Dec 2015 Quarterly

Quarterly Report


SARACEN MINERAL HOLDINGS LIMITED

ACN: 009 215 347


QUARTERLY REPORT: DECEMBER 2015


Corporate Details:

29th January 2016 ASX code: SAR Corporate Structure:

Ordinary shares on issue: 792.8m


Unvested employee performance rights: 20.2m


Market Capitalisation: A$595m (share price A$0.75)


Cash & Bullion (31 December): A$42.1m Debt (31 December): Nil

Directors:


Mr Geoff Clifford

Non-Executive Chairman


Mr Raleigh Finlayson Managing Director


Mr Mark Connelly Non-Executive


Mr Martin Reed Non-Executive


Ms Samantha Tough Non-Executive


Substantial Shareholders:


Wroxby Pty Ltd 8.2%


Paradice Investment Management 7.9% Karara Capital Pty Ltd 6.2%

Van Eck Associates 6.1%


Registered Office:


Level 4

89 St Georges Terrace Perth WA 6000

Telephone: +61 8 6229 9100

Facsimile: +61 8 6229 9199


For further details contact:


Troy Irvin Telephone +61 8 6229 9100

[email protected]

Significant cash-flow generation underwrites low-cost/ debt-free growth strategy

Production

  • Quarterly gold production of 44,265oz (first half FY16 production of 82,405oz compares favourably with FY16 outlook of 150- 160,000oz - Carosue Dam only)

  • Quarterly all-in sustaining cash costs (AISC) of A$1,009/oz, below the FY16 outlook range of A$1,025-1,075/oz

  • Karari cash flow positive and in commercial production

  • Red October had its second highest quarter of gold production with 21.1koz produced at an average grade of 6.7g/t

  • FY16 group production outlook to be re-assessed in the coming weeks taking into account the strong progress at Thunderbox (current group outlook 170-180,000oz)

  • Thunderbox plant commissioning and first production both one month ahead in the March and June quarters FY16 respectively

  • First ore mined at Deep South underground, on track for first full-scale stoping in the June quarter 2016

  • Cash and equivalents at 31 December of A$42.1m, marginally down from A$44.9m at 30 September, after project development expenditure of A$29.3m (A$22.7m at Thunderbox, A$3.1m at Deep South, A$1.5m at Kailis / KOTH, and A$2.0m on exploration)

  • Estimated $61m operating cash flow and $9-11m profit before tax for first half of FY16 (based on preliminary unaudited financials)

  • Stage 1 of the Kailis Pit cutback is scheduled to commence during FY17, with ~50koz of production and ~$27m indicative cash flow

  • Scoping study underway for the King of the Hills project

  • Recent multiple shallow high-grade drill results at Carosue Dam include (previously released):

  • One LTI occurred during the Quarter, TIFR steady at 376

Development

Financial

Exploration and growth

Karari - 19.0m @ 6.1 g/t, 7.0m @ 8.7 g/t, 12.0m @ 5.6g/t

Deep South - 3.0m @ 22.5g/t, 11.5m @ 4.9g/t

Health and safety

Summary

Table 1 - Carosue Dam Operations, Key Statistics


Carosue Dam Units Mar Qtr Jun Qtr Sept Qtr Dec Qtr

2015 2015 2015 2015

Underground Mining

Ore Mined

t

68,000

119,000

143,000

248,000

Mine Grade

g/t

6.08

4.77

4.30

4.54

Contained Gold

oz

13,252

18,262

19,759

36,229

Mill Production

Ore Milled

t

549,000

576,000

577,000

569,000

Mill Grade

g/t

2.58

2.77

2.25

2.62

Contained Gold

oz

45,429

51,281

41,753

47,854

Recovery

%

91.5%

90.8%

91.3%

92.5%

Recovered Gold

oz

41,550

46,563

38,140

44,265


Figures 1-4 - Carosue Dam Operations, Key Charts



Table 2 - Thunderbox Operations, Key Statistics


Thunderbox Units Sept Qtr Dec Qtr 2015 2015

Open Pit Mining

Total Mining

BCM

2,421,000

4,247,000

Mining Costs

A$m

$8.64

$11.59

Mining Costs

A$/BCM

$3.57

$2.73

Carosue Dam Operations


Processing


Table 3 - Carosue Dam Operations, Processing Statistics


Carosue Dam

Units Mar Qtr 2015

Jun Qtr

2015

Sept Qtr

2015

Dec Qtr

2015

Mill Production

Ore Milled

t

549,000

576,000

577,000

569,000

Mill Grade

g/t

2.58

2.77

2.25

2.62

Contained Gold

oz

45,429

51,281

41,753

47,854

Recovery

%

91.5%

90.8%

91.3%

92.5%

Recovered Gold

oz

41,550

46,563

38,140

44,265


Metallurgical recoveries increased by over 1%, representing an additional 574 recovered ounces or

~A$900k of revenue relative to the September Quarter. This was due to a combination of improved metallurgical properties associated with Red October ore at depth, and continuous processing plant improvements, specifically the installation of a second gravity screen increasing gravity gold extraction. The mill grade increased due to higher grades and production at Red October and Karari.


The closing ore stockpile at the end of the December quarter was 1.6Mt @ 1.0g/t for 50,281oz. These ounces will only incur processing and administration costs, equivalent to ~A$1,081/oz AISC or A$19 million in deferred free cashflow using latest costs and a A$1,511/oz gold price (average hedge price).


Underground


Table 4 - Carosue Dam Operations, Underground Mining Statistics


Carosue Dam

Units Mar Qtr 2015

Jun Qtr

2015

Sept Qtr

2015

Dec Qtr

2015

Underground Mining

Ore Mined

t

68,000

119,000

143,000

248,000

Mine Grade

g/t

6.08

4.77

4.30

4.54

Contained Gold

oz

13,252

18,262

19,759

36,229


Total underground production has increased 83% relative to the previous quarter due to the commencement of commercial production from Karari. Table 4 includes production from:


  • Karari - 15.1koz @ 3.1g/t (vs. September Quarter 4.2koz @ 2.6g/t)

    The first full quarter of commercial production at Karari saw 15.1koz @ 3.1g/t mined. AISC was

    $104/t which reconciles well with the $100/t quoted in the CDO 5 year plan.


  • Red October - 21.1koz @ 6.7g/t (vs. September Quarter 15.5koz @ 5.2g/t)

The second highest ever month of production was recorded in December, with 9,000oz produced at an average grade of 8.7g/t.


Underground development at Deep South commenced in the December Quarter, with 519m of development completed. First development ore was intersected at the end of the quarter with full scale mining set to commence in the June quarter 2016.

Thunderbox Operations


Open Pit Mining


4.2 million BCMs were pre-stripped from Thunderbox (Zone A) during the quarter with a total mining expenditure of A$11.6 million (inclusive of load and haul, drill and blast, grade control, supervision and overheads). This compares favourably with budgeted movement of 3.5 million BCMs (22% over performance) and budgeted costs of A$14.8 million (27% lower), resulting in mining unit costs for the Quarter being 24% lower than the previous quarter and 29% below YTD budget (A$3.03/bcm vs. A$4.24/bcm).

Figure 5 - Thunderbox Open Pit (looking north)



A second excavator (190t) was mobilised to site during October in accordance with the development schedule. This excavator was purchased by Saracen (under a finance lease arrangement) for approximately A$2.5 million. The machine will be maintained by

Read the rest of the article at www.publicnow.com
Data and Statistics for these countries : Georgia | All
Gold and Silver Prices for these countries : Georgia | All

Saracen Mineral Holdings Ltd

PRODUCER
CODE : SAR.AX
ISIN : AU000000SAR9
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Saracen Minerals Holdings is a gold producing company based in Australia.

Saracen Minerals Holdings holds various exploration projects in Australia.

Its main assets in production are CAROSUE DAM and SOUTH LAVERTON in Australia, its main assets in development are RED OCTOBER, SAFARI BORE and PORPHYRY in Australia and its main exploration properties are ENTERPRISE, WHIRLING DERVISH, KARARI, PORPHYRY UNDERGROUND, DEEP SOUTH, WALLBROOK, DEEP SOUTH UNDERGROUND, MEXICO, TWIN PEAKS, BUTCHER WELL, MONTYS DAM, MARGARET, YUNDAMINDERA, ELLIOTS LODE and MILLION DOLLAR in Australia.

Saracen Minerals Holdings is listed in Australia. Its market capitalisation is AU$ 3.8 billions as of today (US$ 2.9 billions, € 2.4 billions).

Its stock quote reached its lowest recent point on July 12, 2013 at AU$ 0.09, and its highest recent level on July 31, 2020 at AU$ 6.75.

Saracen Minerals Holdings has 807 550 016 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Corporate Presentations of Saracen Mineral Holdings Ltd
1/30/2008Upgrade in Resources to 2.6m Ounces
Project news of Saracen Mineral Holdings Ltd
8/20/2015150820 ASX - KOTH and Kailis acquisition
11/4/2009(Carosue Dam)Major Gold Ore Reserves increase at Carosue Dam
5/25/2009(South Laverton)South Laverton Gold Project – 60% Ore Reserve Increase
1/29/2008(Whirling Dervish)Whirling Dervish - Substantial Resource Increase
Corporate news of Saracen Mineral Holdings Ltd
8/18/2016Corporate Update -
7/29/2016RBC - SAR Outperform PT$1.80
7/27/2016FY17 Exploration and production outlook
7/7/2016June Qtr Pre-release 160707
6/15/2016UK Asia Corporate Presentation 160614
5/24/2016Resources Rising Stars Corporate Presentation 160524
5/19/2016RBC - Saracen Upside PT $1.50
5/17/2016RBC - Saracen Outperform -160512
5/11/2016Deep South ramp-up
5/10/2016Commercial production declared at Thunderbox -160510ASX
5/4/2016SAR Corporate Presentation - 160504
5/3/2016SAR Added to ASX200
4/27/2016March 2016 Quarterly Report-160427 ASX
4/21/2016Purchase of Thunderbox royalty - 160421 ASX
4/14/2016Saracen Ready to Flex its Muscles - RBC
4/13/2016Karari Resource and Reserve Growth - 160413 ASX
4/6/2016160406 ASX - March Qtr Pre-release
2/1/2016Thunderbox commissioning underway - 160201 ASX
1/29/2016Dec 2015 Quarterly
1/21/2016High Grade Gold Intersections at Pinnacles JV Gold Project -...
1/15/2016160115 Hartleys upgrade target price to 88c
1/11/2016160111 ASX - December Qtr Pre-release
12/22/2015151222 ASX - TBO update
11/25/2015151125 ASX - TBO update
10/15/2015Low Cost Growth Presentation - MBL
10/15/2015151015 ASX - CDO Robust 5 Year Outlook
10/7/2015Sept 2015 Qtly production summary
9/30/2015Full Year Statutory Accounts
9/16/2015Thunderbox progress & guidance
8/27/20152015 Financial Year Results
8/5/2015SAR Presentation Diggers 2015
8/3/2015150731 ASX Thunderbox Site Visit Presentation
7/22/2015June 2015 Quarterly Final
7/8/2015Kalpini Project - High grade intersections
7/7/2015June 2015 Quarterly
7/3/2015150702 ASX - Karari Drilling Update
6/10/2015150609 ASX - Blue Manna Exploration Update
4/9/2015March 2015 Quarterly Report
3/23/2015150323 ASX - MBL Debt Hedging Thunderbox Decision
11/17/2014Notice of General Meeting/Proxy Form
11/5/2014Capital return and special dividend
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (SAR.AX)
4.69+0.00%
AUSTRALIA
AU$ 4.69
02/12 10:00 -
0%
Prev close Open
4.69 4.69
Low High
4.69 4.69
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  4.69 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -32
Produces Gold
Develops Gold
Explores for Gold
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/13/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2021-1.26%5.224.64
202047.52%6.752.82
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.84+1.75%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.29-0.29%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.71+4.41%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.65+0.00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.19+1.57%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.22+7.50%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.96-1.51%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.40-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04-5.26%Trend Power :