Mindoro Resources Ltd

Published : August 12th, 2008

d Resource Estimate Released For Agata North Nickel Laterite Project

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Tuesday, August 12, 2008
Updated Resource Estimate Released For Agata North Nickel Laterite Project




EDMONTON, Alberta; August 12, 2008 - Mindoro Resources Ltd. (TSXV: MIO; Frankfurt: WKN 906167) is pleased to report results of an updated National Instrument 43-101 compliant mineral resource estimate for its Agata Nickel Laterite Project, Philippines.

The estimate for combined Measured and Indicated Resources is 4.95 million wet metric tonnes (WMT) grading 1.18 percent nickel, 0.074 percent cobalt and 28 percent iron, at a cut-off grade of 0.80 percent nickel. Contained nickel is approximately 92.4 million pounds. In addition, the Inferred Resource estimate is 4.37 million WMT grading 1.26 percent nickel, 0.047 percent cobalt and 20 percent iron, also at a cut-off grade of 0.80 percent nickel. Contained nickel is approximately 92.5 million pounds. The estimate covers approximately 25 percent of the Agata North nickel laterite prospect. Step-out drilling is in progress at 100 x 100 meter centers using six drill rigs. Updated resource figures will be released as they come to hand.

Tony Climie, CEO of Mindoro, commented, "This updated resource estimate represents an increase of 36 per cent over the estimate released on April 30 of this year. Results are continuing to reinforce our expectations of defining a significant nickel laterite resource on our Surigao Projects, potentially justifying establishing a local processing plant to maximize economic returns to all stakeholders. Processing technologies which may be especially suited to our laterites include atmospheric (tank) leaching, or ferronickel smelting which could potentially utilize power from a "mini-hydro plant" constructed on an adjacent large river".

Mineral Resource Estimate

The Mineral Resource model was generated by Dallas Cox, BE (Min), an independent qualified person as defined by NI 43-101. A total of 228 drill holes, comprising 4,507 meters of diamond drill core and 4,480 assay samples, have been used for the estimate. An Inverse Distance Squared grade estimation method was utilized within tightly constrained lithological and grade domains. Mr. Cox has indicated that the density of drilling and continuity of mineralization is sufficient to classify the estimated resource and has verified and authorized the technical information detailed in this release. The accompanying maps show the area of the current resource in relation to the Agata North Project and the location of the holes drilled to date. Both dry metric tonnes (DMT) and wet metric tonnes (WMT) are quoted. The NI 43-101 compliant Technical Report will be filled on SEDAR within 45 days.

Summary of the Mineral Resource Estimate:

Resource @ 0.8 % Ni cutoff grade

Category

Laterite Horizon

Mil. WMT

Mil. DMT

Ni%

Co%

Fe%

Contained Ni

tonnes

pounds

Measured

Limonite

0.85

0.55

1.07

0.117

44

5,914

13,037,809

Saprolite

0.58

0.47

1.30

0.031

13

6,037

13,309,802

Indicated

Limonite

1.88

1.22

1.06

0.117

44

12,976

28,606,163

Saprolite

1.63

1.31

1.30

0.031

13

16,975

37,423,819

Combined Measured + Indicated

Limonite

2.73

1.78

1.06

0.117

44

18,889

41,643,972

Saprolite

2.22

1.77

1.30

0.031

13

23,012

50,733,621

Sub-Total

4.95

3.55

1.18

0.074

28

41,902

92,377,593

Inferred

Limonite

1.14

0.74

1.04

0.105

43

7,741

17,065,435

Saprolite

3.23

2.58

1.32

0.030

13

34,211

75,421,718

Sub-Total

4.37

3.33

1.26

0.047

20

41,952

92,487,153

  • Total metal contents in the reported resources represent metal in the ground and have not been adjusted for metallurgical recoveries and other factors which will be considered in later study.
  • Mineral resources which are not mineral reserves do not have demonstrated economic viability.
  • The tonnage and nickel grades above have been rounded to the nearest 2nd decimal, and iron grades to the nearest whole number, which may have resulted in minor discrepancies.
  • The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
  • It is uncertain if further exploration will result in upgrading the Inferred mineral resource to an Indicated or Measured mineral resource or the Indicated mineral resource to a Measured Resource category.
Mr. Dallas Cox has 26 years of experience in open pit mine technical services, mine operations and management in Australia, China, Indonesia and the Philippines. His engineering, mine design and development experience in the Philippines includes the Rusina Mining Limited Acoje nickel project, the Platinum Group Metals Corporation Caga4 nickel project, the Red5 Limited Siana gold project, the Metals Exploration Limited Runruno gold-molybdenum project, the Filminera Resources Masbate gold project and the Mindoro Resources Limited Kay Tanda gold project.

ABOUT THE AGATA NICKEL LATERITE PROJECT

Location in the Prolific Surigao Copper-Gold and Nickel District


The Agata Nickel Laterite Project is situated on the Agata Project, Surigao Gold District, northern Mindanao, the Philippines. The Surigao Gold District is not only a current and historical gold producing district but, with the discovery of a cluster of porphyry copper gold deposits by Anglo American, it also has high potential to become a major copper-gold camp. Mindoro has multiple gold and copper-gold targets in the Surigao District at varying stages of drill evaluation. The Surigao Region is now emerging as a major nickel laterite district. There are currently several deposits either in production, providing Direct Shipping Ore (DSO) to markets and processing plants in China, Japan, Korea and Australia. Sumitomo and Philippine partner Taganito have recently announced plans to construct a processing plant in the Surigao District.

Agata North Mineral Resource Estimate and Exploration Target

On April 30, 2008, Mindoro announced an early-stage 43-101 compliant mineral resource estimate for the Agata Nickel Laterite Project. The estimate is herein updated as above. The latest resource estimate covers about 25% of the Agata North laterite as mapped to date. Based on the more complete drill data now at hand, the Exploration Target is revised to 30 to 40 million WMT (down from 40 to 60 million WMT) at a grade of 0.9% to 1.5% nickel and 18% to 28% iron. This does not include other areas of laterite mineralization on the Agata Project, nor other Mindoro Projects in the Surigao District.

The potential quantity and grade of the exploration target described above is conceptual in nature. There has been insufficient exploration to define mineral resources other than those disclosed in this release, and it is uncertain if further exploration will result in the targets delineating additional mineral resources or that these resources, if delineated, will be economic or sufficient to support a commercial mining operation. Until a feasibility study has been completed there is no certainty that the company's projections will be economically viable.

Enhanced Value, On-Site Processing Alternatives

While sulphide nickel deposits have dominated historical nickel production, the future belongs to nickel laterite deposits. Once regarded as too difficult metallurgically, break-throughs and technological refinements, still in their relative infancy, are leading rapidly to a new generation of much larger nickel production centers from laterite deposits. The Agata Project with its excellent infrastructure, proximity to tide water and the markets that really count, is attractively placed for potential development.

While much of the Surigao District nickel laterite production has been as DSO to processing plants in Japan, Australia and China, several attractive alternatives are emerging for local processing, which include; constructing an on-site blast or electric arc furnace for nickel pig iron production (a low grade ferronickel product); ferronickel smelting (a ferronickel smelter recently commenced operation not far away in NW Mindanao); heap-leaching, for which pilot testing on another Philippine laterite deposit has produced promising results; atmospheric (tank) leaching; and an improved generation of High Pressure Acid Leach (HPAL) plants. HPAL technology is currently being used with great success by Sumitomo on its Philippine Coral Bay operation, and shows considerable promise for the local processing of Surigao ores. In fact, Sumitomo recently announced plans to proceed with permitting to construct an HPAL plant in the Surigao District.

As noted in a February 7, 2008, news release, there is abundant evidence of the beginning of a trend for local/on-site processing of Philippine laterite ores and the growth of a large high-value industry in the Philippines. Mindoro expects that the prolifically nickel laterite-mineralized Surigao District will be an important part of this evolution.

While options are being kept open for DSO production in the short term, on-site processing offers much more exciting and high value opportunities. Construction of a local processing plant, rather than simply shipping out raw product, would greatly increase the returns to all stakeholders; including Mindoro's shareholders, its Philippine partner, the local people, local government units, and to the Philippines itself.

Programs are carried out under the supervision of Tony Climie, P.Geol., CEO and COO of Mindoro, who is a qualified person as defined by National Instrument 43-101. Previous sample preparation and assaying were performed by McPhar Laboratory of Manila, an ISO 9001/2000 accredited laboratory. Ni, Co, Fe, MgO and Al2O3 assays are performed by AAS after an HCl-HNO3-HClO4 digest, and SiO2 by gravimetric method. More recent results were from Intertek Testing Services Phils, XRF analysis are performed to determine total element concentrations (13 elements). Normal Quality Control and Quality Assurance procedures are being carried out, using a system of duplicate samples. MRL has conducted assays verification by using standard samples and re-assaying of field, coarse and pulp duplicates.

ABOUT MINDORO

Mindoro is a Tier 1 Issuer trading on the TSX Venture Exchange (MIO) and the Frankfurt Stock Exchange (WKN 906167). In addition to advancing the Agata Nickel Laterite Project, Mindoro has announced an initial 43-101 compliant gold-silver mineral resource estimate on its Kay Tanda gold-silver project, and is proceeding to advance this project. The company has also identified 22 porphyry copper-gold prospects in the Philippines and is currently involved in several advanced joint venture discussions.

INVESTOR RELATIONS - CANADA
Mindoro Resources Ltd.

Penny Gould, President: penny@mindoro.com
Tel: 780.413.8187
Toll Free: 1.877.413.8187
www.mindoro.com

Renmark Financial Communications Inc.
Barbara Komorowski: bkomorowski@renmarkfinancial.com
Jason Roy: jroy@renmarkfinancial.com
Tel.: 514.939.3989
Fax: 514.939.3717
www.renmarkfinancial.com

INVESTOR RELATIONS - EUROPE
ARGENTUMINVEST GmbH

Richard H. Mayr: info@argentuminvest.com
Tel: +49.9421.568899-0
Fax: +49.9421.568899-4

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

This release may contain forward-looking statements including management's assessments of future plans and operations, and expectations of future production. These statements are based on current expectations that involve a number of risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to, the risks associated with the mining and exploration industry (e.g. operational risks in development, exploration and production; delays or changes in plans with respect to exploration or development projects or capital expenditures; the uncertainty of reserve estimates; the uncertainty of estimates and projections relating to production). The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

You can also view this News Release on our website at:
http://www.mindoro.com/s/PressReleases.asp?ReportID=314918


 

Mindoro Resources Ltd

DEVELOPMENT STAGE
CODE : MIO.V
ISIN : CA6029131050
CUSIP : 602913105
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Mindoro Res. is a nickel and copper exploration company based in Canada.

Mindoro Res. develops nickel, copper, cobalt and iron in Philippines, and holds various exploration projects in Philippines.

Its main asset in development is AGATA in Philippines and its main exploration properties are LOBO, ARCHANGEL, TAPIAN MAIN and TAPIAN SAN FRANCISCO in Philippines.

Mindoro Res. is listed in Australia, in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 1.5 millions as of today (US$ 1.1 millions, € 1.0 millions).

Its stock quote reached its highest recent level on June 22, 2007 at CA$ 1.31, and its lowest recent point on July 05, 2016 at CA$ 0.01.

Mindoro Res. has 297 437 399 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Mindoro Resources Ltd
6/4/2012Releases Corporate Presentation for May 2012
Annual reports of Mindoro Resources Ltd
2008 Annual Report Available
Annual Report 2007
Financings of Mindoro Resources Ltd
12/17/2013Mindoro's JV Partner Enters into Definitive Agreements for T...
10/10/2012Results of Special Meeting and Provides Update on Private Pl...
10/1/2012TVI Pacific completes Tranche 1 of the Private Placement in ...
3/22/2012Mindoro Closes Private Placement for C$0.3M
3/12/2012Results of Special Meeting and Private Placement
2/2/2012Mindoro Closes Final Tranche of Private Placement
1/26/2012Receives Additional Private Placement Commitments of C$1.28M...
1/13/2012Mindoro Closes Second Tranche of Private Placement and Provi...
12/1/2011Mindoro completes first closing of Private Placement raising...
11/28/2011receives commitments for initial C$1.2 million under Private...
8/25/2009Closes Private Placement
8/19/2009Arranges Private Placement
2/19/2009Closes Private Placement; Planning Underway to Drill Americ...
1/14/2009Announces Private Placement
12/18/2008 Amends Price and Term of Purchase Warrants
Option Grants of Mindoro Resources Ltd
7/29/2010Issues Incentive Stock Options
8/6/2009 Issues Incentive Stock Options
11/3/2008Appoints Tosney an Advisor and Issues Incentive Stock Option...
11/3/2008Appoints Tosney An Advisor And Issues Incentive Stock Option...
Nominations of Mindoro Resources Ltd
7/2/2013Announces Director and Executive Appointments
6/6/2008Announces Executive Appointments
Project news of Mindoro Resources Ltd
3/13/2015(Agata)Agata Project Completes Two More High-Iron/Low Nickel DSO Sh...
4/28/2014(Agata)The Agata Mining Joint Venture Receives Declaration of Minin...
2/25/2014Mindoro Shareholder, Prime Resources, Increases Stake in Min...
10/21/2013Mindoro Provides an Update on the Agata High-Iron DSO Projec...
10/18/2013Mindoro's JV Partner Reports on Test Work Results for the Ag...
10/18/2013Mindoro Advises Variation To Agreement For The Sale Of Proje...
9/24/2013Mindoro Advises Further Economic Information for Agata DSO P...
9/23/2013(Agata)Renegotiates Option for Additional 25% in Agata Project
6/6/2013(Agata).: Agata Nickel Project Pilot Plant Commissioned, Operation ...
3/20/2013Mindoro Partner, TVI, Discusses Philippine Projects
2/19/2013Mindoro Provides an Update on the TVI Joint Venture Projects
9/27/2012Mindoro and TVI sign Joint Venture Agreements for Agata and ...
9/26/2012(Archangel)Releases Further Results from Archangel Gold Drilling Progra...
8/31/2012Mindoro Intersects 26.2m @ 4.07 g/t gold in First New Hole a...
7/6/2012Mindoro Announces TVI Pacific Strategic Investment and Propo...
1/4/2012(Archangel)Reports the Results of Drilling Gold Feeder-Structures at Ar...
12/9/2011(Archangel)on Archangel Gold Drilling Program, Results from First Hole
7/6/2011(Agata)Intersects Strong Nickel and Iron Grades at Agata South
6/8/2011China's Steel Production is Expected to Soar By Up to 25 Per...
5/5/2011(Pan De Azucar)Reports High Grade Copper Intersections and Thick Extensions...
4/1/2011(Pan De Azucar)Reports High-Grade Gold and Copper Intersections at Pan De A...
3/29/2011(Agata)RECEIVES FAVOURABLE ECONOMIC ASSESSMENT FOR AGATA NICKEL PRO...
2/28/2011(Pan De Azucar)Announces Strong Gold-Copper Drill Results at Pan De Azucar ...
1/24/2011(Bolobolo)Drills Further Strong Nickel Intersections from Bolobolo
1/15/2011(Bolobolo)Drills Further Strong Nickel Intersections and Acquires New ...
1/12/2011(Bolobolo)Drills Strong Nickel Intersections of Potential Economic Int...
8/24/2010(Agata)Announces Increased Nickel Resources
8/10/2010(Agata)Completes Agata Nickel Drilling; Higher-Grades Intersected
6/23/2010(Agata)Announces Further Nickel Laterite Intersections at Agata
9/14/2009(Kay Tanda)Looks to Maximize Value from Kay Tanda Gold Project as Avoce...
9/25/2009(El Paso)Gold Fields Commences Drilling on Mindoro's El Paso Copper-G...
9/1/2009(El Paso)Gold Fields Provides Further Update On Progress On The Batan...
8/6/2009(Agata)Drilling To Commence At American Tunnels
12/16/2008(Agata)Final Resource Estimate Released for Agata North Nickel Late...
11/17/2008(Agata)Extensive Copper Mineralization from Mindoro's American Tunn...
9/16/2008(Agata)Reports Further Drill Results From Agata Nickel Laterite Pro...
9/4/2008(Agata) Reports Further Drill Results from Agata Nickel Laterite Pr...
9/4/2008(Agata)Reports Further Drill Results From Agata Nickel Laterite Pro...
8/19/2008(Agata)Reports Further Excellent Drill Results From Agata Nickel La...
8/12/2008(Agata)d Resource Estimate Released For Agata North Nickel Laterite...
7/29/2008(Agata)Reports Further Drill Results From Nickel Laterite Project
7/16/2008(Agata)Drill Results From Agata North Nickel Laterite Project
5/12/2008(Agata)Artisanal Miners Expose High-Grade, Porphyry-Related Copper ...
4/30/2008(Agata) Starter Resource Estimates Released for Agata North Nickel ...
Corporate news of Mindoro Resources Ltd
5/2/2016Mindoro Files Annual Audited Financial Statements
9/1/2015Second Quarter Results and Board and Management Changes
9/1/2015Mindoro Resources Ltd.: Second Quarter Results and Board and...
7/8/2015Mindoro Announces that Prime Resources Holdings, Inc. has be...
4/10/2015Mindoro JV Completes Three Nickel Laterite DSO Shipments in ...
3/13/2015Mindoro's Agata Project Completes Two More High-Iron/Low Nic...
1/30/2015Mindoro Announces Extension To Bridge Loan Maturity Date
1/9/2015Mindoro Joint Venture Completes Two Additional Shipments of ...
12/17/2014Mindoro Announces $500,000 Financing Arrangement
12/10/2014Mindoro Joint Venture Completes Third DSO Shipment from Agat...
12/3/2014Mindoro Advises Results From Annual And Special Shareholders...
12/2/2014Mindoro Advises Results from Annual and Special Shareholders...
12/2/2014Mindoro's Agata Mining JV to Ship Higher Grade DSO and Provi...
12/2/2014Mindoro Announces Resource Definition Drill Program at Agata...
12/2/2014Mindoro Announces Negotiations For Bridge Loan And Convertib...
11/28/2014Mindoro Announces Negotiations for Bridge Loan and Convertib...
11/27/2014Mindoro Announces Resource Definition Drill Program at Agata...
11/26/2014Mindoro's Agata Mining JV to Ship Higher Grade DSO and Provi...
11/25/2014Mindoro Joint Venture Nears Completion of Definitive Feasibi...
11/20/2014Mindoro Joint Venture Acquires US$8 Million Loan for Agata P...
11/18/2014Mindoro Joint Venture Completes Second DSO Shipment
10/23/2014Mindoro Announces Changes to Board of Directors
10/23/2014Mindoro Announces Completion of First DSO Shipment at Agata
10/16/2014Mindoro Announces Start of DSO Shipping From Agata Project
9/30/2014Mindoro Announces Director and Corporate Secretary Appointme...
9/30/2014Mindoro Adopts Advance Notice Bylaw
8/29/2014Mindoro Announces Board and Management Changes
8/15/2014Mindoro Signs Agreements for Additional 25% in Agata and Tap...
6/17/2014Mindoro Sets Date for Annual and Special Meeting
5/28/2014Mindoro Applies to Delist From ASX
5/5/2014Mindoro Repays Loan
4/28/2014The Agata Mining Joint Venture Receives Declaration of Minin...
2/20/2014Mindoro's 100 Million Red Mountain Shares to be Released fro...
12/10/2013Mindoro Arranges Bridging Loan
10/24/2013Mindoro'S JV Partner Announces Third-Party Investment Opport...
10/18/2013Advises Variation to Agreement for the Sale of Projects to R...
10/1/2013Mindoro Advises Results From Annual And Special Shareholders...
10/1/2013Advises Results from Annual and Special Shareholders Meeting
9/10/2013(Agata)TVI Pacific Inc. and Mindoro Resources Ltd. Announce Robust ...
7/2/2013Mindoro Announces Director And Executive Appointments
6/24/2013Mindoro Secures up to $1.3m Loan and Amends Earn-In Terms
6/24/2013Secures Up to $1.3M Loan and Amends Earn-in Terms
4/11/2013(Agata).: New Resource Estimate for Agata North Provides a Strong F...
2/11/2013Red Mountain Mining Discloses New Mineral Resource Estimates...
10/31/2012Completes A$10 Million Sale of Philippines Gold and Copper-G...
9/7/2012Mindoro Provides Further Update on the Proposed TVI Transact...
9/7/2012Provides Further Update on the Proposed TVI Transaction
9/5/2012Red Mountain Mining Shareholders Approve Purchase of Mindoro...
7/27/2012Mindoro Draws Funding from Red Mountain Mining to Commence D...
7/23/2012Mindoro Signs Gold Assets Sale Agreement with Red Mountain M...
6/25/2012Mindoro Provides Update on Red Mountain Mining Transaction
5/29/2012Mindoro Proposes Major Restructure of Philippines Assets
5/1/2012Mindoro Files First Quarter 2012 Financial Results and Provi...
2/8/2012(Pan De Azucar)Releases Pan de Azucar Exploration Target and Positive Metal...
7/30/2011MAKES ORGANIZATIONAL CHANGES TO POSITION COMPANY FOR KEY GRO...
7/28/2011RECEIVES POSITIVE THERMAL UPGRADE TEST RESULTS
7/26/2011CEO Discusses Copper-Gold Results and Updates Nickel Program...
7/20/2011(Lobo)Intersects High-Grade Copper at Pan De Azucar and Plans to D...
6/7/2011ADVISES ON VOTING PROCEDURES AND EXTENDS INVITATION TO AGM
6/3/2011?S CEO PROVIDES AUDIO PRESENTATION ON BOARDROOM R
6/1/2011TO BE FEATURED BY CEO CLIPS ON THE DOCUMENTARY CHANNEL
5/25/2011(Bolobolo)ANNOUNCES FINAL STRONG NICKEL INTERSECTIONS FROM BOLOBOLO
5/17/2011(Pan De Azucar)REPORTS 76 METERS OF COPPER-GOLD IN STEP OUT HOLE AT PAN DE ...
4/21/2011(Agata)Commences Agata Nickel Pre-Feasibility Study and Makes Key A...
3/30/2011(Pan De Azucar)CEO Discusses Agata and Pan De Azucar on Boardroom Radio
3/22/2011(Bolobolo)Drills Further Strong Nickel Intersections from Bolobolo
3/2/2011Releases Fourth Quarter Activity and Financial Results for 2...
7/15/2010IFC To Invest CAD$2.1 Million In Mindoro
7/6/2010Awarded Commendation by Philippines Government for Coastal M...
6/22/2010Results of Mindoro Annual General Meeting
6/14/2010Reminder for Investor Luncheon for Mindoro Resources Ltd.
6/14/2010IFC Posts Summary of Proposed Investment
6/9/2010Announces Proposed IFC Investment
6/7/2010Invitation to Mindoro AGM
6/1/2010Gold Fields Commence Drilling Mindoro's Lobo Copper-Gold Tar...
8/2/2009Retains Senergy Communications For Investor Relations Servic...
7/8/2009Update on Progress on the Batangas Joint Ventures
6/2/2009Sumitomo's Palawan nickel plant starts full-scale operation
2/24/2009will be exhibiting at the Prospectors and Developers Associa...
2/11/2009Japanese Eye Philippines' Resources
2/5/2009Drilling Commences On Mindoro'S Kay Tanda Gold Resource
1/13/2009 Announces Director and Advisory Board Changes
1/13/2009Announces Director And Advisory Board Changes
1/9/2009Shareholder Letter
11/26/2008LOOMING FERTILIZER SHORTAGE
11/25/2008: Valderama Massive Pyritic Sulphide Prospect to be Evaluate...
11/10/2008Joint Ventures on Track for 2009
9/26/2008Announces Proposed IFC Investment
9/23/2008And Avocet Announce Joint Venture On Archangel Project
9/19/2008Retains Richmond Club
9/3/2008And Gold Fields Sign Letter Of Agreement On Three Batangas P...
8/14/2008Results of Mindoro Annual General Meeting
5/15/2008Creates Unique Partnership with Small-Scale Miners in the Ph...
4/2/2008Signs Benefits Sharing Agreement With Indigenous Community
4/1/2008at the 2008 Calgary Resource Investment Conference
3/31/2008at the 2008 Rohstoffmesse (Invest Stuttgart) Conference
3/27/2008Mindoro Subsidiary Launches New Website
3/26/2008 Management and Board Changes
3/25/2008Update on Mindoro's Nickel Laterite Projects
2/26/2008Expanded Nickel Laterite Resource Potential Enhances Foundat...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (MIO.V)FRANKFURT (OLM.F)
0.005+0.00%0.005+0.00%
TSX-V
CA$ 0.005
07/05 11:39 -
0%
Prev close Open
0.010 0.010
Low High
0.005 0.010
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.005 -50.00%
Volume 1 month var.
220,525 -50.00%
24hGold TrendPower© : -37
Produces
Develops Cobalt - Iron - Nickel
Explores for Copper - Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.76-1.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.04-1.95%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56-3.12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.44-2.01%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.23-1.17%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.23-4.17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-7.14%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.74+0.87%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.18-0.94%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+0.00%Trend Power :