Chart usGOLD   Chart usSILVER  
 
Food for thought
You know you’re in a bear market when people are losing money but feeling pretty good about it
Wall Street Adage  
Search for :
LATEST NEWS  :
MINING STOCKS  :
Subscribe
Write Us
Add to Google
Search on Ebay :
PRECIOUS METALS (US $)
Gold 1356.91-19.79
Silver 22.25-0.23
Platinum 1462.002.00
Palladium 745.301.10
WORLD MARKETS
DOWJONES 1541326
NASDAQ 3489-14
NIKKEI 15627246
ASX 5142-14
CAC 40 405115
DAX 853159
HUI 2562
XAU 97-3
CURRENCIES (€)
AUS $ 1.3278
CAN $ 1.3340
US $ 1.2857
GBP (£) 0.8548
Sw Fr 1.2611
YEN 132.9100
CURRENCIES ($)
AUS $ 1.0328
CAN $ 1.0377
Euro 0.7778
GBP (£) 0.6648
Sw Fr 0.9812
YEN 103.3600
RATIOS & INDEXES
Gold / Silver60.98
Gold / Oil14.13
Dowjones / Gold11.36
COMMODITIES
Copper 3.380.05
WTI Oil 96.05-0.66
Nat. Gas 4.190.00
Market Indices
Metal Prices
RSS
Precious Metals
Graph Generator
Statistics by Country
Statistics by Metals
Advertise on 24hGold
Projects on Google Earth
In the same category 
Nevada Copper Corp.: Drilling Continues to Expand Shallow Mineralization in the South Deposit and Lower Zones in the North Deposit
Published : August 09, 2012
( 0 vote, 0/5 ) Print article
     
Tweet
Keywords :   Copper | Gold | Iron | Nevada Copper | Silver | Southern | Sulphur |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Aug. 9, 2012) - Nevada Copper Corp. (News - Market indicators) ("Nevada Copper") is pleased to announce the latest step-out and expansion drill results from its 100% owned Pumpkin Hollow Property located near Yerington, Nevada. Additional drill results are pending and will be released as they become available.

An updated resource estimate will be released by September 7, 2012 which is later than initially anticipated. This delay will allow for the inclusion of the positive drill results reported below, as well as the previously-reported assays from the current step-out and expansion drilling program. This program has been ongoing since November 2010 and represents over 47,000 meters of drilling.

The drill results reported below include 12 holes drilled in the open-pittable Western deposits (North, South and Southeast deposits). The drilling continues to expand the lower zone mineralization in the North deposit, between the North and South open pits, and shallow areas of the South deposit. Much of the drilling intersected mineralization within, or just outside the current National Instrument 43-101 Feasibility Study ultimate pit limits for the North and South pits.

In the North deposit, four holes were drilled (NC12-18, 19, 23, and 24). Results continue to expand mineralization along the southern edge and at depth. NC12-23 targeted the expansion of the lower zones intersected 475 feet (144.8 meters), 266.4 feet (81.2 meters) true thickness grading 0.62% copper. NC12-18 and NC12-24 also drilled in the southeast intersected mineralization. NC12-19 was drilled where previous holes were shallow. Mineralization in the North deposit remains open at depth and to the east.

In the South deposit, four holes were also completed (NC12-26, 27, 29, and 37). NC12-29 was drilled in the center of the deposit where drill spacing was wide and mineralization needed better definition. In addition to confirming the main mineralized zone, a much higher grade shallow zone was also intersected. The shallow zone intersected 81.5 feet (24.8 meters), 66.6 feet (20.3 meters) true thickness grading 1.23% copper. NC12-27 and NC12-37 were drilled along the eastern border of the south deposit where older drilling was shallow and the host unit had not been tested. The new mineralization intersected is just within, and also outside, the current feasibility ultimate pit limit. Future drill programs will follow up on the open mineralization. NC12-26 successfully intersected deeper mineralization.

In addition, three holes were drilled in the saddle area between the North and South deposits a (Drill holes NC11-21, NC12-22, and NC12-25). Drilling continues to intersect and expand low grade mineralization between the two deposits. The mineralization remains open in this area.

Drill hole NC12-20 was drilled in the Southeast deposit and intersected two zones of mineralization. The hole expanded the lower mineralized zone and confirmed the shallow upper zone.

Gregory French, Vice President, Senior Project Manager, commented, "The latest step out drilling in the South deposit has been successful in expanding shallow mineralization. Higher grades intersected in the center of the deposit and open mineralization discovered along the southeast border should have positive affect on future mine designs. The North deposit drilling also continues to expand mineralization, especially in the deeper zones. Bringing the new drill results into the database is expected to have a very positive effect on the upcoming resource estimate and future mine designs."

NORTH DEPOSIT - Assays greater than 0.15% Cu
 
  From To Length Length True
Length
Copper Gold Silver Mo
Drill Hole # (m) (m) (m) (ft) (m) % (g/t) (g/t) (g/t)
NC12-18 202.1 213.4 11.3 37.0 8.0 0.50 0.005 0.8 <0.001
  368.8 385.6 16.8 55.0 8.4 0.22 0.035 1.0 0.007
  476.9 500.8 23.9 78.5 12.0 0.39 0.035 1.9 0.005
NC12-19 185.9 201.4 15.5 51.0 14.0 0.24 0.014 1.3 0.001
  270.8 307.8 37.0 121.5 32.0 0.45 0.053 1.5 0.002
NC12-23 224.0 259.1 35.1 115.0 24.8 0.93 0.087 3.1 0.011
  278.9 286.5 7.6 25.0 5.4 0.87 0.520 2.1 0.005
  332.2 447.0 144.8 475.0 81.2 0.62 0.106 2.0 0.008
  491.3 502.9 11.6 38.0 8.9 0.64 0.081 1.8 0.016
  516.9 527.6 10.7 35.0 9.3 0.42 0.048 0.9 0.015
NC12-24 312.4 327.6 15.2 50.0 11.6 0.23 0.012 0.8 0.010
  441.1 449.6 8.5 28.0 5.4 0.28 0.021 1.2 0.014
  461.8 469.2 7.5 24.5 4.3 0.62 0.082 2.4 0.011
  477.9 513.6 35.7 117.0 22.9 0.66 0.087 2.1 0.016
                   
                   
SOUTH DEPOSIT - Assays greater than 0.15% Cu
 
  From To Length Length True
Length
Copper Gold Silver Fe
Drill Hole # (m) (m) (m) (ft) (m) % (g/t) (g/t) (%)
NC12-26 181.4 189.0 7.6 25.0 4.4 0.28 0.138 1.7 6.5
  234.7 283.8 49.1 161.0 31.6 0.22 0.014 1.2 27.1
  329.2 389.4 60.2 197.5 38.7 0.32 0.030 1.0 34.9
NC12-27 76.4 106.7 30.3 99.5 28.4 0.33 0.036 1.8 39.6
  128.0 196.6 68.6 225.0 64.3 0.30 0.015 0.6 27.9
  207.3 221.9 14.6 48.0 9.4 0.17 0.027 0.9 44.7
  245.3 265.9 20.6 67.5 10.3 0.21 0.028 1.0 16.6
  270.7 299.3 28.6 94.0 14.3 0.19 0.035 1.1 18.7
NC12-29 146.3 171.1 24.8 81.5 20.3 1.23 0.105 6.9 8.4
  184.4 200.7 16.3 53.5 13.4 0.19 0.003 0.6 10.5
  216.4 228.6 12.2 40.0 10.0 0.21 0.019 1.2 5.2
  244.5 309.4 64.9 213.0 53.2 0.38 0.054 2.7 16.6
  341.4 395..0 53.6 176.0 43.9 0.40 0.050 2.1 26.9
  401.0 410.0 9.0 29.5 7.4 0.19 0.051 0.7 46.2
NC12-37 95.9 106.7 10.8 35.5 10.1 0.18 0.036 1.4 24.7
  131.1 172.2 41.1 135.0 38.5 0.42 0.034 2.4 6.0
                   
                   
BETWEEN NORTH & SOUTH DEPOSITS - Assays greater than 0.15% Cu
 
  From To Length Length True
Length
Copper Gold Silver Fe
Drill Hole # (m) (m) (m) (ft) (m) % (g/t) (g/t) (%)
NC12-21 158.5 169.2 10.7 35.0 8.8 0.18 0.020 0.7 20.4
  262.1 269.7 7.6 25.0 7.1 0.19 0.026 0.5 5.6
  283.5 292.6 9.1 30.0 8.6 0.25 0.011 0.6 6.2
NC12-22 358.2 367.3 9.1 30.0 7.5 0.24 0.006 0.6 2.9
NC12-25 189.0 198.6 9.6 31.5 8.7 0.28 0.048 1.2 <0.001
                   
                   
SOUTHEAST DEPOSIT - Assays greater than 0.15% Cu
 
  From To Length Length True
Length
Copper Gold Silver Fe
Drill Hole # (m) (m) (m) (ft) (m) % (g/t) (g/t) (%)
NC12-20 86.9 160.0 73.1 240.0 56.0 0.41 0.085 1.1 51.0
  184.4 239.3 54.9 180.0 45.0 0.22 0.043 1.0 12.0

Plan maps with the respective drill locations will be made available at http://www.nevadacopper.com/i/pdf/NCU-Maps-Aug2012.pdf.

Iron Metallurgical Testwork Update

Iron metallurgical testing commenced in February and is ongoing with initial flotation testing of iron concentrates producing encouraging results which reduce the levels of sulphur in the high-Fe magnetite concentrates. Additional testing is now focused on different flotation collectors and grind size to further improve these results. These results will be incorporated into an updated feasibility study for an Integrated open pit and underground mine that will include the benefits from the project's iron magnetite resource.

Feasibility Study Update

Feasibility study work continues on track for a stand-alone 5,000 to 7,500 ton per day high grade underground mine and mill as described in News Release dated June 20, 2012. Release of this feasibility study is anticipated for October 2012. 

An updated feasibility study for an Integrated open pit and underground mine with a single 67,500 ton per day processing facility which will incorporate the benefits of an updated resource estimate and iron magnetite resource is scheduled for completion in late December 2012.

The Pumpkin Hollow drilling program is under the supervision of Gregory French, CPG #10708, and a Qualified Person as defined in Canadian National Instrument 43-101, who is responsible for the preparation of the technical information in this news release. All assaying and whole rock geochemistry is processed at the American Assay Laboratories (AAL) in Reno, Nevada. Samples are delivered from the project core logging facility to AAL by Nevada Copper or AAL personnel. A Quality Assurance and Quality Control Assay Protocol have been implemented whereby blanks and standards are inserted into the assay stream and check samples are sent to Chemex-Reno and Inspectorate-Reno laboratories.

NEVADA COPPER CORP.

Giulio T. Bonifacio, President & CEO

Cautionary Language

We seek safe harbour.



Nevada Copper Corp.
Eugene Toffolo
Corporate Communications
604-683-8266 or Toll free: 1-877-648-8266
etoffolo@nevadacopper.com
or
Nevada Copper Corp.
Robert McKnight, P.Eng.
Executive Vice President
604-683-1309
bmcknight@nevadacopper.com
www.nevadacopper.com
Tweet

Nevada Copper

DEVELOPMENT STAGE
CODE : NCU.TO
CUSIP : 64128F
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Email Alert Add to Watchlist Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy
Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Nevada Copper
4/27/2010Closes $23,7 Million Bough-Deal Private Placement Financing
4/9/2010$20.6 Million Bought-Deal Private Placement Financement
10/27/2009$11,250,000 Private Placement with Capstone Mining Corp.
Nominations of Nevada Copper
2/28/2012Appoints New Director and Launches Project Website
11/17/2010NCU - NEVADA COPPER ANNOUNCES INVESTMENT BY PALA, EXERCISE O...
Project news of Nevada Copper
4/28/2011(Pumpkin Hollow)Provides Update on Feasibility Study & Engages Merit for Pre...
3/31/2011(Pumpkin Hollow)s Mineral Resource Estimate and Clarifies Technical Disclosu...
2/8/2011S FEASIBILITY STUDY PROGRESS
11/25/2010(Pumpkin Hollow)Announces Expansion of Drilling Program and Selection of Tet...
11/9/2010(Pumpkin Hollow)Announces Positive Metallurgical Test Results
11/1/2010(Pumpkin Hollow)Announces Decision to Proceed Directly to Definitive Feasibi...
10/26/2010(Pumpkin Hollow)Intersects 305 Feet of 1.02% Copper in the Open Pittable Nor...
10/5/2010(Pumpkin Hollow)Drilling Update
9/30/2010(Pumpkin Hollow)Continues to Intersect Multiple Zones Totaling 481 feet Incl...
9/8/2010(Pumpkin Hollow)Intersects Over 1,258 feet of 0.58% Copper in Four Separate ...
8/4/2010(Pumpkin Hollow)Intersects 230 Feet of 1.46% Copper in The Open Pittable Nor...
7/8/2010(Pumpkin Hollow)E2 Deposit Drilling Intersects 145 Feet of 2.37% Copper and ...
6/16/2010(Pumpkin Hollow)Mineralization Remains Open at North Deposit: Intersecting 9...
5/27/2010(Pumpkin Hollow)Increases Drilling Program
5/18/2010(Pumpkin Hollow)Discovers Two New Zones Intersecting 275 Feet of 0.98% Coppe...
5/6/2010(Pumpkin Hollow)Step Out Drilling Expands the Open Pittable North Deposit: I...
4/23/2010(Pumpkin Hollow)Drills Over 650 Feet Of Greater Than 0.70% Copper In Three S...
3/3/2010(Pumpkin Hollow)Intersects 4.18% Copper Over 29.7 Meters (97.5 Ft)
2/16/2010(Pumpkin Hollow)Continues to Intersect High Grade Copper
1/21/2010(Pumpkin Hollow)Intersects 31.1 Meters of 2.45% Copper
1/14/2010Files NI 43-101 Preliminary Economic Assessment
12/8/2009(Pumpkin Hollow)Commences Pre-Feasibility & 25,000 Meter Drilling Program
8/25/2009(Pumpkin Hollow)Files resource update NI 43-101 on Sedar
7/15/2009(Pumpkin Hollow)Reports Significant Resource Increase to 9.3 Billion Pounds ...
4/28/2009(Pumpkin Hollow)Drills High Grade in the East Deposit
Corporate news of Nevada Copper
5/7/2013s Lyon County Bill Status
4/23/2013(Pumpkin Hollow)to Proceed With Two-Stage Approach to Building Pumpkin Hollo...
4/17/2013s Permitting and Yerington Land Bill Status
4/17/2013s Permitting and Yerington Land Bill Status
3/28/2013Closes US$200 Million Loan Facility and Concentrate Off-Take...
3/11/2013North Deposit Mineralization Continues to Expand Intersectin...
2/15/2013-Permitting and Feasibility Study Update
1/3/2013Status of Congressional Action-Lyon County Land Bill
12/21/2012Senators Reid and Heller Introduce Land Bills to U.S. Senate
12/13/2012Announces Positive Feasibility Study Results for Stage 1 Und...
12/5/2012to Start Follow-Up Drilling of Discovery Hole NC12-34 Which ...
12/5/2012to Start Follow-Up Drilling of Discovery Hole NC12-34 Which ...
12/5/2012to Start Follow-Up Drilling of Discovery Hole NC12-34 Which ...
11/19/2012Announces Positive Feasibility Study Results for Stage 1 Und...
10/30/2012North Deposit Mineralization Remains Open Intersecting 119 F...
10/19/2012Files Resource Update NI 43-101 Technical Report on SEDAR
10/5/2012to Purchase 17.8% of Mercator Minerals
2/27/2012Appoints New Director & Launches Project Website
10/19/2010NCU - Nevada Copper PERMIT APPROVAL
10/19/2010Permit Approval
12/1/2009Robust Economic Results
12/1/2009Reports robust economic results
11/3/2009Capstone Mining Makes Strategic Investment in Nevada Copper
6/29/2009US$2,000,000 Convertible Debenture
5/2/2007Press Release: Augusta Files Q1 Financials - Negotiates Sale...
Comment this article
You must be logged in to comment an article8000 characters max.
 
Sign in
User : Password : Login
Sign In Forgot password?
 
Latest comment posted for this article
Be the first to comment
Add your comment
TORONTO (NCU.TO)FRANKFURT (ZYT.F)
2.41+2.12%1.70-2.19%
TORONTO
CA$ 2.41
05/22 13:16 0.050
2.12%
Prev close Open
2.36 2.43
Low High
2.41 2.43
Year l/h YTD var.
2.27 -  4.01 -35.39%
52 week l/h 52 week var.
1.85 -  4.01 1.26%
Volume 1 month var.
7,570 -6.23%
24hGold TrendPower© : -18
Produces
Develops Copper - Gold - Silver
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
TOP NEWSRELEASES
Annual variation
DateVariationHighLow
2013-28.49%
2012-34.05%5.611.75
201110.61%6.423.12
201056.61%4.741.82
20091452.63%3.220.17
 
5 years chart
 
3 months chart
 
3 months volume chart