Chart usGOLD   Chart usSILVER  
 
Food for thought
Coming together is a beginning, Keeping together is a progress Working together is success
Henry Ford  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1359.60-27.44
Silver 22.25-0.41
Platinum 1451.52-31.48
Palladium 735.25-1.25
WORLD MARKETS
DOWJONES 15354120
NASDAQ 349934
NIKKEI 15138101
ASX 516016
CAC 40 400122
DAX 839828
HUI 246-10
XAU 97-3
CURRENCIES (€)
AUS $ 1.3162
CAN $ 1.3193
US $ 1.2827
GBP (£) 0.8461
Sw Fr 1.2479
YEN 132.4800
CURRENCIES ($)
AUS $ 1.0284
CAN $ 1.0279
Euro 0.7796
GBP (£) 0.6594
Sw Fr 0.9728
YEN 103.1300
RATIOS & INDEXES
Gold / Silver61.11
Gold / Oil14.16
Dowjones / Gold11.29
COMMODITIES
Copper 3.320.02
WTI Oil 96.020.86
Nat. Gas 4.060.13
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
In the same category 
( 0 vote, 0/5 ) Print article
     
Tweet

Marketwire

 

 

 

 

Donner Metals Ltd.

TSX VENTURE:

DON

 

 

FRANKFURT:

D4M

 

 

 

 

Other Recent News

 

April 13, 2010

Donner Metals Ltd.: Definition Drill Program Completed at Bracemac-McLeod

VANCOUVER, BRITISH COLUMBIA--(Marketwire - April 13, 2010) - Mr. Harvey Keats, Chief Executive Officer of Donner Metals Ltd. (TSX VENTURE:DON)(FRANKFURT:D4M), reports that the definition drill program on Bracemac-McLeod has been completed. This program was conducted by Xstrata Zinc in support of the Accelerated Feasibility Study presently being conducted jointly by Genivar Engineering and Xstrata Zinc. The definition drilling tested the Bracemac Zones and the upper portion of the McLeod Zone at approximately 25 metre centers. Under the project plan, the lower portion of the McLeod Zone, currently drilled at approximately 50 metre spacing from surface, will be drilled at a 25 metre spacing from underground should the project pass feasibility.

New assays received to date for the McLeod Zone are reported in the attached Table 1. Additional assay results from drilling at McLeod are pending.

Additional geological information, including maps and sections, is available at www.donnermetals.com.

PROJECT OVERVIEW

Donner has the option to earn a 50% participating joint venture interest in the Matagami Project by incurring a total of $25 million of expenditures on exploration and related work on or before May 31, 2011. Upon earn-in by Donner, five separate joint ventures will be formed, covering the property and the area of interest. In each of the five joint venture areas, Xstrata Zinc has the option to earn-back a 15% interest in each area by incurring up to $20 million on a bankable feasibility study. By electing to conduct a bankable feasibility study on Bracemac-McLeod, Xstrata Zinc has triggered its back-in right in the South Flank project area, subject to Donner completing its earn-in requirements by May 31, 2011.

The Matagami Project has an area of mutual interest of 4,750 square kilometres and presently includes 2,986 mineral claims covering 644 square kilometres. The project covers the Matagami Mining Camp, a world-class mining district, with 18 known Volcanogenic Massive Sulphides (VMS) deposits including 10 past producers of varying sizes, including the giant Matagami Lake Deposit (25.64 million tonnes of 8.2% zinc, 0.56% copper, 20.91g/t silver and 0.41g/t gold) discovered in 1957 and mined from 1963 to 1988. The area is host to historical production of 8,600 million pounds of zinc and 853 million pounds of copper. The Matagami area is well serviced by established infrastructure including the town of Matagami, power, a permitted tailings facility, railway, airport and well-developed road and highway networks. Xstrata Zinc is currently producing from its low-cost and wholly-owned Perseverance Deposit which feeds its refurbished 2,600 tonnes per day Matagami mill complex. Any future development under the Donner-Xstrata agreement will benefit from the established infrastructure and facilities. Zinc concentrates produced at Matagami are refined at the Noranda Income Fund zinc refinery in Valleyfield, Quebec. Copper concentrates are smelted at Xstrata's Horne smelter in Rouyn-Noranda and refined at Xstrata's Canadian Copper Refinery in Montreal, Quebec.

The Company's strategy is to explore for and discover zinc-copper deposits in the Matagami Camp and to leverage the general infrastructure and existing processing facilities within a known and well-established cost structure for developing VMS deposits. Donner's exploration objective is to investigate multiple stratigraphic horizons with potential for VMS mineralization including the prolific Key Tuffite horizon throughout the Matagami Camp. To date, Donner has discovered new mineralization at Bracemac-McLeod, Daniel 1, Bell Channel and down dip from the McLeod Zone. Within the extensive project area there are numerous exploration targets with excellent potential for additional discoveries.

SUPPLEMENTARY INFORMATION

Xstrata Zinc is the project operator for the Matagami Project and the Accelerated Feasibility Study. Xstrata Zinc is responsible for both fieldwork and resource evaluation including, but not limited to, sampling, submittal of samples for assay, assay verification, metallurgical evaluation and QA/QC. Sample preparation and assaying of samples that form the basis of the resource calculation were carried out and certified by ALS Chemex-Chimitec, of Val D'Or, Quebec (zinc, copper and silver by atomic absorption, and gold by standard fire assay procedures).

Robin Adair, VP of Exploration for the Company, is the Qualified Person for Donner Metals Ltd. and is responsible for the technical information reported in this news release.

ON BEHALF OF THE BOARD OF DONNER METALS LTD.

Harvey Keats, Chief Executive Officer

Cautionary Statement:

Certain phrases in this news release are "forward-looking statements" Forward-looking statements are identified by wording such as "will" and "should" (future sense), and apply specifically to the possible future completion of the Matagami Option, or decisions related to the Bracemac-McLeod Deposit and the feasibility study currently underway on this deposit. With respect to Donner earning an interest in the Matagami Project, Donner's ability to meet the requirements of the Option and Joint Venture Agreement can be negatively affected by financial markets and Donner's ability to raise financing, among others. With respect to the feasibility study underway on Bracemac-McLeod, there is no certainty that the study will be positive and there are numerous factors that may impact the outcome of the study either positively or negatively. These factors are being evaluated as part of the feasibility study. "Forward-looking statements" involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. This press release refers to information about Xstrata's Perseverance mine and mine property on which the Company has no right to explore or mine. This press release also refers to information about historical production from land covered by the Matagami Project. Investors are cautioned that mineral deposits on other properties and/or historical production on lands under option are not necessarily indicative of characteristics of new mineral deposits discovered on the Matagami Project. Further discussion of "forward looking statements" and the risks inherent to mineral exploration and development, in relation to Donner's activities, can be found on the Company's website at www.donnermetals.com. The reader is cautioned not to place any undue reliance on any forward-looking statement, reference to other properties or historical production from the Matagami Project area.

To view the tables accompanying this press release, please click on the link provided below: http://media3.marketwire.com/docs/don413t1.pdf.


NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE.

 

CONTACT INFORMATION:

Donner Metals Ltd.
Andrea Magee
(604) 683-0564 or Toll Free: 1-800-909-8311
Fax: (604) 602-9311
donner@bed-rock.com
www.donnermetals.com

INDUSTRY: Manufacturing and Production - Mining and Metals

 

 

Footer


Tweet

Donner Metals Ltd.

EXPLORATION STAGE
CODE : DON.V
ISIN : CA2578751042
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Donner Metals Ltd.
9/26/2009Donner Metals already looking to next big Matagami discovery
Annual reports of Donner Metals Ltd.
2008 Annual report
Annual Report 2007
Financings of Donner Metals Ltd.
11/14/2012Announces Closing of C$1,439,000 Final Tranche Private Place...
2/28/2012Increases Private Placement Financing
2/27/2012Announces C$10,000,000 Private Placement Financing
11/16/2011$440,000 Non-Brokered Private Placement Closes
11/10/2011$2,000,000 Brokered Private Placement Closes
10/27/2011Announces C$2,440,000 of Private Placement Financings
7/27/2011$3 Million Private Placement
7/25/2011Funds Received, Private Placement Closed
7/13/2011Financing News
12/21/2010$1,500,000 Private Placement Closes
2/15/2010Additional Private Placement Closings
11/16/2009Private Placements close
7/10/2009Private Placements Close
5/14/2009Non-Brokered Financing
5/8/2009Brokered private placement totaling $954,353 closes
4/8/2009Brokered Private Placement
4/8/2009Private Placement Totalling $901,595 Closes
3/17/2009Non-Brokered Financing
1/7/2008 $3.2 Million Private Placement Closed
12/17/2007 Private Placement Increased to $3.2 Million
Nominations of Donner Metals Ltd.
12/8/2010Appoints Vice President of Engineering
Project news of Donner Metals Ltd.
4/26/2011(Matagami)Completes Earn-In on the Matagami Project
3/6/2011(Matagami)Bracemac-McLeod Ramp Moves Past 660 Metres
2/10/2011(Pd1) Matagami Project Advances as the PD1 Deposit Moves to Feasi...
1/14/2011(Pd1)(angl) 1.74 MILLION TONNES GRADING 4.55% ZINC
11/15/2010(Matagami)2.35% Copper Over 8.9 Metres Intersected in the North Flank ...
10/4/2010(Matagami)Xstrata Zinc To Conduct Definition Drilling at PD1 Deposit
9/2/2010(Matagami)Receives a Positive Feasibility Study for the Bracemac-McLeo...
9/1/2010(Matagami)Inferred Resources at Bracemac-McLeod Expand by 2.07 Million...
7/12/2010(Matagami)Drilling Extends McLeod Deep Discovery
3/7/2010(Matagami)Bracemac-McLeod Update
2/16/2010(Matagami)McLeod Deep Discovery Expanded-7.50 Metres Grading 10.27% Zi...
11/23/2009(Matagami)Expanded Winter Drill Progam Initiated at Matagami
10/1/2009(Matagami)Bracemac-McLeod Feasibility Advances as Exploration Continue...
7/15/2009(Matagami) BRACEMAC-MCLEOD advances to feasibility
6/5/2009(Matagami)on BNN and Matagami Project Details
5/25/2009(Matagami)Drilling to Resume at Matagami; Scoping Study Nears Completi...
3/12/2009(Matagami)NEW DISCOVERY AT MATAGAMI²
2/26/2009(Matagami)BRACEMAC-MCLEOD NI 43-101 INDICATED RESOURCE: 3,623,000 TONN...
2/26/2009(Matagami)UPDATED BRACEMAC-MCLEOD NI 43-101
2/11/2009(Matagami)featured on Minesite.com
1/26/2009(Matagami)NI43-101 Resource
1/23/2009(Matagami)INITIAL BRACEMAC-MCLEOD NI43-101 INDICATED RESOURCE
11/12/2008(Matagami)Assays Return High-Grade Zincand Copper from the McLeod Disc...
10/27/2008(Matagami)Scoping Study Initiated as Latest Step-Out ...
9/5/2008Provides Initial Results From a Single Drill Hole Program on...
5/27/2008(Matagami)Four New High GradeIntersections at Bracemac/McLeod Includin...
5/9/2008(Matagami)13.47% Zinc, 2.33% Copper Over 6.95 Metres Intersected at Br...
4/11/2008High Grade Discovered Between Bracemac and McLeod
3/3/2008New High Grade Intersections Expand Zones at Bracemac and Mc...
1/9/2008 Drilling Intersects 9.48% Zinc and 2.81% Copper Over 6.00
11/26/2007DRILLING INTERSECTS MORE HIGH GRADE SULPHIDES AT BRACEMAC AN...
9/13/2007(South Voisey's Bay)Exploration Program Planned for South Voisey Bay Nickel-Copp...
Corporate news of Donner Metals Ltd.
10/22/2012Announces Results from Annual General Meeting, Head Office M...
10/22/2012Announces Results from Annual General Meeting, Head Office M...
7/13/2011Sandstorm Provides US$25 Million Senior Financing
11/29/2010Development of the Year!
10/23/2010Amendment to Warrant Terms
4/14/2010Definition Drill Program Completed at Bracemac-McLeod
2/3/2010$2,409,930 Financing Closed
1/30/2010Financing Increased
9/8/2009engineering contract and fast-tracked feasibility
8/24/2009Two Near Term Production Stories
6/22/2009Industrial Alliance Features Report on Donner Metals
5/19/2009A "Green Shoot" Rising
5/14/2009Is At The Starting Gate
4/14/2009Chinese zinc imports rise as domestic prices outperform LME ...
3/13/2009Xstrata and Donner Team Up to Exploit Matagami
2/26/2009Hotsheet
2/18/2009positioned for success
2/9/2009featured in Mining Journal
12/12/2008$1,048,000 Financing Closes
12/4/2008 AND XSTRATA ZINC CANADA WIN INTERNATIONAL EXPLORATION AWARD
11/25/2008$1.0 Million Financing
11/18/2008Donner Metals has fast-track potential says Reinhard
7/31/2008 Drilling Continues toDelineate and Expand Mineralization at...
8/1/2008Hotsheet for 7/31/2008
6/6/2008Hotsheet for 6/6/2008
6/6/2008$3.2 Million of Debentures Issued
5/28/2008$3 Million Debenture Offering
5/27/2008Hotsheet for 5/27/2008
4/11/2008Hotsheet for 4/11/2008
3/20/2008March Chairman's Letter
3/5/2008Hotsheet for 3/5/2008
2/1/2008Engages Mau Capital to Provide Investor Relations
1/8/2008Hotsheet for 1/8/2008
11/28/2007Expands Interest in Matagami Camp
11/8/2007Join us at the San Francisco Hard Assets Investment Conferen...
10/22/2007 Hotsheet for 10/21/2007
10/10/2007Corporate Update
8/2/20076 New Massive Sulphide =?ISO-8859-1?Q?=20Intersections,=20In...
6/14/2007New Zinc-Copper Discover 9.24% Zinc, 0.99% Copper Over 27.95...
6/7/2007Bracemac Yields Additional Results With New Mineralization I...
4/11/2007Copper-Rich Massive Sulphides Intersected in BRC-07-32 in th...
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (DON.V)FRANKFURT (D4M.F)
0.110-8.33%0.101+8.60%
TSX-V
CA$ 0.110
05/17 15:59 -0.010
-8.33%
Prev close Open
0.120 0.120
Low High
0.110 0.120
Year l/h YTD var.
0.110 -  0.180 -38.89%
52 week l/h 52 week var.
0.110 -  0.200 -42.11%
Volume 1 month var.
969,650 -%
24hGold TrendPower© : -35
Produces
Develops
Explores for Copper - Gold - Nickel - Palladium - Platinum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-45.00%
20120.00%0.270.16
2011-25.93%0.370.17
201012.50%0.370.18
2009200.00%0.280.08
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Get Investor Information
High Desert Gold
Select
& click