metal sales were $3.19 per pound of copper, $1,293 per ounce of gold and $20.49 per ounce of silver.
________________________________
1 Adjusted EBITDA removes unrealized gains/ losses on derivative instruments and foreign exchange gains/ losses

Jim O'Rourke, President and CEO of Copper Mountain, remarked "This quarter marks our 6th consecutive quarter of improved production. This continued improvement is a result of the mines focus on integrating the three temporary portable crushers into the circuit to pre-crush a portion of the SAG mill feed. These temporary solutions have been successful in increasing throughput and will remain in place until the permanent secondary crusher is installed this summer. The 2014 first quarter production results are in line with our annual production guidance of 80 -90 million pounds of copper, despite some unscheduled downtime in March.  The operational highlights for this first quarter include better than expected grade, improved mill availability and steady progress in mill throughput. These combined factors contributed to record production during the quarter".

Mr. O'Rourke continued, "Overall, construction of the secondary crusher is progressing on budget and on schedule for a mid-summer 2014 start-up. Structural steel is being erected and foundations for the new conveyor systems are in progress."

Summary Financial Results
                 
       

Three months ended
March 31,

 

(CDN$, except for cash cost data in US$)

      2014
$
      2013
$
                 

Revenues

     

61,182,272

     

55,093,821

Cash flow from operations

     

12,444,204

     

(5,138,404)

Gross profit

     

1,096,076

     

8,064,408

Operating income (loss)

     

(1,938,146)

     

6,309,499

Adjusted earnings 2

     

6,724,129

     

7,844,294

Net loss

     

(15,619,792)

     

(2,271,910)

Loss attributable to shareholders of the Company

     

(12,154,340)

     

(2,274,775)

Adjusted earnings per share3

     

0.07

     

0.08

Loss per share4

     

(0.10)

     

(0.02)

EBITDA

     

(5,240,729)

     

7,461,709

Adjusted EBITDA

     

17,103,192

     

17,577,913

                 

Cash and cash equivalents

     

41,151,517

     

8,738,558

Working capital

     

31,541,865

     

10,078,877

Equity

     

273,740,178

     

255,103,182

                 

Copper produced (lbs)

     

19,100,000

     

14,200,000

Gold produced (oz)

     

5,400

     

5,300

Silver produced (oz)

     

105,300

     

64,200

                 

Copper sold (lbs)

     

19,800,000

     

15,000,000

Gold sold (oz)

     

6,500

     

5,800

Silver sold (oz)

     

98,700

     

69,200

Site cash costs per pound of copper produced (net of gold, silver credits) (US$)

      1.62      

1.62

Total cash costs per pound of copper sold (net of gold, silver credits) (US$)

     

2.08

     

2.18

Copper Mountain Mine

During the period, the company completed a total of three shipments of concentrate containing approximately 19.7 million pounds of copper to Japan for smelting and recorded revenues, net of smelter charges and pricing adjustments, of $61.2 million, realizing a gross profit of $1.1 million.  The total cash cost of copper sold for the three months ended March 31, 2014 was US$2.08 per pound of copper after gold and silver by-product credits.

The Copper Mountain Mine achieved record first quarter copper production. Total production for the three months ended March 31st, 2014 at Copper Mountain Mine was 19.1 million pounds of copper, 5,400 ounces of gold and 105,300 ounces of silver. This represents a 35% growth in copper production from the same period last year.

SAG Mill throughput was improved during the quarter as a result of adding the third portable crusher late last year.  Copper production during the quarter was in line with guidance, despite some unscheduled down time in March resulting from a ball mill transformer failure.  Mill crews completed repairs in a timely manner and identified the root cause of the transformer failure. A permanent solution has been identified and will be implemented across all six mill transformers over the next four months. During the quarter the mill averaged 91% availability.

A permanent secondary crusher is being installed at the site at a capital cost of $40 million.  Progress is on budget and on schedule for a mid-summer start-up.  This crusher will replace the three temporary high cost portable crushers and will provide 100% minus 2 inch feed to the SAG mill.  Currently the mill is operating at the planned capacity of 32,000 tpd with about 35% of the mill feed being crushed to the 2 inch size range.

Mining activities continued to shift more towards Pit 3 during the quarter and mining in the Pit 2 area shifted more towards the southwest end of the Pit.  During the quarter a total of 13.6 million tonnes of material was mined, including 4.1 million tonnes of ore and 9.5 million tonnes of waste. The mine moved an average of approximately 160,000 tonnes of material per day.  The Komatsu haul fleet continues to have favourable mechanical availability.

_______________________________________
2 Adjusted earnings (loss) is a non-GAAP financial measure which removes unrealized gains/losses on interest rate swaps, pricing adjustments on concentrate metal sales and foreign currency gains/losses.
3 Calculated based on weighted average number of shares outstanding under the basic method based on adjusted earnings.
4 Calculated based on weighted average number of shares outstanding under the basic method based on earnings attributable to shareholders.

Listed below are a summarized balance sheet and income statement as well as conference call in details:

Summarized Balance Sheet
                 
        March 31,
2014
$
      December 31,
2013
$
Assets                
Cash       41,151,517       42,281,137
Accounts Receivable and prepaids       13,149,336       17,953,700
Inventory       27,510,891       26,789,416
Property, plant and equipment       532,093,285       531,890,214
Other Assets       48,731,269       44,166,934
        662,636,298       663,081,401
Liabilities                
Current liabilities       50,269,879       44,374,657
Decommissioning and restoration provision       6,534,508       6,245,963
Interest rate swap liability       7,009,562       6,364,019
Long-term debt       319,561,052       311,241,671
Deferred tax liability       5,521,119       6,354,461
        388,896,120       374,580,771
Equity                
Share capital       186,208,461       186,291,105
Contributed surplus       10,604,961       9,662,977
Retained earnings       3,137,689       15,292,029
Non-controlling interest       73,789,067       77,254,519
Total equity       273,740,178       288,500,630
        662,636,298       663,081,401
                 
Summarized Income Statement
                 
        Three months ended
March 31,
(CDN$)       2014
$
      2013
$
Revenues       61,182,272       55,093,821
Cost of sales5       (60,086,196)       (47,029,413)
Gross profit       1,096,076       8,064,408
                 
Other income and expenses                
General and administration       (1,627,662)       (1,696,867)
Share based compensation       (1,406,560)       (58,042)
Operating income       (1,938,146)       6,309,499
                 
Pricing adjustments on concentrate and metal sales       9,864,933       4,146,749
Finance income       22,711       99,481
Finance expense       (2,058,711)       (2,099,319)
Current resource tax expense       (124,345)       (297,409)
Deferred income and resource tax recovery (expense)       957,687       (314,707)
Adjusted earnings6       6,724,129       7,844,294
                 
Pricing adjustments on concentrate and metal sales       (9,864,933)       (4,146,749)
Unrealized gain (loss) on interest rate swap       (931,894)       289,837
Unrealized loss on foreign exchange       (11,547,094)       (6,259,292)
Net loss and comprehensive loss for the period       (15,619,792)       (2,271,910)
                 
Net income (loss) and comprehensive income (loss) attributable to:                
Shareholders of the company       (12,154,340)       (2,274,775)
Non-controlling interest       (3,465,452)       2,865
        (15,619,792)       (2,271,910)
                 
Loss per share       (0.10)       (0.02)
Adjusted earnings per share       0.07       0.08
____________________________________
5 Cost of sales consists of direct mining and milling costs (which include mine site employee compensation and benefits, mine site general and administrative costs, non-capitalized stripping costs, maintenance and repair costs, operating supplies and external services), depreciation and offsite transportation costs.
6 Adjusted earnings (loss) is a non-GAAP financial measure which excludes unrealized gains/losses on derivative instruments, changes in fair value of financial instruments, foreign currency gains/losses, pricing adjustments related to metal sales and non-recurring transactions.

The full set of financial statements and accompanying MD&A are posted on Sedar.com.

About Copper Mountain Mining Corporation:
Copper Mountain's flagship asset is the Copper Mountain mine located in southern British Columbia near the town of Princeton. The Company has a strategic alliance with Mitsubishi Materials Corporation who owns 25% of the mine. The Copper Mountain mine commenced production in the summer of 2011 and has continued to improve its operations since startup. The 18,000 acre site has a large resource of copper that remains open laterally and at depth. The mine has significant exploration potential that will need to be explored over the next few years to fully appreciate the properties full development potential.  Additional information is available on the Company's web site at www.CuMtn.com.

A conference call and audio webcast will be held on Friday May 2nd, 2014 at 7:30 am (Pacific Standard Time) for management to discuss the 2014 first quarter results.  This discussion will be followed by a question-and-answer period with investors.

Live Dial-in information
Toronto and international: 416-764-8688
North America (toll-free): 888-390-0546
To participate in the webcast live via your computer go to: http://www.newswire.ca/en/webcast/detail/1332255/1472383

Replay call information
Toronto and international: 416-764-8677,  passcode  559428
North America (toll-free): 888-390-0541,  passcode  559428

The conference call replay will be available from 10:30  am (PST) on May 2nd , 2014, until 11:59 pm PST on May 8th, 2014
Participant audio webcast will also be available on the company's website  http://www.cumtn.com

On behalf of the Board of

COPPER MOUNTAIN MINING CORPORATION

"Rod Shier" 

Rodney A. Shier, CA.
Chief Financial Officer

Note:  This release contains forward-looking statements that involve risks and uncertainties.  These statements may differ materially from actual future events or results.  Readers are referred to the documents, filed by the Company on SEDAR at www.sedar.com, specifically the most recent reports which identify important risk factors that could cause actual results to differ from those contained in the forward-looking statements.  The Company undertakes no obligation to review or confirm analysts' expectations or estimates or to release publicly any revisions to any forward-looking statement.

Read the rest of the article at finance.yahoo.com
Data and Statistics for these countries : Japan | All
Gold and Silver Prices for these countries : Japan | All

Copper Mountain Mining Corp.

DEVELOPMENT STAGE
CODE : CUM.TO
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Copper Mountain is a copper development stage company based in Canada.

Copper Mountain holds various exploration projects in Canada.

Its main asset in development is COPPER MOUNTAIN PROJECT in Canada and its main exploration property is SIMILCO MINE in Canada.

Copper Mountain is listed in Canada and in Germany. Its market capitalisation is CA$ 119.2 millions as of today (US$ 89.7 millions, € 83.4 millions).

Its stock quote reached its lowest recent point on November 28, 2008 at CA$ 0.31, and its highest recent level on June 03, 2011 at CA$ 8.15.

Copper Mountain has 132 390 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Copper Mountain Mining Corp.
3/14/2008Canaccord initiates Coverage On Copper MiountainReceived: fr...
In the News and Medias of Copper Mountain Mining Corp.
1/10/2019Copper Mountain produces 79m lb in 2018, sets guidance for n...
3/27/2018Copper Mountain gains approval for $71m acquisition of Alton...
2/9/2018Former millwright suing Copper Mountain for wrongful dismiss...
Annual reports of Copper Mountain Mining Corp.
Annual Report 2007
Financings of Copper Mountain Mining Corp.
12/18/2007 Closes An Additional $2.2 Million Private PlacementReceived...
Nominations of Copper Mountain Mining Corp.
6/24/2013Report on Voting Results for Directors from the 2013 Annual ...
Financials of Copper Mountain Mining Corp.
2/20/2015Announces 2014 Year End Results
11/12/2014Announces 2014 Third Quarter Results
10/8/2013Provides Third Quarter Operational Update
7/11/2013provides second quarter operational update
4/16/2013provides operational update and first quarter results
2/26/20082007 REVIEW AND FINANCIAL RESULTSReceived: from mailer
Project news of Copper Mountain Mining Corp.
4/14/2015announces production results for Q1-2015
1/19/2015announces production results for 2014
7/9/2014Copper Mountain mine achieved record second quarter copper p...
4/9/2014Copper Mountain mine achieved record first quarter copper pr...
1/15/2014announces production results for 2013
12/11/2013provides 2014 production guidance and operational update
5/16/2013SAG Mill Motor Transformer Failure at Copper Mountain Mine
1/17/2013announces production results for 2012
1/17/2013announces production results for 2012
5/29/2011(Copper Mountain Project)MITSUBISHI ISSUES STANDARD FORCE MAJEURE NOTICE TO COPPER MO...
4/20/2011(Copper Mountain Project)COMMISSIONS PRIMARY CRUSHER WITH ORE ON SCHEDULE
3/29/2011(Copper Mountain Project)Drilling below Pit 2 intersects 127.5m grading 1.01% Cu, 2.3...
3/20/2011(Copper Mountain Project)PROJECT UNAFFECTED BY JAPAN EARTHQUAKE
3/7/2011(Copper Mountain Project)- Drilling extends Pit 2 mineralization below planned Super ...
3/3/2008(Copper Mountain Project)NEW HIGH GRADE ZONE IDENTIFIED AT COPPER MOUNTAIN: INTERSECT...
2/7/2008(Copper Mountain Project)Intersects 215 FT. GRADING 0.85% Cu, 0.45 g/t Au, and 4.93 g...
Corporate news of Copper Mountain Mining Corp.
7/13/2016Copper Mountain Increases Size of Bought Deal Offering
7/12/2016Copper Mountain Announces C$5 Million Bought Deal Offering
7/12/2016Copper Mountain Announces Production Results For Q2-2016
6/8/2016Copper Mountain Appoints Dan Gibbons to Investor Relations
5/19/2016Premier of BC Visits Copper Mountain
5/2/2016Copper Mountain Mining Announces Positive Q1 2016 Results
4/19/2016Copper Mountain Receives Mine Safety Award for Second Consec...
1/21/2016Copper Mountain Mining to Present at TD Securities Mining Co...
1/14/2016Copper Mountain Announces Production Results For 2015
9/2/2015Edited Transcript of CUM.TO earnings conference call or pres...
7/9/2015mine announces production results for Q2-2015
6/24/2015Copper Mountain Mining Corporation Report on Voting Results ...
4/22/2015Safety Performance Honoured by the BC Government
1/19/2015Copper Mountain announces production results for 2014
11/12/2014Copper Mountain Announces 2014 Third Quarter Results
10/8/2014Copper Mountain Mine Achieved Record Third Quarter Copper Pr...
8/11/2014Copper Mountain announces 2014 second quarter results
6/20/2014Copper Mountain Mining Corporation Report on Voting Results ...
6/18/2014Copper Mountain construction of secondary crusher on schedul...
6/18/2014construction of secondary crusher on schedule and budget
5/2/2014Copper Mountain announces 2014 first quarter results
4/9/2014mine achieved record first quarter copper production
2/21/2014s construction progress on secondary crusher
2/14/2014announces 2013 year end conference call details
2/4/2014announces secondary crusher construction on schedule for sum...
12/3/2013closes Cdn $30 million bought deal financing
11/22/2013reports Ball Mill transformer interruption
10/25/2013announces third quarter 2013 conference call details
7/29/2013announces 2013 second quarter conference call details
6/10/2013mine back in full operation one week ahead of schedule
5/22/2013mine back in operation earlier than expected
5/6/2013announces 2013 first quarter conference call details
4/3/20132012 drilling extends mineralization to the north and below ...
3/14/2013announces 2012 year end conference call details
11/6/2012Announces 2012 Third Quarter Conference Call Details
10/30/2012Jim O'Rourke, CEO is inducted into the Canadian Mining Hall ...
10/16/2012announces 2012 third quarter production and sales results
9/17/2012Operational Update
10/4/2011Mitsubishi Lifts Force Majeure Notice to Copper Mountain
7/12/2011produces first concentrate and commences trucking to port
6/6/2011MINE PROCESSES FIRST ORE
9/8/2009FILES PRELIMINARY PROSPECTUSReceived: from mailer
3/18/2008Former BMO Nesbitt Burns Inc Managing Director Carl Renzoni ...
8/14/2007MINERALIZED ZONES CONTINUE TO BE EXTENDED AT COPPER MOUNTAIN...
7/31/2007Drill program progresses at Copper Mountain
7/12/2007New Mineralized Zones Intersected at Copper MountainReceived...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (CUM.TO)FRANKFURT (COQ.F)
0.900+13.92%1.69-1.51%
TORONTO
CA$ 0.900
12/05 15:59 0.110
13.92%
Prev close Open
0.790 0.830
Low High
0.830 0.910
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.900 -%
Volume 1 month var.
862,778 -%
24hGold TrendPower© : 16
Produces
Develops Copper
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/2/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.71-0.39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.11+2.21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55-0.90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.47+3.78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.25-3.42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.79-3.76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.57+0.84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :