Pele Mountain Resources Inc

Published : May 01st, 2007

Drilling Confirms Near-Surface, Higher-Grade Uranium at Pele Mountain's Elliot Lake Project

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

Drilling Confirms Near-Surface, Higher-Grade Uranium at Pele Mountain's Elliot Lake Project 

Significant Rare Earth Oxides Also Confirmed Within Main Conglomerate Bed

Symbol: GEM
Listing: TSX Venture Exchange
Common Shares Outstanding: 71,581,860
Website: www.pelemountain.com

May 1, 2007 - Toronto - Pele Mountain Resources Inc. (TSX Venture: GEM) ("Pele" or the "Company") today announced results of its 22-hole drill program at its Elliot Lake Uranium Project in Northern Ontario. Ongoing technical, economic, and environmental scoping studies at Elliot Lake are being conducted under the supervision of Scott Wilson Roscoe Postle Associates ("Scott Wilson RPA"). Pele is focused on developing a world-class mine at Elliot Lake where an inferred resource of over 33 million pounds of U3O8 has been defined, with the potential for significant upgrade and expansion.

The drill program included over 3,000 metres in 22 holes, primarily within the 600 by 800-metre Adit Block where near-surface and relatively higher-grade intercepts were recorded in historic drilling and sampling. The program was designed to provide in-fill drilling and confirm results of historic holes.

Results of the program are consistent with historic drilling, returning grades within the Adit Block higher than the 1.10 pounds per tonne (lbs/tonne) average across the currently-defined Inferred Resource. Holes drilled within the Adit Block (PM-1, PM-4 through PM-22) demonstrate an estimated true width of the Main Conglomerate Bed (MCB) ranging from 2.06 to 2.95 metres with average U3O8 grades ranging from 0.029 to 0.125-percent (0.64 to 2.76 lbs/tonne) and average Total Rare Earth Oxide (REO) grades within the Adit Block ranging from 0.149 to 0.322-percent (3.28 to 7.10 lbs/tonne). The relatively higher-grade, near-surface Adit Block presents a favorable location for mining early in the project life.

A fan of holes (PM-4 through PM-18) was drilled from a single set-up, intersecting the MCB at spacings varying from 2 to 65 metres to determine the short-range variability of the MCB grade and thickness for geostatistical block modeling and grade simulation studies. The average true thickness of the 14 completed holes was 2.5 metres with an average grade of 0.075-percent U3O8 (1.65 lbs/tonne).

The variation seen in these close-spaced holes is consistent with the variation in grades from historic face sampling in the nearby exploration adit where 18 samples taken at 1.5-metre intervals ranged from 0.028 to 0.097-percent U3O8 (0.62 to 2.14 lbs/tonne). In the fan drilling exercise, the 14 holes ranged in grade from 0.036 to 0.125-percent (0.79 to 2.76 lbs/tonne). While the grade variation was slightly higher in the fan drilling, this was expected given the greater distance between sample points.

These results will be used to develop an updated block model for the Adit Block, along with grade simulation models for resource estimation and mine planning. They will enable an upgrade of substantial Inferred mineral resources to the Indicated category within the Adit Block. Updated resource estimates are expected to be available during June. The grade simulation models will also be used to identify other potential higher grade zones outside of the Adit Block.

As indicated by historic drilling, the highest U3O8 grades within the MCB consistently occur near its base. Highest grade intervals included 0.274, 0.255, and 0.250-percent U3O8 (6.04, 5.62, and 5.51 lbs/tonne) over true widths of 0.69, 0.58, and 0.80 metres, respectively. The grades decrease toward the top of the MCB as a result of the presence of narrow bands of quartzite interbedded with the conglomerate. These results support previously-announced plans to consider a reduction in the mining height from the MCB base in order to optimize grade and reduce operating costs.

In summary, the Pele drill program was successful in verifying that:

  • The thickness of the MCB, and the U3O8 grades and distribution within the MCB, are consistent with historic drill results..
  • The spatial variation in U3O8 grades from close-spaced fan drilling is consistent with historic face sampling results from within the nearby exploration adit.
  • The Total REO grades & distribution within the MCB meet or exceed previous results.
  • The Total REO grades correlate very closely with ThO2 grades.

Uranium and REO assay results from intersections of the MCB are included in the table below.

Drill Results - Main Conglomerate Bed

Drill Hole From (m) Length (m) Est. True Width (m) U3O8 (%) U3O8 (lbs/tonne) REO (%) REO (lbs/tonne)
PM-01 203.32 3.43 3.43 0.046 1.01 0.169 3.73
PM-02 279.70 2.38 2.06 0.050 1.10 0.025 0.55
PM-03 135.00 3.14 3.14 0.033 0.73 0.183 4.03
PM-04 84.71 2.29 2.22 0.050 1.10 0.216 4.76
PM-05 91.05 2.78 2.61 0.055 1.21 0.216 4.76
PM-06 99.60 2.90 2.35 0.058 1.28 0.254 5.60
PM-07 129.70 4.91 2.95 0.118 2.60 0.270 5.95
PM-08 186.30 6.20 2.42 0.125 2.76 0.322 7.10
PM-09 Not Completed to Planned Depth
PM-10 85.72 2.28 2.09 0.040 0.88 0.227 5.00
PM-11 94.44 2.94 2.49 0.036 0.79 0.149 3.28
PM-12 116.46 4.31 2.87 0.096 2.12 0.272 6.00
PM-13 93.39 3.11 2.54 0.111 2.45 0.233 5.14
PM-14 83.44 2.61 2.41 0.071 1.57 0.252 5.56
PM-15 79.35 3.00 2.91 0.070 1.54 0.244 5.38
PM-16 78.00 2.50 2.42 0.046 1.01 0.202 4.45
PM-17 90.00 3.48 2.69 0.094 2.07 0.196 4.32
PM-18 85.27 2.46 2.08 0.057 1.26 0.220 4.85
PM-19 103.20 2.20 2.18 0.067 1.48 0.194 4.28
PM-20 113.30 2.48 2.45 0.039 0.86 0.164 3.62
PM-21 121.45 2.24 2.20 0.029 0.64 0.184 4.06
PM-22 185.14 2.57 2.53 0.029 0.64 0.149 3.28

PM-1 was drilled in the Adit Block as part of Peles due diligence on the property in October 2006. Holes PM-2 and PM-3 were drilled outside the Adit Block to test the northeast edge of the MCB and to confirm its presence within a gap between historic drill holes. Holes PM-19 through PM-22 were drilled elsewhere in the Adit Block, separate from the fan drilling location.

As noted in prior press releases, Scott Wilson RPA is investigating the technical and economic viability of REO recovery as a means of increasing revenues at Elliot Lake. REOs are critical components in many high-tech applications including hybrid motor vehicles, flat screen monitors, and high-power magnets. Although demand for REOs is growing rapidly, over 90-percent of their supply is controlled by China, which has recently imposed tariffs on their export. Relative percentages of individual REOs within the Total REO content from drill intersections of the MCB are displayed in the table below.

Relative Percentages of Individual REOs Main Conglomerate Bed

Rare Earth Oxide Relative Percentage
Yttrium Oxide Y2O3 4.8
Cerium Oxide CeO2 46.3
Dysprosium Oxide Dy2O3 1.1
Erbium Oxide Er2O3 0.5
Europium Oxide Eu2O3 0.1
Gadolinium Oxide Gd2O3 1.9
Holmium Oxide Ho2O3 0.2
Lanthanum Oxide La2O3 23.5
Neodymium Oxide Nd2O3 14.0
Praseodymium Oxide Pr6O11 4.6
Samarium Oxide Sm2O3 2.4
Terbium Oxide Tb4O7 0.3
Ytterbium Oxide Yb2O3 0.4

A more detailed review of the recent drill results from the Main Conglomerate Bed and QA/QC program is available on Pele's website at www.pelemountain.com/pdfs/drillresultsMCB043007.pdf

All samples were processed at SGS Mineral Services in Toronto, an ISO 17025 accredited laboratory.

This press release has been reviewed and approved by Robert MacGregor, P.Eng., an independent Qualified Person with 14 years experience working in the Elliot Lake area during its time as an active uranium mining camp and any reference to the drilling program results has been reviewed and approved by Lawrence B. Cochrane, Ph.D., P. Eng. of Scott Wilson RPA, a Qualified Person under NI 43-101.

About Pele Mountain Resources

Pele Mountain Resources is focused on developing a world-class mining and processing facility at its 100-percent owned Elliot Lake Uranium Project in Northern Ontario. The project hosts a NI 43-101 compliant inferred resource of over 33 million pounds of U3O8 with the potential for significant near-term upgrade and expansion. Scott Wilson RPA is collaborating with experienced professionals from a wide range of disciplines to lead its recommended technical, economic, and environmental scoping studies.

The Elliot Lake camp was once known as "the uranium capital of the world" and has produced more than 270 million pounds of U3O8 from stratigraphically-bound deposits that demonstrate remarkable consistency over extensive areas. The uranium market is currently experiencing unprecedented price gains due to surging global demand and increasingly uncertain supply.

Pele also holds a diverse portfolio of gold, Diamond, and base metal projects located across Northern Ontario, including the Highland Project where drilling has outlined several high-grade, narrow-vein gold zones within an historic mining camp.. Through project generation and mineral discovery, Pele provides shareholders with exposure and leverage to the ongoing bull market in natural resources. Pele stock trades on the TSX Venture Exchange under the symbol "GEM".

For further information please contact Al Shefsky, President, at (416) 368-7224, or visit the Pele website at www.pelemountain.com.

The TSX-V has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.Some of the statements contained in this release are forward-looking statements, such as estimates and statements that describe Pele's future plans, objectives or goals, including words to the effect that Pele or management expects a stated condition or result to occur. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties. Actual results in each case could differ materially from those currently anticipated in such statements.


 
Sent to: .com
If you prefer not to receive
future e-mails of this type,
Leave this List.
Sent By:
Pele Mountain Resources
2200 Yonge Street
Suite 1002
Toronto Ontario M4S 2C6
To view as a web page.
Data and Statistics for these countries : China | All
Gold and Silver Prices for these countries : China | All

Pele Mountain Resources Inc

DEVELOPMENT STAGE
CODE : GEM.V
ISIN : CA7059071034
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Pele Mountain Res. is a and uranium exploration company based in Canada.

Pele Mountain Res. develops rare earth in Canada, and holds various exploration projects in Canada.

Its main asset in development is ECO RIDGE in Canada and its main exploration properties are HIGHLAND (EAST / WEST), ARDEEN, ALLIANCE, SUDBURY and FESTIVAL in Canada.

Pele Mountain Res. is listed in Canada and in United States of America. Its market capitalisation is CA$ 6.3 millions as of today (US$ 4.6 millions, € 4.3 millions).

Its stock quote reached its highest recent level on December 31, 2007 at CA$ 1.62, and its lowest recent point on June 02, 2017 at CA$ 0.01.

Pele Mountain Res. has 210 000 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Pele Mountain Resources Inc
10/24/2007 Advances Baseline Environmental Studies at Elliot Lake Uran...
Financings of Pele Mountain Resources Inc
9/23/2016Pele Mountain Enters Into Funding Agreement
4/13/2015Announces Closing of Private Placement
10/3/2013Announces Closing of Private Placement Offering
7/26/2013Announces Closing of Private Placement Offering
7/4/2013Announces Closing of Second Tranche of a Private Placement O...
Nominations of Pele Mountain Resources Inc
2/11/2014Nominates Janis Peleshok to its Board of Directors
11/27/2013John Wilkinson Former Ontario Cabinet Minister Joins Pele Mo...
11/7/2007 Appoints Fergus Kerr Vice-President of Uranium Operations t...
5/9/2007Appoints James Andersen as Chief Financial Officer and Renew...
Project news of Pele Mountain Resources Inc
10/9/2013Interview with Roger Payne P. Eng. Executive Vice President ...
9/12/2013(Eco Ridge)Reviews Economics at Its Eco Ridge Mine Rare Earth and Urani...
6/10/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
6/10/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
6/10/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
6/10/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
6/10/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
5/28/2013(Festival)Announces Reactivation of Festival Project Joint Venture Nea...
4/3/2013(Eco Ridge)to Update Eco Ridge Resource Estimate
1/29/2013Hits Higher Grade Uranium & Rare Earths at Elliot Lake
1/17/2013(Eco Ridge)Drilling Expands Eco Ridge Deposit
10/16/2012(Eco Ridge)Begins 6,500-Metre Drill Program at Its Eco Ridge Mine Rare ...
9/27/2012Samples High Grade Rare Earths at Mountain Pass
9/26/2012Closes Acquisition of Mining Claims 1800 Metres from Molycor...
5/15/2012(Eco Ridge)Closes Highland Project Sale Agreement; Will Focus on Eco Ri...
4/17/2012(Eco Ridge)Enters Agreement to Sell Highland Gold Projects; Will Focus ...
4/16/2012(Eco Ridge)Announces Robust Updated PEA for Eco Ridge Mine Rare Earths ...
3/6/2012Enters Agreement to Acquire Rare Earth Mining Claims Surroun...
10/13/2011(Eco Ridge)Announces Discovery of Continuous Rare Earths Mineralization...
9/7/2011(Eco Ridge)Files Preliminary Economic Assessment for Eco Ridge, Providi...
7/5/2011(Eco Ridge)Announces Preliminary Economic Assessment for Eco Ridge Mine...
5/26/2011(Eco Ridge)Launches 7,000 Metre Drill Program at Its Eco Ridge Mine Rar...
5/17/2011(Eco Ridge)Receives Mining Leases at Its Eco Ridge Mine Rare Earths and...
3/7/2011(Ardeen)Provides Gold Projects Update
2/24/2011(Eco Ridge)Announces Total Rare Earth Oxide Resources of 52-Million Pou...
1/24/2011(Eco Ridge)Announces Major Increase in Indicated Resources at its Eco R...
6/25/2010(Highland (east / West))Initiates Permitting Process to Mine Gold Bulk Sample
3/4/2010(Highland (east / West))Hits High Grade Gold at Highland’s A-Zone
1/18/2010(Highland (east / West))Begins Drilling at East Highland Gold Project
12/23/2009(Highland (east / West))Samples 14.76 g/t Gold Over 3.6 Metres at Its East Highland ...
12/11/2009(Highland (east / West))Samples 50 g/t Gold, 161 g/t Silver 4.3% Zinc, and 1.2% Lead...
11/10/2009(Highland (east / West))Discovers New Mineralized Zones, Expands Others, at East Hig...
9/17/2009Finds More High-Grade Gold at East Highland
9/1/2009(Ardeen)Coventry Resources Commences Diamond Drilling at Pele Mounta...
8/11/2009(Highland (east / West))High-Grade Gold Discovery at Its Highland Project
7/27/2009(Eco Ridge)Signs Agreement With the City of Elliot Lake for Surface Rig...
1/9/2009(Eco Ridge)Advances Eco Ridge Mine Project - Extensive Drill Program Re...
1/8/2009(Sudbury)Wallbridge Mining Company to Continue Exploration at Pele Mo...
9/9/2008(Eco Ridge)Initiates Permitting Process at Eco Ridge
8/26/2008(Eco Ridge)assembles team of uranium industry leaders to develop Eco Ri...
5/12/2008(Timmins - Whitney Township)Enters Into Option Agreement to Sell Its Timmins Nickel Proj...
5/2/2008(Eco Ridge)Launch Pre-Feasibility Study for Elliot Lake Uranium Mine Pr...
3/6/2008(Eco Ridge) Reports Additional Positive Drill Results from Its Elliot L...
2/13/2008(Eco Ridge)Identifies High Priority Geophysical Targets at its Elliot L...
1/25/2008(Eco Ridge)New Drill Results Expand Higher-Grade Zone at Pele Mountain'...
1/17/2008(Eco Ridge)Expands Exploration for Higher Grade Remobilized Uranium at ...
11/28/2007(Eco Ridge)Targets Remobilized Uranium at Elliot Lake
10/12/2007(Eco Ridge)Publishes Positive Scoping Study for Uranium Mine Project at...
10/4/2007Achieves Major Milestone with Positive Scoping Study for Ura...
10/2/2007Announces Scoping Study for Its Elliot Lake Uranium Project ...
9/19/2007(Eco Ridge)Achieves Positive Results from 5,600-Metre Drill Program at ...
7/9/2007(Eco Ridge)Advances Mine Planning and Scoping Studies on 33-Million Pou...
5/30/2007(Eco Ridge)Expands Drilling at Elliot Lake Uranium Project
5/7/2007(Eco Ridge)Intersects High-Grade Uranium In Basal Conglomerate Bed at E...
5/2/2007(Eco Ridge)Expands Elliot Lake Uranium Project
5/1/2007(Eco Ridge)Drilling Confirms Near-Surface, Higher-Grade Uranium at Pele...
1/26/2006hits more high grade gold at Talisker
Corporate news of Pele Mountain Resources Inc
7/5/2016Pele Mountain to Sell Its Ardeen Gold Project
5/4/2016Pele Mountain Provides Update on Development Plans and Progr...
1/15/2016Pele Mountain Resources Appoints Wayne Richardson as Chairma...
10/7/2015Pele Mountain Announces Option Grants
10/1/2015Pele Mountain Provides an Update on its Eco Ridge Monazite P...
7/28/2015Pele Mountain Advances Cogent Solution to Rare Earth Industr...
4/13/2015Pele Mountain Announces Closing of Private Placement
3/30/2015Pele Mountain Executes MOU with Major Chinese Rare Earth Pla...
3/30/2015IIROC Trading Resumption - GEM
3/30/2015Executes MOU with Major Chinese Rare Earth Player to Pursue ...
3/30/2015IIROC Trading Halt - GEM
3/5/2015Pele Mountain Shareholders Approve All Matters Presented at ...
3/5/2015Shareholders Approve All Matters Presented at the Annual and...
2/17/2015Pele Mountain Advances Monazite Recycling Strategy to Kick-S...
2/12/2015Pele Mountain Announces Option Grants
12/24/2014Pele Mountain Announces Closing of Private Placement
12/2/2014The Council of the City of Elliot Lake Supports Pele Mountai...
11/7/2014Pele Mountain Announces Proposed Shares for Debt Settlement
10/7/2014Pele Mountain Expands its Business Model to Include Recyclin...
9/25/2014Pele Mountain Appoints Martin S. Cooper As Vice President of...
9/11/2014Pele Mountain Acquires Key Mining Lease in Elliot Lake
9/2/2014Pele Mountain Announces Collaboration with Canmet to Advance...
7/8/2014Pele Mountain Participates in Regional Roundtable Discussion...
6/25/2014Parliamentary Committee on Natural Resources Publishes "The ...
6/24/2014Pele Mountain Announces Closing of Private Placement
5/9/2014Pele Mountain Announces Closing of Private Placement Offerin...
5/2/2014Pele Mountain Announces Closing of First Tranche of Private ...
5/1/2014Pele Mountain Announces Closing of First Tranche of Private ...
6/5/2013Shareholders Approve All Matters Presented at the Annual and...
1/29/2013Intersects Higher-Grade Uranium & Rare Earths; Discovers Wid...
1/17/2013CEO Interviewed by Jeb Handwerger
10/24/2012(Eco Ridge)Achieves Processing Milestone: Mixed Rare Earth Concentrate ...
7/4/2012(Eco Ridge)Files Updated Preliminary Economic Assessment for Eco Ridge ...
1/31/2012Updated PEA on Schedule for Q1 2012
9/12/2011(Eco Ridge)Drilling Expands Eco Ridge Deposit Northward, Demonstrates S...
7/27/2011Roger Payne Named Executive Vice-President at Pele Mountain
7/21/2011(Eco Ridge)to Separate Gold Assets from Eco Ridge
5/3/2011Commences Trading in the United States on OTCQX Internationa...
8/5/2010Dr. William Bird Joins Rare Metals Advisory Board
5/17/2010Begins Drilling Ni-Cu-PGE Targets at Pigeon River
4/29/2010to Drill Ni-Cu-PGE Targets at Pigeon River
5/3/2010Coventry Resources Reports Winter Drill Results from Pele Mo...
3/5/2010Completes VTEM Survey at Pigeon River, Identifies Several Pr...
1/7/2010Acquires Property in Thunder Bay Area with High Potential fo...
10/7/2009Confirms Significant Rare Earth Mineralization at Its Eco Ri...
8/5/2009Initiates Long-Term Research Study to Minimize Environmental...
2/5/2009Letter to Shareholders
2/5/2008Completes Acquisition of the Westward Extension of the Histo...
10/29/2007 Resumes Drilling at Its Elliot Lake Uranium Mine Project
7/26/2007Retains O&M Partners for Investor Relations
5/3/2007Announces Plan to Optimize Corporate Structure
4/27/2007Featured in Northern Miner Article
4/17/2007Expands Elliot Lake Uranium Project
3/29/2007Advances Mine Planning Studies on 33-Million Pound Uranium O...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (GEM.V)Other OTC (PMNHF)
0.030+20.00%0.040+0.00%
TSX-V
CA$ 0.030
04/24 15:25 0.010
20%
Prev close Open
0.025 0.025
Low High
0.025 0.030
Year l/h YTD var.
0.025 -  0.060 -50.00%
52 week l/h 52 week var.
0.025 -  0.080 -57.14%
Volume 1 month var.
7,930 -%
24hGold TrendPower© : 22
Produces
Develops Rare earth
Explores for Diamonds - Gold - Platinum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 11/13/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
2024-45.45%
202337.50%0.100.04
2022-70.37%0.180.04
202117.39%0.720.09
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.75+0.52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.92-1.71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.55+0.00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.38-3.64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.32+0.46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24-2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.77-1.12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.10-0.89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+0.00%Trend Power :