Atlas Iron Limited

Published : March 09th, 2009

Drilling Results Add to Wodgina Infrastructure Potential

( 0 vote, 0/5 ) Print article
  Article Comments Comment this article Rating Follow Company  
0
Send
0
comment
Keywords :   Australia | Iron | Tantalum |

Atlas Iron Limited (ASX: AGO)

 

ASX RELEASE                                                                                                                                    9 March 2009

 

 

DRILLING RESULTS ADD TO WODGINA INFRASTRUCTURE POTENTIAL

 

Atlas Iron Limited [ASX Code: AGO] is pleased to report on further drilling success at Wodgina, located 100 kilometres South of Port Hedland in the Pilbara of Western Australia.  Atlas owns 100% iron ore rights at Wodgina.

 

On 17 February 2009 Atlas reached agreement to utilise the Talison owned Wodgina mine infrastructure, including the crushing and screening capacity and camp facilities, initially constructed to support the Wodgina tantalum mine. This agreement allows Atlas to support the commencement of Atlas�� Abydos iron ore project for significantly reduced capital costs, with a much reduced environmental impact.

 

With this production infrastructure secured, Atlas is actively engaged in drilling extensions to the Anson deposit on the granted mining lease immediately adjacent to the Wodgina mine infrastructure. 

 

Atlas announced the maiden resource for the Anson deposit on 15 January 2009, just two months after the first hole was drilled at Wodgina. The Anson deposit borders a granted Mining Lease less than three kilometres from the Wodgina production infrastructure.

 

New intercepts from further drilling targeting the extensions to the Anson deposit include:

 

46 metres at 58.3% Fe and 0.06% P from surface in WDRC162

38 metres at 59.1% Fe and 0.07% P from surface in WDRC028

26 metres at 60.8% Fe and 0.03% P from 64 metres in WDRC027

26 metres at 59.1% Fe and 0.03% P from 50 metres in WDRC204

28 metres at 57.2% Fe and 0.05% P from surface in WDRC091

34 metres at 57% Fe and 0.10% P from 4 metres in WDRC111

 

Drilling has concentrated on initial testing of Direct Shipping Ore (DSO) targets in the south and extensions to the Anson deposit in the north on the granted mining lease adjacent to Talison��s Wodgina mine infrastructure.

 

��These Anson extensions are only 2.6 kilometres from the Wodgina production infrastructure which was recently secured by Atlas for our initial mine production�� commented David Flanagan, Atlas Managing Director.

 

��The North Pilbara, in close proximity to the world��s largest iron ore port, is clearly under-explored. We very much look forward to drilling more holes, making more discoveries and starting some very good mines in this well endowed region.��

 

Since November 2008, Atlas has embarked on a drilling campaign totalling approximately 550 RC holes for 28,000 metres to test 15 DSO targets located within the Wodgina north and south areas. Over half the program is now completed with over 350 holes drilled for some 18,000 metres. Assay results have been returned for the first 206 holes.

 

In the northern area, drilling is testing an initial target of mapped surface enrichment spanning 3.4 kilometres in length. Recent drilling has concentrated on the northwest strike extension to the current Anson resource where near surface iron enrichment has been delineated over a 600 metre strike length and up to 50 metres true thickness. The drilling programme is expected to be completed by the end of March 2009 and Atlas expects to provide a Resource Update on the Anson deposit in the second quarter of 2009.

 

As shown on the attached Project location plan, Wodgina is well located, less than 5 kilometres from the Great Northern highway and less than10 kilometres from the Fortescue Metals Group and BHPB railways.

 

Atlas has also received all remaining assays for broad-spaced exploration drilling to the south of Wodgina completed in December and early January. There are several areas where follow-up drilling is required, and a number of prospects at Wodgina South appear likely to have considerable exploration potential.

 

Background Atlas Iron Limited

Atlas recently commenced mining and shipping ore from its 100%-owned Pardoo Iron Ore Project in the Pilbara of Western Australia.  Atlas is planning to export 1 million tonnes during its first 12 months of operations at the Pardoo Project, growing to 3 Mtpa for year 2.  With additional export tonnages from Abydos, the Company is targeting exports of 6 Mtpa for 2010, growing to 12 Mtpa by 2012.  Atlas is currently on target to ship its third vessel of iron ore in the last week of March 2009.

 

For further information please contact

David Flanagan, Managing Director         

Andrew Paterson, Geology Manager

Tel (08) 9476 7900

 

 

Exploration Results

The information in this report that relates to exploration results is based on information compiled by Mr. Mark Gunther who is a member of the Australian Institute of Geoscientists and is an employee of Atlas Iron Limited. Mark Gunther has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ��Australasian Code for Reporting of Exploration Results��. Mark Gunther consents to the inclusion in the report of the matters based on his information in the form and context in which it appears

 

Greater Abydos Project

Atlas has reported a resource of 8.1 million tonnes at 57.5% Fe at Wodgina, which is part of the Greater Abydos exploration project. While the Company intends to do further exploration in the Greater Abydos area and remains optimistic it will report additional resources and reserves in the future, any discussion in relation to targets, resources, reserves or ��ore�� over and above the resource of 8.1 million tonnes at 57.5% Fe is only conceptual in nature. There has been insufficient exploration to define a Mineral Resource over and above the resource of 8.1 million tonnes at 57.5% Fe, and it is uncertain if further exploration will result in the determination of a Mineral Resource over and above the resource of 8.1 million tonnes at 57.5% Fe.

 

 

wod_B_Q109_4 (2).JPG

Figure 1: Wodgina drilling completed in 2009

 

 

wod_B_Q109_5 (2).JPG

Figure 2: Wodgina drilling cross section


 

WODGINA RC Drilling Results

 

Hole ID

Easting (GDA94)

Northing (GDA94)

Dip��

Azimuth (GDA94)

Hole Depth

From

To

Int Width

Fe      %

SiO��    %

Al��O�� %

P        %

S        %

LOI    %

Wodgina North ? Anson, intercepts greater than 15 metres at 57% Fe

WDRC025

672480

7654079

-60

178

90

18

60

42

58.09

5.53

1.12

0.13

0.03

9.52

WDRC027

672160

7654017

-89

129

90

64

90

26

60.79

3.80

0.61

0.03

0.13

6.72

WDRC028

672241

7654019

-90

0

108

0

38

38

59.08

6.21

1.46

0.07

0.02

7.26

WDRC029

672477

7654083

-60

358

96

18

42

24

58.63

3.82

1.67

0.13

0.02

10.07

Northwest

Extension

 

 

 

 

 

 

 

 

 

 

 

 

 

WDRC162

671978

7654238

-60

270

78

0

46

46

58.28

5.21

1.38

0.06

0.02

9.52

WDRC163

671999

7654238

-60

270

90

4

32

28

58.60

3.27

1.98

0.06

0.02

10.36

WDRC164

672019

7654238

-60

270

90

16

40

24

58.74

4.02

1.51

0.12

0.01

9.93

WDRC165

671998

7654283

-60

270

54

8

34

26

57.36

5.07

1.80

0.08

0.02

10.26

WDRC169

672077

7654279

-60

270

42

4

22

18

58.26

5.75

1.66

0.12

0.02

8.58

WDRC170

672048

7654358

-60

90

84

30

48

18

58.67

4.83

1.09

0.10

0.01

9.68

WDRC193

672118

7654239

-60

270

72

12

60

48

60.32

2.52

1.54

0.11

0.01

9.03

WDRC194

672157

7654240

-60

270

84

16

52

36

58.96

2.59

2.20

0.11

0.01

10.26

WDRC196

672160

7654279

-60

270

84

22

58

36

58.58

4.27

1.46

0.13

0.01

9.78

WDRC197

672189

7654280

-60

90

84

26

50

24

60.04

2.44

1.13

0.12

0.01

9.90

WDRC198

672198

7654240

-60

270

96

28

62

34

59.74

2.63

1.26

0.10

0.01

9.62

WDRC199

672240

7654240

-60

270

120

26

82

56

59.59

3.68

1.38

0.12

0.01

8.95

 

 

Includes

 

 

 

52

68

16

61.82

1.82

0.92

0.13

0.01

8.04

WDRC200

672249

7654241

-60

90

102

10

52

42

59.63

3.09

1.19

0.13

0.01

9.67

WDRC204

672042

7654599

-60

270

102

50

76

26

59.08

6.30

0.42

0.03

0.07

7.47

Wodgina South, intercepts greater than 6 metres at 56% Fe

WDRC091

672600

7651120

-60

180

54

0

28

28

57.21

7.31

2.35

0.05

0.04

7.77

WDRC021

673202

7654643

-90

0

48

18

24

6

57.80

4.10

2.15

0.02

0.14

9.37

WDRC023

673101

7654640

-90

0

60

8

18

10

57.50

5.75

1.50

0.02

0.10

9.08

 

 

 

 

 

 

24

30

6

57.00

6.04

1.30

0.01

0.11

9.64

WDRC122

672761

7651440

-60

180

60

0

8

8

57.30

5.49

3.04

0.05

0.03

9.02

WDRC125

672600

7651401

-60

180

48

28

34

6

57.43

5.12

2.53

0.02

0.03

9.82

WDRC151

672681

7651359

-60

180

30

16

22

6

57.07

6.65

2.23

0.03

0.05

9.07

WDRC152

672681

7651400

-60

180

48

10

22

12

56.95

5.27

2.95

0.02

0.05

9.83

WDRC049

672441

7651918

-60

180

42

0

6

6

56.07

3.79

4.04

0.06

0.03

11.05

WDRC077

672600

7651837

-60

180

66

24

34

10

57.78

4.52

1.78

0.05

0.04

10.71

WDRC078

672600

7651880

-60

180

42

2

20

18

56.36

5.25

2.85

0.05

0.04

10.58

WDRC056

671080

7651160

-60

182

54

16

34

18

57.84

5.52

2.02

0.08

0.02

9.17

WDRC057

671080

7651200

-60

178

42

6

32

26

56.82

6.28

2.23

0.08

0.03

9.31

WDRC058

671080

7651236

-60

174

54

18

30

12

56.78

5.46

2.54

0.09

0.03

10.20

WDRC059

671080

7651276

-60

180

48

12

36

24

56.38

5.70

2.62

0.06

0.03

10.50

WDRC060

671641

7651199

-60

180

48

12

30

18

56.88

6.81

1.86

0.09

0.04

9.20

WDRC063

671641

7651318

-60

180

36

0

6

6

56.23

6.26

3.05

0.05

0.02

9.87

WDRC074

671800

7651240

-60

180

42

14

22

8

56.38

5.25

2.80

0.12

0.04

10.56

WDRC096

672120

7651078

-60

180

42

6

20

14

57.20

5.33

2.09

0.05

0.04

10.40

WDRC111

671160

7651199

-60

177

84

4

38

34

57.01

6.63

2.34

0.10

0.03

8.80

WDRC114

671160

7651102

-60

184

42

14

26

12

56.08

6.20

2.83

0.09

0.04

10.04

WDRC115

671159

7651139

-60

186

54

14

20

6

57.97

6.08

2.06

0.06

0.03

8.46

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: 2m composite samples, cone split sampling, 55.0% Fe lower cut, no upper cut, maximum internal waste of 2 m, analysis by X-Ray Fluorescence Spectrometry Method with Loss on Ignition (LOI) determined using Thermo-Gravimetric Analyses.

Note that a minimum reporting criteria for Anson of 15m at 57% Fe, and 6m at 56% Fe for the other prospects has been used to reduce the volume of results.

 

READ CORPORATE
Public Relations Corporate Communications
T: (+61-8) 9388-1474 | F: (+61-8) 9388-1472 | E: info@readcorporate.com.au | Web: www.readcorporate.com.au 

PLEASE NOTE:

This e-mail and any attachments may contain confidential and/or privileged material and is for the intended addressee(s) only. If you are not an intended addressee, you must not use, copy, retain, disclose or distribute this information. Please notify the sender immediately by return e-mail and delete the message from your system. If you believe that this message constitutes a Commercial Electronic Message (CEM) under the Spam Act 2003 and you wish to unsubscribe please contact the originator of this message with the subject line of unsubscribe.

Note: Virus scanning is carried out on all incoming and outgoing email, but cannot be guaranteed to be timely, secure, error or virus-free. To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. If you are having problems please check your e-mail security settings to determine how attachments are handled.

 

 

 

<
Data and Statistics for these countries : Australia | All
Gold and Silver Prices for these countries : Australia | All

Atlas Iron Limited

PRODUCER
CODE : AGO.AX
ISIN : AU000000AGO1
Follow and Invest
Add to watch list Add to your portfolio Add or edit a note
Add Alert Add to Watchlists Add to Portfolio Add Note
ProfileMarket
Indicators
VALUE :
Projects & res.
Press
releases
Annual
report
RISK :
Asset profile
Contact Cpy

Atlas Iron is a iron exploration company based in .

Atlas Iron holds various exploration projects in Australia.

Its main asset in production is PARDOO in Australia, its main assets in development are WODGINA and RIDLEY MAGNETITE PROJECT in Australia and its main exploration properties are ABYDOS, MT WEBBER and MID WEST IRON in Australia.

Atlas Iron is listed in Australia and in Germany. Its market capitalisation is AU$ 416.8 millions as of today (US$ 302.7 millions, € 265.6 millions).

Its stock quote reached its highest recent level on July 29, 2011 at AU$ 3.96, and its lowest recent point on June 24, 2016 at AU$ 0.01.

Atlas Iron has 9 261 129 728 shares outstanding.

Your feedback is appreciated, please leave a comment or rate this article.
Rate : Average note :0 (0 vote) View Top rated
 
In the News and Medias of Atlas Iron Limited
10/16/2018Australia's Atlas Iron names ex-Hancock executive CEO in boa...
6/8/2018Australia's Fortescue takes stake in Atlas Iron, may block b...
2/28/2018Atlas Iron reveals strategy to weather storm of discounts
12/24/2014Atlas Iron to take a $900 million write-down
Nominations of Atlas Iron Limited
5/25/2011Retirement of Chairman and Appointment of Interim Chairman
12/2/2008Appoints Geoff Clifford as Chairman
Financials of Atlas Iron Limited
10/19/2016September 2016 Quarterly Activities Report
Project news of Atlas Iron Limited
9/22/2016Mineral Resources and Ore Reserves at 30 June 2016
5/9/2011(Wodgina)Increases production capacity at Wodgina by 75% to 7Mtpa
6/21/2010(Wodgina)Mining Commences at Wodgina
6/16/2010(Wodgina)New DSO Discovery at Wodgina
4/7/2010(Wodgina)Key DSO Growth Projects on Track
10/13/2009(Pardoo)Progress Update - North Pilbara DSO Projects
8/4/2009(Mt Webber)Maiden Resource for Mt Webber DSO Project
7/31/2009(Wodgina)Wodgina DSO Project Feasibility Study Compete
6/19/2009(Mt Webber)Continued North Pilbara Exploration Success
5/26/2009(Wodgina)Wodgina DSO Project - Interim Feasibility Study Outcomes
5/21/2009(Mt Webber)New DSO Discovery at Mt Webber
5/19/2009(Wodgina)500% Increase in Wodgina DSO Resource
3/9/2009Drilling Results Add to Wodgina Infrastructure Potential
1/29/2009(Pardoo)Atlas Increases Pilbara DSO Resources By 45 per cent to 56.7...
1/7/2009(Pardoo)Intersects High Grade at Pardoo DSO Project
12/31/2008(Abydos)New Hematite Discoveries at the Abydos DSO Project
12/11/2008(Abydos)New DSO Discovery at Wodgina
12/8/2008(Abydos)Signs Native Title Mining Agreement for Abydos
11/26/2008(Pardoo)Ridley Magnetite Resource Upgrade to 2 Billion Tonnes
11/24/2008(Pardoo)Pilbara DSO Projects - Operations Update
11/10/2008(Pardoo)Delivers First Iron Ore to Port
10/2/2008(Pardoo)Ridley Magnetite Resource Upgrade
8/6/2008(Abydos)Abydos Magnetite Joint Venture with FMG
7/30/2008(Abydos)Abydos Direct Shipping Ore Project - Pre Feasibility Study U...
6/17/2008Ridley Magnetite Pre Feasibility Study Technical Update
4/7/2008(Abydos)Abydos Drilling Continues To Impress
Corporate news of Atlas Iron Limited
11/16/2016Change in substantial holding for Centaurus
11/16/2016Change in substantial holding (Marathon)
7/27/2016June 2016 Quarterly Report
6/28/2016Atlas welcomes WA Government announcement
6/28/2016David Flanagan resigns as Managing Director
6/23/2016Change in substantial holding for CTM
6/6/2016Appointment of Chairman
5/23/2016May 2016 Investor Presentation
5/10/2016Ceasing to be a substantial holder
5/6/2016Implementation of Creditors' Scheme
4/29/2016Creditors' Scheme
4/27/2016Chairman's Address to Shareholders at General Meeting
4/27/2016Presentation at General Meeting
4/21/2016Atlas March 2016 Quarterly Activities Report
4/18/2016Letter to Shareholders
4/4/2016Update on Debt Restructure
3/24/2016Notice of General Meeting/Proxy Form
12/23/2015Atlas signs debt restructure agreement
12/22/2015Trading Halt
12/15/2015Change in substantial holding for CTM
12/2/2015Change in substantial holding for CTM
10/28/2015Managing Director's AGM Presentation
10/28/2015Chairman's Address to Shareholders
10/22/2015Atlas Iron September 2015 Quarterly Report
10/22/2015Pre-feasibility Study Underway for Corunna Downs
10/6/2015Company Secretary Appointment/Resignation
9/29/2015Notice of Annual General Meeting/Proxy Form
9/29/2015Annual Report
9/24/2015New Iron Ore Sales Agreement and Marketing Update
9/9/2015Atlas Production Figures
9/1/2015Executive Changes as Part of Cost Reduction Programme
8/28/2015Production Update
8/17/201513 August 2015 Sale of Pilbara Iron Tenements
8/14/2015Appendix 4E - 30 June 2015
8/14/20152015 Annual Results
8/14/20152015 Annual Financial Report
8/13/2015Full Year Results Presentation FY2015
8/13/20152015 Annual Financial Report and Appendix 4E
8/13/2015SFX: Sale of Pilbara Iron Tenements
7/31/2015Quarterly Report
7/30/2015Ceasing to be a substantial holder
7/29/2015Becoming a substantial holder
7/29/2015MCS: Business Update and FY15 Result
7/27/2015Shares in Australia's Atlas Iron sink 70%
7/24/2015Reinstatement to Official Quotation
7/24/2015Request to Lift Suspension
7/22/2015Australia shares fall on profit taking, NZ stocks up
7/20/2015Atlas set for stronger future after raising $86m
7/15/2015Extension of the Closing Date - SPO and General Placement
7/8/2015Update on Forward Price Strategies
7/6/2015Supplementary Prospectus
7/2/2015Letter to Shareholders
6/17/2015Prospectus
6/11/2015Capital Raising to Strengthen Balance Sheet
6/11/2015Change of Date for General Meeting
6/11/2015David Flanagan Appointed as Managing Director
4/21/2015Voluntary Suspension Extension Request
4/14/2015Update Regarding Operational and Financial Review
4/13/2015Atlas Iron Suspends Production
4/12/2015Abydos Contract Update (1 pages)
4/10/2015Atlas Suspends Production in Response to Low Iron
4/6/2015Voluntary Suspension
3/9/2015Resignation of Director
3/6/2015S&P DJ Indices Announces March Quarterly Review
2/13/2015AGO: Investment Update - Mt Webber Project and Shaw River
2/13/2015Investment Update - Mt Webber Project and Shaw River
4/21/2011Quarterly Report for the Period Ending 31 March 2011
4/7/2011Media Alert - Atlas Iron MD to shed his locks this Friday......
4/4/2011Atlas posts shipping record in March
2/24/2011Reports $30M maiden half year profit
2/14/2011Declares Giralia takeover offer unconditional and accelerate...
7/6/2010More DSO Success at Hercules
5/28/2010Broker Report from Credit Suisse
5/5/2010to Ship Additional Tonnes Through Port Hedland Port Ahead of...
4/29/2010To Raise $63.5 Million To Capitalise On Strong Iron Ore Pric...
2/22/2010Atlas And Aurox Enter Into Utah Point Port Cooperation Agree...
11/6/2009Dr David Smith Joins The Atlas Board
10/20/2009Merger Moves Ahead
9/8/2009and Warwick Resources Agree to Merge
7/31/2009June 2009 Quarterly Report
6/15/2009to raise $116.7 Million to fund development of Pilbara Iron ...
2/17/2009and Talison Complete Infrastructure Sharing Agreement
1/19/2009 Ships Second Commercial Iron Ore to China
1/15/2009Maiden Inferred Resource At Wodgina
12/19/2008Completes Sale of Second Shipment of Connie Deposit Ore
12/15/2008Additional Excellent Results Enhance Wodgina DSO Project
12/5/2008Ships First Commercial Iron Ore to China
11/21/2008Managing Director's Address
9/25/2008Pardoo DSO Project - Mining Team Mobilised to Site
8/6/2008Signs Port Access Agreement with FMG
8/4/2008North West Iron Ore Alliance Maintains Pressure for Fair and...
8/1/2008June 2008 Quarterly Activities Report
7/28/20081.3 Billion Tonne Ridley Magnetite Resource
7/25/2008 DSO Resource and Reserve Update Summary
7/22/2008Pardoo Project Development Update
7/17/2008New Hematite Mineralisation Discovered at Pardoo
6/23/2008Welcomes NCC Recommendation to Declare Goldsworthy Railway
6/16/2008EPA Recommends Pardoo DSO Project for Ministerial Approval
5/19/2008Pardoo Mining Contract Awarded to CDE Capital
5/1/2008Supports Goldsworthy Railway Declaration
4/23/2008to Raise $100 Million to Accelerate Growth of Pilbara Iron O...
3/25/2008 Targets 120-180Mt of Pilbara Iron Ore
2/25/2008Open BriefingR. Production and Export of DSO
1/31/2008December 2007 Quarterly Activities Report
Comments closed
 
Latest comment posted for this article
Be the first to comment
Add your comment
AUSTRALIA (AGO.AX)Berlin (ATU.BE)
0.045+0.00%0.0000
AUSTRALIA
AU$ 0.045
11/21 10:00 -
0%
Prev close Open
0.045 0.045
Low High
0.045 0.045
Year l/h YTD var.
 -  -
52 week l/h 52 week var.
- -  0.045 -%
Volume 1 month var.
0 -%
24hGold TrendPower© : 19
Produces Iron
Develops Iron
Explores for Iron
 
 
 
Analyse
Interactive chart Add to compare
Interactive
chart
Print Compare Export
You must be logged in to use the porfolio and watchlists (free)
Top Newsreleases
MOST READ
Annual variation
DateVariationHighLow
 
5 years chart
 
3 months chart
 
3 months volume chart
 
 
Mining Company News
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
AU$ 0.12-8.00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
AU$ 7.72-0.19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
AU$ 2.20+0.00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
AU$ 3.86+0.00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
CA$ 0.12+4.55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
CA$ 0.02+100.00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
US$ 10.90+0.28%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
US$ 0.20-12.28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
GBX 0.59+5.59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
CA$ 0.06-8.33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
CA$ 2.41+1.26%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
CA$ 1.84+0.00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
CA$ 15.10-4.37%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
CA$ 0.24+2.08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
AU$ 0.19+0.00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
US$ 6.80-2.86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
CA$ 1.84-1.08%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
US$ 52.18+0.10%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
CA$ 8.66-0.35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
AU$ 0.04+5.88%Trend Power :