Ascot Updated Resource Estimate Significantly Increases Grade and Tonnage at Premier
Published : February 13, 2013
( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Gold | Market | Missouri | Recovery | Silver |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Feb. 13, 2013) - Ascot Resources Ltd. (News - Market indicators) (the "Company") is pleased to announce that P&E Mining Consultants Inc. ("P&E") has completed an updated independent National Instrument 43-101 compliant mineral resource estimate for the Company's Premier property located near Stewart, British Columbia. The updated mineral resource estimate incorporates the Big Missouri and Martha Ellen deposits and replaces the previous mineral resource estimate for the Big Missouri deposit.

Highlights for the 2013 mineral resource estimate: all mineral resources have been reported inside an optimized pit shell at a cut-off grade of 0.25 g/t gold-equivalent (AuEq), and contains a total of 2.43 million ounces AuEq at a grade of 0.85 g/t AuEq in the Indicated category and 0.49 million ounces AuEq at a grade of 0.74 g/t AuEq in the Inferred category.

The updated mineral resource estimate is based on 155,153 m of drilling from 1,080 drillholes, incorporating results from three target areas: the Big Missouri deposit, the Martha Ellen deposit, and the Dilworth deposit. At present a mineral resource has not been defined for the Company's Dilworth zone. All three target areas remain open for expansion as shallow dipping sheets within a six square kilometer area. This latest resource represents approximately 15% of the total target area.

These targets have the advantage of having favorable moderate topography and developed infrastructure from previous mine operations and on ongoing hydroelectric construction at nearby Long Lake.

Fred Brown, P.Geo. of P&E is the Independent Qualified Person responsible for preparing the updated mineral resource estimate. The mineral resource estimate involved three dimensional modeling methods and statistical and grade continuity analysis. Gemcom GEMS modeling software was used for the three dimensional block model and subsequent grade estimates. Grade capping was used to restrict the influence of statistical outliers during Inverse Distance Cubed (1/d3) interpolation of block grades.

The updated mineral resource estimate is summarized in the following tables:

Big Missouri Deposit mineral resources (in-pit) at a gold-equivalent (AuEq) cutoff of 0.25 g/t.(1)(2)(3)(4)(5)
Classification Tonnes Ag Au AuEq Ag ozs Au ozs AuEq
ozs
(000's) g/t g/t g/t (000's) (000's) (000's)
Indicated 80,987 5.1 0.76 0.83 13,290 1,969 2,168
Inferred 19,935 4.3 0.67 0.73 2,734 428 469
               
Martha Ellen Deposit mineral resources (in-pit) at a gold-equivalent (AuEq) cutoff of 0.25 g/t.(1)(2)(3)(4)(5)
Classification Tonnes Ag Au AuEq Ag ozs Au ozs AuEq
ozs
(000's) g/t g/t g/t (000's) (000's) (000's)
Indicated 8,433 7.6 0.87 0.98 2,049 235 266
Inferred 554 12.0 0.83 1.01 213 15 18
               
Total (Big Missouri and Martha Ellen Deposits) mineral resources (in-pit) at a gold-equivalent (AuEq) cutoff of 0.25 g/t.(1)(2)(3)(4)(5)
Classification Tonnes Ag Au AuEq Ag ozs Au ozs AuEq
ozs
(000's) g/t g/t g/t (000's) (000's) (000's)
Indicated 89,420 5.3 0.77 0.85 15,339 2,204 2,434
Inferred 20,489 4.5 0.67 0.74 2,947 443 487
               
  1. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues.
  2. The quantity and grade of reported Inferred resources in this estimation are conceptual in nature and there has been insufficient exploration to define these Inferred resources as an Indicated or Measured mineral resource, and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured mineral resource category.
  3. The mineral resources in this estimate were calculated with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions.
  4. The resources and gold-equivalent ratio of 68 g/t silver = 1 g/t gold was calculated using a gold recovery of 90% and a silver recovery of 65%. Metal prices used (Jan 31, 2013 two year trailing average) were Au US$1,632/oz for gold and US $33.25/oz for silver.
  5. All resources are reported within an optimized pit shell derived from a processing cost of CDN$11.00/tonne and a G&A cost of CDN$1.00 per tonne. Mining cost used is CDN$1.75 per tonne and optimized pit slopes are 50 degrees. The US$/CDN$ exchange rate used was 1:1

An in-situ global sensitivity analysis to the updated mineral resource estimate of the economic potential for the Premier deposits was also completed simultaneously with the in-pit mineral resource estimate, and is not restricted to the optimized pit shell. The inclusion of this sensitivity analysis is not meant to supersede or replace the results of the in-pit mineral resource estimate and should not be construed as a mineral resource.

In-Situ Global Sensitivity Table: Total Indicated Inventory
Cutoff AuEq Tonnes Ag Au AuEq Ag
ozs
Au
ozs
AuEq
ozs
(000's) g/t g/t g/t (000's) (000's) (000's)
5.00 g/t 1,219 15.1 7.28 7.50 591 285 294
4.00 g/t 1,890 13.4 6.22 6.42 816 378 390
3.00 g/t 3,112 12.1 5.06 5.24 1,206 506 524
2.00 g/t 6,212 11.4 3.66 3.83 2,270 730 764
1.00 g/t 18,705 9.3 2.05 2.19 5,578 1,230 1,314
0.50 g/t 48,699 6.8 1.16 1.26 10,717 1,818 1,979
0.45 g/t 55,000 6.5 1.08 1.17 11,575 1,901 2,075
0.40 g/t 62,683 6.2 0.99 1.08 12,532 1,992 2,180
0.35 g/t 71,411 5.9 0.91 1.00 13,504 2,082 2,285
0.30 g/t 81,154 5.6 0.83 0.92 14,540 2,168 2,386
0.25 g/t 92,581 5.3 0.76 0.84 15,697 2,252 2,488
0.20 g/t 104,902 5.0 0.69 0.76 16,740 2,325 2,577
               
In-Situ Global Sensitivity Table: Total Inferred Inventory
Cutoff AuEq Tonnes Ag Au AuEq Ag
ozs
Au
ozs
AuEq
ozs
(000's) g/t g/t g/t (000's) (000's) (000's)
5.00 g/t 154 11.3 7.28 7.45 56 36 37
4.00 g/t 226 10.1 6.29 6.44 74 46 47
3.00 g/t 540 8.5 4.60 4.73 148 80 82
2.00 g/t 1,028 10.2 3.47 3.62 336 115 120
1.00 g/t 3,220 8.9 1.93 2.06 916 199 213
0.50 g/t 11,538 5.6 0.98 1.06 2,088 363 394
0.45 g/t 13,930 5.2 0.88 0.96 2,347 395 431
0.40 g/t 16,424 4.9 0.81 0.88 2,597 426 465
0.35 g/t 19,346 4.6 0.73 0.80 2,873 457 500
0.30 g/t 22,285 4.4 0.68 0.74 3,141 484 531
0.25 g/t 25,361 4.2 0.62 0.68 3,407 507 558
0.20 g/t 28,411 4.0 0.58 0.64 3,652 525 580
               

Further discussion and analysis: this updated mineral resource estimate clearly demonstrates the amenability of the mineralization to an open pit scenario, which can be further enhanced with expansion of the current drilling results. A much higher percentage of mineralization is within the present Indicated category compared to the 2012 resource, as a better understanding of controls on mineralization is gained with further work. The optimized pit for the mineral resource estimate is based on a 0.25 g/t AuEq cut-off aided by the favorable infrastructure and topography of the project. The 2012 drill program again demonstrates the good lateral continuity of the shallow dipping system of which the present resource has only tested approximately 15% of the target area. This is regarded as a baseline mineral resource to allow expansion over all three target areas (Big Missouri-Martha Ellen-Dilworth) with an aggressive 2013 program.

The Dilworth target has been tested with 135 drill holes to date. Numerous gold and silver intersections have been reported, similar to those reported at Big Missouri and Martha Ellen, that is high grade intervals contained within lower grade zones. In 2013, the Company, plans to do sufficient drilling at Dilworth to delineate a viable resource. A few select examples of previously released intersections from the Dilworth area include:

Hole # Interval (m) Au g/t Ag g/t
HL-08-03 31.50 0.65 76.6
P-10-97 3.02 77.8 99.5
P-10-100 140.00 0.41 11.7
P-10-109 204.00 0.62 11.2
incl. 58.06 1.40 22.9
P-11-213 126.37 1.95 22.4
include 2.00 73.00 34.8
P-11-221 79.03 3.60 109.5
include 0.97 246.00 7840.0
P-12-391 0.45 3550.00 2180.0
P-12-398 52.10 0.88 6.6
P-12-401 127.50 0.54 14.7
P-12-402 1.71 64.80 37.0
P-12-405 189.70 0.48 7.2
P-12-422 31.52 1.37 11.2

N.B. Estimated true widths are generally 10-20% less than reported drill widths, as holes fan across gently dipping sheets. 

Qualified Persons

The Independent Qualified Persons as defined by NI 43-101 for the purpose of this news release are Fred Brown, P.Geo. and Eugene Puritch, P.Eng., both of P&E Mining Consultants Inc. of Brampton, Ontario. The contents of this press release have been reviewed and approved by Mr. Puritch. P&E Mining Consultants Inc. is an established and internationally recognized geological and mine engineering consulting firm specializing in resource estimates, scoping, pre-feasibility studies and participation with other consulting firms on feasibility studies, with over 150 projects undertaken in the last eight years. Graeme Evans is the Company Qualified Person responsible for the supervision of the drilling programs. Mr. Evans has also reviewed and approved the contents of this news release.

An updated mineral resource report will be filed on SEDAR within 45 days of this news release.

On Behalf of the Board of Directors

ASCOT RESOURCES LTD.

John A. Toffan, President and Director

Cautionary Statement Regarding Forward-Looking Information

All statements, trend analysis and other information contained in this press release relative to markets about anticipated future events or results constitute forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "expect" and "intend" and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions. All statements, other than statements of historical fact, included herein, including, without limitation; the completion of the Offering on the terms set forth herein, the anticipated closing date of the Offering and the use of proceeds from the Offering are forward looking statements. Forward-looking statements are subject to business and economic risks and uncertainties and other factors that could cause actual results of operations to differ materially from those contained in the forward-looking statements. Important factors that could cause actual results to differ materially from the Company's expectations include fluctuations in commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; the need for cooperation of government agencies and native groups in the exploration and development of properties and the issuance of required permits; the need to obtain additional financing to develop properties and uncertainty as to the availability and terms of future financing; the possibility of delay in exploration or development programs and uncertainty of meeting anticipated program milestones; and uncertainty as to timely availability of permits and other governmental approvals. Forward-looking statements are based on estimates and opinions of management at the date the statements are made. The Company does not undertake any obligation to update forward-looking statements except as required by applicable securities laws. Investors should not place undue reliance on forward-looking statements.

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this press release.

Ascot Resources Ltd.
(604) 684-8950
(604) 684-9877 (FAX)
www.ascotresources.ca

Ascot Resources

EXPLORATION STAGE
CODE : AOT.V
ISIN : CA04364G1063
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Ascot Res. is a silver and gold exploration company based in Canada.

Ascot Res. holds various exploration projects in Burkina Faso and in Canada.

Its main exploration properties are PREMIER AREA DEPOSIT, MT. MARGARET, DILWORTH and VICTORIA ISLAND (WASHBURN) in Canada and KOUPELA in Burkina Faso.

Ascot Res. is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 91.6 millions as of today (US$ 69.1 millions, € 63.5 millions).

Its stock quote reached its lowest recent point on December 12, 2008 at CA$ 0.05, and its highest recent level on September 09, 2016 at CA$ 2.83.

Ascot Res. has 140 880 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Ascot Resources
8/16/2013Announces Closing of Final Tranche of Private Placement
8/15/2013Provides Financing Update
7/31/2013Announces Closing of First Tranche of Private Placement
7/24/2013Financing Amended
6/27/2011Announces Close of Private Placement
Project news of Ascot Resources
7/27/2015Ascot Starts Infill Drilling to Determine Bulk Sample Potent...
5/2/2012_ Ascot Resources Ltd
12/8/2011_ Ascot Resources Ltd
12/1/2010(Mt. Margaret)Drills 380.2 Meters of 0.500% Copper on Its Sixth Hole on th...
6/23/2010(Premier Area Deposit)Drilling Intersects 7.33 g/t Au Over 12.79 Meters at Premier...
Corporate news of Ascot Resources
7/11/2016Ascot Announces Closing of Offering
7/11/2016Ascot Announces $20 million Private Placement
7/8/2016Ascot Announces Private Placement
7/5/2016Ascot Resources Intersects 104.74 g/t Gold over 3.05 Metres ...
6/30/2016Ascot Announces Closing of Final Tranche of Offering
6/24/2016Ascot Announces Closing of First Tranche of Offering
6/13/2016Ascot Announces Private Placement
6/8/2016Ascot Announces Drill Results and Private Placement
4/20/2016Ascot Resources Starts 2016 Drill Program at Premier
12/18/2015Ascot Resources Intersects 572.00 g/t Gold And Over 1.00 Met...
12/17/2015Ascot Announces Option Payment on Premier has been made
12/16/2015Ascot Announces Closing of $7.5 Million Offering
10/28/2015Ascot Resources Intersects 443.00 g/t Gold Over 1.00 Meter a...
10/15/2015Ascot Resources Intersects 367.00 G/T Gold Over 0.90 Meter a...
9/25/2015Ascot Resources Intersects 284.00 G/T Gold Over 1.00 Meter a...
9/14/2015Ascot Resources Intersects 257.00 g/t Gold Over 1.00 Meter a...
9/4/2015Ascot Resources Intersects 880.0 g/t Gold Over 1.00 Meter at...
8/28/2015Ascot Resources Intersects 1009.5 G/T Gold Over 0.90 Meter a...
8/11/2015Ascot Resources Intersects 582.00 g/t Gold Over 1.00 Meter a...
4/20/2015Ascot Resources Commences 2015 Drill Program At Premier
12/4/2014Ascot Resources Intersects 753.00 g/t Gold and 1190.0 g/t Si...
11/12/2014Ascot Resources Intersects 1,115.00 g/t Gold and 481 g/t Sil...
11/5/2014Ascot Resources Intersects 128.71 g/t Gold and 3,209.4 g/t S...
10/27/2014Ascot Resources Intersects 873.0 g/t Gold Over 1.00 Meter at...
10/14/2014Ascot Resources Intersects 14,394.5 g/t Gold Over 0.75 m at ...
8/22/2014Ascot Resources Opening Up Large System at Premier Mine
7/15/2014Ascot Resources Intersects 78.77 Meters of 20.31 (2.70 Cut) ...
7/4/2014Ascot Resources Ltd.: Mt Margaret
6/20/2014Ascot Resources Ltd. News Release
10/24/2013Intersects 20.00 Metres of 4.18 Grams Per Tonne Gold at Prov...
9/26/2013Intersects 23.72 Meters of 5.09 Grams Per Tonne Gold at Mart...
9/17/2013
9/12/2013Intersects 10 Meters of 33.66 Grams Per Tonne Gold at Premie...
7/19/2013(Dilworth)Premier / Dilworth Option Agreements Extended to 2015
3/28/2013Has Filed the New Premier Property NI 43-101 Technical Repor...
3/26/2013U.S. Forest Service Affirms Decision Notice and Finding of N...
2/13/2013d Resource Estimate Significantly Increases Grade and Tonnag...
10/10/2012(Dilworth)Drills 0.45 Metres of 3550 Grams Per Tonne Gold and 2180 Gra...
9/10/2012Drills 8.00 Metres of 22.68 Grams Per Ton Gold and 96.4 Gram...
5/25/2011Announces $2.55 Million Private Placement
5/10/2011Starts 2011 Drill Program at Premier
3/24/2011Premier/Dilworth Option Agreements Extended to 2013
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (AOT.V)FRANKFURT (BHQ.F)
0.650+4.84%0.546-2.50%
TSX-V
CA$ 0.650
09/30 16:39 0.030
4.84%
Prev close Open
0.620 0.610
Low High
0.610 0.650
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.650 -%
Volume 1 month var.
145,660 -%
24hGold TrendPower© : -15
Produces
Develops
Explores for Copper - Gold - Lead - Molybdenum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.73-1.90%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.95-2.75%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.56-3.12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.44-2.01%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.28-0.84%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.23-4.17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-2.38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.74+0.87%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.15-1.01%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.03+3.03%Trend Power :