Bell Copper Corporation

Published : August 23rd, 2008

Disclosure Review

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Copper | Diamond | G Mexico | Iron | Mexico | Water |

Disclosure Review

Friday, August 22, 2008

Vancouver, B.C.: Bell Copper Corporation ("Bell Copper" or the "Company") (TSX-V Symbol: BCU) reports that as a result of a review by the British Columbia Securities Commission, it is issuing the following news release to clarify its disclosure.

The Company has filed an independent technical report dated May 20, 2005, revised June 20, 2005 (the "Granduc report"). Portions of the Granduc report should not be relied on because it contains disclaimers of compliance for historical resource estimates and other information at the Granduc. All mineral resource estimates at Granduc are historical in nature and have not been adequately reviewed by a Qualified Person to be reported as current resources. They also lack original assay sheets, specific gravity determinations and quality control data, and must only be regarded as historical resources that cannot be relied upon by anyone. The historical resources at Granduc are to be used for geological purposes only. The economic analyses previously disclosed for Granduc in the Company's website and investor materials cannot be supported by any new technical report at this time.

The Company has made reference through its website and other materials to the results of internal economic analysis of both the Granduc and La Balsa projects not supported by a technical report. In response the Company retracts any reference made to any unsupported economic analysis of either the Granduc or the La Balsa projects and has removed any references from its website and materials.

The Company has reported mineral resources in a manner that is contrary to NI 43-101 for the Granduc and La Balsa projects. In response all references to the La Balsa mineral resource have been replaced by the resource table as contained in the Behre Dolbear NI43-101 Technical Report on the La Balsa project.

The Company specifically retracts the estimates of potential exploration targets at its Sombrero project of 10-20 million tonnes of 1.5% Cu to 2.5 % Cu ore in breccias, underlain by 200-300 million tonnes of 1.0% Cu-Mo ore in subjacent porphyry targets. The Company does not have drillhole or other information specific to this volume of rock that could satisfy the reporting requirements of s.2.3(2)(b) of NI 43-101, and it was based on a hypothetical ore deposit model unproven by any exploration to depth. The potential quantity and grade is conceptual in nature. There has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource.

Furthermore, the Company retracts a previously disclosed 40-150 million tonne estimate of a potential exploration target at Granduc because the known geology at Granduc makes this range of tonnages appear overly promotional. The potential exploration targets at Granduc are retracted and restated adopting a more conservative tonnage range that falls within the small to median tonnage of known Besshi-type deposits world-wide as published by the Geological Association of Canada (Slack, J.F., 1993, Descriptive and grade-tonnage models for Besshi-type massive sulfide deposits, in Kirkham, R. V., Sinclair, W.D., Thorpe, R.I., and Duke, J.M., eds., Mineral deposit modeling, GAC Special Paper 40, p. 343-372). The tonnage range that the Company is targeting in its exploration at Granduc will therefore be between 20 and 40 million tonnes. The grade range that the Company is targeting in its exploration at Granduc will be between 1.5% Cu and 2.5% Cu which is both within the range of previous drill intersections of the Granduc Mine Series rocks and is also within the range of recent exploration drilling results derived up to 800 meters south of and 2000 meters north of the historic resources at Granduc along what is reasonably inferred to be the same geological interval (the late-Triassic Granduc Mine Series) that hosts the historic resources. The potential quantity and grade referred to above is conceptual in nature. There has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource.

Geological and geophysical support for the Granduc exploration target size and quality comes from successful prospecting in areas of recent glacial retreat, from geophysical surveying, and from Diamond drilling. An airborne EM/magnetic survey flown in May 2005 showed linear high magnetic anomalies and high conductivity anomalies coincident with the Granduc Mine Series rocks, supporting the concept that this same stratigraphic package of magnetite-facies exhalite, massive sulfide, and graphitic argillite extends under ice nearly one kilometre south of and two kilometres north of the Granduc Mine. A former geologic theory which held that the Granduc Mine Series had been faulted away at the north end of the Granduc Mine has been shown to be erroneous by this survey and the subsequent discovery in 2006 of outcropping magnetite- and massive sulfide-exhalite further north in an area recently exposed by melting of the Granduc Mountain icefield. Subsequent Diamond drilling by the Company in 2005 and 2006 of 17 Diamond drillholes which targeted the along-strike continuation of the Granduc Mine Series rocks beneath the South Leduc glacier and the Granduc Mountain icefield demonstrated that the aeromagnetic and EM anomalies were indeed related to exhalative magnetite iron formation, massive sulfide, and interbedded graphitic argillite and tourmaline-bearing chert. The following table summarizes drill intersections from the Company's Diamond drilling campaigns in 2005 and 2006:

Granduc Diamond Drill Results 2005-2006

Drillhole

Position*

Azimuth

Dip

From

To

Length (m)

True Thick (m)

Cu %

Fe %

Ag g/t

Au g/t

DDH2005-1

140m South

90

50

92.7

101.8

9.1

7.6

2.21

13.9

11.8

0.16

DDH2005-1

140m South

90

50

227.4

229.8

2.4

2.0

1.66

18.6

18.8

0.11

DDH2005-1

140m South

90

50

245.7

248.1

2.4

2.0

1.85

10.0

21.8

0.07

DDH2005-2

150m South

90

52

140.7

143.0

2.3

1.8

1.19

15.7

16.7

0.11

DDH2005-3

150m South

90

69

163.3

169.8

6.5

4.1

1.84

15.8

20.7

0.13

DDH2005-3

150m South

90

69

197.0

204.7

7.7

4.8

1.49

11.1

13.1

0.10

DDH2005-4

240m South

90

62

218.2

229.2

11.0

7.8

2.57

12.0

6.7

0.16

DDH2005-4

240m South

90

62

365.5

370.0

4.6

3.4

2.02

9.1

20.3

0.22

DDH2005-5

140m South

90

75

197.3

200.4

3.1

1.7

2.42

20.2

17.4

0.24

DDH2005-5

140m South

90

75

263.0

265.7

2.7

1.5

3.92

14.5

36.0

0.25

DDH2005-5

140m South

90

75

416.7

431.2

14.6

8.1

2.13

11.3

23.2

0.24

DDH2006-1

517m South

90

70

170.5

176.0

5.5

3.9

2.11

15.3

26.1

0.37

DDH2006-2

517m South

90

89

234.6

245.6

11.0

6.3

1.89

12.5

22.8

0.26

DDH2006-3

N/A

 

 

 

No significant intersection (off trend magnetic anomaly - Pollux Target)

 

DDH2006-4

762m South

110

70

220.3

226.3

6.0

4.9

2.19

15.0

20.2

0.19

DDH2006-5

550m South

100

70

325.3

329.3

4.0

3.1

2.08

12.7

28.4

0.14

DDH2006-5

550m South

100

70

349.6

354.6

5.0

4.3

1.84

10.0

26.8

0.29

DDH2006-6

1240m South

96

51

 

No significant intersection - strongly deflected hole

 

 

DDH2006-7

1240m South

90

58

 

No significant intersection - strongly deflected hole

 

 

DDH2006-8

3030m North

63

45

191.3

199.0

7.7

4.2

0.57

14.7

1.0

0.06

incl

3030m North

63

45

191.3

194.8

3.5

1.9

0.74

21.5

1.5

0.09

DDH2006-9

3030m North

63

70

199.9

213.9

14.0

5.3

1.12

12.0

2.8

0.11

incl

3030m North

63

70

201.1

208.0

6.9

2.6

1.47

11.6

3.4

0.13

DDH2006-10

2890m North

140

45

129.4

135.5

6.0

4.6

0.76

18.6

1.8

0.06

DDH2006-10

2890m North

140

45

 

Hole lost at 153.3m due to high pressure water.

 

 

 

DDH2006-11

2890m North

140

70

170.4

173.2

2.8

1.3

1.37

20.6

2.0

0.16

DDH2006-11

2890m North

140

70

224.3

230.0

5.8

2.7

1.26

17.5

3.9

0.14

DDH2006-12

2940m North

105

57

 

Hole lost at 139.9m due to high pressure water.

 

 

 


*Position is referenced to an imaginary coordinate system having an origin at the south end of historic mining at Granduc and oriented parallel to strike of the Granduc Mine Series rocks. Historic mining of 15 Mt of massive sulfide took place between 0m North and about 840m North.

Historic drilling conducted by Esso Minerals in 1983 and 1984 on very rough 120 meter centers between positions from 1300m North to 1600m North and 1740m North to 2170m North is reported to have cut massive sulfide intervals comparable in thickness and grade to the Company's drill intersections south of the mine. The unassayed halves of these core intervals were preserved in a core shed in Stewart and were personally inspected by Dr. Marsh, the Company's Qualified Person. These intervals represented typical massive sulfide and magnetite iron formation hosted by Granduc Mine Series rocks. Although gaps between drillholes are as great as 400 meters, more than one half of the drillholes that cut the projected Granduc Mine Series rocks north of the area of historic mining also cut massive sulfide mineralization. These historic intersections, together with the results from the Company's 2005 and 2006 drilling programs, support an exploration target that extends south of the area of historic production for at least 800 meters and north of the area of historic production for at least 1800 meters. Massive sulfide drill intersections span a vertical range of at least 300 meters south of the mine to nearly 500 meters north of the mine, and mean true thicknesses of massive sulfide are around 4 meters. Though drill intersections have not yet probed so deeply, no fundamental geological limitation has been encountered at depth to prevent massive sulfide mineralization north of the mine from extending to similar elevations south of the mine where massive sulfide has been demonstrated by drilling. Extension of massive sulfide another 400 meters deeper to sea level along the entire 4 kilometer extent of the Granduc Mine Series rocks would yield a target tonnage near 40 million tonnes. If massive sulfide mineralization is less blanketlike and more podiform in distribution, as some lean drill intersections suggest, the tonnage might be substantially lower. This line of reasoning supports an exploration target size at Granduc of 20 to 40 million tonnes of massive sulfide. Grades of this mineralization might be similar to those already intersected in the Company's Diamond drilling campaigns in 2005 and 2006, or in the range of 1.5% to 2.5% Cu. This potential quantity and grade of the Granduc exploration target is conceptual in nature. There has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource.
All other references to potential numerical exploration targets have been removed from the Company's website and other materials.

The contents of this News Release were prepared and/or supervised by Dr. Tim Marsh, Ph.D., P.Eng., the Company's VP of Exploration and a Qualified Person.

Bell Copper -- Value through Production & Discovery

Bell Copper is focused on the development to production of the La Balsa copper mine in Michoacan, Mexico & the Granduc copper mine in British Columbia, Canada while continuing exploration and development of its pipeline of copper projects in some of the world's premier copper producing regions.

More information on Bell Copper: www.bellcopper.net

On behalf of the Board of Directors of
Bell Copper Corporation


"W. Glen Zinn"

W. Glen Zinn, President and CEO

For further information please contact the Company
Tel: 604 669-1484 or email: info@bellcopper.net


THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. Forward-looking statements in this release are made pursuant to the 'safe harbor' provisions of the Private Securities Litigation Reform act of 1995. Investors are cautioned that such forward-looking statements involve risks and uncertainties

You can also view this News Release on our website at:
http://www.bellcopper.net/s/News_Releases.asp?ReportID=316485

Data and Statistics for these countries : Canada | Mexico | All
Gold and Silver Prices for these countries : Canada | Mexico | All

Bell Copper Corporation

DEVELOPMENT STAGE
CODE : BCU.V
ISIN : CA0778862080
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Bell Copper is a copper exploration company based in Canada.

Bell Copper develops copper and gold in Mexico, and holds various exploration projects in Canada and in Mexico.

Its main asset in development is LA BALSA in Mexico and its main exploration properties are SOMBRERO BUTTE, KABBA and LEDUC in Canada and SILVER BELL and COPPER SPRINGS (BELLCOPPER) in Mexico.

Bell Copper is listed in Canada and in United States of America. Its market capitalisation is CA$ 3.1 millions as of today (US$ 2.3 millions, € 2.1 millions).

Its stock quote reached its highest recent level on April 13, 2006 at CA$ 6.20, and its lowest recent point on March 06, 2015 at CA$ 0.01.

Bell Copper has 41 410 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Bell Copper Corporation
Annual Report 2007
Financings of Bell Copper Corporation
3/29/2012Announces Amendments to Private Placement Financing
6/3/2011Closes Balance of $4.5 Million Financing
5/12/2011Closes First Tranche of Financing
4/27/2011Increases Financing to $4 Million and Announces Board and Ma...
6/17/2010Shares Issued to Macquarie, Expiration & Exercise of Share P...
5/17/2010Non-Brokered Private Placement
3/10/2010Closing of Private Placement
1/21/2010Non-brokered Private Placement Increase
11/30/2009Non-Brokered Private Placements
11/2/2009Closing of Private Placement and Warrant Amendment
10/29/2009Non-Brokered Private Placement
8/13/2009Private Placement Closed and Warrant Amendment Approved
8/11/2009Private Placement Increased
7/29/2009Non-Brokered Private Placement
3/10/2009Non-Brokered Private Placement
12/17/2008Kabba Project Drilling - Increased Private Placement
12/11/2008Non-Brokered Convertible Debenture Private Placement
11/3/2008Non Brokered Private Placement
9/25/2008Second Tranche Closing of Private Placement
9/8/2008First Tranche Closing of Private Placement
8/7/2008Non-Brokered Private Placement Terms Amended
7/9/2008Non Brokered Private Placement
4/18/2008Brokered Private Placement Of Units
Nominations of Bell Copper Corporation
2/29/2012Announces Changes to Board of Directors
10/7/2011Announces Appointment of New Corporate Secretary
5/8/2007Appointment to the Board & Exercising of Warrants
Project news of Bell Copper Corporation
8/7/2013(La Balsa)Completes Sale of the La Balsa Project & SXEW Plant - Procee...
7/9/2013(La Balsa)Agreement to Sell the La Balsa Project & SXEW Plant Proceeds...
9/10/2012(Sombrero Butte)Amends Purchase Agreement with Copper Fox Metals and Complet...
4/12/2012(Kabba)Options 60% Interest in Kabba Project to AKA Ventures
3/21/2012(La Balsa)Provides Update on its La Balsa Project
3/12/2012to Complete Van Dyke Acquisition
9/1/2011(Kabba)Intersects Significant Base Metal Mineralization in Kabba Po...
6/30/2010(La Balsa)Drilling Update
5/18/2010(La Balsa)Update
5/13/2010Sombrero 43-101 Technical Report
5/6/2010(La Balsa)Exploitation Agreement
5/4/2010(La Balsa)Drilling commences
2/11/2010(Kabba)Completes Drillhole K-8, Cores K-9
12/16/2009(Granduc Copper Mine)Begins Geophysical Survey of Granduc Mine
12/14/2009(Kabba)Begins Drillhole K-8 at Kabba Project
11/23/2009(Kabba)Kabba Drilling Update
11/6/2009(Kabba)Kabba Drilling Update
11/2/2009(Kabba)Kabba Phase II Drill Update:
7/7/2009(Kabba)Kabba Drilling Update
6/11/2009(Kabba)Kabba Drilling Re-Commences
3/10/2009(Kabba)Kabba Drilling Update
3/2/2009(Kabba)Kabba Drilling Commences
1/27/2009(Sombrero Butte)Mineral Exploration Roundup Core Shack 2009
1/13/2009(Sombrero Butte)Creek-Sombrero Option Agreement Amendment
6/24/2008(Kabba)Kabba Data Compilation Supports Large Porphyry Mo-Cu Target
3/17/2008(Fox River Mafic Belt)Drilling Begins at Fox River Project
2/6/2008Phase II Drilling Complete at Sombrero Butte in Arizona
1/28/2008(La Balsa) Reports La Balsa NI 43-101 Technical Report
7/4/2007(Fox River Mafic Belt)Fox River Exploration Update
5/24/2007More High Grade Copper from Arizona: Bell cuts 66 meters of ...
5/23/2007(Kabba)Drilling of Cu-Mo Porphyry Target Begins at Kabba Project
Corporate news of Bell Copper Corporation
9/17/2015Bell Issues Units, Shares For Debt And Announces Annual Meet...
3/25/2015Non-brokered Private Placement Financing
11/20/2013(Kabba)Kabba NI43-101 Report
9/24/2012Announces Management Changes/Advance Notice Policy
7/9/2012(Sombrero Butte)Signs Purchase Agreement with Copper Fox Metals in Respect o...
6/28/2012Announces Results of Annual and Special Meeting of Sharehold...
6/21/2012Provides Corporate Update
6/8/2012Announces Defaults Under Secured Term Credit Facility
5/31/2012Announces Proposed Share Consolidation
6/27/2011(Kabba)Commences Drilling a 3 km by 5 km Copper-Molybdenum Porphyry...
6/20/2011(La Balsa)Advances La Balsa Feasibility Study and Van Dyke Programs fo...
3/11/2011Announces $2,500,000 Brokered Private Placement Financing
8/19/2010La Balsa Iron Ore Exploitation Agreement
6/2/2010Drillhole K-9 Update
5/12/2010New Director Appointed
5/3/2010Shares Issued To Macquarie
4/29/2010Retains Renmark Financial Communications Inc.
4/9/2010Shares Issued to Macquarie
4/8/2010Van Dyke Copper Mine Purchase
4/6/2010Granduc Option Agreement
3/2/2010Shares Issued To Macquarie
2/4/2010Shares Issued to Macquarie
1/21/2010Management Addition
12/15/2009New Management
12/9/2009Acquisition of 100% Interest in Silver Leduc Mineral Claims
12/7/2009Proposes Spin-Off Transaction
11/5/2009Shares Issued To Macquarie
10/2/2009Shares Issued To Macquarie
9/2/2009Shares Issued to MacQuarie
8/13/2009Gryphon Summit Litigation
7/3/2009Shares Issued To Macquarie
3/4/2009Shares Issued To Macquarie
2/26/2009Debenture Financing Completed
2/6/2009Options
1/23/2009Extension of Macquarie Demand Debenture
12/17/2008Investor Relations
12/4/2008Strategic Plan
11/15/2008CFO, Brian Leeners provides update on Bell Copper's upcoming...
8/23/2008Disclosure Review
7/16/2008Options Interest in Arizona Project
7/14/2008Brian Leeners explains the significance of new breccia pipes...
7/8/2008Discovers Advanced Argillic Alteration in New Breccia Pipes ...
6/25/2008Executive Interview
4/12/2008Announces Final Court Hearing Date for Grandcru-Rogue River ...
4/8/2008 Grandcru Resources and Rogue River Resources Announce Propo...
4/3/2008 Retains Agoracom To Provide Investor Relations, Social Netw...
4/3/2008Exhibiting at the Calgary Resource Investment Conference
3/29/2008, Grandcru Resources And Rogue River Resources Receive Major...
2/28/2008Phase II Drilling Confirms More Copper at Sombrero Butte in ...
12/19/2007Options Outland Silver Bar Property to Glen Hawk Minerals Lt...
10/31/2007Continued Drilling at La Balsa Finds More Copper in New
10/30/2007 Phase II Drilling at Sombrero Butte Targets Suspected Under...
10/16/2007Begins Phase One Drilling Program at Gryphon Project
10/10/2007Provides Gryphon Summit Property Overview
9/25/2007Option Agreement With Golden Gryphon USA, Inc.
9/20/2007Reports La Balsa Project Drill Results of Rogue River Resour...
9/19/2007Drilling Begins at Mesa Well Project in Arizona
9/4/2007Grandcru Resources & Rogue River Resources to Complete Three...
8/15/2007 Continues to Expand Presence in Arizona With New Copper Pro...
8/8/2007Introduces New Porphyry Copper Project in Arizona
7/10/2007Extends Copper Mineralization at Sombrero Butte Project
7/5/2007Engages Barnes McInerney
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (BCU.V)
0.075+7.14%
TSX-V
CA$ 0.075
04/25 16:53 -
7.14%
Prev close Open
0.070 0.070
Low High
0.070 0.075
Year l/h YTD var.
0.070 -  0.110 -25.00%
52 week l/h 52 week var.
0.070 -  0.190 -60.53%
Volume 1 month var.
49,000 -16.67%
24hGold TrendPower© : -21
Produces
Develops Copper
Explores for Copper - Molybdenum
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-46.43%
20237.69%0.250.12
2022-18.75%0.730.11
2021-52.94%0.360.11
2020423.08%0.450.03
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :