UR-Energy

Published : December 07th, 2015

December 7, 2015: Ur-Energy Has Second 2015 Increase to Mineral Resources for Lost Creek Property Combined 2015 Updates Add 4.6M/lbs M&I and 1.7M/lbs Inferred

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Evaluation | Growth | Recovery | Uranium |

December 7, 2015: Ur-Energy Has Second 2015 Increase to Mineral Resources for Lost Creek Property Combined 2015 Updates Add 4.6M/lbs M&I and 1.7M/lbs Inferred

Littleton, Colorado (PR Newswire - December 7, 2015) Ur-Energy Inc. (NYSE MKT:URG, TSX:URE) (the 'Company' or 'Ur-Energy') is pleased to announce a new and increased mineral resource estimate for the Lost Creek Property, Sweetwater County, Wyoming. This second increase during 2015 is the result of an updated resource estimation from wellfield development drilling in Mine Unit 2 (MU2) and the results of the second phase of the 2015 Lost Creek Property exploration drilling program. In addition, all previously-identified Lost Creek Property resources were revised using a 0.20 grade-thickness (GT) cut-off. The incorporation of this new, lower GT cut-off is the result of better-than-expected uranium recoveries from mining operations, as reported in the June 17, 2015 National Instrument 43-101 (NI 43-101) technical report authored by TREC, Inc., titled 'Technical Report for the Lost Creek Property, Sweetwater County, Wyoming.'

The current mineral resource estimate for all of the Lost Creek Property, at a 0.20 GT cut-off, after subtraction of 1.358 million pounds of Mine Unit (MU1) production (through September 30, 2015), is 13.25 million pounds eU3O8 in the Measured and Indicated categories, and 6.44 million pounds eU3O8 in the Inferred category. This revised resource estimate represents a net increase to the Lost Creek Property (all projects) of 3.15 million pounds eU3O8 in the Measured and Indicated categories and 1.40 million pounds eU3O8 in the Inferred category when compared to the previous estimate in the June 17, 2015 Technical Report. The following table shows the resulting increase to Lost Creek Property resources due to this further evaluation:

Resources are classified as Measured, Indicated and Inferred as defined in Section 1.2 of Canadian NI 43‑101 Standards of Disclosure for Mineral Projects and the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resources and Mineral Reserves (May 2014).

Steve Hatten, Vice President Operations commented, 'This current resource increase, which is based on the production experience gained at Lost Creek and our exploration drilling this year, continues to exceed our initial expectations and provides further proof that the Lost Creek Property has the ability to be a long-term profit center for Ur-Energy. '

The Lost Creek Property consists of six contiguous project areas totaling approximately 42,000 acres. The Lost Creek Project is the fully-permitted and licensed project where uranium production operations began in 2013. The updated resource estimate for the Lost Creek Property, by project, is summarized here:

The revised resource total for the Lost Creek Property is derived from the following three areas:

Lost Creek Project MU2 Resource Estimate

The Company has been operating the Lost Creek Mine since August 2013 and, to date, all production has come from MU1. In anticipation of commencing production in MU2 in 2016, wellfield drilling for this mine unit was initiated in July 2015. The revised MU2 resource estimate is based on drilling results from 138 close-spaced pattern wells, 20 monitor wells and 22 delineation drill holes. This resource re-estimation for MU2, based on increased drill hole density and the lower 0.20 GT cut-off, resulted in an increase of 682,000 pounds eU3O8 of Measured and Indicated resource and 185,000 pounds eU3O8 of Inferred resource. Since the June 17, 2015 Technical Report, this represents a 41% increase and a 58% increase, respectively.

Resources Estimated from Phase 2, 2015 Exploration Drill Program

A 150-hole exploration drilling program was conducted in 2015 immediately south and east of MU1. The primary goal of this program was to characterize three previously-identified mineralized sand units (FG, HJ, and KM). The exploration program was conducted in two phases, with the first phase completed during Q1 2015, and previously reported as a part of the June 17, 2015 Technical Report. Ninety-one exploratory holes were drilled in Phase 1 (total, 51,535 ft). Phase 1 successfully extended several mineralization trends and increased resources within three mineralized horizons by 121,000 pounds eU3O8 of Measured and Indicated resources and 296,000 pounds eU3O8 of Inferred resources. In Q3 2015, the second phase of the exploration program, consisting of 59 drill holes (total, 24,760 ft), was completed. An additional 18,000 pounds eU3O8 of resources in theMeasured and Indicated categories and 202,000 pounds eU3O8 of resources in the Inferred category were added.

The combined increase in mineral resource as a result of the 150-hole program is 139,000 pounds eU3O8 of new Measured and Indicated uranium resources and 498,000 pounds eU3O8 of Inferred resources. The cost of this exploration program was approximately $500,000.

Resources Re-Estimated from All Lost Creek Property, Using 0.20 GT cut-off

The June 17, 2015 Technical Report reported resources for MU1 and Phase 1 of the 2015 exploration program at a revised 0.20 GT cut-off, based upon information gained through production operations. In that report, resources from the remainder of the Lost Creek Property were reported at the original 0.30 GT cut-off, with the recommendation to update these resources at the lower GT cut-off. Company geologists have completed this re-estimation, which involved the re-mapping of all mineralized trends within all host sand horizons for the Lost Creek, LC East, LC South, LC North and LC West Projects. Using the lower GT cut-off value in the resource estimation process, there was a net increase of 2.446 million pounds eU3O8 in the Measured and Indicated categories, and 1.015 million pounds eU3O8 in the Inferred category. There was a slight decrease in average grades of most resource areas because of the lowered GT cut-off value.

Combined 2015 Resource Growth at Lost Creek Property

Together with the resource update reflected earlier this year in the June 17, 2015 Technical Report, the Lost Creek Property resources have seen combined 2015 net increases of 4.596 million pounds in the Measured and Indicated resource categories, and 1.699 million pounds in the Inferred resource category. These figures represent combined, net increases of 53% for Measured and Indicated categories of resource and 36% of Inferred resources.

'One of our objectives for 2015 was to demonstrate the scalability of the Lost Creek Property resources and, thanks to the efforts of our geologic team, led by Jim Bonner, Vice President Geology, we have done just that!' Jeff Klenda, Executive Director of the Company said, further observing, 'The two updates to our Lost Creek resource estimates this year, and the collective increase in all categories of resources, represents more than an eight-fold multiple of our production thus far this year.'

The combined resource estimate increases for the year 2015, are set forth here:

An updated NI 43-101 technical report, the purpose for which is to update the Lost Creek Property resource estimate and economic analysis, will be filed on SEDAR within 45 days. Mr. James Bonner, VP Geology with Ur-Energy, C.P.G., American Institute of Professional Geologists, and a Qualified Person as defined by NI 43-101, has reviewed and approved the technical disclosure contained in this news release. Mr. Bonner has verified the sampling, analytical and test data underlying the mineral resource estimate disclosed here.

About Ur-Energy

Ur-Energy is a uranium mining company operating the Lost Creek in-situ recovery uranium facility in south-central Wyoming. The Lost Creek processing facility has a two million pounds per year nameplate design capacity. Shirley Basin, our newest project, is one of the Pathfinder Mines assets we acquired in 2013. Baseline studies necessary for permitting and licensing of the project are complete, and permit applications are expected to be filed Q4 2015. Ur-Energy is engaged in uranium mining, recovery and processing activities, including the acquisition, exploration, development and operation of uranium mineral properties in the United States. Shares of Ur-Energy trade on the NYSE MKT under the symbol 'URG' and on the Toronto Stock Exchange under the symbol 'URE.' Ur-Energy's corporate office is located in Littleton, Colorado; its registered office is in Ottawa, Ontario. Ur-Energy's website is www.ur-energy.com.

FOR FURTHER INFORMATION, PLEASE CONTACT

Rich Boberg, Senior Director IR/PR

Jeff Klenda, Chairman / Executive Director

866-981-4588

866-981-4588

[email protected]

[email protected]

Cautionary Note Regarding Forward-Looking Information

This release may contain 'forward-looking statements' within the meaning of applicable securities laws regarding events or conditions that may occur in the future (e.g., the ability to continue to continue to return successful exploration and development projects at the Lost Creek Property, to further increase the mineral resources; further development of the resources to be a part of production at Lost Creek; the minability and scalability of the project on a continuing, sustained basis) and are based on current expectations that, while considered reasonable by management at this time, inherently involve a number of significant business, economic and competitive risks, uncertainties and contingencies. Factors that could cause actual results to differ materially from any forward-looking statements include, but are not limited to, capital and other costs varying significantly from estimates; failure to establish estimated resources and reserves; the grade and recovery of ore which is mined varying from estimates; production rates, methods and amounts varying from estimates; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; inflation; changes in exchange rates; fluctuations in commodity prices; delays in development and other factors described in the public filings made by the Company at www.sedar.com and www.sec.gov. Readers should not place undue reliance on forward-looking statements. The forward-looking statements contained herein are based on the beliefs, expectations and opinions of management as of the date hereof and Ur-Energy disclaims any intent or obligation to update them or revise them to reflect any change in circumstances or in management's beliefs, expectations or opinions that occur in the future.

Read the rest of the article at www.noodls.com

UR-Energy

DEVELOPMENT STAGE
CODE : URE.TO
ISIN : CA91688R1082
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

UR-Energy is a uranium development stage company based in United states of america.

Its main asset in development is LOST CREEK in USA.

UR-Energy is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 323.1 millions as of today (US$ 236.6 millions, € 221.0 millions).

Its stock quote reached its highest recent level on February 23, 2007 at CA$ 5.29, and its lowest recent point on October 17, 2008 at CA$ 0.34.

UR-Energy has 145 870 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of UR-Energy
2007 Annual report
Financings of UR-Energy
3/3/2011Provides Update on Closing Date for Offering
2/7/2011Announces CAD$30,000,000 Bought Deal Common Share Financing
Option Grants of UR-Energy
12/1/2010Announces Proceeds of C$3.0M from the Exercise of Expiring E...
Nominations of UR-Energy
8/2/2011Announces Appointment of Wayne Heili as Chief Executive Offi...
5/17/2011Announces the Appointment of Wayne Heili as President and CO...
Financials of UR-Energy
11/3/2014Releases 2014 Q3 Financial Results
8/4/2014Releases 2014 Q2 Financial Results
3/3/2014Releases 2013 Year End Results
10/29/2013Reports Third Quarter 2013 Results
10/31/2012Reports Third Quarter 2012 Results
4/29/2011Reports First Quarter 2011 Results
Project news of UR-Energy
6/24/2015(Lost Creek)Achieves One Million Pound Milestone at Lost Creek
9/19/2013(Lost Creek)Court Upholds BLM Record of Decision on Ur-Energy's Lost Cre...
8/3/2013(Lost Creek)Begins Production Operations at Lost Creek
7/12/2013Provides Pathfinder Mines Acquisition Update
4/29/2013(Lost Creek)Lost Creek Receives Additional NRC Approval, Private Mineral...
2/22/2013(Lost Creek)Provides Photos of Lost Creek ISR Project Construction Activ...
1/29/2013(Lost Creek)Provides Update on its Lost Creek ISR Uranium Mine Project
10/5/2012(Lost Creek)Lost Creek Project Now Fully Permitted Receives Record of ...
8/29/2011(Lost Creek)Progresses With Permitting of Lost Creek Project
3/14/2011(Lost Creek)Announces Uranium Sales Agreement
2/25/2011(Lost Creek)Releases Amended Preliminary Assessment on Lost Creek
1/12/2011(Lost Creek)Receives Draft NRC License for Lost Creek ISR Project
1/6/2011(Lost Creek)Delineates Deeper Resources at Lost Creek
Corporate news of UR-Energy
8/1/2016July 29, 2016: Ur-Energy Releases 2016 Q2 Results; Webcast A...
8/1/2016July 25, 2016: Ur-Energy to Release 2016 Second Quarter Resu...
8/1/2016August 01, 2016: Ur-Energy to Host Webcast and Teleconferenc...
7/14/2016July 14, 2016: Ur-Energy Provides 2016 Q2 Operational Result...
6/16/2016June 08, 2016: Ur-Energy Announces Cost Savings Measures and...
6/16/2016June 06, 2016: Ur-Energy Confirms No Corporate Developments
1/27/2016January 27, 2016: Ur-Energy Announces Bought Deal Financing
1/27/2016Ur-Energy Announces Bought Deal Financing
1/14/2016Ur-Energy Provides 2015 Q4 and Year-End Operational Results ...
11/2/2015November 2, 2015: Ur-Energy to Host 2015 Third Quarter Webca...
11/2/2015Ur-Energy to Host 2015 Third Quarter Webcast and Teleconfere...
10/30/2015Ur-Energy Releases 2015 Q3 Results; Webcast November 3, 2015
10/22/2015October 22, 2015: Ur-Energy to Release 2015 Third Quarter Re...
10/22/2015Ur-Energy to Release 2015 Third Quarter Results and Host Web...
10/14/2015October 14, 2015: Ur Energy Provides 2015 Q3 Operational Res...
10/14/2015Ur-Energy Provides 2015 Q3 Operational Results and Further G...
9/16/2015September 16, 2015: Ur-Energy Confirms BLM EIS for Lost Cree...
8/20/2015August 20, 2015: Ur-Energy to Present at the Midwest IDEAS I...
8/3/2015August 3, 2015: Ur-Energy to Host 2015 Second Quarter Webcas...
8/3/2015Ur-Energy to Host 2015 Second Quarter Webcast and Teleconfer...
7/31/2015July 31, 2015: Ur-Energy Releases 2015 Q2 Results; Webcast t...
7/31/2015Ur-Energy Releases 2015 Q2 Results; Webcast to be Held Augus...
7/10/2015July 10, 2015: Ur-Energy Provides 2015 Q2 Operational Result...
7/10/2015Ur-Energy Provides 2015 Q2 Operational Results
7/6/2015June 17, 2015: Ur-Energy Announces Updated Technical Report ...
4/13/2015Provides 2015 Q1 Operational Results
4/10/2015April 10, 2015: Ur-Energy Announces Management Changes
4/10/2015Ur-Energy Announces Management Changes
3/2/2015March 2, 2015: Ur-Energy Releases 2014 Year End Results
3/2/2015Ur-Energy Releases 2014 Year End Results
1/28/2015Ur-Energy Completes Preliminary Economic Assessment on Shirl...
12/2/2014December 1, 2014: Ur-Energy to Present at the LD Micro Confe...
12/2/2014to Present at the LD Micro Conference on December 4th
12/2/2014Ur-Energy to Present at the LD Micro Conference on December ...
11/20/2014November 20, 2014: Ur-Energy Completes Final Delivery on Its...
11/20/2014Completes Final Delivery on Its 2014 Sales Contracts
11/20/2014Ur-Energy Completes Final Delivery on Its 2014 Sales Contrac...
11/7/2014Ur-Energy to Present at the Cowen and Company 5th Annual Glo...
11/6/2014November 6, 2014: Ur-Energy Announces R.A.F. Penrose Gold Me...
11/6/2014Ur-Energy Announces R.A.F. Penrose Gold Medal Awarded to Jam...
11/3/2014November 3, 2014: Ur-Energy Releases 2014 Q3 Financial Resul...
11/3/2014Ur-Energy Releases 2014 Q3 Financial Results
10/8/2014Ur-Energy Provides 2014 Q3 Operational Results
9/5/2014to Present at the Fourth Annual Euro Pacific Global Investme...
7/22/2014Announces Mineral Resource at Shirley Basin Project
7/16/2014Provides 2014 Q2 Operational Results
5/28/2014Completes Shirley Basin Confirmation Drill Program
5/22/2014Provides Additional 2014-2015 Guidance
5/1/2014Releases 2014 Q1 Results
4/22/2014Provides 2014 Q1 Operational Results
3/31/2014Announces New Vice President of Geology
3/19/2014Completes Amendment to RMBAH Loan Facility
12/31/2013(Lost Creek)Issues an Updated Preliminary Economic Assessment for Lost C...
12/16/2013s on Pathfinder Mines Acquisition
12/4/2013(Lost Creek)Ships First Production from Lost Creek
11/11/2013to Present at Cowen and Company 4th Annual Global Metals, Mi...
10/24/2013(Lost Creek)Closes US$34,000,000 State Bond Loan, Retires Earlier Debts ...
9/25/2013(Lost Creek)Lost Creek Production Rate Exceeding Expectations
9/6/2013ANNOUNCES PARTICIPATION AT THE THIRD ANNUAL EURO PACIFIC GLO...
8/28/2013Closes US$15,000,000 Loan Facility
7/3/2013Completes Additional Uranium Sales Agreement
6/25/2013Closes US$20,000,000 Loan Facility
6/17/2013Set to Join Russell 3000 Index
5/14/2013Secures Bridge Loan Facility, Provides Update on Corporate A...
3/28/2013Issues 2012 Year-End Letter to Shareholders
3/25/2013(Lost Creek)Raises Funds for Ongoing Lost Creek Construction
11/13/2012(Lost Creek)BLM's Lost Creek Record of Decision to be Reviewed
2/1/2012Announces $15 Million Private Placement
1/23/2012Enters Into New Uranium Sales Agreement
8/17/2011Announces Receipt of Final NRC License
7/20/2011Announces Start of 2011 Drilling Program
6/19/2011Set to Join Russell 3000 Index
6/18/2007Added to S&P/TSX* Global Mining Index
6/11/2007Forms Bootheel Project, LLC With Target Exploration & Mining
6/7/2007Prepays Promissory Note
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (URE.TO)FRANKFURT (U9T.F)
2.22+0.68%1.49-0.53%
TORONTO
CA$ 2.22
04/25 16:59 0.010
0.68%
Prev close Open
2.20 2.20
Low High
2.16 2.26
Year l/h YTD var.
1.95 -  2.69 11.56%
52 week l/h 52 week var.
1.16 -  2.69 86.55%
Volume 1 month var.
107,841 2.78%
24hGold TrendPower© : 15
Produces
Develops Uranium
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 12/9/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
20245.48%
202333.76%2.181.13
2022-8.72%2.491.26
202165.38%2.720.94
202040.54%1.150.41
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :