Sphinx Resources

Published : July 31st, 2008

Drilling Continues toDelineate and Expand Mineralization at McLeod

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Canada | Copper | Diamond | Gold | Silver | Zinc |

Marketwire

 
 
Donner Metals Ltd.
TSX VENTURE: DON
FRANKFURT: D4M
Other Recent News

July 30, 2008
Donner Metals Ltd.: Drilling Continues to Delineate and Expand Mineralization at McLeod and Bracemac Unusually High Copper Values Encountered
VANCOUVER, BRITISH COLUMBIA--(Marketwire - July 30, 2008) - Mr. Harvey Keats, Chief Executive Officer of Donner Metals Ltd. (TSX VENTURE:DON)(FRANKFURT:D4M), reports the expansion of the Bracemac Key Tuffite and McLeod zones at the Company's Matagami Project in central Quebec. At the Bracemac Key Tuffite Zone, Diamond drill hole BRC-08-75, intersected massive and semi-massive sulphides down-dip of this zone that returned 7.75 metres averaging 3.79% copper and 5.61% zinc. The Old McLeod Zone, approximately 1 kilometre east of Bracemac, has been extended up-dip by MC-08-55 that returned 11.90 metres averaging 2.26% copper and 7.77% zinc. Drilling up-dip of the New McLeod Zone returned 1.04% Cu, and 13.16% Zn over 2.51 metres in MC-08-47. The West McLeod Zone, located between the Old McLeod Zone and Bracemac Key Tuffite Zone, returned significant copper mineralization in two drill holes, MC-08-46, averaging 4.12% copper over 15.65 metres and 3.02% copper over 5.32 metres, and MC-08-53, averaging 2.96% copper over 7.91 metres.

Drilling Highlights
--------------------------------------------------------------------------
DDH                                   Core Length                g/t   g/t
(Depth)                From       To      (metres)  % Zn  % Cu    Ag    Au
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Bracemac Key Tuffite Zone
--------------------------------------------------------------------------
--------------------------------------------------------------------------
BRC-08-75            652.10   659.85         7.75   5.61  3.79  9.24  0.52
--------------------------------------------------------------------------
--------------------------------------------------------------------------
New McLeod Zone
--------------------------------------------------------------------------
--------------------------------------------------------------------------
MC-08-47             744.38   746.89         2.51  13.16  1.04 27.23  0.68
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Old McLeod Zone
--------------------------------------------------------------------------
--------------------------------------------------------------------------
MC-08-55             476.80   488.70        11.90   7.77  2.26 32.12  0.42
--------------------------------------------------------------------------
--------------------------------------------------------------------------
West McLeod
--------------------------------------------------------------------------
--------------------------------------------------------------------------
MC-08-46             637.40   653.05        15.65   0.18  4.12 36.20  0.27
--------------------------------------------------------------------------
  and                665.63   670.95         5.32   0.07  3.02 14.73  0.03
--------------------------------------------------------------------------
--------------------------------------------------------------------------
MC-08-53             504.92   512.83         7.91   0.28  2.96 16.87  0.23
--------------------------------------------------------------------------
--------------------------------------------------------------------------
 
Bracemac Area

Bracemac Zone: Diamond drill holes BRC-08-75 and BRC-08-76, engineered to target the Key Tuffite horizon, also tested the Bracemac horizon east of known mineralization and intersected heavily disseminated and semi-massive sulphides over thin intervals underlain by strong chlorite alteration. BRC-08-75 intersected the horizon 20 metres east and up-dip of BRC-08-74 and 20 metres down-dip from BRC-07-34, both of which did not intersect mineralization at the Bracemac horizon. BRC-08-76 was drilled 50 metres down-dip and to the east of BRC-07-28 (9.83% Zn, 0.90% Cu, 13.3 g/t Ag, 0.18 g/t Au over 6.90 metres) and 55 metres east of MC-06-27 (13.98% Zn, 3.69% Cu, 38.9 g/t Ag, 0.48 g/t Au over 8.80 metres). BRC-08-77, also targeting the underlying Key Tuffite level, intersected the Bracemac Tuffite 25 metres down-dip from BRC-08-75 and did not encounter mineralization or alteration.

Bracemac Key Tuffite Zone: Drill hole BRC-08-75 extended mineralization 95 metres down-dip from BRC-08-74 (11.46% Zn, 5.63% Cu, 17.73% Ag, 1.47 g/t Au over 23.70 metres) where it intersected massive, semi-massive and stringer sulphides within a thick interval of intense Pipe alteration. BRC-08-76 intersected unmineralized Key Tuffite followed by intense Pipe alteration 40 metres down-dip and to the west of BRC-08-74 and 60 metres west and up-dip from BRC-08-75. Drill hole BRC-07-28 was extended to the Key Tuffite where it intersected unmineralized tuffite 60 metres west and slightly up-dip from BRC-08-74. BRC-06-26 was also extended and intersected unmineralized Key Tuffite followed by chlorite alteration 75 metres west of BRC-08-76. Diamond drill hole BRC-08-77 intersected unmineralized, brecciated Key Tuffite, underlain by Pipe alteration 60 metres east and up-dip from BRC-08-74. Drill hole BRC-08-80 intersected weakly mineralized Key Tuffite, 100 metres east of BRC-07-61 (9.48% Zn, 2.81% Cu, 26.74 g/t Ag, 0.37 g/t Au over 6.00 metres). Mineralization and/or intense Pipe alteration encountered in drill holes BRC-08-74, BRC-08-75, BRC-08-76 and BRC-08-77 warrants continued drill investigation in this area of the Bracemac Key Tuffite Zone. The zone remains open down-dip.

Two widely spaced step-out drill holes investigated the up-dip extension of the Bracemac Key Tuffite Zone. BRC-08-78 intersected weakly mineralized Key Tuffite 225 metres up-dip and west of known mineralization at a depth of 50 metres. BRC-08-79 tested the Key Tuffite 75 metres up-dip from BRC-08-71 (3.53% Zn, 0.33% Cu, 10.56 g/t Ag, 0.08 g/t Au over 8.40 metres) where it encountered a gabbro sill, occupying the Key Tuffite stratigraphic interval.

McLeod Area

New McLeod Zone: Two drill holes were completed up-dip of the New McLeod Zone. MC-08-47 investigated the up-dip extension of the central portion of the zone and intersected high-grade mineralization 65 metres up-dip from MC-07-22 (19.30% Zn, 1.32% Cu, 28.5 g/t Ag, 0.75 g/t Au over 5.04 metres) and 40 metres down dip of MC-07-25 (35.6% Zn, 1.82% Cu, 54.9 g/t Ag, 2.93 g/t Au over 0.96 metres). Drill hole MC-08-51 intersected stringer mineralization 55 metres up-dip and to the east of MC-08-43 (13.98% Zn, 1.15% Cu, 30.03 g/t Ag, 0.94 g/t Au over 8.54 metres) and 50 metres west and up-dip of MC-07-25. Drilling continues to investigate a link between mineralization in the New McLeod and Old McLeod Zones.

Old McLeod: Two drill holes were completed in the Old McLeod Zone. MC-08-52, drilled 80 metres up-dip from MC-07-27 (18.45% Zn, 2.11% Cu, 42.83 g/t Ag, 1.12 g/t Au over 9.80 metres and 10.51% Zn, 3.94% Cu, 92.38 g/t Ag, 0.85 g/t Au over 3.22 metres) encountered weakly mineralized Key Tuffite. BRC-08-55 was drilled 50 metres up-dip from MC-07-27 and 45 metres west of MC-08-52 where it intersected high-grade mineralization related to an off-hole EM anomaly detected in MC-08-52. The Zone is open up-dip from MC-08-55 and its extent remains to be delineated.

Old McLeod, Up-dip: Drill hole MC-08-49 intersected unmineralized, brecciated Key Tuffite underlain by intense chlorite alteration 45 metres west and down-dip from MC-08-45 (8.09% Zn, 2.35% Cu, 5.64 g/t Ag, 0.26 g/t Au over 6.35 metres). MC-08-50 was drilled 125 metres west of M6 (1.7% Zn, 4.21% Cu over 6.95 metres) and intersected weakly mineralized Key Tuffite underlain by Pipe alteration. This hole also intersected pipe alteration stratigraphically above the Key Tuffite horizon at approximately the same stratigraphic position as MC-08-36 (18.10% Zn, 3.14% Cu, 61.28 g/t Ag 1.37 g/t Au over 4.18 metres) drilled 130 metres to the west and up-dip of MC-08-50.

West McLeod Zone: Assay results for drill hole MC-08-46 (previously described in News Release dated May 27, 2008) were returned and yielded high-grade copper over 15.65 metres and 5.32 metres. This hole was drilled at an orientation 90 degrees to the standard drill hole direction to test for vertical, northeast - southwest structures that trend parallel to the standard drill orientation. Pipe alteration, locally mineralized, has been observed at and below the Key Tuffite in previous drilling in the West McLeod Zone and is thought to be controlled by these structures. MC-08-46 undercut the area between MC-07-30W1 (0.89% Zn, 2.77% Cu, 12.23 g/t Ag, 0.05 g/t Au over 2.24 metres) and MC-07-21 (traces of chalcopyrite associated with chloritized structures). Mineralization is hosted within Pipe alteration at and immediately below the Key Tuffite horizon. MC-08-46W1 is a wedge cut up-dip and slightly west of MC-08-46 where it intersected weakly mineralized Key Tuffite followed by weakly mineralized Pipe alteration in the footwall to the Key Tuffite. The true width and the geometry of the sulphides encountered in MC-08-46 remain uncertain and will require continued drill follow-up.

MC-08-53 was drilled between the Old McLeod Zone and the West McLeod Zone where it intersected substantial copper mineralization in Pipe alteration in the immediate footwall to the Key Tuffite. Mineralization is similar to copper-rich sulphides encountered in MC-08-46 and may suggest a link between the Old McLeod Zone and the West McLeod Zone.

Details of the assay results can be found in the attached Appendix 1. Four drills are active on the Matagami Project at Bracemac and McLeod. A total of 70,278 metres of Diamond drilling in 145 drill holes has been reported on since the project began in late 2006. Additional geological information, including maps and sections, is available at www.donnermetals.com.

The Matagami Project has an area of mutual interest of 4,750 square kilometres and presently includes 3,340 mineral claims covering 801 square kilometres. Taking advantage of Xstrata Zinc's extensive historical database, Donner and Xstrata Canada Corporation - Xstrata Zinc Canada Division (Xstrata Zinc) are using a combination of 3D data integration, innovative advanced technologies, new concepts and Diamond drilling to explore for new deposits in this prolific mining camp.

The Matagami Mining Camp is a world-class mining district, with 18 known VMS deposits, including 10 past producers of varying sizes, including the giant Matagami Lake Deposit (25.64 million tonnes of 8.2% Zn, 0.56% Cu, 20.91 g/t Ag and 0.41 g/t Au) discovered in 1957 and mined from 1963 to 1988. The area is host to historical production of 8.6 billion pounds of Zn and 853 million pounds of Cu and has established infrastructure including the town of Matagami, a railway, a paved road, and a 2,600 t/day mill owned by Xstrata Zinc.

Donner has the option to earn a 50% participating joint venture interest in the Matagami Project by incurring a total of $20 to $25 million of expenditures on exploration and related work on or before May 31, 2011. Upon earn-in by Donner, five separate joint ventures will be formed, covering the property and the area of interest. In each of the five joint venture areas, Xstrata Zinc has the option to earn back a 15% interest in each area by incurring up to $20 million on a feasibility study.

The Company's strategy is to explore for and discover zinc - copper deposits in the Matagami Camp and to leverage the general infrastructure and existing processing facilities within a known and well-established cost structure for developing VMS deposits. Donner's exploration objective is to investigate multiple stratigraphic horizons with potential for VMS mineralization including the prolific Key Tuffite horizon throughout the Matagami Camp. To date Donner has discovered new mineralization at Bracemac in the Upper Bracemac and Bracemac zones and the Key Tuffite horizon. In addition to delineation drilling at Old McLeod, Donner has discovered new mineralization at New McLeod and West McLeod at the Key Tuffite horizon at McLeod.

Supplementary Information

The field work on the Matagami Project is being carried out by project operator Xstrata Zinc Canada Division who is responsible for the sampling, submittal of samples for assay, assay verification and QA/QC. Assaying of samples reported in this news release was carried out and certified by ALS Chemex-Chimitec, of Val D'Or, Quebec (zinc, copper and silver by atomic absorption, and gold by standard fire assay procedures). Sample preparation was done by ALS Chemex of Val D'Or, Quebec. Robin Adair, VP of Exploration for the Company is the Qualified Person responsible for the technical information in this news release.

ON BEHALF OF THE BOARD OF DONNER METALS LTD.

Harvey Keats, Chief Executive Officer

To view tables in Appendix 1, please click on the following link: http://media3.marketwire.com/docs/DON_Tables.pdf


The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

Donner Metals Ltd.
Harvey Keats
Chief Executive Officer
(604) 683-0564 or Toll Free: 1-800-909-8311
Fax: (604) 602-9311
Email: donner@bed-rock.com
Website: www.donnermetals.com

INDUSTRY: Financial Services - Investment Opinion, Financial Services - Investment Services and Trading, Financial Services - Personal Finance

Footer


If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click . .
Data and Statistics for these countries : Canada | All
Gold and Silver Prices for these countries : Canada | All

Sphinx Resources

EXPLORATION STAGE
CODE : SFX.V
ISIN : CA8484221012
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Sphinx is a zinc and copper development stage company based in Canada.

Sphinx develops zinc, copper, gold and silver in Canada.

Its main asset in development is PD1 in Canada and its main exploration properties are SOUTH VOISEY BAY, WEST RAGLAN and MATAGAMI in Canada.

Sphinx is listed in Canada, in Germany and in United States of America. Its market capitalisation is CA$ 838 700 as of today (US$ 670 585, € 638 839).

Its stock quote reached its highest recent level on August 26, 2016 at CA$ 0.14, and its lowest recent point on December 06, 2022 at CA$ 0.01.

Sphinx has 83 870 000 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
Financings of Sphinx Resources
8/8/2013Announces Second Closing of Private Placement
8/8/2013=3A Donner Metals announces closing of private placement
7/9/2013=3A Financing Update
6/24/2013Announces Financing
11/14/2012Announces Closing of C$1,439,000 Final Tranche Private Place...
2/28/2012Increases Private Placement Financing
2/27/2012Announces C$10,000,000 Private Placement Financing
10/27/2011Announces C$2,440,000 of Private Placement Financings
7/27/2011$3 Million Private Placement
7/25/2011Funds Received, Private Placement Closed
7/13/2011Financing News
2/15/2010Additional Private Placement Closings
11/16/2009Private Placements close
5/14/2009Non-Brokered Financing
1/7/2008 $3.2 Million Private Placement Closed
12/17/2007 Private Placement Increased to $3.2 Million
12/7/2007 $2.0 Million Private Placement
Project news of Sphinx Resources
12/10/2013Donner Metals Acquires Option on Valmond Gold Property from ...
10/30/2013(Matagami)Matagami Exploration Joint Ventures Update
9/3/2013=3A Donner Forfeits Interest in Bracemac=2DMcLeod
8/13/2013=3A Donner Metals Bracemac=2DMcLeod Interest
8/13/2013Bracemac-McLeod Interest
7/31/2013=3A Donner Metals Mineralization Extended=2C New Copper Zone...
7/12/2013=3A Donner Metals Update on Production at Bracemac=2DMcLeod
7/12/2013Update on Bracemac-McLeod Production
5/22/2013More High-Grade at McLeod Deep
5/16/2013Production has started!
5/16/2013Production Commences at Bracemac-McLeod
11/1/2012Development and Exploration Update
9/5/2012Bracemac-Mcleod Continues on Target
7/6/2012Provides Exploration Drilling Update
7/6/2012=3A Higher Production at Bracemac=2DMcLeod
7/5/2012Higher Production at Bracemac-McLeod
2/22/2012(Matagami)Ltd=2E: New Drilling Continues to Demonstrate Potential of M...
1/16/2012Ltd=2E: Bracemac-McLeod Mine Development Continues to Track ...
10/25/2011Ltd=2E: Bracemac-McLeod Mine Development Tracking On Budget ...
4/26/2011(Matagami)Completes Earn-In on the Matagami Project
3/6/2011(Matagami)Bracemac-McLeod Ramp Moves Past 660 Metres
2/10/2011(Pd1) Matagami Project Advances as the PD1 Deposit Moves to Feasi...
7/12/2010(Matagami)Drilling Extends McLeod Deep Discovery
3/7/2010(Matagami)Bracemac-McLeod Update
2/16/2010(Matagami)McLeod Deep Discovery Expanded-7.50 Metres Grading 10.27% Zi...
11/23/2009(Matagami)Expanded Winter Drill Progam Initiated at Matagami
10/1/2009(Matagami)Bracemac-McLeod Feasibility Advances as Exploration Continue...
7/15/2009(Matagami) BRACEMAC-MCLEOD advances to feasibility
6/5/2009(Matagami)on BNN and Matagami Project Details
5/25/2009(Matagami)Drilling to Resume at Matagami; Scoping Study Nears Completi...
2/26/2009(Matagami)BRACEMAC-MCLEOD NI 43-101 INDICATED RESOURCE: 3,623,000 TONN...
2/26/2009(Matagami)UPDATED BRACEMAC-MCLEOD NI 43-101
2/11/2009(Matagami)featured on Minesite.com
1/26/2009(Matagami)NI43-101 Resource
1/23/2009(Matagami)INITIAL BRACEMAC-MCLEOD NI43-101 INDICATED RESOURCE
11/12/2008(Matagami)Assays Return High-Grade Zincand Copper from the McLeod Disc...
9/5/2008Provides Initial Results From a Single Drill Hole Program on...
5/27/2008(Matagami)Four New High GradeIntersections at Bracemac/McLeod Includin...
5/9/2008(Matagami)13.47% Zinc, 2.33% Copper Over 6.95 Metres Intersected at Br...
4/11/2008High Grade Discovered Between Bracemac and McLeod
3/3/2008New High Grade Intersections Expand Zones at Bracemac and Mc...
1/9/2008 Drilling Intersects 9.48% Zinc and 2.81% Copper Over 6.00
Corporate news of Sphinx Resources
12/30/2013Announces Completion of Share Consolidation
12/13/2013Announces Results From AnnualGeneral and Special Meeting and...
11/14/2013Annual and Special General Meeting
7/18/2013Announces Closing of C$2,807,010 Placement
7/8/2013=3A Copper Stream with Sandstorm Amended
7/8/2013Donner Metals Copper Stream With Sandstorm Amended
3/14/2013Announces Financial Support from Quebec Institutions
1/15/2013Stock Options Granted
11/1/2012Ltd=2E: Increased Upfront Paymen =?ISO-8859-1?Q?t=20From=20S...
10/22/2012Announces Results from Annual General Meeting, Head Office M...
10/22/2012Announces Results from Annual General Meeting, Head Office M...
10/4/2012Underground photos and video updates from Donner Metals
9/19/2012Ltd=2E: Mcleod Zone Extended Up-Dip: Exploration Drilling In...
8/28/2012=3A President's Message
4/17/2012Normand Champigny Appointed President of Donner Metals
2/23/2012Sandstorm Partners With Donner Metals
2/22/2012Ltd=2E: Development to Reach the McLeod Zone a Year Ahead of...
2/22/2012News Release
1/20/2012Join us at at the Vancouver Resource Show and Exploration Ro...
9/1/2011September Video update from Donner Metals
7/13/2011Sandstorm Provides US$25 Million Senior Financing
4/14/2010Definition Drill Program Completed at Bracemac-McLeod
2/3/2010$2,409,930 Financing Closed
1/30/2010Financing Increased
9/8/2009engineering contract and fast-tracked feasibility
8/24/2009Two Near Term Production Stories
6/22/2009Industrial Alliance Features Report on Donner Metals
5/19/2009A "Green Shoot" Rising
5/14/2009Is At The Starting Gate
2/26/2009Hotsheet
2/18/2009positioned for success
2/9/2009featured in Mining Journal
12/12/2008$1,048,000 Financing Closes
12/4/2008 AND XSTRATA ZINC CANADA WIN INTERNATIONAL EXPLORATION AWARD
11/25/2008$1.0 Million Financing
11/18/2008Donner Metals has fast-track potential says Reinhard
7/31/2008 Drilling Continues toDelineate and Expand Mineralization at...
8/1/2008Hotsheet for 7/31/2008
5/28/2008$3 Million Debenture Offering
5/27/2008Hotsheet for 5/27/2008
4/11/2008Hotsheet for 4/11/2008
3/20/2008March Chairman's Letter
3/5/2008Hotsheet for 3/5/2008
2/1/2008Engages Mau Capital to Provide Investor Relations
1/8/2008Hotsheet for 1/8/2008
12/7/2007Chairman's Letter
11/28/2007Expands Interest in Matagami Camp
11/8/2007Join us at the San Francisco Hard Assets Investment Conferen...
10/22/2007 Hotsheet for 10/21/2007
8/2/20076 New Massive Sulphide =?ISO-8859-1?Q?=20Intersections,=20In...
6/14/2007New Zinc-Copper Discover 9.24% Zinc, 0.99% Copper Over 27.95...
6/7/2007Bracemac Yields Additional Results With New Mineralization I...
4/11/2007Copper-Rich Massive Sulphides Intersected in BRC-07-32 in th...
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
TSX-V (SFX.V)
0.010+0.00%
TSX-V
CA$ 0.010
12/06 09:30 -
0%
Prev close Open
0.010 0.010
Low High
0.010 0.010
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.010 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : -9
Produces
Develops
Explores for Copper - Gold - Nickel - Palladium - Platinum - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
Last updated on : 1/23/2010
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.70-0.65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 12.26+2.68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.53-1.87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06+0.00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.64-1.86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 16.23+4.04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+4.26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.20+2.63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.88+0.53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.71+0.19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.56%Trend Power :