Copper Fox Metals Inc.

Published : December 14th, 2010

Drilling Continues to Intersect Deep Higher Grade Copper-Gold-Molybdenum Mineraliztion at Schaft Cre

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment

http://www.copperfoxmetals.com/i/tdot.gif

http://www.copperfoxmetals.com/i/tdot.gif

http://www.copperfoxmetals.com/i/tdot.gif

http://www.copperfoxmetals.com/i/misc/CopperFox_e-Head.jpg

 

 


Drilling Continues to Intersect Deep Higher Grade Copper-Gold-Molybdenum Mineraliztion at Schaft Creek Environmental Assessment Process Reaches Milestone

 


- Copper Fox Metals Inc. (TSX-Venture: CUU) is very pleased to announce additional assay results from the ongoing diamond drilling program at the Schaft Creek porphyry deposit located in north western British Columbia. The drilling program is concentrating on an area of the deposit that is 600 metres (m) long by 200m wide to: i) establish a higher grade starter pit on surface and ii) to test for higher grade copper-gold mineralization at depth. Highlights are as follows:

Highlights:

- diamond drill hole (DDH) CF399 has extended the mineralization 175m to the east and 125m at depth. DDH CF401 has extended the mineralization a further 130m to the east and 100m at depth. The mineralization on both sections is open at depth and to the east,

- DDH CF399 intersected 0.39% copper, 0.10 g/t gold and 0.05% molybdenum and 2.09 g/t silver (0.67% copper equivalent) from 9.14m to 517.24m a core interval of 508.1m,

- DDH CF399 includes a higher grade interval of 0.45% copper, 0.33 g/t gold and 0.06% molybdenum and 3.01 g/t silver (0.94% copper equivalent) from 462.7m to 517.24m, a core interval of 54.5m at the bottom of the hole,

- DDH CF401 intersected 0.43% copper, 0.25g/t gold, 0.04% molybdenum and 2.40 g/t silver (0.75% copper equivalent) from 5.66m to 495.9m a core interval of 489.5m,

- DDH CF401 includes a higher grade interval of 0.66% copper, 0.50g/t gold, 0.04% molybdenum, 3.10 g/t silver (1.17% copper equivalent) from 345.4m to 429.2m, a core interval of 83.8m at the bottom of the hole, and

- copper and gold grades increase substantially in the lower portions of DDH CF399 and DDH CF401 similar to that seen in DDH CF398 and both holes are open at depth.

Mr. Stewart, President of Copper Fox stated, "We are very encouraged with the higher grades and significant extension of the mineralization to depth and to the east. The first three drill holes completed in 2010 indicate that the IP anomaly correlates to the significantly higher copper and gold grades intersected at depth. We are currently waiting for the assays results of DDH CF402 located 150m north of DDH CF398 to determine if this trend continues along strike. Of significant interest to the potential of the Schaft Creek deposit is a 600m wide portion of the IP anomaly located east of the current drilling that remains to be tested."

Diamond Drilling Update:
The weighted average grades for the mineralized intervals in DDH CF398 (previously reported) DDH CF399 and DDH CF401 are set out below in Table-1.

DDH ID

Dip

Azimuth

From (m)

To (m)

Interval (m)

Copper (%)

Gold (g/t)

Molybdenum (%)

Silver (g/t)

Cu Eqv (%)

CF398

-55

90

7.10

539.20

532.10

0.42

0.27

0.020

2.00

0.67

including

7.10

61.40

54.30

0.70

0.42

0.040

2.80

1.13

including

325.50

539.20

213.70

0.47

0.37

0.020

3.00

0.78

CF399

-55

90

9.14

517.24

508.10

0.39

0.10

0.050

2.09

0.67

including

9.14

159.70

150.56

0.53

0.05

0.040

2.87

0.77

including

462.74

517.24

54.50

0.45

0.33

0.060

3.01

0.94

CF401

-55

90

5.66

495.90

489.53

0.43

0.25

0.028

2.4

0.75

including

158.00

442.49

283.78

0.55

0.38

0.034

3.15

0.98

including

345.40

429.20

83.80

0.66

0.50

0.036

3.10

1.17

Note: Results for DDH CF398 were reported in a News Release dated November 4, 2010
Note: Mineralized intervals reported in the above table are not true thickness


DDH CF399 was terminated earlier than expected due to drilling difficulties. The mineralization in DDH CF399 is hosted in potassic altered intrusive breccia overprinted by abundant vein controlled prophylitic alteration. The last sample in this hole at a vertical depth of 433m below surface assayed 1.03 % copper, 0.11% molybdenum, 0.26 g/t gold and 2.0 g/t silver over an interval of 0.5m. The molybdenum concentrations at the bottom of this hole are significantly higher than in DDH CF398 and DDH CF401.

The mineralization in DDH CF401 is also hosted in potassic altered intrusive breccia overprinted by abundant vein controlled prophylitic alteration. Three very thick (approximately 15m to 30m) barren post mineralization mafic dikes were intersected in this hole. The inclusion of these un-mineralized intervals has reduced the weighted average grade of the drill hole. The average copper and gold grades in the bottom portion of this hole are the highest intersected to date in the 2010 drilling program. The core interval from 429.2m to 459m is a barren post mineralization mafic dike. From 459m to the end of the hole is mineralized. Mineralization was intersected in this hole to a vertical depth of 399m below surface.

Table-2: 2010 Diamond drill status Schaft Creek:

DDH ID

Easting

Northing

Dip

Azimuth

Core Length (m)

Verticle Depth (m)

Status

CF402

379313

6361056

-55

90

581.3

475

Completed**

CF403

379347

6360502

-80

90

212.5

210

Completed**

CF404

380024

6358546

-80

270

255.1

248

Completed**

CF405

379418

6360908

-58

90

648.3

550

Completed**

CF406

379550

6360654

-60

90

700*

609

In Progress

* Projected depth
**Core logging, sawing and sampling of the completed diamond drill holes CF402, CF403, CF404 and CF405 is in progress and analytical results will be reported on receipt thereof.


Re-sampling Historical Drill Holes;
The re-sampling of some of the historical diamond drill holes (completed between 1960 and 1985) is progressing well. The results of the re-sampling program will be released when a sufficient number of assays are available. These results will be included in the updated resource estimate.

Environmental Assessment Update:
Copper Fox is pleased to announce that the 30 day public comment period for the draft Application Information Requirements (AIR) ended on November 5, 2010. Copper Fox expects to finalize the AIR by the end of the year. This is the last major milestone in the pre-Application stage of the environmental assessment process for the Schaft Creek project. Copper Fox will now focus on completing the Environmental Assessment Application for review by the British Columbia Environmental Assessment Office, the Canadian Environmental Assessment Agency and the Tahltan Nation.

Future Drilling Plans:
The current drilling program is expected to continue until December 22, at which time drilling will be temporarily suspended for the holidays. Plans for resumption of the drilling program in January 2011 are underway, contingent on assay results from the outstanding drill holes of the 2010 drilling program. DDH CH406 is currently in progress and is expected to be completed before the holiday break. The re-sampling program is also expected to resume in early January 2011.

Diamond Drilling and Sampling Procedures:
The diamond drilling was completed using HQ and NQ core size. Core recovery was estimated to be greater than 97%. After cutting with a diamond saw, one half of the core was collected for sample preparation and analysis and the other half is retained for future reference. Sample intervals were selected based on lithology changes/alteration intensity/estimated mineral content. Sample intervals ranged from 0.58m to 2.49m. Sample preparation was completed by ACME Analytical Laboratories Ltd ("ACME") located in Smithers, British Columbia and analyses were completed by ACME in Vancouver, British Columbia.

Base metals were assayed using the ACME's 7TD package which includes 4-acid digestion and ICP-ES finish. Lower detection limits are as follows: Cu >0.001%, Mo >0.001%, Ag >2 g/t. Gold is assayed by the G6 fire assay package - fusion of a 30-gram followed by ICP-ES finish; with a lower detection limit of 0.005 g/t. ACME has a 9001:2008 International Standard Organization rating.

Copper equivalent calculations are based on 100% of the copper content plus 81% of the gold content, 72% of the molybdenum content and 71% of the silver content. Metal prices are copper $US2.50/pound, gold $US1,075.00/ounce, molybdenum $US17.00/pound and silver $US16.10/ounce.

Quality Control
Copper Fox follows a rigorous Quality Assurance/Quality Control program consisting of inserting standards, blanks and duplicates into the sample stream submitted to the laboratory for analysis.

Elmer B. Stewart, MSc. P. Geol., President of Copper Fox, is the Corporation's nominated Qualified Person pursuant to National Instrument 43-101, Standards for Disclosure for Mineral Projects, has reviewed the technical information disclosed in this news release.

About Copper Fox
Copper Fox is a Canadian based resource company listed on the TSX-Venture Exchange (CUU) focused on completing a Feasibility Study on the Schaft Creek deposit, one of the largest undeveloped copper, gold, molybdenum and silver deposits in North America. Categorized as a "giant porphyry deposit" this project is at the advanced development stage with a Preliminary Feasibility Study ("PFS") prepared by Samuel Engineering, Inc. of Denver, Colorado, in September 2008. The results of the PFS were extremely "robust" reporting a NPV @ 8% (before tax) of $2.8 billion dollars over a 23 year mine life. They contemplated processing 100,000 tonne per day ("tpd") from an open pit mine using a standard flotation recovery process. The PFS estimated the current Mineral Resources (using a 0.2% copper equivalent cutoff) at Schaft Creek includes; Measured Resources of 436.5 million tonnes grading 0.30% copper, 0.23 g/t gold, 0.02% molybdenum and 1.55 g/t silver, Indicated Resources of 929.8 million tonnes grading 0.23% copper, 0.15 g/t gold, 0.02% molybdenum and 1.56 g/t silver. The PFS projected a recovery of 4.8 billion pounds of copper, 255 million pounds of molybdenum, 4.5 million ounces of gold and 32.5 million ounces of silver.

A Feasibility Study on a minimum 120,000 tpd open pit mine is expected to be completed in early 2011.

Copper Fox holds title and a 100% working interest in a contiguous 21,025 hectares (51,954 acres) property which includes the Schaft Creek deposit subject to certain royalty agreements and an earn back option. Teck Resources Limited ("Teck") has an option to acquire 20%, 40% or 75% of the Schaft Creek project which is triggered upon completion of the Feasibility Study. Should Teck elect to exercise its option for 75% they are required to fund subsequent property expenditures up to a total of 400% of those incurred by Copper Fox ($55 million to date) and arrange for project financing, including the Copper Fox portion. For full details of the option please refer to the Company's website
www.copperfoxmetals.com.

*United States investors are advised that current Mineral Resources are not current Mineral Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate and in keeping with "best practice principals".

For additional information contact: Investor line 1-866-913-1910
or J. Michael Smith, Executive Vice President, at 1-604-689-5080.

On behalf of the Board of Directors

Elmer B. Stewart
President & Chief Executive Officer

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of the Canadian securities laws. Forward-looking information is generally identifiable by use of the words "believes," "may," "plans," "will," "anticipates," "intends," "budgets", "could", "estimates", "expects", "forecasts", "projects" and similar expressions, and the negative of such expressions. Forward-looking information in this news release include statements about anticipated timing and analytical results of the core sampling of historical diamond drill holes and current diamond drill holes, the assays results and extensions of the mineralization , anticipated results and timing of the proposed updated resource estimate, and feasibility studies ; the possibility of a higher grade starter pit; the timing, approvals and anticipated results of an Environmental Assessment Application for the Schaft Creek project; estimated timing and amounts of future expenditures and "earn-back" options; geological interpretations and potential mineral recovery processes Information concerning mineral reserve and resource estimates also may be deemed to be forward-looking information in that it reflects a prediction of the mineralization that would be encountered if a mineral deposit were developed and mined.

The forward-looking information contained in this news release, Copper Fox has made numerous assumptions , regarding, among other things: the geological, metallurgical, engineering, financial and economic advice that Copper Fox has received is reliable, and is based upon practices and methodologies which are consistent with industry standards, the obtaining of an Environmental Assessment Certificate; and the continued financing of the Feasibility Study; and the anticipated analytical results of the current drilling program. While Copper Fox considers these assumptions to be reasonable, these assumptions are inherently subject to significant uncertainties and contingencies. Additionally, there are known and unknown risk factors which could cause Copper Fox's actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information contained herein. Known risk factors include, among others: the assay results does not extend the area of mineralization outlined in the 2010 diamond drilling; drilling programs may not continue or proceed in accordance with previously announced schedules and timing; the Feasibility Study may not be completed within the contemplated time frame, or at all; the possibility that the analytical results from the core sampling does not return significant grades of copper minerlaization; the possibility that an Environmental Assessment Certificate may not be obtained on a timely basis, or at all, or that additional approvals will be necessary in order to obtain an Environmental Assessment Certificate; fluctuations in copper and other commodity prices and currency exchange rates; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, recovery rates, and estimated economic return; the need to obtain additional financing to develop properties and uncertainty as to the availability and terms of future financing; the possibility of delay in exploration or development programs or in construction projects and uncertainty of meeting anticipated program milestones; uncertainty as to timely availability of permits and other governmental approvals

A more complete discussion of the risks and uncertainties facing Copper Fox is disclosed in Copper Fox's continuous disclosure filings with Canadian securities regulatory authorities at
www.sedar.com. All forward-looking information herein is qualified in its entirety by this cautionary statement, and Copper Fox disclaims any obligation to revise or update any such forward-looking information or to publicly announce the result of any revisions to any of the forward-looking information contained herein to reflect future results, events or developments, except as required by law.

http://www.copperfoxmetals.com/i/tdot.gif


 

Copper Fox Metals Inc.

DEVELOPMENT STAGE
CODE : CUU.V
ISIN : CA21749Q1046
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Copper Fox is a copper development stage company based in Canada.

Copper Fox develops copper, gold, molybdenum and silver in Canada.

Its main asset in development is SCHAFT CREEK in Canada.

Copper Fox is listed in Canada. Its market capitalisation is CA$ 104.8 millions as of today (US$ 76.7 millions, € 71.7 millions).

Its stock quote reached its highest recent level on April 21, 2011 at CA$ 2.63, and its lowest recent point on March 13, 2020 at CA$ 0.01.

Copper Fox has 427 809 984 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Annual reports of Copper Fox Metals Inc.
2007 Annual report
2006 Annual report
Financings of Copper Fox Metals Inc.
7/1/2016Announces Closing of the Second placement
4/8/2013Announces Closing of a $2,653,000 Financing
2/22/2013announces a $2,500,000 Private Placement Unit Offering, insi...
1/22/2013ANNOUNCES the Closing of a $1,500,000 Financing by an Inside...
1/16/2013Announces a $1,500,000 Private Placement Unit Offering, Insi...
1/16/2013Announces a $1,500,000 Private Placement Unit Offering, Insi...
10/24/2012ANNOUNCES the Closing of a $2,500,000 Financing by an Inside...
9/14/2012Announces the Closing of a $4,025,000 Financing by an Inside...
7/23/2012ANNOUNCES a $4,025,000 Private Placement Unit Offering, Insi...
6/18/2012Announces A $4,480,000 Private Placement Unit Offering Insid...
1/30/2012Announces The Closing Of $2,200,000 Financing By An Insider
1/19/2012Announces a $2,200,000 Private Placement Unit Offering Insid...
12/14/2011Announces the Closing of $4,000,000 Financing by an Insider
12/7/2011Announces Increase of $2,000,000 to previously announced Pri...
10/5/2011Announces the Closing of $5,000,000 Financing by an Insider
9/13/2011Announces an Additional $2,000,000 Private Placement Unit Of...
9/8/2011announces a $3,000,000 Private Placement Unit Offering. Ins...
3/31/2011ANNOUNCES THE ACCELERATION TERM TO BE APPLIED TO THE EXPIRY ...
3/17/2011CLOSING OF A $3,750,000 NON BROKERED PRIVATE PLACEMENT FLOW-...
2/17/2011Announces a $3,750,000 Non Brokered Private Placement Flow-T...
10/22/2009closing of a $2,000,000 Private Placement Unit Offering
9/28/2009$2,000,000 Private Placement
6/23/2009Provides Update on its $6,000,000 Private Placement
6/19/2009 Updates on its $6,000,000 private placement
6/2/2009announces a $6,000,000 non-brokered Private Placement of whi...
12/16/2008Announces the Withdrawal of a Private Placement Financing
11/7/2008ANNOUNCES PRIVATE PLACEMENT FINANCING
11/7/2008Announces Private Placement Financing
5/15/2008closes Non Brokered Private Placement Financing of $12,398,2...
7/17/2007to raise $10,000,000 in flow-through and non-flow-through fu...
7/17/2007Intends to offer a brokered private placement
Option Grants of Copper Fox Metals Inc.
4/30/2012Announces Incentive Stock Option Grants
3/14/2011Grant of 1,700,000 shares at $ 1,69 par share
6/26/2008grant of incentive stock options to Employees, Officers, Con...
Nominations of Copper Fox Metals Inc.
5/3/2011ANNOUNCES RESIGNATION OF CFO, APPOINTMENT OF AN INTERIM CFO
7/16/2009Announces Executive Changes and the Appointment of a Directo...
9/17/2007Announces the appointment of Shane Uren as Vice President
Financials of Copper Fox Metals Inc.
9/22/2016Announces 2016 Third Quarter Financial Results
3/31/2016Announces 2016 First Quarter Financial Results
9/29/2015Announces Third Quarter Results
9/28/2013Announces Third Quarter Results
6/24/2013Announces Second Quarter Results
9/27/2012Announces Third Quarter Results
6/18/2012Announces Second Quarter Results
4/25/2012Announces First Quarter Results
2/29/2012Reports 2011 Annual Financial Results and a Corporate Update
9/29/2011Reports 2011 Third Quarter Financial Results and a Corporate...
6/30/2011Advances Feasibility Study and Reports 2011 Second Quarter F...
3/31/2011Announces First Quarter 2011 Highlights and Financial Result...
2/16/2011Announces Fourth Quarter Highlights and 2010 Year-End Financ...
2/25/2010Announces 2009 Year-End Financial Results
3/6/20092008 Year-end Financial Results
6/4/2008Second Quarter Results Three and Six Months Ended April 30, ...
6/3/2008Second Quarter Results
3/31/2008First Quarter Financials
3/27/2008First Quarter Results Three Months Ended January 31, 2008
2/11/20082007 Year-End Financial Results
9/24/2007Announces third quarter results
3/28/2007announces its first quarter results for the three months en...
Project news of Copper Fox Metals Inc.
1/9/2014Outlines 2014 Diamond Drilling Plans for Van Dyke Copper Pro...
11/19/2013Sampling Locates Two Large Areas Of Porphyry Style Copper-M...
4/12/2013Acquires Van Dyke Copper Deposit in Arizona
3/25/2013(Schaft Creek)Enters Into Facilities Study Agreement with BC Hydro for Sch...
2/4/2013(Schaft Creek)Files Positive Feasibility Study on Schaft Creek Project
9/10/2012Completes Acquisition Of Sombrero Butte Copper Project And V...
7/9/2012To Acquire From Bell Copper The Van Dyke Copper Deposit And ...
5/31/2012(Schaft Creek)Schaft Creek Resource Estimate Update
5/24/2012(Schaft Creek)Provides Update on Schaft Creek Project
5/10/2012(Schaft Creek)Announces 2012 Exploration Program And Acquires Additional M...
3/27/2012(Schaft Creek)Completes Land Acquisitions Covering Positive Magnetic Linea...
3/19/2012(Schaft Creek)s Activities on the Schaft Creek-Copper-Gold-Molybdenum-Silv...
2/3/2012(Schaft Creek)Announces Drilling Intersect of 0.96% CuEq Over 110m and Rep...
12/12/2011Drilling Expands Paramount Zone with Intersection of 1.10% C...
10/13/2011(Schaft Creek)Secures Shipping Facilities for Concentrate at Port of Stewa...
9/23/2011(Schaft Creek)Extends Mineralized Zone to the East And Completes Strategic...
9/6/2011Welcomes the Awarding of the Construction Contract for the N...
7/26/2011(Schaft Creek)Drilling Intersects 1.18% Copper Equivalent Over 161M at Sch...
5/31/2011(Schaft Creek)Commences 2011 Drilling Program, Updates Other Activities ...
5/10/2011(Schaft Creek)Welcomes the Federal Government of Canada's Approval of the ...
5/6/2011(Schaft Creek)Provides Update on 2011 Plans for Schaft Creek, Diamond Dril...
5/5/2011(Schaft Creek)FOX PROVIDES UPDATE ON 2011 PLANS FOR SCHAFT CREEK, DIAMOND ...
3/24/2011(Schaft Creek)Announces Strategic Acquisitions to Enlarge Schaft Creek Pro...
2/28/2011(Schaft Creek)Copper Fox Metals Applauds the Announcement of the Province ...
2/23/2011(Schaft Creek)DDH CF405 Tests Chargeability Anomaly And Expands Zone Of De...
2/14/2011(Schaft Creek)News Release
2/3/2011(Schaft Creek)Latest Assay Results Expands Zone of Deep, Higher Grade Mine...
6/18/2010files an amended Preliminary Feasibility Study on SEDAR
4/1/2010s Status of Feasibility Study and Reports 2010 First Quarter...
1/21/2010(Schaft Creek)Awards Feasibility Study On Schaft Creek Project
11/18/2009(Schaft Creek)Geophysical Survey Outlines "8" IP Anomalies at Schaft Creek...
9/15/2008Positive Results of Preliminary Feasibility Study on Schaft ...
9/15/2008Announces Positive Results of Preliminary Feasibility Study ...
7/14/2008(Schaft Creek)Strategic Drilling Program and Greenfield Camp Expansion Hig...
6/26/2008(Schaft Creek)2007 Drilling And Geophysical Results All Show Increased Pot...
3/20/2008(Schaft Creek)Announces Schaft Creek progress
1/14/2008(Schaft Creek)Releases Positive Preliminary Economic Assessment on its Sch...
11/27/2007(Schaft Creek)continues development of its Schaft Creek British Columbia m...
10/22/2007(Schaft Creek)'Pit Optimization Study Demonstrates 65,000-tonne per-day Op...
7/10/2007(Schaft Creek)Updates 2007 Schaft Creek Work Program
7/4/2007(Schaft Creek)Significantly Increases Resources at Schaft Creek
Corporate news of Copper Fox Metals Inc.
6/29/2016Copper Fox Announces 2016 Second Quarter Financial Results
6/10/2016Copper Fox Announces a $1,000,000 Non-Brokered Private Place...
3/31/2016Copper Fox Announces 2016 First Quarter Financial Results
3/30/2016Copper Fox Annnounces 2016 Schaft Creek Program
1/25/2016Copper Fox Announces Mineral Mountain Copper Project in Ariz...
12/24/2015Copper Fox Files Van Dyke Technical Report on SEDAR
12/22/2015Copper Fox Announces $1,650,000 Non-Brokered Private Placeme...
11/6/2015Copper Fox Provides Update of Activities
9/29/2015Copper Fox Announces Third Quarter Results
9/25/2015Copper Fox Extends Size of Exploration Target on Sombrero Bu...
9/8/2015Copper Fox Reports Large Chargeablity Signature on Sombrero ...
7/28/2015Copper Fox Provides Update of Activities
7/13/2015Copper Fox Commences Titan-24 DCIP Survey at Sombrero Butte ...
4/15/2015Copper Fox Announces Preliminary Results of Metallurgical Te...
4/8/2015Copper Fox Announces Commencement of Preliminary Economic As...
3/31/2015Copper Fox Annnounces First Quarter Results
3/17/2015Copper Fox Annnounces 2015 Schaft Creek Program
3/13/2015Copper Fox Receives $3.63 Million Cash Refund
3/12/2015Copper Fox Extends Warrant Expiry Dates and Announces AGM Da...
2/27/2015Copper Fox Announces Annual Results
2/9/2015Copper Fox Updates Schaft Creek Project Activities
2/3/2015Copper Fox Files Van Dyke Technical Report on SEDAR
1/15/2015Copper Fox Completes Top-Up Investmentin Carmax Mining Corp.
12/24/2014Copper Fox Provides Corporate Update on Project Activities
12/19/2014Copper Fox Completes Inferred Mineral Resource Estimate for ...
12/3/2014Copper Fox Announces Preliminary In-Situ Leach Test Results ...
10/28/2014Copper Fox Announces Commencement of Resource Estimate at Va...
10/23/2014Copper Fox Announces Update on Schaft Creek Project
9/25/2014Copper Fox Completes Top-Up Investment in Carmax Mining Corp...
9/23/2014Copper Fox Announces Third Quarter Results
9/10/2014Copper Fox Announces Van Dyke Drill Results and Provides Oth...
8/7/2014Copper Fox Announces Van Dyke Drill Results and Provides Cor...
7/21/2014Copper Fox Completes Van Dyke Drilling Program and Provides ...
6/18/2014Copper Fox Announces Second Quarter Results
5/29/2014Copper Fox Closes Carmax Investment
5/23/2014Copper Fox Announces Carmax Shareholders Approve Private Pla...
5/15/2014Copper Fox Adds Second Drill to Van Dyke Project and Provide...
12/3/2013s Activities on Van Dyke Copper Deposit in Arizona
11/19/2013Sampling locates two large areas of porphyry style copper-mo...
8/30/2013announces a corporate reorganization
8/12/2013provides update on corporate activities
7/16/2013(Schaft Creek)And Teck Resources Form Schaft Creek Joint Venture
6/5/2013(Schaft Creek)provides update on discussions regarding Schaft Creek
2/7/2013(Schaft Creek)Completes Land Acquisitions at Schaft Creek & Sombrero Butte...
1/17/2013Announces Extension Of Expiry Date Of Certain Stock Options
10/17/2012(Schaft Creek)Reports Diamond Drill Results From the 2012 Drilling Program...
9/25/2012(Schaft Creek)Reports the Status of the Schaft Creek Feasibility Study and...
9/25/2012(Schaft Creek)Reports the Status of the Schaft Creek Feasibility Study and...
9/4/2012Drilling Indicates Widespread Mineralization in the Discover...
8/2/2012(Schaft Creek)Drilling Extends Mineralization In Discovery Zone And Acquir...
2/16/2012(Schaft Creek)Locates a New Zone of Copper Mineralization 1,200M North of ...
1/23/2012Announces The Issuance Of 1,272,727 Shares For Outstanding ...
1/13/2012Announces Shares For Debt Agreement
9/6/2011(Schaft Creek)Drilling Intersects 0.81% Copper Equivalent Over 154m at Sch...
7/11/2011(Schaft Creek)Measured and Indicated Resource Estimate Exceeds 1 Billion T...
6/21/2011(Schaft Creek)High Resolution Magnetic Survey at Schaft Creek Confirms Sim...
4/13/2011Announces Completion of 3D Model and Award of High-Resolutio...
4/13/2011ANNOUNCES COMPLETION OF 3D MODEL AND AWARD OF HIGH-RESOLUTIO...
6/17/2010June 17 2010 news release
6/1/2010June 1 2010 News release
2/2/2010Feb 2 2010 news release
1/21/2010Jan 21, 2010
10/23/2009New release attached
10/22/2009announces the closing of a $2,000,000 Private Placement Unit...
9/17/2009Applauds Federal Government’s Support for British Columbia N...
9/17/2009Applauds Federal Government's Support for British Columbia N...
7/13/2009Special Shareholders Meeting Approves a New control Person -...
7/13/2009July 13, 2009 News release
6/30/2009Three and Six Months Ended April 30, 2009
6/26/2009June 25, 2009 news release
3/3/2009Annual Financial
2/27/2009Feb 26, 2009 News release
2/27/2009Lions Gate Metals Inc. and Copper Fox Metals Inc. Announce B...
2/12/2009Correct News release
2/12/2009Feb 11 09 News release
2/12/2009provides an update of Corporate Activities
2/3/2009Highway 37 Power Line Coalition Applauds Premier for Express...
1/22/2009Cambridge House Invitation - Vancouver
12/18/2008December 17 2008 News release
12/18/2008Announces Resignation Of A Director
9/30/2008Sept 30/08
9/29/2008Applauds Advancement of Northwest Power Line
9/29/2008Applauds Advancement of Northwest Power Line
9/26/2008Northwest Power Line Could Create Thousands of Jobs, Attract...
9/17/2008Schaft not Galore says Copper Fox president
9/2/2008LV Hard Assets Conference Personalized Html
7/17/2008from the Ministry of Energy, Mines and Petroleum Resources r...
6/26/2008June 26 2008 Options
6/26/2008June 26, 2008
5/26/2008Register Today for a Discounted Rate to the New Orleans 2008...
4/4/2008Applauds Advancement of Northwest Power Line Study
3/31/2008$16mm offering
11/15/2007announces the renewal of the engagement of Jason Shepherd fo...
10/12/2007Announces is has earned a 70% Direct Interest in the World C...
10/2/2007$400 million to empower B.C.'s far northwest
8/8/2007Drilling to Commence at Copper Flats
7/12/2007Press Release: Augusta Files Plan of Operations for Rosemont...
7/3/2007 2nd Quarter Financials
6/11/2007announces its request for a trading halt
5/4/2007and the Tahltan Nation Development Corporation complete a "M...
4/22/2007Adopts a Shareholder Rights Plan.
2/27/2007Welcomes New Executive to the Team
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (CUU.V)
0.245+4.26%
TSX-V
CA$ 0.245
04/25 16:59 0.010
4.26%
Prev close Open
0.235 0.235
Low High
0.235 0.250
Year l/h YTD var.
0.160 -  0.250 6.52%
52 week l/h 52 week var.
0.150 -  0.300 -10.91%
Volume 1 month var.
91,000 44.12%
24hGold TrendPower© : 40
Produces
Develops Copper - Gold - Molybdenum - Silver
Explores for
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 7/8/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
202425.64%
202321.88%0.310.15
2022-36.00%0.320.13
2021-25.37%0.660.20
2020346.67%0.470.01
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 11.94+9.34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.54-2.55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.69+13.03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.60+1.83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+0.00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.87+5.65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.61+0.98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :