Troymet Exploration Corp.

Published : February 11th, 2008

Drill to McClarty Lake VMS Project

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Copper | Diamond | Gold | Silver | Zinc |
======================================================================
Re: News Releases - Monday, February 11, 2008
Troymet Mobilizes Drill to McClarty Lake VMS Project
======================================================================

February 11, 2008 -- Troymet Exploration Corp. (TSXV:TYE) (the
"Company") is pleased to announce the mobilization of a Diamond drill
to its McClarty Lake project, located 47 kilometres southwest of Snow
Lake, Manitoba. Field preparation is underway for a 3000-metre drilling
campaign scheduled to commence on February 15, 2008.

The Company has contracted Dr. Alan Bailes, formerly Chief Geologist of
the Precambrian Mapping Division, Manitoba Geological Survey, to assist
with the drilling program. Dr. Bailes is an expert on the geology and
volcanogenic massive sulphide (VMS) deposits of the Flin Flon -- Snow
Lake Belt and will be invaluable in gaining an understanding of the
geological setting and controls to mineralization on the McClarty Lake
project.

This program follows up on the 2007 discovery of zinc + copper
mineralization within a semi- to massive sulphide horizon that has been
intersected over a 425-metre strike at vertical depths of 100 to 250
metres (Reference: Sept. 26, 2007 news release). Up to 8.3% zinc over
0.5 metres was returned from the second hole of the program, within a
7.45-metre intersection that returned 2.94% zinc and 0.17% copper.
Approximately 225 metres to the north, previous drilling intersected
precious metal mineralization and anomalous base metal values,
returning up to 4.17 g/t gold and 8.48 g/t silver over 4.0 metres. The
225-metre strike length between these holes remains untested and the
massive sulphide horizon remains open along strike and to depth.

The 2008 program will focus on stepping out along the strike and depth
extension on the known zinc-copper mineralization, testing along
225-metre gap and further testing of the gold-rich portion of the
mineralized horizon.

The discovery of zinc + copper VMS mineralization at McClarty Lake
represents a new discovery in a significantly under-explored area. The
property is located approximately 24 kilometres southeast of the VMS
Ventures' Reed Lake discovery and approximately 45 kilometres
south-southeast of HudBay Minerals' Lalor Lake discovery.

The VMS horizon at McClarty is associated with a minimum 600-metre
long, north-trending electromagnetic (EM) conductor. A detailed
airborne VTEM survey is being flown over the entire property to fully
define the extent of the conductor system and to test for the presence
of other conductors which may also have associated VMS mineralization.

The McClarty Lake property comprises five contiguous mineral claims
totalling 596 hectares. Troymet owns 100% of three of the claims staked
in 2000 and holds an option to obtain a 60% interest in two claims (252
hectares) from Hudson Bay Exploration and Development (HBED).

Tracy Hurley, PGeo, Vice President, Exploration and qualified person as
defined by National Instrument 43-101 is responsible for the technical
information provided in this release.

For further information, contact:
Tracy Hurley (250) 468-5557; th@troymet.com
Kieran Downes (250) 729-0453; kd@troymet.com

Website: www.troymet.com

The TSX Venture Exchange does not accept responsibility for the
adequacy or accuracy of this release. Statements in this press release
may contain forward-looking statements. Except for statements of
historical fact, all statements in this press release - including,
without limitation, statements regarding future plans and objectives of
the Company - are forward-looking statements that involve various risks
and uncertainties. There can be no assurance that such statements will
prove to be accurate and actual results and future events could differ
materially from those anticipated in such statements.

======================================================================
Copyright (c) 2008 TROYMET EXPLORATION CORP. (TYE) All rights
reserved. For more information visit our website at
http://www.troymet.com/ or send mailto:info@troymet.com
Message sent on Thu Feb 7, 2008 at 9:52:11 AM Pacific Time
======================================================================
.

Troymet Exploration Corp.

EXPLORATION STAGE
CODE : TYE.V
ISIN : CA8977731071
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Troymet is a silver and gold exploration company based in Canada.

Its main exploration properties are MCCLARTY LAKE, KEY, WHEATCROFT and GOLDEN EAGLE in Canada.

Troymet is listed in Canada. Its market capitalisation is CA$ 609 281 as of today (US$ 452 325, € 397 720).

Its stock quote reached its highest recent level on November 26, 2010 at CA$ 0.41, and its lowest recent point on June 28, 2019 at CA$ 0.01.

Troymet has 121 856 225 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Troymet Exploration Corp.
9/18/2013Cancels Private Placement
9/26/2011s Exploration Programs
8/19/2011Closes $1,844,850 Private Placement
7/29/2011Increases Private Placement to $1,500,000
12/8/2009Announces $500,000 Private Placement
7/9/2008Completes $1,300,000 Unit Private Placement
Project news of Troymet Exploration Corp.
3/25/2015(Key)Reports: New Gold Completes Expenditure Commitment on the Ke...
3/19/2015(Mcclarty Lake)Announces That McClarty Lake JV Identifies New VMS Targets
12/11/2013(Key)Completes Sale of Key Property
11/19/2013(Key)Signs Agreement to Sell Key Property
4/15/2013(Mcclarty Lake)Reports on the 2013 Drill Program at McClarty Lake Project
1/14/2013(Key)Reports Assays From Key Project
1/14/2013(Key)Reports Assays From Key Project
11/8/2012(Key)Completes Drilling on Key Project
10/4/2012(Key)Mobilizes Drill to the Key Project
9/18/2012(Key)Resumes Exploration & Schedules Drilling on Key Project
8/14/2012(Mcclarty Lake)& Hudbay Sign Joint Venture Agreement on McClarty Lake Proje...
7/24/2012(Key)s Progress and Expands Program at Key Gold Project
5/29/2012(Key)Initiates Exploration Program on Key Project
3/1/2012(Key)Focuses on Key Project
2/16/2012(Golden Eagle)Intersects 1.27 g/t Gold over 36.45 metres at Golden Eagle
1/12/2012(Mcclarty Lake)s Exploration Progress at McClarty Lake
11/30/2011(Golden Eagle)Completes Drilling at Golden Eagle
10/12/2011(Golden Eagle)Mobilizes Drill to Golden Eagle Project
6/13/2011(Key)Completes Phase I Exploration on Key Project
6/6/2011(Mcclarty Lake)Reports HudBay Earnback Complete on McClarty Lake Project
4/5/2011(Key)s Drill Program on Key Project
3/30/2011(Mcclarty Lake)Optionee HudBay Drilling at McClarty Lake
3/3/2011(Key)s Drill Programs at Key & McClarty Lake Projects
2/15/2011(Mcclarty Lake)Drilling at McClarty Lake
2/10/2011(Key)Drilling on Key Property
6/21/2010(Key)Confirms Regional Structures on Key Project
6/10/2010(Key)Identifies Structures on Key Project
5/20/2010(Key)Mobilizes Crews to Key Project
4/28/2010(Key)Reports Anomalous Gold at Key - Plans Summer Drill Program
4/13/2010(Key)to Drill on Key Project
3/8/2010(Mcclarty Lake)Confirms VMS Target on 100% Owned McClarty Claims
2/17/2010(Golden Eagle)Confirms New Gold Targets
1/28/2010(Mcclarty Lake)Commences Winter Program
1/14/2010(Mcclarty Lake)Winter Program
12/21/2009(Golden Eagle)Identifies 9 New Target Areas
10/2/2009(Golden Eagle)Mobilizes Drill
10/21/2009(Golden Eagle)Completes Drilling
11/6/2009(Mcclarty Lake)Plans to Drill the Mac Target
9/10/2009(Golden Eagle)Commences Exploration Program at Golden Eagle Project
6/25/2009(Golden Eagle)Updates Skarn Zone, Golden Eagle Project
6/16/2009(Golden Eagle)Targets Bulk-Tonnage Gold at Golden Eagle
2/24/2009(Golden Eagle)Confirms Intrusion Related Gold System on Golden Eagle Proje...
8/13/2008(Key)Completes Airborne VTEM Survey at the Key Project
6/13/2008(Mcclarty Lake) Hudson Bay to Earn Back Interest in Troymet's McClarty Lake...
5/15/2008(Mcclarty Lake)Reports Final Drill Results from McClarty Lake
4/25/2008(Mcclarty Lake) Preliminary Geological and Geophysical Observations at McCl...
4/9/2008(Mcclarty Lake) First McClarty Lake Holes Intersect Zinc, Copper and Gold
3/17/2008(Mcclarty Lake)Intersects Massive Sulphide Mineralization at McClarty Lake ...
3/5/2008(Mcclarty Lake) Completes VTEM Survey on McClarty Lake VMS Property
2/28/2008(Mcclarty Lake)Drilling Underway at McClarty Lake VMS Project
2/11/2008(Mcclarty Lake)Drill to McClarty Lake VMS Project
1/9/2008(Mcclarty Lake) Commence Winter Exploration Program at McClarty Lake VMS Pr...
Corporate news of Troymet Exploration Corp.
7/25/2016Troymet Identifies New Drill Targets & Expands Prospective A...
7/11/2016Troymet Starts Detailed Sampling of Gold and 3DIP Anomalies ...
6/20/2016Troymet Reports Significant 3DIP Results at Redhill
6/2/2016Troymet Completes Wildcat Drill Program
5/10/2016Troymet Commences RC Drill Program at Wildcat Project - Utah
5/10/2016Renaissance Gold Obtains Drill Permit for Wildcat Project
4/26/2016Troymet Commences Induced Polarization Survey at Redhill
4/4/2016Troymet Starts Field Program at Redhill
1/20/2016Renaissance Gold Exploration Update
1/19/2016Troymet Targets the Core Area at Wildcat
12/15/2015Troymet’s Joint Venture Partner Plans Ground Geophysics at M...
12/15/2015Troymet's Joint Venture Partner Plans Ground Geophysics at M...
11/24/2015Troymet Targets the Rattler Breccia at Wildcat
10/29/2015Troymet Identifies New Copper and Gold Soil Anomalies at Red...
10/20/2015Troymet Identifies Significant Copper and Gold Soil Anomalie...
10/7/2015Troymet Reviews Initial Drill Targets on Alpha Zone
9/16/2015Troymet Completes Redhill Field Program
8/20/2015Troymet Shareholders Approve All Matters at AGM
7/27/2015Troymet Updates Wildcat SE Target Area Progress
7/14/2015Troymet Appoints New Auditor
7/9/2015Troymet Options Redhill Project From Homegold
3/19/2015Troymet Announces That McClarty Lake JV Identifies New VMS T...
2/23/2015Troymet Options Wildcat Project from Renaissance Gold
1/16/2015Grants 1.35 Million Stock Options
1/16/2015Troymet Grants 1.35 Million Stock Options
12/8/2014Troymet Terminates Thelon Option & Provides Corporate Update
10/20/2014Troymet Reports Significant Skarn Zone Prospecting Results
8/20/2014Troymet Announces Corporate Update
7/18/2014Troymet Shareholders Approve All Matters at AGM
6/2/2014Troymet Announces Appointment of CFO
5/13/2014Troymet Announces the Resignation of Brian Cebryk as CFO of ...
4/28/2014Troymet Announces Adoption of Advance Notice By-Law
2/19/2014Provides Corporate Strategy Update
6/14/2013(Mcclarty Lake)Receives Assays from Hudbay for McClarty Lake
4/19/2013Shareholders Approve All Matters at AGM
3/25/2013Files AGM Materials and Announces AGM Matters
1/23/2013(Mcclarty Lake)s McClarty Lake Planning
7/10/2012(Golden Eagle)Files NI 43-101 Technical Report for Golden Eagle Gold Proje...
6/12/2012(Key)Files NI 43-101 Technical Report for Key Gold Project
1/19/2012(Key)Identifies Large Geochemical Soil Anomalies and Additional D...
5/9/2011(Key)Intersects Porphyry Style Mineralization on Key Project
4/11/2011(Mcclarty Lake)Identifies Extension of Discovery Horizon at McClarty Lake P...
1/25/2010Update on Status
2/23/2010Expands Geophysical Survey at McClarty
1/23/2010Completes $500,000 Financing
8/11/2009s Activities
9/4/2008Extends Tannis Zone at Golden Eagle Project
8/7/2008Commences Drilling at Golden Eagle Project
8/1/2008Provides Operational Update
1/16/2008Tax Rollover Election Reminder to Former Signet Shareholders
9/26/2007Announces Base Metal Discovery at McClarty Lake VMS Project
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (TYE.V)
0.005+0.00%
TSX-V
CA$ 0.005
06/28 17:00 -
0%
Prev close Open
0.005 0.010
Low High
0.005 0.010
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.005 -%
Volume 1 month var.
1,743,000 -%
24hGold TrendPower© : -11
Produces
Develops
Explores for Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 2/24/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.62+1.00%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :