Osisko Discovers Two New Gold-Copper Zones at Upper Beaver
Published : March 21, 2013

High-Grade Results Include 9.3 g/t Au with 1.7% Cu over 18.1 Metres

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   1971 | Canada | Copper | Diamond | Gold | Gold Mine | Lead | Market | Silver |

MONTREAL, QUEBEC--(Marketwire - March 21, 2013) - Osisko Mining Corporation (News - Market indicators)(FRANKFURT:EWX) ("Osisko") is pleased to announce that new drilling at the Upper Beaver gold project located in Kirkland Lake, Ontario has led to the discovery of two new gold-copper zones.

The following intersections highlight high-grade results from the two new discoveries:

  • East Basalt Zone Discovery: 9.3 g/t Au with 1.7% Cu over 18.1 metres (hole UB13-284) and 2.2 g/t Au with 0.5% Cu over 17.8 metres (hole UB13-287);
  • North Q Zone Discovery: 11.0 g/t Au with 1.6% Cu over 2.0 metres (hole UB13-282);

Additional new results from infill drilling on previously known mineralized zones include the following highlights: 3.2 g/t Au with 0.8% Cu over 30.0 metres (UB13-278), 16.1 g/t Au with 8.8% Cu over 3.0 metres and 11.4 g/t Au with 3.3% Cu over 3.0 metres (hole UB13-280) from the North Basalt Zone and 5.4 g/t Au with 0.5% Cu over 59.0 metres (hole UB13-262W4) from the Porphyry West Zone.

The table below outlines the results of 10 new holes completed in 2013 as part of the ongoing exploration and in-fill resource definition drill program at Upper Beaver:

Hole # From (m) To (m)   Interval (m) Cu (%)   Au (g/t) Zone
New zones                
UB13-279 92.0 93.0   1.0 0.22   0.81 East Basalt
UB13-281 120.0 123.0   3.0 0.18   3.16 East Basalt
UB13-284 147.0 165.1   18.1 1.70   9.30 East Basalt
including 154.0 165.1   11.1 2.75   13.05 East Basalt
UB13-287 170.0 187.8   17.8 0.50   2.20 East Basalt
UB13-282 174.0 177.0   3.0 0.89   2.34 North Q
and 185.0 192.0   7.0 trace   1.28 North Q
and 264.0 272.0   8.0 0.56   3.20 North Q
including 269.0 271.0   2.0 1.57   11.00 North Q
and 311.0 322.0   11.0 0.59   0.91 North Q
UB13-288 177.0 182.0   5.0 0.12   1.46 North Q
and 196.0 199.0   3.0 1.53   2.56 North Q
and 277.0 291.0   14.0 0.30   1.84 North Q
including 280.0 284.0   4.0 0.75   4.40 North Q
Infill holes                
UB13-262W4 812.0 871.0   59.0 0.53   5.43 Infill - Porphyry West
including 829.0 844.0   15.0 1.03   14.60 Infill - Porphyry West
UB13-276 333.0 334.0   1.0 1.32   4.83 North Basalt
and 423.0 427.0   4.0 trace   1.48 North Basalt
UB13-278 360.0 390.0   30.0 0.80   3.20 North Basalt
including 364.0 368.0   4.0 1.70   9.70 North Basalt
and 370.0 380.0   10.0 0.90   2.80 North Basalt
and 385.0 390.0   5.0 1.00   3.80 North Basalt
UB13-280 447.0 450.0   3.0 8.81   16.10 North Basalt
and 479.0 482.0   3.0 3.23   11.40 North Basalt

New Discoveries: East Basalt Zone and the North Q Zone

Step-out exploration drilling in the first quarter of 2013 has intersected two new gold-copper discoveries: the East Basalt Zone and the North Q Zone, both occurring in mafic volcanic rocks adjacent to the Upper Beaver Igneous Complex.

Four holes (UB13-279, -281, -284 and -287) drilled approximately 700 metres north-east of the Upper Beaver deposit have intersected new copper-gold mineralization in the East Basalt Zone. All four holes drilled on the same section intersected the mineralization starting at 75 m below surface. The most significant result was intersected in hole UB13-284 where a 18.1 metre thick continuous zone of gold and copper mineralization assayed 9.3 g/t Au with 1.7% Cu, included is an interval assaying 13.1 g/t Au with 2.8% Cu over 11.1 metres. Hole UB13-287 drilled below UB13-284 intersected 2.2 g/t Au with 0.5% Cu over 17.8 metres. The chalcopyrite-magnetite stringer mineralization at the East Basalt Zone dips steeply to the north and resembles the mineralization previously mined near the south-west margin of the igneous complex.

Two holes (UB13-282 and -288) drilled approximately 400 metres north-west of the Upper Beaver deposit intersected the new North Q Zone. The holes intersected multiple stringers of gold and copper mineralization approximately 200 metres below surface with significant intervals assaying 3.2 g/t Au with 0.6% Cu over 8.0 metres including 11.0 g/t Au with 1.6% Cu over 2.0 metres (hole UB13-182) and 1.84 g/t Au with 0.3% Cu over 14.0 metres including 4.4 g/t Au with 0.75% Cu over 4.0 metres (UB13-288).

North Basalt Zone

The North Basalt Zone is located approximately 800 metres north of the Upper Beaver deposit and was initially discovered by Queenston in 2005 in drill hole UB05-13 assaying 0.5 g/t Au over 8.0 metres. In 2006 drilling continued to target the zone including hole UB06-51 intersecting two intervals assaying 6.2 g/t Au with 1.3% Cu over 9.9 metres and 8.0 g/t Au with 1.0% Cu over 9.1 metres. Later in 2006 drilling at the North Basalt Zone was postponed as emphasis was focussed to the south to extend the primary Upper Beaver deposit.

Three new holes targeted the North Basalt Zone located west of the north-south trending diabase dyke. Hole UB13-278 intersected a 30.0 metre wide zone of mineralization assaying 3.2 g/t Au with 0.8% Cu including 9.7 g/t Au with 1.7% Cu over 4.0 metres at approximately 300 m below surface. Fifty metres below this interval hole UB13-280 intersected high grade mineralization assaying 16.1 g/t Au with 8.8% Cu over 3.0 metres and 11.4 g/t Au with 3.3% Cu over 3.0 metres.

In-fill Resource Definition

Drilling continues to confirm the continuity of the mineralization in the western portion of the main Upper Beaver deposit. At approximately 700 metres below surface hole UB13-262W4 intersected a thick zone of mineralization assaying 5.4 g/t Au with 0.5% Cu over 59.0 metres including 8.0 g/t Au with 0.7% Cu over 32.0 m. This interval is approximately 30 m above previous hole UB12-262W3 that cut a similar wide interval assaying 5.5 g/t Au with 0.6% Cu over 54.0 metres. (See News Release dated January 30, 2013).

About Upper Beaver

The Upper Beaver project is 100% owned by Osisko Mining Ltd., a wholly-owned subsidiary of Osisko. The Upper Beaver mine produced approximately 140,000 oz of gold and 12 million pounds of copper intermittently from 1912 to 1971, from 526,678 tonnes averaging 8.31 g/t Au and 1.03% Cu. Queenston commenced exploration on the property in 2005 and defined the first new mineral resource in 2009. Since 2005 three-hundred and eighty new Diamond drill holes (including wedges) have been completed on the property, representing 236,874 metres of drilling.

A Preliminary Economic Assessment ("PEA") was completed on Upper Beaver in early 2012 (Queenston press release, February 16, 2012). The PEA studied the economics of building a 2,000 tonne per day mine/mill complex at Upper Beaver that would produce on average 120,000 oz of gold and 5.3 million pounds of copper annually with first production targeted in 2016. The permit to sink a new 1,300 m deep shaft was received in September 2012 and detailed engineering, procurement and shaft collar excavation have commenced. The PEA incorporated the May 2011 mineral resource for Upper Beaver, containing 3,074,000 t averaging 7.0 g/t Au (690,000 oz) with 0.5% Cu (36.6 M lbs) (Indicated) and 3,093,000 t averaging 6.2 g/t Au (616,000 oz) with 0.4% Cu (28.0 M lbs) (Inferred) (Queenston press release, May 4, 2011).

An updated mineral resource was announced on September 2012, increasing the indicated resource by 112% to 6,870,000 t averaging 6.6 g/t Au (1,461,000 oz) and 0.37% Cu (56 M lbs), and increasing the inferred resource by 16% to 4,570,000 t averaging 4.9 g/t Au (712,000 oz) and 0.32% Cu (32 M lbs) (Queenston press release, September 26, 2012).

The focus at Upper Beaver for 2013-2014 will be on the development of the 1,300 metre exploration shaft, including engineering, design and fabrication of the head frame and hoisting facilities budgeted at $70 million. The shaft collar has now been established to a depth of 26 metres and exploration on the deposit continues with six drills. In addition to the development program at Upper Beaver the Company has budgeted an additional $20 million for 2013 exploration in the Kirkland Lake gold camp.

Quality Control

True widths of reported intervals are interpreted based on drill-hole intercepts and interpreted orientations of intersected lithologies and are estimated at 65-80% of the core length interval. Assays are uncut. Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. All NQ core assays reported were obtained by standard 30 g fire-assaying-AA finish or gravimetric finish at Swastika Laboratories of Swastika, Ontario. Drill program design, Quality Assurance/Quality Control and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. The Upper Beaver project is supervised by Mark Masson, P.Geo. Standards and blanks are submitted every 25 samples for QA/QC purposes by the Company as well as the lab. Approximately 5% of sample rejects and/or pulps are sent to secondary laboratories for check assaying.

Mr. William McGuinty, P.Geo. is Project Manager for Osisko Mining Ltd. and is the Qualified Person responsible for the technical information reported herein, including verification of the data disclosed. 

About Osisko

Osisko Mining Corporation operates the Canadian Malartic Gold Mine in Malartic, Quebec and is carrying out aggressive exploration and project development elsewhere in Canada and Latin America. 

Cautionary Notes Concerning Estimates of Mineral Resources

This news release uses the terms measured, indicated and inferred resources as a relative measure of the level of confidence in the resource estimate. Readers are cautioned that mineral resources are not economic mineral reserves and that the economic viability of resources that are not mineral reserves has not been demonstrated. In addition, inferred resources are considered too geologically speculative to have any economic considerations applied to them. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies or economic studies except for Preliminary Assessment as defined under NI 43-101. Readers are cautioned not to assume that that further work will lead to mineral reserves that can be mined economically.

Forward-Looking Statements

Certain statements contained in this press release may be deemed "forward-looking statements". All statements in this release, other than statements of historical fact, that address events or developments that Osisko expects to occur, are forward looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential", "scheduled" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur including, without limitation, the continued development of the Upper Beaver project and more specifically the development of the exploration shaft. Although Osisko believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, including, without limitation, that all technical, economical and financial conditions will be met in order to achieve such events qualified by the foregoing cautionary note regarding forward looking statements, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include gold prices, access to skilled consultants, mining development and construction personnel, results of exploration and development activities, Osisko's limited experience with production and mining operations, uninsured risks, regulatory framework and changes, defects in title, availability of personnel, materials and equipment, timeliness of government approvals, actual performance of facilities, equipment and processes relative to specifications and expectations, unanticipated environmental impacts on operations market prices, continued availability of capital and financing and general economic, market or business conditions. These factors are discussed in greater detail in Osisko's most recent Annual Information Form and in the most recent Management Discussion and Analysis filed on SEDAR, which also provide additional general assumptions in connection with these statements. Osisko cautions that the foregoing list of important factors is not exhaustive. Investors and others who base themselves on forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. Osisko believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon. These statements speak only as of the date of this press release.



John Burzynski
Vice-President Corporate Development
(416) 363-8653
or
Sylvie Prud'homme
Director of Investor Relations
(514) 735-7131
Toll Free: 1-888-674-7563
www.osisko.com
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Osisko Mining Corp.

PRODUCER
CODE : OSK.TO
ISIN : CA6882781009
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Osisko Mining is a gold exploration company based in Canada.

Osisko Mining holds various exploration projects in Argentina, in Brazil and in Canada.

Its main asset in production is MALARTIC in Canada and its main exploration properties are GOLDBORO, SLEITAT, JC - SMART SKARNS, HAMMOND REEF, MALARTIC CHL GOLD PROPERTY, DUPARQUET and CLEMENT LAKE in Canada, EL POTOSI and SANTA CLARA / CERRO BONITO in El Salvador, CERRO CONDORINI and COAL CREEK in Peru, CASTELO DOS SONHOS in Brazil and FAMATINA in Argentina.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Osisko Mining Corp.
12/20/2018Osisko Mining reports 39% higher grade than resource model a...
Annual reports of Osisko Mining Corp.
2008 Annual report
Financings of Osisko Mining Corp.
8/31/2011Osisko Announces an Increase in Caterpillar Lease Financing ...
8/31/2011Announces an Increase in Caterpillar Lease Financing Facilit...
11/18/2009Strengthens Balance Sheet With $241 M Proceeds From Exercise...
6/30/2009Closes $10.64 Million Flow-Through Financing
4/17/2006Announces C10$ million "bought deal" financing
Nominations of Osisko Mining Corp.
5/10/2013Anounces Election of Directors
4/17/2012Nominates Michele Darling to Board of Directors
3/14/2012Appoints Gary Sugar to Board of Directors
2/2/2012Board Member Resigns
9/16/2011Osisko Appoints Richard Ross to Board of Directors
9/15/2011Appoints Richard Ross to Board of Directors
8/22/2011Director Resigns
Financials of Osisko Mining Corp.
2/14/2014Provides Notice of Fourth Quarter and Year End 2013 Results ...
8/1/2013Reports Second Quarter 2013 Results
7/15/2013Provides Notice of Second Quarter 2013 Operating and Financi...
5/9/2013Reports First Quarter 2013 Results
4/29/2013Provides Notice of First Quarter 2013 Financial Results Rele...
2/21/2013Reports Fourth Quarter and Year-End 2012 Results
11/13/2012Reports Third Quarter 2012 Results
7/5/2012Produces 92,003 Ounces Au in Second Quarter
5/9/2012Provides Notice of First Quarter 2012 Financial Results Rele...
2/27/2012Q4 2011 Net Profit of $37.8 Million
1/16/2012Provides Notice of Fourth Quarter and Year-End 2011 Financia...
8/11/2011Releases Second Quarter 2011 Results
5/16/2011Osisko Releases First Quarter 2011 Results
5/14/2011Osisko Releases First Quarter 2011 Results
2/28/2011Releases Year-End Financial Results and Review of 2010
11/6/2009Releases Third Quarter 2009 Results
8/11/2009Releases Second Quarter 2009 Results
Project news of Osisko Mining Corp.
7/26/2017OSK Osisko Mining drills 2.7 m of 57 g/t Au at Windfall
2/21/2014Intersects 2.26 g/t Gold Over 128 Metres at Kirkland Lake
2/7/2014(Malartic)Commences 2014 Canadian Malartic Exploration Program
2/6/2014(Malartic)Reports Record January Production at Canadian Malartic
12/4/2013Intersects 61.6 Metres Averaging 1.44 g/t Au at Bidgood
11/21/2013(Malartic)Canadian Malartic Mine Produces Millionth Ounce
10/23/2013GLOBAL'S NEVADA PROJECTS ATTRACT STRONG THIRD PARTY INTEREST...
7/10/2013(Malartic)Deposits Study Reporting Local and Regional Economic Impact ...
1/30/2013Intersects 5.5 g/t Au Over 54.0 Metres at Upper Beaver
12/10/2012(Malartic)Reports November Production From Canadian Malartic
11/12/2012Announces Friendly Acquisition of Queenston
10/11/2012(Malartic)Canadian Malartic Mine Produces Half Millionth Ounce
10/10/2012(Malartic)Reports Record Quarterly Production from Canadian Malartic
9/6/2012(Malartic)Reports Record Monthly Production from Canadian Malartic
7/26/2012Acquires Common Shares of Bowmore Exploration Ltd=2E
5/17/2012(Malartic)Canadian Malartic Mill Returns to Operation
5/10/2012(Malartic)Reports Fire Damage at Canadian Malartic Mill Limited to Cyc...
1/30/2012(Famatina)s Status of Famatina Exploration Project
12/22/2011and DIOS Discover New Gold Showings on the AU33 WEST Project
11/28/2011TSX.V Company Adjacent to Osisko Property - 3 Minute Video
9/29/2011(Goldboro)Orex to Pursue Exploration Work on Goldboro Gold Project
9/8/2011(Malartic)Intersects 1.23 g/t Au Over 172 Metres at Barnat Extension
8/31/2011Osisko and EMSE Sign Agreement for Development of Famatina P...
8/31/2011(Famatina)and EMSE Sign Agreement for Development of Famatina Project ...
8/11/2011(Goldboro)Goldboro Gold Project Drill Assay Results Identify Extension...
8/5/2011Osisko Buys Back a 1% Royalty Interest on Canadian Malartic ...
8/5/2011(Malartic)Buys Back a 1% Royalty Interest on Canadian Malartic Propert...
6/21/2011Osisko Declares Commercial Production at Canadian Malartic
6/21/2011(Malartic)Declares Commercial Production at Canadian Malartic
6/17/2011Osisko Submits Notice of Termination in Duparquet Project
6/17/2011(Duparquet)Submits Notice of Termination in Duparquet Project
6/14/2011(Malartic)Intersects 1.50 g/t Au Over 63.6 Metres at Jeffrey Zone
6/13/2011(Duparquet)et Clifton Star annoncent une estimation de ressources pour ...
6/13/2011(Duparquet)and Clifton Star Release Resource Estimate for the Beattie D...
6/1/2011(Malartic)Officially Inaugurates the Canadian Malartic Mine
6/1/2011Osisko Officially Inaugurates the Canadian Malartic Mine
5/2/2011(Malartic)Announces Revised Mine Production Plan at Canadian Malartic
4/21/2011(Goldboro)Orex Exploration Inc.: Drilling Campaign Has Begun at Goldbo...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/20/2011Osisko Mining Corporation - Drilling campaign has begun at G...
4/13/2011(Malartic)Pours First Gold at Canadian Malartic Mine
3/31/2011(Malartic)Increases Gold Reserve at Canadian Malartic to 10=2E7 Millio...
3/29/2011(Malartic)Exercises Buy Out Option in Canadian Malartic Net Smelter Ro...
2/28/2011(Malartic) Découverte de minéralisation de type Canadian Malartic
2/24/2011(Hammond Reef)Reports 124 Metres Averaging 0.73 g/t Au in Southeast Extens...
1/29/2011(Malartic)Osisko Reports Significant New Intersections at Barnat Exten...
1/25/2011(Malartic)Reports Significant New Intersections at Barnat Extension, I...
12/21/2009(Malartic)Provides Update on Construction and Development Progress at ...
12/14/2009(Malartic)Releases New Resource Estimate for Canadian Malartic Project
10/20/2009(Malartic) Intersects New Gold Mineralization on the Malartic CHL Prop...
9/14/2009(Malartic)Intersects 1.20 g/t Au Over 86.9 Metres at Jeffrey Zone
9/1/2009(Malartic)Osisko Mining Corporation: Construction Activities at Canadi...
8/20/2009(Malartic)Quebec Government Authorizes Construction of Osisko's Canadi...
2/26/2009(Malartic) Preliminary Metallurgical Results on Barnat
1/26/2009(Malartic)Announces Inferred Resource Estimate for South Barnat Deposi...
12/3/2008(Malartic) Intersects 102 Metres Averaging 3.21 g/t Au at South Barnat
Corporate news of Osisko Mining Corp.
2/13/2014Mails Letter to Shareholders Regarding Inadequate Goldcorp O...
2/5/2014Provides Corporate Update
1/29/2014Commences Legal Proceeding to Restrain Misuse of Confidentia...
1/29/2014Announces Filing and Mailing of Directors' Circular and Reco...
1/20/2014Reports Preliminary Fourth Quarter 2013 Production
1/15/2014Responds to Unsolicited Proposal From Goldcorp Inc=2E
1/13/2014Responds to Announcement by Goldcorp
12/16/2013Completes Long-Term Debt Renegotiation
10/24/2013Provides Notice of Third Quarter 2013 Operating and Financia...
7/30/2013Enhances Financial Flexibility by Improving Long-Term Debt T...
7/5/2013Intercepts 68 Metres Averaging 1=2E26 =?ISO-8859-1?Q?=20g/t=...
7/2/2013Receives Final $30 Million Payment from Kirkland Lake Gold
4/29/2013Corporate Update
4/17/2013Comments on Trading Activities
4/9/2013(Malartic)Previews Q1 2013 Canadian Malartic Operating Results
3/21/2013Discovers Two New Gold-Copper Zones at Upper Beaver
2/19/2013(Malartic)Receives Modified Operating Parameters at Canadian Malartic
2/19/2013(Malartic)s Reserves at Canadian Malartic
2/11/2013Denis Cimon Receives the 2013 Mineral Processor of the Year
1/29/2013(Hammond Reef)Provides Resource Update for Hammond Reef Project
1/24/2013(Malartic)Previews Q4 2012 Canadian Malartic Operating Results and 201...
11/12/2012(Malartic)Reports Record Monthly Throughput at Canadian Malartic
10/15/2012Founder Retires
10/9/2012Acquires Ground in Emerging Gold Belt in Mexico and Identifi...
10/3/2012Deposits the Second Tranche of itsFinancial Guarantee Coveri...
8/3/2012Secondary Crusher Installation Completed
7/24/2012Acquisition of Subscription Receipts of Druk Capital Partner...
5/16/2012Enhances Credit Agreement With CPPIB
5/14/2012(Malartic)Provides Update on Canadian Malartic
5/10/2012(Malartic)Reports Fire at Canadian Malartic Milling Plant
4/3/2012and Metis Nation of Ontario Sign Memorandum of Understanding
3/12/2012Brings First Half of Secondary Crusher Online
3/1/2012Announces Record Date for Annual Meeting
2/16/2012Canadian gold producer Osisko Mining Corporation joins Globa...
1/12/2012(Malartic)Previews Q4 2011 Canadian Malartic Operating Results
1/3/2012Responds to Below Market Price Offer for 5 Million Shares On...
12/14/2011Osisko Comments on Trading of Common Shares
12/14/2011Comments on Trading of Common Shares
10/8/2011President Sean Roosen Named Ernst & Young 2011 Quebec Entrep...
6/17/2011(Duparquet)met fin =E0 sa participation au projet Duparquet
6/13/2011Osisko and Clifton Star Release Resource Estimate for the Be...
5/14/2011Osisko publie ses r=E9sultats du premier trismestre de 2011
5/12/2011Annual and Special Meeting of Shareholders of Osisko Mining ...
4/29/2011Osisko Announces Revised Mine Production Plan at Canadian Ma...
3/29/2011Osisko Exercises Buy Out Option in Canadian Malartic Net Sme...
2/9/2011Goldcorp Sells Osisko Investment
12/22/2009Donates Shares to McGill University
12/11/2009and Clifton Star Complete Joint Venture Agreement on Duparqu...
11/13/2009Options Goldboro Gold Property From Orex Exploration
9/28/2009 Signs Option Agreement With Claim Post Resources for the Mo...
9/24/2009 Enters Into Financing Agreement With CPPIB Credit Investmen...
8/11/2009Signs Option Agreement With Midland Exploration for the Dunn...
7/10/2009Report on Osisko's Canadian Malartic Bape Hearings is Made P...
7/3/2009Osisko Mining Corporation Completes Strategic Investment
6/18/2009Comments on Trading of Common Shares
5/21/2009Discovers New Mineralized Zone Adjacent to South Barnat
5/19/2009Makes Strategic Investment
1/13/2009 Extends South Barnat to 1200 Metres Length
12/4/2008 Recognized for Strong Sustainability Performance
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (OSK.TO)FRANKFURT (EWX.F)
2.93-0.85%2.43-1.62%
TORONTO
CA$ 2.93
05/07 12:00 -0.030
-0.85%
Prev close Open
2.95 2.95
Low High
2.92 2.98
Year l/h YTD var.
2.42 -  3.21 6.16%
52 week l/h 52 week var.
2.36 -  3.67 -24.29%
Volume 1 month var.
155,305 -2.33%
Produces Gold
Develops
Explores for Gold - Lead - Silver - Tin - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
20249.55%3.242.41
2023-23.71%4.532.36
2022-6.17%5.022.36
20210.81%3.972.33
2020-4.88%4.851.67
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.52+0.47%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.12+0.58%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.61+13.17%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64+0.00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.94+0.60%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20-4.76%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+0.00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 50.90+0.08%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :